1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1145 Project Name Sindh Water Sector Improvement Project Region SOUTH ASIA Sector Irrigation and drainage (100%) Project ID P Borrower(s) GOVERNMENTS OF PAKISTAN AND SINDH Implementing Agency Government of Pakistan Pakistan Government of Sindh... Pakistan SIDA Pakistan Environment Category [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Safeguard Classification [ ] S 1 [X] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined) Date PID Prepared October 5, 2004 Estimated Date of March 8, 2005 Appraisal Authorization Estimated Date of Board March 16, 2005 Approval 1. Key development issues and rationale for Bank involvement Agriculture plays a fundamental role in Pakistan s economy and is one of the main driver of poverty reduction objectives in the country. Agriculture contributes to 25% of the GNP, 50% of employment and 60-70% of exports. Irrigation along the Indus river is the backbone of the agricultural sector and uses 95% of the water available in the country. The development of the largest irrigation network in the world is one of the major achievements and asset of Pakistan and the Bank has been an active partner in this process since the negotiation of the Indus treaty in In 1997, the Government, with the support of the Bank, launched the National Drainage Program (NDP) 1 with the objective of improving the efficiency of the irrigation and drainage system in Pakistan and ensure its sustainability, through : (i) launching the first phase of policy and institutional reforms in the water sector; (ii) improving the irrigation and drainage infrastructure; and (iii) strengthening sector planning and research. The program was laid out over a period of 25 years and covered all the Provinces. 1 World Bank National Drainage Program Project Staff Appraisal Report. Report No PAK. Rural Development Sector Management Unit. South Asia. Region.
2 After six years of implementation the results of the project are mixed. Of all the Provinces, Sindh is the only one that has moved ahead in the implementation of the reforms and of the corresponding investments to improve the irrigation network. Sindh is the second largest province in the country, home of 30 million people and represents 25% of the agricultural production with 26% of the total irrigated area in Pakistan. The reforms implemented through NDP included the institutional transformation of the Irrigation Department into a decentralized organization at the Provincial level (SIDA); the enactment of the Sindh Water Management Ordinance; the creation of a pilot Area Water Board (AWB) at the canal command zone and the integration of Farmers Organizations (FOs) at the distributary level. The FOs operate and maintain the irrigation and drainage networks, collect the abiana (water charges) and participate in the decision making process of the water service delivery. So far, Sindh is the champion of the irrigation reform process in Pakistan. The Province has made progress in the Nara Canal and lately in four more canal commands that have been notified to SIDA with a total area of 3 million ha which represents 60% of the irrigated system in the Province. SIDA is operating at the Provincial level with independence from the Irrigation Department and has formed 195 FO who are now actively participating in the daily management of the system. These achievements and the continuous progress of the reform agenda is a long term process which needs sustained support and persistence. Still considerable resistance exists to the implementation of the reform program. Some positive results have been achieved, but much remains to be done to cope with the magnitude of the growing problems affecting the water sector. Conjunctive use of water, equity in the water distribution, environmental degradation and inefficiency in the water distribution are some of the most pressing problems. The reform agenda in Sindh is still fragile and requires the strong support of the Bank to develop deeper roots. The fight against rent seeking behaviors is recognized as one of the major constraints to improve service delivery and equity in Sindh. Because of the geological formation of the Province, most of the groundwater is not suited for agriculture, making the farmers dependant mainly on canal water. According to recent studies, water has become the major limiting factor to further growth. 2 The location of Sindh at the end of the Indus basin, makes drainage an integral element in water resource management and a basic element to solve the salinity and waterlogging problems. In the last years extreme meteorological events have affected the Province, from drought to flood, affecting principally the small farmers, sharecroppers and rural laborers. 3 Sea water intrusion damages the soils and the ecosystem in the coastal areas and fisheries. The pervasive water management vicious circle needs to be broken by a continuous effort to promote a change and a new water culture in Sindh based on a more responsible participation of the farmers and a sensible mix of investment and reform actions. This strategy is supported by the 2 Derek Byerlee World Bank. Strategic Issues in Environmental Sustainability in Pakistan. Box page 41. (SASES) 3 World Bank The impact of drought on rural communities in Pakistan. Annex A, op. cit.
3 government and represents an important step in the devolution of the traditional irrigation sector. The Bank has been promoting irrigation reform and has helped Sindh in building better lines of accountability between the users and the service providers as well as a more conscious attitude towards efficiency gains and water productivity. SIDA has produced a long term 2025 Water Issues and Options paper for the Province. 4 The Bank through NDP has also helped in the integration of several national planning studies pertinent to the integration of this planning process. 5 The proposed project supports the CAS goal of reducing poverty through pro-poor growth interventions such as improving water productivity, employment in the rural sector and increased food security in the country while diversifying the agricultural production. This project will help pursue the Bank dialogue on the better management of an international river, and to improve governance in the management of this vital natural resource together with a clear definition of water rights and entitlements. The overall strategy will be to unbundle at the provincial level the support initially provided under NDP, and support the provinces that have demonstrated initial results. 2. Proposed objective(s) The overall development objective is to improve water productivity trough the pursuit of a reform agenda and required investments leading to a better management system that links the canal command areas, the distributary and the watercourse level. The project interventions would: (a) define and implement an enforceable water rights system among users in the selected canal command areas; (b) devolve responsibility for water management including O&M to WUAs and FOs (c) improve the reliability, efficiency and equity of water distribution, among the agricultural users, (c) modernize the existing irrigation and drainage networks, and the on-farm technology to improve water service delivery and use and (d) strengthen the institutional capacity of the irrigation institutions in Sindh according to the existing Water Ordinance. 3. Preliminary description The Project aims at consolidating the institutional reform process initiated under NDP and expand its scope to an additional number of canal command areas. This will include a mix of 4 FAO Pakistan. Sindh Water Resources Management. Issues and Options. Investment Center Division. FAO/World Bank Cooperative Programme. 5 Several efforts and studies have been promoted through NDP: The National Surface Drainage System, The Master Drainage Plan, The National Water Policy all from MWP, WAPDA Water Vision Also the National Water Strategy and Investment Plan MWP and ADB.
4 institutional and infrastructure interventions. Progress on the institutional reform agenda and on the irrigation devolution strategy will be subject to political commitment and is likely to be a long term process. It is recommended that the project be designed as an APL. The triggers in the process will allow, once the conditions are met, to introduce the reform process and Bank support to other canal commands and expand horizontally the scope of the program to the whole Province. The basic elements that will trigger expansion are: a) transfer of the water allocation responsibilities at the barrage and canal level to SIDA; b) notify and commission the canal commands to AWBs; c) devolution to WUA/FO operations and maintenance of the distributary and minor canal level, d) identification of infrastructure improvement needs. Through an APL the pace at which the program would unfold would be subject and adjusted to the prevailing political and economical conditions in the Province. The APL allows for more flexibility than the present NDP strategy given that additional Bank support would only be triggered after evidence that the preconditions for success are in place. Over the medium term, the program will support the development of SIDA into a Provincial Water Management Organization capable of managing the water resources in a sustainable way with equity and with technical and financial capabilities. This will be achieved at the end of the process through the operation of 3 main barrages, establishment and operation of 14 AWB to deliver water by volume to around 1,500 FOs, and organization of a better system of water charges collection. At the same time the dialogue will be pursued with the Irrigation Department so as to support its transformation into a Provincial Water Authority institution with responsibility for administration and oversight of inter-provincial water rights, regulatory and enforcement issues. In order to reach this stage of maturity the APL will be organized in three phases, the first one has interventions in one barrages and 5 Canal Commands; the second could include a second barrage and five additional canal commands areas, and finally the third phase could include the last barrage and the remaining perimeter of four canal commands. During project preparation the phases will be defined with more precision and in consultation with the stakeholders. The social, environmental and institutional triggers will also be clarified. The first phase of this long term process under the present APL I project will cover the five canal commands already transferred to SIDA under NDP. It will require the transfer to SIDA of the Gudu barrage that regulates the water flow of the targeted command areas and further support the modernization 6 and rehabilitation of the distribution infrastructure together with the institutional strengthening of AWBs, FOs and WUAs. The following components are envisaged in the proposed project. 3 Capacity building. Supporting SIDA to develop the local capacity for integrated planning and water management in the Province. Establishment of Water Rights and allocation of water in Sindh. Transforming the present system of water distribution to a volumetric 6 Modernization is a process of improvement of the irrigation and drainage infrastructure according to the new demands of stakeholders for a more reliable, timely and efficient water service delivery, it includes interventions in the physical and also in the managerial components of the service. Includes the use of benchmarking indicators and techniques to evaluate the performance of the systems and compare it with other similar ones at the national and international level.
5 3 3 3 delivery according with the water entitlements and water allocation rules. The process will include the conjunctive use of surface and underground water in line with the needs of the different users and the quality of water available. This component will also support the existing capacity for social mobilization, formation of AWBs, FOs and women groups. The project will address the need to regulate the direct outlets that in some cases (like in the Nara Canal) represent 30% of the volume of water diverted to the farms. Civil Works. This component will support the modernization and improvement of the irrigation and drainage network, construction of metering devices, communication, water distribution structures and fund for the maintenance works required for the sustainability of the system specially drainage. When needed and justified the project will introduce the modernization and improvement of the irrigation and drainage infrastructure in relation with agriculture diversification projects Agriculture and irrigation technology. The project will promote delivery of water to the WUAs according to water delivery contracts and support the necessary infrastructure improvements to achieve a more timely and reliable water distribution. In this way the project will foster the introduction of modern irrigation practices and the installation of pressurized irrigation systems which will represent a major technological innovation for Pakistan agriculture. The project will also pursue coordination with the Sindh OFWMP project in the execution of the investments at the off-farm and on-farm level to establish the required articulation with agriculture productivity objectives. Management and administration. The project will support the transition towards a more efficient system of water and irrigation management including the professionalization of service delivery through SIDA, the devolution of operations and maintenance to AWBs, FOs and WUAs, and the revision of the role of the Irrigation Department. 4. Safeguard policies that might apply [Guideline: Refer to section 5 of the PCN. Which safeguard policies might apply to the project and in what ways? What actions might be needed during project preparation to assess safeguard issues and prepare to mitigate them?] 5. Tentative financing Source: ($m.) BORROWER/RECIPIENT 30 INTERNATIONAL DEVELOPMENT ASSOCIATION 140 Total Contact point Contact: Manuel Contijoch Escontria Title: Sr Water Resources Spec. Tel: (202) Fax: mcontijoch@worldbank.org
6
PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name
PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name Balochistan Small Scale Irrigation Project Region SOUTH ASIA
More informationSECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, and RUDAL DEVELOPMENT. 1. Sector Performance, Problems, and Opportunities
Pehur High Level Canal Extension Project (RRP PAK 47024) SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, and RUDAL DEVELOPMENT Sector Road Map 1. Sector Performance, Problems, and Opportunities
More informationMozambique ProIrri Sustainable Irrigation Development Project Region. 1. Key Development Issues and Rationale for Bank Involvement
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No. AB4683 : Project Name Mozambique ProIrri Sustainable Irrigation Development Project Region AFRICA Sector Irrigation and drainage (50%); Crops
More informationAF Rural Enterprise Development Program Region
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4057 Project Name AF Rural Enterprise Development Program Region South Asia Sector Crops (20%);Other social services (20%);Micro- and SME
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1030 Project Name. WATER RESOURCE MANAGEMENT PROJECT Region
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1030 Project Name WATER RESOURCE MANAGEMENT PROJECT Region EUROPE AND CENTRAL ASIA Sector Irrigation and drainage (100%) Project ID P087964
More informationPakistan Development Forum. Presentation by
Pakistan Development Forum Presentation by M. Ali Shah, Country Director, ADB Pakistan Resident Mission Islamabad 18 March 2004 Part 1 - An Overview of Pakistan Part 2 - The Water Perspective Part 3 -
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5158 Project Name
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5158 Project Name Pakistan Skill Development Region SOUTH ASIA Sector Vocational training (100%) Project ID P118177 Borrower(s) GOVERNMENT
More informationUpdated Project Information Document (PID) Report No: AB319. Project Name. PAKISTAN - Sindh On-Farm Water Management Project Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Updated Project Information Document () Report No: AB319 Project Name PAKISTAN - Sindh
More informationWater Resources and Irrigation Reform
Water Resources and Irrigation Reform Tony Garvey Sr. Water Resources Advisor, SAR Water Week Session 11 March 2003 The Main Problems There is no institutional framework for WRM that is not dominated by
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB7310 Project Name
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB7310 Project Name National
More informationPAKISTAN NATIONAL DRAINAGE PROGRAM PROJECT (CREDIT NO PK)
PAKISTAN NATIONAL DRAINAGE PROGRAM PROJECT (CREDIT NO. 2999-PK) Follow Up to the Meeting of the Executive Directors of the World Bank (October 31, 2006) on the Inspection Panel Investigation Report No.
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2622 Kenya Adaptation to Climate Change in Arid Lands (KACCAL) Project Region
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2622 Project Name Kenya Adaptation to Climate Change in Arid Lands (KACCAL) Project Region AFRICA Sector Environment/Climate Change Project
More informationPro-poor Interventions in Irrigated Agriculture in Pakistan:
Pro-poor Interventions in Irrigated Agriculture in Pakistan: Issues, Options and Proposed Actions Introduction Reducing poverty is a major development goal. But to achieve this, we need to answer some
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Project Name Region Sector Project ID Implementing Agencies Report No. PID6732 Philippines-Mindanao Rural (@+#) Development Project East Asia and Pacific Agriculture PHPE58842 Date of PID May 24, 1999
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC1037 Project Name GEF
More informationIntegrated Safeguards Data Sheet (Initial)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Initial) Report No: AC124 Section I - Basic Information
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6108 Project Name. Mineral Development Support Project Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6108 Project Name Mineral
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2796 Project Name. Andhra Pradesh Rural Water Supply & Sanitation Project Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2796 Project Name Andhra
More informationRegional Experiences on Irrigation Modernization. Joop Stoutjesdijk Lead Irrigation Engineer, World Bank
Regional Experiences on Irrigation Modernization Joop Stoutjesdijk Lead Irrigation Engineer, World Bank Why Modernize Few main reasons why to modernize: Rapidly increasing competing uses for water. Irrigation
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4706. Project Name
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project Borrower(s) Implementing Agency PROJECT INFORMATION
More informationSECTOR ASSESSMENT (SUMMARY): IRRIGATION. 1. Sector Performance, Problems, and Opportunities
Community-Managed Irrigated Agriculture Sector Project Additional Financing (RRP NEP 33209) SECTOR ASSESSMENT (SUMMARY): IRRIGATION 1. Sector Performance, Problems, and Opportunities 1. Agriculture is
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. RY-Second Vocational Training Project
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE RY-Second Vocational
More informationPROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No. PIDC Sindh Jobs and Competitiveness Program
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No. PIDC0147966 Program
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3028 Project Name
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3028 Project Name BR Santos
More informationSECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1
Country Partnership Strategy: Pakistan, 2015 2019 SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1.
More informationBuilding Blocks and Strategies for Agriculture Water Management Policy Lessons from Modernization Programmes in Asia
1 of 40 Building Blocks and Strategies for Agriculture Water Management Policy Lessons from Modernization Programmes in Asia About the FAO Policy Learning Programme This programme aims at equipping high
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5167 Project Name. Agricultural Technology and Advisory Services Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5167 Project Name Agricultural
More informationEmerging issues in the implementation of Irrigation & Drainage sector reforms in Sindh, Pakistan
Emerging issues in the implementation of Irrigation & Drainage sector reforms in Sindh, Pakistan Junaid Alam Memon Assistant Professor Pakistan Institute of Development Economics Email: memon@pide.org.pk
More informationINDUS. Inclusive water governance
INDUS Inclusive water governance People in Pakistan are facing an increase in drought and floods, which results in more frequent water shortages. Particularly the food security and livelihoods of rural
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1916 Project Name. Business Environment Reform and Institutional Strengthening Region
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1916 Project Name Business Environment Reform and Institutional Strengthening Region EUROPE AND CENTRAL ASIA Sector General public administration
More informationProject Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6411 Additional Financing to the Poverty Alleviation Fund II
Project Name Region Sector PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6411 Additional Financing to the Poverty Alleviation Fund II Project ID Borrower(s) Implementing Agency Environment
More informationDr. Muhammad Ashfaq Dr. Ifran Ahmad Baig
Dr. Muhammad Ashfaq Dr. Ifran Ahmad Baig Sequence of Presentation Background and Existing Situation Consumption pattern Existing situation Future scenario Key issues Water efficiency Recommendations Background
More informationCreating Synergy and ADB s Water Policy
INTERNATIONAL WATER CONFERENCE Hanoi, Vietnam, October 14-16, 2002 Creating Synergy and ADB s Water Policy By: Pieter M. Smidt CREATING SYNERGY AND ADB S WATER POLICY Pieter M. Smidt 1 Water for All is
More informationProspectives and Limits of Groundwater Use in Pakistan
Prospectives and Limits of Groundwater Use in Pakistan International Waterlogging and Salinity Research Institute, Lahore, Pakistan Abstract Groundwater use in Pakistan has increased due to increased demand
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB959 Project Name. Amazonas: Regional Development Project Region
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB959 Project Name Amazonas: Regional Development Project Region LATIN AMERICA AND CARIBBEAN Sector Health (34%);Water Supply and Sanitation
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1050 Project Name. Brazil Municipal Lending Program I ( APL Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1050 Project Name Brazil
More informationIrrigation Policy, 2060
Irrigation Policy, 2060 Chapter- 1 1.1 BACKGROUND Realizing the pivotal role of irrigation in increasing agricultural production and productivity, Nepalese farmers have been traditionally investing in
More informationIssues in Rural Development and Agriculture
Issues in Rural Development and Agriculture A Presentation for the Public Expenditure Analysis and Management Course Csaba Csaki (RDV) May 22, 2002 Structure of Presentation New Framework: Revised Rural
More informationSINDH WATER RESOURCES MANAGEMENT ISSUES AND OPTIONS
FAO INVESTMENT CENTRE OCCASIONAL PAPER SERIES NO. 15 December 2003 PAKISTAN SINDH WATER RESOURCES MANAGEMENT ISSUES AND OPTIONS By A. Azad with contributions from: M. Aslam Rasheed and Yameen Memon FOOD
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Tsunami Disaster Recovery in India
Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Tsunami Disaster Recovery in India Report No.: AB1770 Region SOUTH ASIA Sector General agriculture, fishing and forestry sector (90%);Other
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3188 Project Name. Niger Agro-Pastoral Export and Market Development Project Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3188 Project Name Niger
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Report No.: AB5273 Project Name Water and Irrigation Sector Management Program 2 (WISMP 2) Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5273 Project Name Water
More informationAssociated Event : SDG 6 on Water and Sanitation
Associated Event : SDG 6 on Water and Sanitation Ir. (Dr.) Keizrul bin Abdullah Chairperson, Network of Asian River Basin Organizations (NARBO) The Role of River Basin Organizations (RBOs) in Fostering
More informationSector: General water, sanitation and flood protection sector (55%); Pollution Control and Waste Management (45%) Project ID
Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6680 GEF Huai River Basin Marine Pollution Reduction Project Region EAST ASIA AND PACIFIC Sector Sector: General water, sanitation
More informationProposed additional financing to the Kingdom of Cambodia for the Tonle Sap Poverty Reduction and Smallholder Development Project
Document: EB 2017/LOT/P.20 Date: 17 November 2017 Distribution: Public Original: English E President s memorandum Proposed additional financing to the Kingdom of Cambodia for the Tonle Sap Poverty Reduction
More informationCAMBODIA S ROAD MAP FOR SUSTAINABLE DEVELOPMENT
CAMBODIA S ROAD MAP FOR SUSTAINABLE DEVELOPMENT The National Environment Strategy and Action Plan Cambodia s National Environment Strategy and Action Plan, 2016 2023 (NESAP) aims to ensure that environmental
More informationEFFICIENT AND SUSTAINABLE IRRIGATION-MANAGEMENT IN PAKISTAN
EFFICIENT AND SUSTAINABLE IRRIGATION-MANAGEMENT IN PAKISTAN Illahi B. Shaikh* ABSTRACT P akistan, with a Geographical area of 796,101 square kilometers, possesses large rivers, like Indus which, along
More informationProposed Results-Based Loan Republic of Indonesia: Integrated Participatory Development and Management of Irrigation Program
Initial Poverty and Social Analysis Project Number: 43220 May 2016 Proposed Results-Based Loan Republic of Indonesia: Integrated Participatory Development and Management of Irrigation Program The views
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6559 Project Name. Arab World Initiative for Financing Food Security Region
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6559 Project Name Arab World Initiative for Financing Food Security Region MIDDLE EAST AND NORTH AFRICA Sector General agriculture, fishing
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Public Disclosure Authorized Report No. PID8331 Project Name Angola-Water Sector Development (*) Region Africa Sector Water Supply And Sanitation Project ID AOPE60512 Borrower(s) Government of Angola Public
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Barranquilla
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Barranquilla Flood Management Region LATIN AMERICA AND CARIBBEAN Sector Flood protection (100%) Project ID P120159 Borrower(s) COLOMBIA Implementing
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. GZ-Gaza II Emergency Water Project MIDDLE EAST AND NORTH AFRICA PLO FOR THE BENEFIT OF THE PA
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE GZ-Gaza II Emergency
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1881 Project Name. West Africa Regional Biosafety Project Region
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1881 Project Name West Africa Regional Biosafety Project Region AFRICA Sector Crops (50%); Agro-industry (50%) Project ID P096058 GEF Focal
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3758 Project Name. Senegal SLM supplemental to PSAOP2 Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3758 Project Name Senegal
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Report No. PID5987 Project Name Turkey-Sanliurfa and Harran Plains (+)... Onfarm and Village Development Project Region Sector Project ID Borrower Europe and Central Asia Agriculture and Rural Development
More informationIndonesia-Lombok Poverty Alleviation and... Environmental Infrastructure Project
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency Regional Dev. &
More informationMuscat Declaration on Water adopted by the First Ministerial Forum on Water of the Group of 77 Muscat, Sultanate of Oman, February 2009
Muscat Declaration on Water adopted by the First Ministerial Forum on Water of the Group of 77 Muscat, Sultanate of Oman, 23-25 February 2009 We, the Ministers in charge of water resources of the Member
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1853 Project Name
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1853 Project Name India Sustainable Land and Ecosystem Management Country Partnership Program Region SOUTH ASIA Sector Forestry (50%); Crops
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4343 Project Name. VIETNAM: Haiphong Urban Transport Project Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4343 Project Name VIETNAM:
More informationUNDP-Spain MDG Achievement Fund. Terms of Reference for Thematic Window on Environment and Climate Change
UNDP-Spain MDG Achievement Fund Terms of Reference for Thematic Window on Environment and Climate Change This document provides policy guidance to UN Country Teams applying for funding under the UNDP-Spain
More informationPresentation Transboundary water cooperation in Mekong Countries, key issues, challenges and intervention to address
Regional Workshop on Transboundary Water Cooperation in the context of the SDGs in South Asia and beyond Pokhara, Nepal 23-24 May 2017 Presentation Transboundary water cooperation in Mekong Countries,
More informationan Asia and Pacific region free of poverty.
Strategy 2020 Strategy 2020 sets the vision of the Asian Development Bank (ADB) as an Asia and Pacific region free of poverty. ADB s mission is to help its developing member countries (DMCs) reduce poverty
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE CG - FCPF
More informationPolicies, Institutions & Climate Change: How Policy-Based Lending & Policy Dialogue can support Climate Change Response
Policies, Institutions & Climate Change: How Policy-Based Lending & Policy Dialogue can support Climate Change Response Christophe Crepin & Thu Thi Le Nguyen May 15, 2012 Second FAO/WB Expert Meeting Contents
More informationPolicies, Institutions & Climate Change: How Policy-Based Lending & Policy Dialogue can support Climate Change Response
Policies, Institutions & Climate Change: How Policy-Based Lending & Policy Dialogue can support Climate Change Response Christophe Crepin & Thu Thi Le Nguyen May 15, 2012 Second FAO/WB Expert Meeting Contents
More informationPROJECT INFORMATION DOCUMENT (PID) AFTER PCN REVIEW Report No.: Project Name. Sustainable Management of Mineral Resources.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) AFTER PCN REVIEW Report No.: 36720 Project Name Sustainable
More informationMinistry of Public Works
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name CEMAC - Transport-Trade Facilitation Region AFRICA Sector General transportation sector (100%) Project ID P079736 Borrower(s) Implementing
More informationIntroducing A Framework For National Water Sector Apex Bodies To Assess Their Effectiveness 1
Introducing A Framework For National Water Sector Apex Bodies To Assess Their Effectiveness 1 I. Abstract 1. National water sector apex bodies have been established in several countries in Asia to guide
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5136 Project Name
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5136 Project Name Luhri Hydro Electric Project Region SOUTH ASIA Sector Power (50%); Renewable energy (50%) Project ID P102843 Borrower(s)
More informationSECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1
Country Partnership Strategy: People s Republic of China, 2016 2020 SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1 Sector Road Map A. Sector Performance, Problems,
More informationTowards an Efficient Water Management for a Sustainable Development of Water Resources in Egypt
DEPARTMENT OF ECONOMIC AND SOCIAL AFFAIRS STATISTICS DIVISION UNITED NATIONS User-Producer Conference on Water Accounting for Integrated Water Resource Management Voorburg, the Netherlands 22-24 May 2006
More informationBorrower IDA Credit Arab Republic of Egypt. Principal Bank for Development and. Agricultural Credit (PBDAC) Contact Dr. Hassan Khedr, Chairman,
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID7086 Project Name Egypt-Private Sector and Agricultural (+) Development
More informationSummary - Project/Program Concept Note for the Use of Additional PPCR Resources. XPCRTJ040A SPCR endorsement date: 10 November 2010
PILOT PROGRAM FOR CLIMATE RESILIENCE Summary - Project/Program Concept Note for the Use of Additional PPCR Resources 1. Country/Region: Tajikistan 2. CIF Project ID#: XPCRTJ040A ---- -- 3. SPCR endorsement
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB972 Project Name. Brasilia Environmentally Sustainable Pro Region
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB972 Project Name Brasilia Environmentally Sustainable Pro Region LATIN AMERICA AND CARIBBEAN Sector General water, sanitation and flood protection
More informationPROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC118305
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC118305 Program
More informationUnderstanding the Laws of the Kabul River Basin. Ahmad Rafay Alam Saleem, Alam & Co.
Understanding the Laws of the Kabul River Basin Ahmad Rafay Alam Saleem, Alam & Co. Map of the Indus Basin Afghan Rivers and Indus Basin Rivers Schematic Diagram of the Kabul River Sub-basins in Afghanistan
More informationIWRM best practices in the 4-Ps Pilot Basin - towards Integrated River Basin Management
i KINGDOM OF CAMBODIA Nation Religion King IWRM best practices in the 4-Ps Pilot Basin - towards Integrated River Basin Management contributed to International Conference on WATERSHED MANAGEMENT: "From
More informationMINISTÈRE DES AFFAIRES ÉTRANGÈRES ET EUROPÉENNES 20 December /5 6th World Water Forum Ministerial Process Draft document
MINISTÈRE DES AFFAIRES ÉTRANGÈRES ET EUROPÉENNES 20 December 2011 1/5 6th World Water Forum Ministerial Process Draft document 1. We the Ministers and Heads of Delegations assembled in Marseille, France,
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5812 Project Name. Vietnam Industrial Pollution Control Project Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5812 Project Name Vietnam
More informationSINDH IRRIGATION & DRAINAGE AUTHORITY INTEGRATED SOCIAL & ENVIRONMENTAL ASSESSMENT (ISEA) FOR WATER SECTOR IMPROVEMENT PROJECT (WSIP-I)
OSMANI & CO. (PVT.) LTD., Consulting Engineers Architects Planners SINDH IRRIGATION & DRAINAGE AUTHORITY INTEGRATED SOCIAL & ENVIRONMENTAL ASSESSMENT (ISEA) FOR WATER SECTOR IMPROVEMENT PROJECT (WSIP-I)
More informationRice Value Chain development : Guiding principles from Asia
Rice Value Chain development : Guiding principles from Asia Guidance for breakouts sessions Policy tools What are the key policies, laws, regulations and standards that ensure delivery of rice of certain
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1901 Project Name. ET- Electricity Access Expansion (FY06) Region
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1901 Project Name ET- Electricity Access Expansion (FY06) Region AFRICA Sector Power (100%) Project ID P097271 Borrower(s) FEDERAL DEMORACTIC
More information4 th India Water Week & 1 st Indian Irrigation Forum 7 April 2016, New Delhi
4 th India Water Week & 1 st Indian Irrigation Forum 7 April 2016, New Delhi 4/19/2016 1 By 2050, global water withdrawals are projected to increase by 55% due to growing demands from manufacturing (400%),
More informationSECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES 1
Country Partnership Strategy: Philippines, 2011 2016 SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES 1 A. Sector Performance, Problems, and Opportunities 1. Sector importance and growth
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. AFRICA General water, sanitation and flood protection sector (40%); General Sector
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Tana Beles Integrated
More informationINTEGRATED WATER RESOURCES MANAGEMENT ROAD MAP
Karnataka Integrated and Sustainable Water Resources Management Investment Program (RRP IND 43253) INTEGRATED WATER RESOURCES MANAGEMENT ROAD MAP 1. Integrated River Basin Management Activities to improve
More informationIn light of the above, this project is evaluated to be satisfactory.
Islamic Republic of Pakistan Ex-Post Evaluation of Japanese ODA Loan National Drainage Program Project Evaluator: Juichi INADA, Waseda University/Senshu University 0.Summary The projects objectives are
More informationPro-Poor Interventions in Irrigated Agriculture in Andhra Pradesh
Pro-Poor Interventions in Irrigated Agriculture in Andhra Pradesh C. Sithapathi Rao * IRRIGATION IN ANDHRA PRADESH Andhra Pradesh (AP) is the fifth largest State in India with a geographical area of 2.75
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3692 Project Name. CM PRG for Kribi Gas to Power Project (FY09) Region
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3692 Project Name CM PRG for Kribi Gas to Power Project (FY09) Region AFRICA Sector Power (100%) Project ID P110177 Borrower(s) REPUBLIC OF
More informationComponent 1: Building Climate Resilience of Watersheds in Mountain Eco-Regions
Component 1: Building Climate Resilience of Watersheds in Mountain Eco-Regions Rationale The Project will support the implementation of the Strategic Program for Climate Resilience (SPCR) which has been
More informationPakistan: National Drainage Sector Project
Validation Report Reference Number: PCV: PAK 2008-53 Project Number: 28266 Loan Number: 1413 November 2008 Pakistan: National Drainage Sector Project Operations Evaluation Department ABBREVIATIONS ADB
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6558 Project Name. Danang Sustainable City Development Project (SCDP) Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6558 Project Name Danang
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Africa Sector Project ID Borrower(s) Implementing Agency Environment
More informationPROJECT INFORMATION DOCUMENT (PID) Tanzania: Additional Financing to the Agricultural Sector Development Project Stage: Appraisal
Project Name Region Country Sector(s) Lending Instrument Project ID Borrower(s) Implementing Agency PROJECT INFORMATION DOCUMENT (PID) Tanzania: Additional Financing to the Agricultural Sector Development
More informationNational Drainage Program Project in Pakistan
National Drainage Program Project in Pakistan IRN Comment on the Inspection Panel Report and the Management Response Prepared by Ann Kathrin Schneider, International Rivers Network, email: akschneider@irn.org,
More informationDocument of The World Bank
Public Disclosure Authorized Document of The World Bank Report No: 22098-PAK Public Disclosure Authorized Public Disclosure Authorized PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT IN THE AMOUNT OF SDR
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5983 Project Name. Flood Prevention and Drainage Project Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5983 Project Name Flood
More informationIntegrated Water Resource Management: Water Security
Integrated Water Resource Management: Water Security Asma Younas, PhD Principal Scientific Officer, UNESCO Chair on Knowledge Systems for IWRM, Pakistan July 10, 2017 Overview Water Security An Emerging
More informationImplementation Status & Results India Uttar Pradesh Water Sector Restructuring Project (P050647)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Uttar Pradesh Water Sector Restructuring Project (P050647) Operation Name: Uttar Pradesh Water
More informationADB s Water Policy and the Need for National Water Sector Apex Bodies 1
ADB s Water Policy and the Need for National Water Sector Apex Bodies 1 Introduction ADB is pleased to support the first Regional Meeting of National Water Sector Apex Bodies in Asia, organized in collaboration
More information