3 Case Study Area Regional Unit of Evros

4 Case Study Area Proposed Case Study Area limits Flood Hazard Zone Embankment Evros River

5 Authorities responsible for Flood Management. In National Level: Ministry of Environment and Energy Special Secretariat for Water. Ministry of Infrastructure, Transport and Networks Directorate of Flood Management and Land Reclamation Works. Ministry of Interior General Secretariat of Civil Protection. In Regional Level: Region of Eastern Macedonia and Thrace Regional Unit of Evros. Infrastructure authorities. Civil Protection authorities. Municipality of Soufli. Infrastructure authorities. Civil Protection authorities. Local Police and Fire Departments.

6 Main causes of flooding in Case Study Area: Evros River flooding. Stormwater flooding from streams vertical to Evros River.

7 Evros River Mandra Stream

8 Flood History in the Study Area: Local District Population (2011) Number of flood events ( ) Amorio Lavara Mandra No human casualties Important Flood Events ( ): Event Date Local District Damaged Area (m ) Compensation ( ) 17/05/1998 Lavara ,00 01/05/2006 Amorio ,00 01/05/2006 Lavara ,00

9 Primary sectors affected by flood events: Agriculture. Livestock. Trade and Business. Transport Infrastructure. Properties (Public and Private). No archeological sites & monuments in Case Study Area. Damaged pump station Flooded area

10 Lagina area flood 2010 Mandra area flood 2010 Pragi area flood 2010 Lavara area flood 2010

11 Bund break (caused by the water pressure) Bund break (caused by the water pressure) Bund break (caused by human intervention) Bund break (caused by human intervention)

12 2005

13 2005

14 Πρόγραμμα Copernicus δορυφορική επισκόπηση πλημμυρισμένης Περιοχής

15

16

17

18 Evros River: Basin Area: km 66,2% in Bulgaria 27,5% in Turkey 6,3% in Greece River Length: 528 km Estimated flow (annual average): 103 m 3 /s

19 Estimated flood by Return Period 20,50,100 year floods in site Kipoi (approx. 40 km downstream).

20 Flood Hazard Map by Return Period of 20 years

21 Flood Hazard Map by Return Period of 50 years

22 Flood Hazard Map by Return Period of 100 years

23 Cost Estimation of damages will be implemented during the next phases of the program. Damages: Agriculture (crops, irrigation networks, subsidies to farmers). Environment (sand sediment transported to the fields, fauna etc.). Infrastructure (roads, railways, utility networks etc.). Properties (buildings, plots etc.). Enterprises. Flood Damage Values Estimation per Damaged Area by Return Period Return Period (Years) Damaged Area (m ) Flood Damage Values * ( ) * Flood Damage Values were estimated by taking into consideration the average value (approx. 76,50 per m ) of the compensation granted to farmers, by the Greek Government, following the flood events of 2012.

24 Damages of Crops of the Lavara Area Year Area of SqrtKhm Crop Cereals, Clover Cereals, Clover Cereals,Clover Cereals Cotton Sunflower Corn Clover Cereals Clover Cotton Corn Cereals, Clover Clover, Cereals