PERFORMANCE OF SOIL-CEMENT PLATING IN THE TEXAS PANHANDLE. Abstract

Size: px
Start display at page:

Download "PERFORMANCE OF SOIL-CEMENT PLATING IN THE TEXAS PANHANDLE. Abstract"

Transcription

1 PERFORMANCE OF SOIL-CEMENT PLATING IN THE TEXAS PANHANDLE By: D.N. Clute, P.E.; M.S. Garsjo, P.E.; K.R. Worster, P.E. National Design, Construction, and Soil Mechanics Center, USDA-NRCS, Fort Worth, Texas Abstract Soil-cement that is installed for wave protection (armor against waves that would otherwise cause shoreline erosion) is typically placed in horizontal layers. In 1979 the USDA - Soil Conservation Service (SCS) in Texas deviated from this conventional method of placing soil-cement in horizontal layers and began plating the front slope of dams being built in the Texas Panhandle with soil-cement placed in layers oriented parallel to the slope of the dam. Several dams were constructed in the Texas Panhandle over a 10 year period from 1979 to 1989 with thin soil-cement plating placed on the front slope for wave protection. Thin soilcement plating was also used to armor some auxiliary spillways and waterways or chutes needed for controlling onsite erosion from localized storm water runoff. Inspections of the thin soil-cement plating were made in 1985, 1991, 1996, and This paper documents the findings of the teams that inspected the soil-cement. The information in this paper should be useful for designers when designing soil-cement structures, selecting the materials, specifying the method of compaction and curing methods for soilcement used for wave protection and protection against erosion from localized storm water runoff. Introduction The USDA Natural Resources Conservation Service (NRCS), formerly the Soil Conservation Service (SCS), completed a long term study to document the performance of thin soil-cement plating on 15 flood control dams. The dams that were studied were built from 1979 to 1989 and are located in three watersheds in the Texas Panhandle (Figure 1). 1

2 These dams are typically less than 50 feet high with 3.5:1 (horizontal:vertical) front and back slopes. Photo 1 shows one of the dams in the study group. Photo 2 shows a aerial view of another of the dams in the study group. Both dams shown are typical of the dams in the study group. Based on NRCS Technical Release 69 (TR 69) 1, a significant wave height of less than three feet would be typical for these dams. Had rock riprap been used for wave protection, TR 69 would have required a layer of graded rock riprap approximately two feet thick with an approximate D 50 rock size of one foot. Soil-cement was deemed more economical than rock riprap since rock was not readily available in the area. Photo 1 A dam that is typical of those in the study group 2

3 Photo 2 Aerial view of a dam that is typical of those in the study group Thirteen of the 15 dams have no permanent pool so the threat of wave damage only occurs on those sites for a few days at a time when they retain floodwater. The thin soilcement plating was installed primarily to protect against this intermittent wave damage along the shoreline. The thin soil-cement plating was also used to armor some auxiliary spillways against erosion that would have occurred from localized storm water runoff and to construct soil-cement plated waterways or chutes needed for controlling onsite erosion from localized storm water runoff. Prior to 1979 the SCS had constructed soil-cement wave protection in the conventional horizontal lift configuration where 8-inch thick, 6 to 8-foot wide horizontal lifts or layers were placed on the front slope of dams above and below the waterline (Figure 2). SCS designers recognized that orienting the soil-cement layers parallel to the slope (Figure 3) would reduce the required soil-cement quantity by more than half that needed for the conventional horizontal lift configuration. In question was the performance and durability of the thin layers of soilcement. It was decided that thin soil-cement plating would be installed and monitored to determine if it would provide the needed protection and be durable in the Texas Panhandle environment. 3

4 Figure 2 - Conventional placement in horizontal lifts. Figure 3 Soil-cement plating oriented parallel to the slope. The soil-cement on the earlier constructed sites was inspected by a team of engineers in 1985 and all of the sites were inspected in 1991, 1996, and This paper documents the findings of the teams that inspected the soil-cement. The information in this paper should be useful for designers when designing soil-cement structures, selecting the materials, specifying the method of compaction, and specifying curing methods for soil-cement used for wave protection and protection against erosion from localized storm water runoff. Exposure Conditions All of the sites within the study area are located within 100 miles and east of Amarillo, Texas. A detailed study of freeze-thaw potential in the area was beyond the scope of this study; however, the average monthly precipitation and temperature data for the period between 1979 and 2000 are given in Table 1. The potential for freeze-thaw damage in this relatively arid climate should be low compared to freeze-thaw damage potential in humid climates. 4

5 Table 1 Temperature and Precipitation Data for Amarillo, Texas from 1971 to Mix Proportioning and Construction of Soil-Cement Plating Soils and Mix Proportioning The soils used for making the soil-cement were obtained onsite and generally had a Unified Soil Classification of SP, SM, SC, or SC-SM. Soils in the northernmost watershed were generally of the SC-SM variety and required more cement to make desirable soil-cement. Soils in the southernmost watershed were classified as SP and required less cement to attain the desired properties. Cement content of soil-cement is commonly expressed as a percentage of the total oven-dry weight of soil used in the soil-cement mixture. Cement contents for soil-cement installed in the study area were determined in the laboratory on the basis of compressive strength, freeze-thaw durability, and wet-dry durability as set forth in the Soil-cement Laboratory Handbook, Portland Cement Association, The 1992 edition of this publication contains the same criteria as that of the 1959 edition. 3 The cement content of the soil-cement installed in the study area ranged from 10 percent for soils with fewer fines to 12 percent for the soils having more plastic-fines. Batching and Mixing The soil-cement was mixed by a pug mill on all but one site where the soil-cement placed in the auxiliary spillway was mixed in place by a roto-tiller. The pug mill produced a well proportioned uniform mix. The in-place mixing produced weaker soil-cement, especially at the edge of placement lanes (i.e. construction joints) where it has deteriorated in several places (Photo 3). 5

6 Photo 3 Deterioration of construction joints occurred where soil-cement was mixed in place Soil-cement was mixed in a pug mill on one site and transported to another site. This soil-cement, having been transported from one site to the other, was noticeably soft and seemed to deteriorate more than soil-cement placed on the sites where the mix was produced. Apparently, the increase in time elapsed from mixing to placement and compaction adversely affected the quality of the soil-cement. 6

7 Placement The soil-cement plating for wave protection was placed in two 6-inch lifts or one 8-inch lift on 3.5:1 (horizontal:vertical) slopes. The soil cement placed in chutes was generally placed in two 6-inch lifts. Soil-cement installed in auxiliary spillways was placed in one 8-inch layer. Soil-cement plating for wave protection placed on some of the earlier constructed sites was placed across the slope in lanes parallel with the centerline of the dam (Figure 4). This method proved difficult as the compaction equipment tended to slide off line as it traveled across the slope. Placement and compaction was easier to control when lanes were oriented up and down the slope, perpendicular to the centerline of the dam (Figure 5). Later applications were oriented up and down the slope. Where two 6-inch lifts were placed, the edges of the lanes in the top lift were generally offset from the edges of the lanes in the bottom lift. Figure 4 - Lanes oriented across the slope. Figure 5 - Lanes oriented up and down slope. 7

8 Compaction Soil-cement was compacted by a steel wheel vibratory compactor, a pneumatic tire roller, or a track type front-end loader. Density was specified to be 100 percent of the maximum dry density as determined by ASTM D 558, Standard Test Methods for Moisture- Density (Unit Weight) Relations of Soil-Cement Mixtures. The moisture content at time of compaction was specified to be from 1 percent below optimum to 2 percent above optimum. Construction documentation points to difficulty meeting the requirement for 100 percent maximum density; actual density was likely in the 95 to 97 percent range. Requiring greater than 95 percent compaction on 3.5:1 (horizontal:vertical) slopes is not realistic or practical. Curing Specifications required the soil-cement to be moist-cured for a period of seven days after placement. A moist soil blanket was used for curing and in most cases it was not removed after curing. Performance Overall the soil-cement has performed well even though there has been some apparent freeze-thaw damage and erosion from localized storm water runoff. Where two 6-inch lifts were installed, the top 6 inches has completely deteriorated on a few of the sites, but the remaining 6 inches of soil-cement on these sites is likely to provide another 25 years of service. Soil-cement on some of the sites has suffered no apparent damage. Mechanism of Deterioration The assumed mechanisms of deterioration were saturation followed by freezing which resulted in expansive forces that damaged the saturated soil-cement and erosion from water flowing over the surface. Delamination was caused by freezing water that expanded in vertical cracks and popped chunks of the soil-cement loose. Where water flowed over the surface of the damaged soil-cement, the materials that crumbled from freeze-thaw damage were eroded away. Larger chunks remain in-place. Thickness of the damaged layers ranged from 1 to 2 inches as evidenced by the remaining portion of damaged layers (Photo 4). The two-inch delamination of layers occurred in soil-cement having lower strengths, and possibly higher permeability. Only one inch thick delaminated layers occurred in soil-cement of a higher quality. 8

9 Photo 4 Remaining portion of layers indicates delamination of layers that are 1 to 2 inches thick. Where soil-cement was placed in lanes oriented up and down the slope, the joints were oriented with the flow. Localized storm water runoff tended to erode these joints (Figure 6). Figure 6 Joints oriented with the flow tended to erode. Where the joints were oriented perpendicular to the flow, freeze damage occurred just down slope of the joint, apparently due to the expansive forces of water trapped in the joint (Figure 7). 9

10 Figure 7 Joints oriented perpendicular to the flow were subject to freeze damage. The potential for freeze damage would be reduced with watertight joints. In an attempt to improve the water tightness of joints, the edge of a placement lane should be dense and clean when soil-cement mix is placed against it. During construction it would be best to maintain a live joint so that the soil-cement on each side of the joint could be compacted concurrently without damage to the previously placed soil-cement. This would effectively eliminate the construction joint and provide a more watertight continuous slab. Soil Dependent Quality The quality of soil-cement varied from site to site. Soil-cement made with SP and SM soils produced a very durable product. Soils containing plastic fines (e.g. SC and SM-SC soils) produced soft soil-cement that could easily be gouged with a knife. Construction records noted that there were clay balls in the mix on one site. Some of these have since eroded leaving small holes or pock marks in the soil-cement surface. The soft soil-cement deteriorated much more than soil-cement made with soils containing fewer plastic fines (e.g. SP and SM materials) (Photo 5). Soil-cement made with SP and SM soils could not be gouged with a knife. Equipment tracks are still visible in the soil-cement surface on some of the sites where SP materials were used, indicating very little deterioration of the more durable soil-cement (Photo 6). 10

11 Photo 5 - Deteriorated soft soil-cement is common where SM-SC soils were used to make soil-cement. Photo 6 - Equipment tracks after 25 years indicate little deterioration of soil-cement made with SP soils. Photos 5 & 6 - Obvious difference in the quality of soil-cement made with different soils Curing A soil blanket was used for curing and in most cases it was not removed after curing. Over time, some of the curing soil eroded away while the remaining soil channeled and concentrated storm water runoff into specific areas. This concentration of runoff and the protection afforded by the curing materials left in place, resulted in uneven deterioration of the soil-cement (Photo 7). A moist blanket of soil is an excellent method of curing; however, it would have been better to remove the curing materials after the curing period to promote uniform wear of the surface. Photo 7 Uneven deterioration caused by curing materials left in place. 11

12 Woody Vegetation Woody vegetation was a problem on some sites. The soil-cement plating apparently functioned like a mulch to help retain ground moisture. This promoted tree growth on sites where there were otherwise few trees. Trees sprouted in open cracks and at the edge of the soil-cement plating. There was more woody vegetation in the cracks where one lift was installed than where two lifts were installed. This was likely due to the fact that, where only one lift was installed, soil would have been present at the bottom of the crack to germinate and support plant growth. Conversely, where two lifts were installed, the bottom layer of soil-cement between the crack and the ground deterred the germination of woody vegetation. Trees that grew to a diameter larger than two inches damaged the soil-cement. In a few cases the larger trees caused the soil-cement to heave and breakup around the tree with the damage radiating several feet from the tree trunk. A more voracious maintenance program to prevent trees from getting larger than two inches in diameter would have been prudent (Photos 8 & 9). Photo 8 - Soil-cement heaved and broke up around trees larger than approximately 6 inches. Photo 9 - Small diameter trees caused little damage. Some were killed with herbicide but not removed. Photos 8 & 9 Large trees damaged soil-cement, smaller trees did little damage. Damage from Waves The damage from wave action was relatively minimal on the site where the soil-cement was subjected to a permanent pool (Photo10). Other sites were subjected to wave action during flood stage only; the soil-cement installed for protection against wave damage on these sites showed no signs of damage from wave action. 12

13 Photo 10 Minimal wave damage on a site with a permanent pool Conclusion Thin soil-cement plating for wave protection and protection against erosion from localized storm water runoff is a viable alternative to the conventional horizontal lift configuration. The quality of the soil-cement, the joint orientation and quality, and exposure conditions are all factors to be considered. Unfortunately, there is no formula for predicting how a specific soil-cement would perform in a specific situation; however, some recommendations can be formulated from observations made during this study: Use cleaner sands with less plastic fines for best soil-cement durability, Mix with a pug mill or drum mixer. Mixing with a tiller in-place produces a poor mix, especially at the construction joints. Locate the mixer on or very near the site to limit the time from mixing to placement. Mixing on a remote site some distance from the placement area results in poor quality soil-cement. Placing soil-cement in two lifts with offset joints will deter the growth of woody vegetation at the joints. 13

14 Ensure the edge of placement lanes are dense and clean whenever soil-cement is placed against them and strive to maintain a live joint so soil-cement on each side of the joint may be compacted concurrently without damage to the previously placed soilcement. Remove trees at an early age before growth to a diameter greater than 2 inches. Place and compact soil-cement in lanes oriented up and down the slope, as opposed to being oriented across the slope. When plating a slope, specify compaction of soil-cement to 95% of the maximum dry density as determined by ASTM D 558. Remove soils used for curing, after the curing period, as opposed to leaving them on the surface to erode at random. In a more demanding service and where environmental conditions are more severe, consider using the more conventional horizontal lift configuration. 14

15 References 1. TR 69 - Riprap For Slope Protection Against Wave Action, 5/24/1982, U.S. Department of Agriculture, Natural Resources Conservation Service, 2. National Weather Service Amarillo Weather Forecast Office, 1900 English Road, Amarillo, Texas 79108, 3. Soil-Cement Laboratory Handbook, 1992, Portland Cement Association, 5420 Old Orchard Road, Skokie, Illinois , 15

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PORTLAND CEMENT. Section PORTLAND CEMENT STABILIZED SUBGRADE

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PORTLAND CEMENT. Section PORTLAND CEMENT STABILIZED SUBGRADE PART 1 GENERAL 1.01 SUMMARY Section 02338 PORTLAND CEMENT This Section includes foundation course of Portland cement stabilized natural subgrade material. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1.

More information

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS 219-1.1 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION This item consists of a base course composed of crushed recycled concrete aggregate, crushed to meet a particular gradation,

More information

ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE

ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE AFTER NOVEMBER 1, 2008 ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE 231.1 Description. This item shall consist of a foundation for surface course or for other base courses and shall be composed

More information

ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE

ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE AFTER MAY 1, 2014 ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE 231.1 Description. This Item shall govern for surface courses or for other base courses composed of a mixture of crushed aggregate,

More information

Cement Stabilized Aggregate Base

Cement Stabilized Aggregate Base Supplemental Technical Specification for June 2, 2008 Cement Stabilized Aggregate Base SCDOT Designation: SC-M-308 (06/08) 1. SCOPE 1.1. Cement Stabilized Aggregate Base (CSAB) consists of aggregate, Portland

More information

Section Fill Placement Tender No. [ ] Page 1

Section Fill Placement Tender No. [ ] Page 1 Tender No. [ ] Page 1 1.0 GENERAL 1.1 GENERAL.1 This section specifies placement requirements for fill materials specified in Section 02330 Earthwork Materials, except for [Waste Fill, Gravel Armour, Riprap,

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL January 2000 Page 1 of 10 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 APPROVALS PART 2 PRODUCTS 2.01 CEMENT 2.02 WATER The General Conditions of the Contract,

More information

CEMENT STABILIZED SAND

CEMENT STABILIZED SAND Section 02321 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Cement stabilized sand material. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. No separate payment will be made for Work performed under this

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

APPENDIX A EARTHEN EMBANKMENT. VERSION 1.0 March 1, 2011

APPENDIX A EARTHEN EMBANKMENT. VERSION 1.0 March 1, 2011 APPENDIX A EARTHEN EMBANKMENT VERSION 1.0 March 1, 2011 SECTION A-1: DESCRIPTION OF PRACTICE An earthen embankment is a raised impounding structure made from compacted soil. The embankment is the feature

More information

Item P-219 Recycled Concrete Aggregate Base Course

Item P-219 Recycled Concrete Aggregate Base Course Item P-219 Recycled Concrete Aggregate DESCRIPTION 219-1.1 This item consists of a base course composed of recycled concrete aggregate, crushed to meet a particular gradation, constructed on a prepared

More information

Reinforced Soil Slopes (RSS)

Reinforced Soil Slopes (RSS) Supplemental Technical Specification for Reinforced Soil Slopes (RSS) SCDOT Designation: SC-M-206-1 (4/16) 1.0 DESCRIPTION 1.1 Construct a reinforced soil slope in accordance with these specifications,

More information

LANDSCAPE RETAINING WALLS

LANDSCAPE RETAINING WALLS SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9070 - Landscape Retaining Walls LANDSCAPE RETAINING WALLS PART - GENERAL.0 SECTION INCLUDES A. Modular Block Retaining Walls

More information

378 - POND NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION I. SCOPE

378 - POND NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION I. SCOPE 378-1 NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION 378 - POND I. SCOPE The work shall consist of constructing an earthfill embankment and appurtenances to the lines, grades,

More information

Diversion Dikes. Fe=0.95

Diversion Dikes. Fe=0.95 2.2 Diversion Dike Erosion Control Description: A diversion dike is a compacted soil mound, which redirects runoff to a desired location. The dike is typically stabilized with natural grass for low velocities

More information

Section CEMENT STABILIZED SAND

Section CEMENT STABILIZED SAND PART 1 GENERAL 1.01 SECTION INCLUDES Cement stabilized sand material. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. Section 02321 1. No separate payment will be made for Work performed under this Section.

More information

SECTION EROSION CONTROLS

SECTION EROSION CONTROLS SECTION 31 25 13 EROSION CONTROLS PART 1 GENERAL 1.1 SUMMARY A. Section Includes installing, maintaining and removing: 1. Silt Fence. 2. Temporary Construction Entrances. 3. Diversion Channels. 4. Sediment

More information

SECTION EROSION CONTROL DEVICES

SECTION EROSION CONTROL DEVICES SECTION 02374 PART 1 GENERAL EROSION CONTROL DEVICES 1.1 SUMMARY A. Section Includes: 1. Diversion Channels. 2. Rock Energy Dissipator. 3. Paved Energy Dissipator. 4. Rock Basin. 5. Rock Barriers. 6. Sediment

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section CEMENT STABILIZED BASE COURSE. 1. Foundation course of cement stabilized crushed stone.

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section CEMENT STABILIZED BASE COURSE. 1. Foundation course of cement stabilized crushed stone. PART 1 GENERAL 1.01 SUMMARY A. This section includes: Section 02712 1. Foundation course of cement stabilized crushed stone. 2. Foundation course of cement stabilized bank run gravel. 1.02 MEASUREMENT

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

Cement Stabilized Aggregate Base

Cement Stabilized Aggregate Base Supplemental Technical Specification for October 28, 2015 Cement Stabilized Aggregate Base SCDOT Designation: SC-M-308 (10/15) 1. SCOPE 1.1. Cement Stabilized Aggregate Base (CSAB) consists of aggregate,

More information

Water Control Structures Selected Design Guidelines Alberta Environment Page 24-1

Water Control Structures Selected Design Guidelines Alberta Environment Page 24-1 Alberta Environment Page 24-1 24.0 CONSTRUCTION CONSIDERATIONS 24.1 Care of Water Typically, the design, construction, maintenance and removal of temporary measures for the care of water during construction

More information

Construction Specification 62 Grouted Rock Riprap

Construction Specification 62 Grouted Rock Riprap Construction Specification 62 Grouted Rock Riprap 1. Scope The work consists of furnishing, transporting, and the installation of grouted rock riprap revetments and blankets, including filter or bedding

More information

COMPACTED CLAY LINERS

COMPACTED CLAY LINERS Technical Reference Document for Liquid Manure Storage Structures COMPACTED CLAY LINERS Table of Contents SECTION 1 - PURPOSE AND SCOPE 1.1. Purpose of the Technical Reference Document 1.2. Requirement

More information

City of Regina Standard Construction Specification SECTION 2350 PLACEMENT OF ASPHALTIC CONCRETE SURFACE 1.0 GENERAL. 1.1 Scope

City of Regina Standard Construction Specification SECTION 2350 PLACEMENT OF ASPHALTIC CONCRETE SURFACE 1.0 GENERAL. 1.1 Scope 1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of placing asphaltic concrete to a compacted thickness conforming to the lines, grades, and cross-sections as shown on the plan or as designated

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,

More information

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER CHAPTER 3 Site Preparation In preparation for constructing buildings on a property, the builder must consider a number of factors related to code requirements. The buildings must be located according to

More information

Appendix A Physical properties of rammed earth

Appendix A Physical properties of rammed earth Appendix A Physical properties of rammed earth 99 A.1 General The level and extent of testing rammed earth materials depends on specific application and novelty of the material in use. Where a proven material

More information

LINED WATERWAY OR OUTLET (Feet) Code 468

LINED WATERWAY OR OUTLET (Feet) Code 468 LINED WATERWAY OR OUTLET (Feet) Code 468 Natural Resources Conservation Service Conservation Practice Standard I. Definition A waterway or outlet having an erosion-resistant lining of concrete, stone,

More information

Cement Modified Recycled Base

Cement Modified Recycled Base Supplemental Technical Specification for Cement Modified Recycled Base SCDOT Designation: SC-M-306 (01/18) 1.0 DESCRIPTION 1.1 This section contains specifications for the materials, equipment, construction,

More information

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT): SECTION 31 32 13.16 CEMENT STABILIZATION PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section pertains to the specifications for cement stabilization of sandy or silty soil and consists of pulverizing, addition

More information

Chapter 6. Soil Compaction

Chapter 6. Soil Compaction Chapter 6. Soil Compaction Increase Density - increase strength characteristics - increase bearing capacity and stability of slopes - decrease settlement Roller, vibroflot 6.1 Compaction-General Principles

More information

Utility Cut Restoration

Utility Cut Restoration Design Manual Chapter 9 - Utilities 9D - Utility Cut Restoration 9D-1 Utility Cut Restoration A. General Utility cuts are made in existing pavement sections to install a myriad of utilities and to repair

More information

PERMEABLE INTERLOCKING PAVERS

PERMEABLE INTERLOCKING PAVERS PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement

More information

CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE

CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE 1.0 GENERAL 1.1 Scope A. This specification guideline covers the technical requirements for furnishing all labor, materials, equipment, and incidentals

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

SECTION AGGREGATES

SECTION AGGREGATES SECTION 32 05 00 AGGREGATES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Aggregate base 2. Engineered fill 3. Backfill 4. Fine filter aggregate (non-frost susceptible fill) 5. Riprap 6. Recreational

More information

Project Specifications

Project Specifications Project Specifications EARTHWORK SCOPE: The work shall consist of the required site preparation, excavation, and the shaping and finishing of the areas to the required lines, grades, and cross-sections.

More information

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS SECTION 13100 MECHANICALLY STABILIZED EARTH RETAINING WALLS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. Includes all labor, material, equipment, testing and submittals required to design and complete construction

More information

G u i d e l i n e s f o r U s i n g I m p o r t e d S o i l for Onsite Wastewater Systems in Marginal Soil-Site Conditions

G u i d e l i n e s f o r U s i n g I m p o r t e d S o i l for Onsite Wastewater Systems in Marginal Soil-Site Conditions N E T A F I M U S A G u i d e l i n e s f o r U s i n g I m p o r t e d S o i l for Onsite Wastewater Systems in Marginal Soil-Site Conditions WASTEWATER DIVISION NETAFIM USA 5470 E. Home Ave. Fresno,

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 850 CEMENT TREATED FREE DRAINING BASE APRIL 18, 2008

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 850 CEMENT TREATED FREE DRAINING BASE APRIL 18, 2008 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 850 CEMENT TREATED FREE DRAINING BASE APRIL 18, 2008 850.01 Description 850.02 Materials 850.03 Proportioning, Mixing, and Transporting

More information

CHANGE YOUR UNIVERSE S o i l - C e m e n t f o r B u i l d i n g F o u n d a t i o n s

CHANGE YOUR UNIVERSE S o i l - C e m e n t f o r B u i l d i n g F o u n d a t i o n s CHANGE YOUR UNIVERSE S o i l - C e m e n t f o r B u i l d i n g F o u n d a t i o n s Doug Hula, P.E. Gosling Czubak Engineering Sciences, Inc. Presentation Outline Introduction Overview Case Study Inspection

More information

SPECIAL PROVISIONS TO ITEM P-304 CEMENT TREATED BASE COURSE

SPECIAL PROVISIONS TO ITEM P-304 CEMENT TREATED BASE COURSE SPECIAL PROVISIONS TO ITEM P-304 CEMENT TREATED BASE COURSE The work under this item shall conform to the requirements of Item P-304 of the FAA standards for Specifying Construction of Airports which have

More information

Ponds: planning, design, and construction

Ponds: planning, design, and construction Ponds: planning, design, and construction Ponds for many purposes: Fish Production Recreation Water Supply Esthetics Wildlife Habitat Natural ponds: Formed in natural depressions in the landscape Not man-made

More information

Soil Compaction. Chapter (6) Instructor : Dr. Jehad Hamad

Soil Compaction. Chapter (6) Instructor : Dr. Jehad Hamad Soil Compaction Chapter (6) Instructor : Dr. Jehad Hamad 1 2017-2016 What is Compaction? In most instances in civil engineering and/or construction practice, whenever soils are imported or excavated and

More information

Rehabilitation of the Blue Ridge Parkway with FDR and AC Overlay. Michael Walters FHWA EFLHD October 7, 2014

Rehabilitation of the Blue Ridge Parkway with FDR and AC Overlay. Michael Walters FHWA EFLHD October 7, 2014 Rehabilitation of the Blue Ridge Parkway with FDR and AC Overlay Michael Walters FHWA EFLHD October 7, 2014 HISTORY Existing pavement on Parkway very deteriorated Repair options were heavy patching and

More information

KU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT

KU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT PERMEABLE BITUMINOUS PAVEMENT PART 1: GENERAL 1.01. RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including Special Requirements General Conditions and Division 1 Specifications Sections,

More information

SECTION ASPHALT PAVING

SECTION ASPHALT PAVING SECTION 321216 ASPHALT PAVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Hot-mix asphalt paving. 1.2 PRE-INSTALLATION MEETINGS A. Pre-installation Conference: Conduct conference at Project site.

More information

AMERICAN ELECTRIC POWER (SWEPCO)

AMERICAN ELECTRIC POWER (SWEPCO) 2016 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-16-163 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

Stanford University Facilities Design Guidelines SECTION STONE FINES PAVING. American Society for Testing and Materials.

Stanford University Facilities Design Guidelines SECTION STONE FINES PAVING. American Society for Testing and Materials. SECTION 32 15 40 STONE FINES PAVING PART 1 GENERAL 1.1 RELATED WORK Section 32 11 00: Base Courses 1.2 QUALITY ASSURANCE A. Applicable Standards: Any reference shall mean the current or latest editions

More information

SECTION 503 TEMPORARY PAVEMENT RESTORATION

SECTION 503 TEMPORARY PAVEMENT RESTORATION SECTION 503 TEMPORARY PAVEMENT RESTORATION 503-1 DESCRIPTION: This work consists of furnishing, placing, compacting, and maintaining a temporary pavement surface suitable for driving in accordance with

More information

Mix Design & Construction -1-

Mix Design & Construction -1- Mix Design & Construction -1- AGENDA RCC Mix Design RCC Mix Production RCC Construction Process -2- THE FINAL SURFACE TYPE WILL DICTATE THE NECESSARY TECHNIQUES & EQUIPMENT NEEDED TO BE SUCCESSFUL Natural

More information

SECTION Segmental Concrete Unit Masonry Retaining Wall Height Over 5-0 High

SECTION Segmental Concrete Unit Masonry Retaining Wall Height Over 5-0 High PART 1: GENERAL 1.0 0 Scope of Standards A. This standard provides general guidance concerning the specific preferences of the Texas State University for a Segmental Retaining Wall up to 5-0 high. B. Texas

More information

SECTION RIPRAP, BOULDERS, AND BEDDING

SECTION RIPRAP, BOULDERS, AND BEDDING SECTION 31 37 00 RIPRAP, BOULDERS, AND BEDDING PART 1 GENERAL 1.01 SECTION INCLUDES A. The WORK includes excavation, grading, and installation of riprap, boulders, soil riprap, void-filled riprap, and

More information

SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course

SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course 1993 Specifications SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course 1. Description. This Item, Cold Processed - Recycled Paving Material (RPM),

More information

G. Shop drawing of wall with all dimensions, details, and finishes. Drawings must include post foundations.

G. Shop drawing of wall with all dimensions, details, and finishes. Drawings must include post foundations. DURA-CRETE S-SERIES PRECAST CONCRETE WALL SPECIFICATIONS PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete Screen Wall Description: Work under this item shall consist of furnishing and erecting a wall in

More information

Item 247 Flexible Base

Item 247 Flexible Base Item Flexible Base 1. DESCRIPTION 2. MATERIALS Construct a foundation course composed of flexible base. Furnish uncontaminated materials of uniform quality that meet the requirements of the and specifications.

More information

Item 247 Flexible Base

Item 247 Flexible Base Item Flexible Base 1. DESCRIPTION 2. MATERIALS Construct a foundation course composed of flexible base. Furnish uncontaminated materials of uniform quality that meet the requirements of the and specifications.

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

715 - PRESTRESSED CONCRETE MEMBERS SECTION 715 PRESTRESSED CONCRETE MEMBERS

715 - PRESTRESSED CONCRETE MEMBERS SECTION 715 PRESTRESSED CONCRETE MEMBERS SECTION 715 PRESTRESSED CONCRETE MEMBERS 715.1 DESCRIPTION Manufacture, cure, handle and install prestressed concrete bridge beams and panels to the dimensions specified on the Contract Documents. Manufacture

More information

Part 4. Sidewalk Construction and Repair

Part 4. Sidewalk Construction and Repair Part 4. Sidewalk Construction and Repair 604.01. Permit Required. No sidewalk or curb and gutter shall be constructed on any street, alley, avenue, or other public property in this city without first having

More information

SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay

SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay 2004 Specifications SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay 1. Description. Furnish and place a multi-layer polymer overlay consisting of a crack seal, polymer resin and aggregates.

More information

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1993 SPECIFICATIONS CSJ 581-1-95 SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1. DESCRIPTION. This Item shall govern for the furnishing and installation of all materials and equipment for

More information

RE: Dam Structural Concrete Conditions Assessment

RE: Dam Structural Concrete Conditions Assessment Ms. Debbie Bluso-Rogers Administrator Richfield Joint Recreation District 4410 West Streetsboro Road Richfield, Ohio 44286 September 1, 2016 2016257.00 RE: Dam Structural Concrete Conditions Assessment

More information

A STUDY ON THE ENHANCEMENT OF DURABILITY PERFORMANCE OF FACED SLAB CONCRETE IN CFRD

A STUDY ON THE ENHANCEMENT OF DURABILITY PERFORMANCE OF FACED SLAB CONCRETE IN CFRD 18 TH INTERNATIONAL CONFERENCE ON COMPOSITE MATERIALS Abstract The main purpose of this research was to enhance the durability in both the design and construction of dams. Especially, in case of rockfill

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

1.0 BACKGROUND 2.0 DIAGRAMS. The attached diagrams illustrate a typical NDDS system. 3.0 CDPHE OWTS REGULATION #43

1.0 BACKGROUND 2.0 DIAGRAMS. The attached diagrams illustrate a typical NDDS system. 3.0 CDPHE OWTS REGULATION #43 COLORADO PROFESSIONALS IN ONSITE WASTEWATER (CPOW) GUIDELINES FOR THE DESIGN AND INSTALLATION OF NON-PRESSURIZED DRIP DISPERSAL SYSTEMS (NDDS) REVISED DECEMBER 11, 2014 1.0 BACKGROUND Non-Pressurized Drip

More information

Sealing Leaking Ponds

Sealing Leaking Ponds 1 of 5 5/21/2004 12:47 PM Sealing Leaking Ponds Excessive seepage in ponds is generally due either to a poor site--that is, one in which the soils in the impounded area are too permeable to hold water--to

More information

CITY OF SAN ANGELO ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

CITY OF SAN ANGELO ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) ITEM 275 CITY OF SAN ANGELO ITEM 275 275.1 DESCRIPTION. This Item shall govern for treating subgrade, new and/or existing base (with or without asphaltic concrete pavement (ACP)), or combinations as shown

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 12 16 ASPHALT CONCRETE PAVING PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for placing a hot laid plant mix asphalt surface course upon either an asphalt stabilized

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition STANDARD FOR SLOPE PROTECTION STRUCTURES Definition Structures to safely conduct surface runoff from the top of a slope to the bottom of the slope. Purpose The purpose of this practice is to convey storm

More information

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 There are three ways to accomplish urban soil erosion and sedimentation control: Allow erosion to take place and then control sediment

More information

ASPHALT MIX DESIGNER

ASPHALT MIX DESIGNER ASPHALT MIX DESIGNER EFFECT OF MIX DESIGN ON PERFORMANCE AND CONSTRUCTION OF HMA Module 8 Module 8 1, July 2005 8-1 QUALITY Meets or Exceeds the Expectations or Needs of the Customer Module 8 2, July 2005

More information

Performance of Thin Roller Compacted Concrete Pavement under Accelerated Loading

Performance of Thin Roller Compacted Concrete Pavement under Accelerated Loading Moving Advancements into Practice MAP Brief May 2016 Best practices and promising technologies that can be used now to enhance concrete paving May 2016 www.cproadmap.org ROAD MAP TRACK 8 PROJECT TITLE

More information

Ch. 5 - Compaction Page 1. Learning Objectives. Thursday, February 03, 2011

Ch. 5 - Compaction Page 1. Learning Objectives. Thursday, February 03, 2011 Ch. 5 - Compaction Page 1 Learning Objectives Ch. 5 - Compaction Page 2 Symbols Ch. 5 - Compaction Page 3 Compaction - Introduction Ch. 5 - Compaction Page 4 Compaction - Introduction (cont.) Ch. 5 - Compaction

More information

Section 502. HMA CRACK TREATMENT

Section 502. HMA CRACK TREATMENT 502.01 Section 502. HMA CRACK TREATMENT 502.01. Description. This work consists of treating cracks in Hot Mix Asphalt (HMA) surfaces using either a saw or rout and seal process or an overband process.

More information

7.1 Flexible Pavement Design. 7.2 Rigid Pavement Design TRANSPORTATION SYSTEM ENGINEERING 1, 61360

7.1 Flexible Pavement Design. 7.2 Rigid Pavement Design TRANSPORTATION SYSTEM ENGINEERING 1, 61360 7.1 Flexible Pavement Design 7.2 Rigid Pavement Design 1 Highway pavements are divided into two main categories: Flexible -Bituminous concrete Rigid -Portland cement concrete- Flexible pavements usually

More information

Matthew W. Singel, PE

Matthew W. Singel, PE Matthew W. Singel, PE RCC is No Slump No reinforcing steel No finishing Consolidated with vibratory rollers Concrete pavement placed in a different way! What Is RCC? Which Sample is RCC? RCC Pavement Usage

More information

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items: ITEM 431 PNEUMATICALLY PLACED CONCRETE 431.1. Description. This Item shall govern for furnishing and placing of "Pneumatically Placed Concrete" for encasement of designated structural steel members, the

More information

Public Works Manual. Revised September Concrete & Asphalt

Public Works Manual. Revised September Concrete & Asphalt Public Works Manual Revised September 2015 Concrete & Asphalt Where it must cross domestic it must cross above and with a 1 minimum separation. Nonpotable water tape. 10.00 PORTLAND CEMENT CONCRETE 10.01

More information

CHAPTER B TABLE OF CONTENTS

CHAPTER B TABLE OF CONTENTS July 2006 Page B-1 CHAPTER B TABLE OF CONTENTS B.00 Introduction B.01 Definitions B.02 Maintenance Levels B.03 Definition of Traveled Way B.04 Policy for Performing Roadbed Maintenance Work B.05 Surface

More information

Properly constructing and maintaining a road drainage system is the most effective ways to reduce flood damage

Properly constructing and maintaining a road drainage system is the most effective ways to reduce flood damage Mitigating Flood Damage to Vermont Local Roads Properly constructing and maintaining a road drainage system is the most effective ways to reduce flood damage Vermont Emergency Management Vermont Local

More information

Compaction and Jet Grouting

Compaction and Jet Grouting Compaction and Jet Grouting Alan Ringen, PE Senior Vice President Breakthroughs in Tunneling Short Course August 16, 2017 Grouting Principles Geotechnical Grouting: The injection of pumpable fluid materials

More information

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida

More information

MagnumStone Specifications Gravity

MagnumStone Specifications Gravity MagnumStone Specifications Gravity SPECIFICATION FOR MAGNUMSTONE GRAVITY MECHANICALLY STABILIZED EARTH SYSTEM PART 1: GENERAL.01Description The work consists of supplying and installing all aspects of

More information

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS Section Page 44-1 SHOTCRETE... 44.1 44-1.01 Description... 44.1 44-1.02 Materials... 44.1 44-1.03 Proportions...

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS TECHNICAL SPECIFICATIONS ITEM 00663 TRAFFIC BUTTONS & PAVEMENT MARKERS 663.1 Description. This item shall consist of furnishing and installing traffic buttons and reflectorized pavement markers and jiggle

More information

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING 402.1 Description. This work shall consist of placing, spreading and compacting a bituminous mixture as shown on the plans or as directed by the engineer.

More information

SECTION ASPHALT CONCRETE

SECTION ASPHALT CONCRETE SECTION 02740 ASPHALT CONCRETE PART 1. GENERAL 1.01 SECTION INCLUDES A. Work includes but is not limited to the following: 1.02 RELATED SECTIONS 1. Provide all material, labor, and equipment to prepare

More information

521D-1 NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE STANDARD POND SEALING OR LINING COMPACTED CLAY TREATMENT (NO.) CODE 521D DEFINITION A liner for a pond or waste storage impoundment constructed

More information

1 Exam Prep Guide to Shotcrete Questions

1 Exam Prep Guide to Shotcrete Questions 1 Exam Prep Guide to Shotcrete Questions 1. According to Guide to Shotcrete, another name used for dry mix shotcrete is: A. batching B. gunite C. shotcrete D. slugging 2. Shotcrete in which all of the

More information

SECTION 28 AGGREGATE BASE COURSE (FAA P-208) [For base course under runway and taxiway surfaces, use Section 29, FAA Item P-209.]

SECTION 28 AGGREGATE BASE COURSE (FAA P-208) [For base course under runway and taxiway surfaces, use Section 29, FAA Item P-209.] 28-1 GENERAL SECTION 28 AGGREGATE BASE COURSE (FAA P-208) The Contractor shall perform all work required by the plans and specifications for construction of aggregate base course for, use under runway

More information

DETENTION, RETENTION AND RECHARGE STRUCTURES

DETENTION, RETENTION AND RECHARGE STRUCTURES DETENTION, RETENTION AND RECHARGE STRUCTURES Introduction Foundation, trenchwall, bedding and backfill considerations for multiple barrel detention systems are not unlike those for conventional CSP installations.

More information

Alexandria Property Inspections Inc.

Alexandria Property Inspections Inc. Alexandria Property Inspections Inc. 14421 Broadwinged Drive Gainesville, VA 20155 Prepared for: Prepared by: National Property Inspections 15 Canterbury Road Great Neck, NY 11021 08:00 July 19, 2012 Page

More information