Tajikistan: Agriculture Rehabilitation Project

Size: px
Start display at page:

Download "Tajikistan: Agriculture Rehabilitation Project"

Transcription

1 Performance Evaluation Report Tajikistan: Agriculture Rehabilitation Project Independent Evaluation

2 Performance Evaluation Report November 2014 Tajikistan: Agriculture Rehabilitation Project This document is being disclosed to the public in accordance with the Asian Development Bank s Public Communications Policy Reference Number: PPE: TAJ Project Number: Loan Number: 1980 Independent Evaluation: PE-773

3 NOTES (i) (ii) In this report, $ refers to US dollars. For an explanation of rating descriptions used in ADB evaluation reports, see ADB Guidelines for Preparing Performance Evaluation Reports for Public Sector Operations. Manila. Director General Director Team leader Team members V. Thomas, Independent Evaluation Department (IED) B. Finlayson, Independent Evaluation Division 2, IED S. Palle Venkata, Evaluation Specialist, IED M.J. Dimayuga, Senior Evaluation Officer, IED E. Li-Mancenido, Associate Evaluation Analyst, IED M. Fortu, Senior Evaluation Assistant, IED C. Regodon, Administrative Assistant, IED The guidelines formally adopted by the Independent Evaluation Department on avoiding conflict of interest in its independent evaluations were observed in the preparation of this report. To the knowledge of the management of the Independent Evaluation Department, there were no conflicts of interest of the persons preparing, reviewing, or approving this report. In preparing any evaluation report, or by making any designation of or reference to a particular territory or geographic area in this document, the Independent Evaluation Department does not intend to make any judgments as to the legal or other status of any territory or area.

4 Abbreviations ADB Asian Development Bank EIRR economic internal rate of return FGD focus group discussion FMU farm machinery unit FOB free on board ha hectare IEM independent evaluation mission IWRM integrated water resources management M&E monitoring & evaluation MOA Ministry of Agriculture MOF Ministry of Finance MWRLR Ministry of Water Resources and Land Reclamation O&M operation and maintenance PCR project completion report PIU project implementation unit PMO project management office PPER project performance evaluation report PVR PCR validation report PWS potable water supply SERF shadow exchange rate factor TA technical assistance WSC water and sanitation council WUA water users association Currency Equivalents Currency Unit somoni (TJS) At Appraisal At Project Completion At Evaluation (22 February 2002) (20 October 2010) (22 April 2013) TJS1.00 = $0.339 $0.228 $0.210 $1.00 = TJS2.953 TJS4.382 TJS4.770

5 Contents Acknowledgements Basic Data Executive Summary v vii ix Chapter 1: Introduction 1 A. Project Description and Expected Results 1 B. Evaluation Purpose and Process 2 Chapter 2: Design and Implementation 4 A. Formulation 4 B. Rationale 4 C. Cost, Financing, and Executing Arrangements 5 D. Procurement, Construction, and Scheduling 5 E. Design Changes 6 F. Outputs 6 G. Consultants 9 H. Loan Covenants 9 I. Policy Framework 9 Chapter 3: Performance Assessment 12 A. Overall Assessment 12 B. Relevance 12 C. Effectiveness 13 D. Efficiency 14 E. Sustainability 14 Chapter 4: Other Assessment 16 A. Impact 16 B. Asian Development Bank Performance 17 C. Borrower and Executing Agency Performance 17 D. Technical Assistance 17 Chapter 5: Issues, Lessons, and Follow-Up Actions 19 A. Issues 19 B. Lessons 19 C. Follow-Up Actions 20 Appendixes 1. Evaluation Methodology Project Costs and Contract Awards Project Framework and Achievements Rehabilitation of Irrigation and Drainage Systems Water Supply Status of Compliance With Loan Covenants Socioeconomic and Environment Indicators Economic Analysis 43

6 Acknowledgements This performance evaluation report for the Agriculture Rehabilitation Project in Tajikistan was prepared by a team led by Srinivasan Palle Venkata, Evaluation Specialist, Independent Evaluation Department (IED), under the supervision of Bob Finlayson, Director, Division 2, IED, and guidance of Vinod Thomas, Director General, IED. The report was prepared with support from Ma. Juana Dimayuga, Elizabeth Li- Mancenido, Myrna Fortu, and Charina Regodon. Clarence Dingcong, consultant, assisted with the analysis and the preparation of the report. Peer reviewers Andrew Brubaker, Toshiyuki Yokota, and Karl Hughes provided valuable comments to strengthen the report. The team is grateful to Asian Development Bank staff and Government of Tajikistan officials for their assistance and participation in the interviews. IED retains full responsibility for this report.

7 Basic Data Loan 1980-Tajikistan: Agriculture Rehabilitation Project Item Appraisal Estimate ($ million) Actual ($ million) Total project cost Foreign exchange cost ADB loan amount/utilization Mission Key Dates Loan negotiations November 2002 Board approval 18 December 2002 Loan signing 2 May 2003 Loan effectiveness 14 August 2003 First disbursement 22 October 2003 Loan closing 20 October 2010 Borrower Executing Agency Republic of Tajikistan Ministry of Water Resources and Land Reclamation Mission Data Type of Mission Number of Missions Number of Person-Days Consultation 1 4 Appraisal waived Inception mission 1 52 Loan review Project completion 2 24 Independent evaluation 1 6 Project Performance Report Ratings Implementation Period Development Objectives Implementation Progress 9 21 April 2003 Satisfactory Satisfactory 22 April June 2003 Satisfactory Satisfactory 24 June December 2004 Satisfactory Satisfactory 22 December August 2005 Satisfactory Satisfactory 25 August November 2007 Satisfactory Satisfactory 1 December January 2008 Satisfactory Satisfactory 1 February December 2008 Satisfactory Highly satisfactory 22 December April 2009 Satisfactory Highly satisfactory 1 May September 2009 Satisfactory Highly satisfactory ADB = Asian Development Bank. Source: Asian Development Bank database.

8 Executive Summary On 18 December 2002, the Asian Development Bank (ADB) approved a loan of $35 million from its Special Fund resources to the Government of Tajikistan for the Agriculture Rehabilitation Project. The project s objectives were (i) to reduce poverty and improve living conditions of farming communities in the project area, and (ii) to institute measures to sustain the benefits of improvements under the project. These objectives were to be achieved through (i) enhanced crop yields brought about by improved irrigation and drainage as a result of infrastructure improvements; (ii) improved access to potable water, which improves health conditions; (iii) capacity building of water users associations (WUAs) and water sanitation councils (WSCs); and (iv) transfer of management of the irrigation, drainage, and potable water systems to the beneficiaries after they are adequately trained to manage them. The project had four components: (i) agricultural support services for dehkan farms (privately managed farms) in the form of farm demonstrations on soil fertility and crop husbandry, promotion of improved seeds, and establishment of farm machinery units (FMUs); (ii) rehabilitation of irrigation and drainage systems covering about 85,000 hectares (ha), and related institutional support; (iii) improvement of potable water supply (PWS) systems within designated areas, to serve 87,000 beneficiaries who did not have a safe source of water; and (iv) project management, monitoring, and evaluation. A. Project Outputs Agricultural support for dehkan farms. During project implementation, eight demonstration farms of 10 ha each were established for soil and seed improvement and crop husbandry trials. The demonstration farms and training provided to farmers helped increase farm productivity, and increased the knowledge of farmers on improved farm technologies, diversified cropping, and better use of land. However, the envisaged continued provision of farm demonstrations after project completion was not realized. The assistance provided to dehkan farms was limited to the duration of the project and no mechanism was put in place to ensure sustainability beyond the life of the project. The demonstration farms and support services to dehkan farms ceased after the project was completed. As envisaged at appraisal, three FMUs were established. Subsidiary loan agreements of $1 million each were made with the Ministry of Finance (MOF) to each of the three FMUs. Initially, the demand for machinery services from dehkan farms was adequate for FMUs to repay their loans on time. However, the increased availability of leased agricultural farm equipment and machinery to farmers decreased the demand for FMU services. Farmers began to have the option to lease more modern, mobile, and relatively cheaper equipment. Over time, FMUs were not able to generate sufficient revenues to recover costs, resulting in failure to pay their loans on time. The FMUs,

9 x Tajikistan: Agriculture Rehabilitation Project however, succeeded in encouraging farmers to use machinery and also in developing a private rental market for such equipment. Rehabilitation of irrigation and drainage systems. The project fully rehabilitated the irrigation and drainage facilities of three major systems comprising: (i) the Khojabakirgan irrigation system in B Gafurov and J Rasulov districts of Sughd region; (ii) the Vakhsh irrigation system in Bokhtar, Vakhsh, and Kolkhozabad districts of Kurgan- Tyube Zone in Khatlon province; and (iii) the Kyzylsu-Yakhsu irrigation system in Vose District of Kulyab region. The construction and rehabilitation undertaken by the project met the target of providing a steady supply of irrigation water to about 85,000 ha of land. In terms of outreach, the target of 471,000 beneficiaries reached by the improved irrigation and drainage system was met, as project areas were rehabilitated as expected at appraisal. Following the rehabilitation of irrigation infrastructure the average yields of cotton increased from about 1.9 tons/ha to 2.7 tons/ha, exceeding the targets set at appraisal. However, total production of cotton in project areas declined and was not at the level expected at appraisal. The general decline in production of cotton was mainly due to the reduction in the area planted with cotton, as farmers diversified to more profitable crops. The government s policy of allowing farmers freedom in crop selection encouraged this diversification. Nonetheless, cotton and wheat continue to dominate the cropping pattern. In 2003, when the project started, the two crops together accounted for 93% of the area cultivated, and in 2008 it was 89%. During implementation, it was agreed with ADB that 20 WUAs rather than the 30 originally agreed would be established in five districts to better reflect hydrological factors such as the borders of irrigation and command areas, and the boundaries of administrative units. As of the end of December 2012, the number of WUAs in project areas rose to 36 as a result of government s continued efforts to transfer management of irrigation and drainage systems to beneficiaries. To build institutional capacity in water management, 15 water resource management agencies within the Ministry of Water Resources and Land Reclamation (MWRLR) were supported with equipment and vehicles. Annual training was also conducted during on the promotion of water resources management to build the capacity of these agencies. Improvement of water supply systems. The water supply infrastructure constructed in selected communities of five districts expanded the area covered by the water supply distribution network, increasing the number of beneficiaries. At project completion, the estimated number of people reached by the improved water supply was 180,546 higher than the appraisal estimate of 87,000. Seven WSCs were established to manage and operate the delivery of potable water to these beneficiaries. The project provided further support to sanitary and epidemiological stations of the Ministry of Health in the five districts through building refurbishment and provision of office and laboratory equipment. Project management, monitoring, and evaluation. As envisaged in the project design, the project management office (PMO), three project implementation units (PIUs), and a high-level project steering committee were established. A monitoring and evaluation (M&E) unit was established within the PMO to monitor the environmental and social impact of the project. The program of environmental monitoring and social impact assessment was developed for the project implementation period and did not continue after project completion.

10 Executive Summary xi B. Performance Assessment The project is rated successful overall. The objectives of improving living conditions in project areas and instituting measures such as WUAs and WSCs to sustain the benefits derived from the project were largely met. The project contributed to an increase in incomes, reduced waterborne diseases, and provided greater access to safe drinking water. The project was rated relevant. At appraisal, the project was relevant to the stated objectives of the government and ADB, namely poverty reduction in the project areas. It addressed the needs of rehabilitating the irrigation systems and restructuring agriculture through privatization. The construction of PWS systems addressed the need for increasing access to safe drinking water, reducing waterborne diseases, and improving living conditions in the project areas. The project design was adequate in addressing the key constraints of defective irrigation, poor water resource management, limited agricultural support services, and lack of access to potable water in the project areas. The financing instrument comprising a loan from ADB Special Fund resources and a technical assistance (TA) grant to support the resolution of accumulated farm debt was appropriate. The project was rated effective in achieving the expected outcomes. It improved the living conditions of farming communities in the project area and implemented measures to sustain the project benefits. Average monthly nominal wages in the project area steadily increased from TJS32 in 2003 to TJS195 in The rehabilitation of irrigation and drainage systems increased yields of cotton by about 34% and wheat yields by 31%. Real farm income increased by 44% for cotton and 41% for wheat. The improvement in PWS significantly reduced the incidence of waterborne diseases. Between 2004 and 2009, reported cases of malaria fell by 96%, acute intestinal disease by 78%, typhoid fever by 55%, and hepatitis by 15%. As of the end of December 2012, safe drinking water was made available to 198,600 people, substantially higher than the 87,000 target set at appraisal. WUAs and WSCs were established as envisaged. Prior to the project the area had no WUAs and WSCs. The creation of these institutions empowered the beneficiary communities to manage irrigation and potable water supplies, organize water distribution, and arrange operation and maintenance (O&M) of their systems. These institutions have remained operational and continued to collect fees from members for O&M. This is likely to sustain the benefits of the rehabilitated irrigation and potable water systems. The introduction of FMUs has been effective in encouraging the use of farm machinery, by stimulating market entry and reducing the costs of leased farm equipment. This resulted in a decline in demand for the services of FMUs. The demonstration farms were beneficial to dehkan farms but no mechanism was put in place to sustain these benefits beyond the life of the project. Sustaining the services provided by the demonstration farms to dehkan farms would have entailed additional operation and management costs. The project was rated efficient in terms of the benefits achieved relative to the costs incurred. The economic internal rate of return (EIRR) was calculated at 18%, indicating efficient use of resources in achieving the outcome. The positive net present value at a discount rate of 12% indicates economic viability. This re-estimated EIRR is much lower than the EIRR of 22.9% estimated at appraisal and is also lower than the

11 xii Tajikistan: Agriculture Rehabilitation Project EIRR calculated by the project completion report (19%). It should be noted, however, that the re-estimated EIRR included the economic value of PWS benefits, which was not the case at appraisal. If the benefits are limited only to irrigation, the re-estimated EIRR drops to 15.84%; however, this would still mean the project is efficient. In terms of efficiency of process, the project is rated less than efficient. Deployment of staff for the PMO and PIUs was delayed, which in turn delayed the recruitment of implementation consultants for civil works. Consequently, the implementation of the civil works was delayed by about 2 years. The delay in implementation start-up also had an effect on the other components. The work on agricultural support for dehkan farms was 12 months behind schedule, while delays in the construction of water supply systems ranged from 15 to 30 months. The project outcomes are less than likely sustainable. Proper maintenance has been carried out by the MWRLR on project infrastructure in primary and secondary systems. However, the capacity of WUAs for effective O&M of tertiary systems has been constrained by the insufficiency of fees collected from dehkan farms to cover costs of maintenance, and the lack of adequate equipment and machinery. As a result, WUAs generally have been unable to properly maintain tertiary systems. The sustainability of the demonstration farms is unlikely as many of these farms have been distributed by the government to the rural population and no longer provide services to dehkan farms. Further, support for the management, operation, and maintenance of these farms was not continued after project completion. The project had a significant socioeconomic impact. The expected impact of the project was poverty reduction in the project areas, from 88% at project appraisal to 43% at project completion. The incidence of poverty using the national poverty line fell from 88% at appraisal (2002) to an average of 41% in 2008 for the five project districts, indicating that the expected impact on poverty was realized. At the national level, the poverty headcount ratio fell from 72.4% in 2003 to 47.2 in Outcomes could not be monitored beyond the project duration as the M&E system established within the MWRLR was discontinued after the PMO was closed. The institutional impact of the project was significant. The project facilitated the creation of WUAs and WSCs, which were nonexistent in the irrigation schemes prior to rehabilitation. The institutional capacity of the MWRLR was strengthened through: support for national and local networks for the establishment and expansion of WUAs, training on water resource management, and provision of equipment and vehicles. The project had no adverse effects on the environment. C. Issues The capacity of WUAs to properly maintain and operate tertiary systems is limited by the water user fees collected from dehkan farms. O&M of the irrigation systems by the WUAs and expansion on a sustainable basis, is only possible if sufficient revenues are generated to fully cover the cost of equipment, machinery, and manpower. Although cotton farming is economically profitable, given the high world price of cotton, financial viability becomes an issue as the farm gate price of cotton tends to be low. Levying of export taxes by the government and lack of competition due to market distortions, such as local government control on the movement of cotton, tends to decrease the prices received by farmers, affecting their profits. This in turn affects the farmers ability to pay user charges for water. Institutional reforms are also needed to strengthen the WUAs capacity to allocate water more efficiently and collect user charges more effectively.

12 Executive Summary xiii The FMUs are unlikely to be sustainable as their profitability has declined due to the increased availability of modern machinery and equipment through lease. As a result, their ability to repay their loans to the MOF on time is doubtful. D. Lessons and Follow-Up Actions The lessons identified are as follows: (i) (ii) (iii) If mechanisms were incorporated in the project design for sustaining farm demonstration units beyond the project life, agricultural extension services could have been provided to dehkan farms on an ongoing basis; Measures for achieving full cost recovery in a phased manner should have been identified early in the implementation process so that sustainable O&M of tertiary systems by the WUAs was possible; Establishing a permanent M&E system within the MWRLR and not just for the implementation period could have provided project-specific data for evaluating long-term outcomes. The follow-up actions to consider are: (i) (ii) monitor closely cost-recovery measures for sustainable O&M of tertiary systems, and also the MWRLR s maintenance of primary and secondary systems; discuss with the MOF options to privatize the FMUs, since they have served their purpose of introducing agricultural mechanization to farmers and catalyzing a lease market for machinery.

13 CHAPTER 1 Introduction A. Project Description and Expected Results 1. On 18 December 2002, the Asian Development Bank (ADB) approved a loan of $35 million from its Special Fund resources to the Government of Tajikistan for the Agriculture Rehabilitation Project. 1 The project was expected to reduce poverty in four project area districts. The expected outcomes were (i) improvement in living conditions of farming communities in the project area, and (ii) instituted measures to sustain the benefits of improvements made under the project. These were to be achieved through (i) enhanced crop yields brought about by improved irrigation and drainage as a result of infrastructure improvements; (ii) access to improved potable water, which will reduce efforts in fetching water and improve health conditions; (iii) capacity building of water resources institutions, and organization and training of water users associations (WUAs) and water sanitation councils (WSCs); and (iv) transfer of management of the irrigation, drainage, and potable water systems to the beneficiaries after they are adequately trained to manage them. 2. The project area comprised three major irrigation systems: (i) (ii) (iii) Khojabakirgan irrigation system in B Gafurov and J Rasulov districts of Sughd region; Vakhsh irrigation system in Bokhtar, Vakhsh, and Kolkhozabad districts of Kurgan-Tyube Zone in Khatlon region; Kyzylsu-Yakhsu irrigation system in Vose District of Kulyab region. 3. The project had four components: (i) agricultural support for dehkan 2 farms that included farm demonstrations on soil fertility and crop husbandry, promotion of improved seeds, and establishment of farm machinery units (FMUs); (ii) rehabilitation of irrigation and drainage systems covering about 85,000 ha, and related institutional support; (iii) improvement of potable water supply (PWS) systems within designated areas to serve 87,000 beneficiaries who did not have a safe source of water; and (iv) project management, monitoring, and evaluation. 1 ADB Report and Recommendation of the President to the Board of Directors: Proposed Loan and Technical Assistance Grant to Tajikistan for the Agriculture Rehabilitation Project. Manila. 2 Dehkan farms are privately managed farms, either individually or cooperatively, on state-owned land allocated to them by state authorities. Following the breakup of the Soviet Union, most of the collective farms in Tajikistan were converted to dehkan farms. The other types of farms in Tajikistan are enterprise farms resulting from the privatization of specialized state farms, and household/kitchen plots.

14 2 Tajikistan: Agriculture Rehabilitation Project B. Evaluation Purpose and Process 4. The purpose of the project performance evaluation was to: (i) assess the project s relevance, effectiveness, and efficiency in achieving its objectives and outputs, sustainability of outcomes, and impact; (ii) assess the performance of ADB, the executing agency, and implementing agencies; and (iii) identify key lessons for future ADB operations in the agriculture sector. 5. The project performance evaluation report (PPER) was based on a review of project documents and related material; discussions with ADB staff and with key informants during the independent evaluation mission (IEM); and data and information provided by the executing and implementing agencies. 3 Benefits to households were assessed based on information obtained from focus group discussions (FGDs) with project beneficiaries and data gathered from farms. Details on the methodology used for this evaluation are presented in Appendix 1. The PPER will feed into a bigger evaluation study, the country assistance program evaluation for Tajikistan in The project completion report (PCR) was prepared in December Overall, it rated the project successful. The project loan was rated relevant to the needs of restructuring agriculture through farm privatization and irrigation rehabilitation in the context of government and ADB poverty-reduction strategies. It was rated effective in achieving the expected outcomes of (i) improving living conditions in project area farming communities and (ii) instituting measures to sustain the benefits from improvements implemented under the project. The project was rated efficient by the PCR. The economic internal rate of return (EIRR) was estimated at 19%, indicating that the project was highly efficient and economically viable when assessed against an assumed opportunity cost of capital of 12%. However, the process was rated less efficient as delays in mobilizing consultants resulted in an almost 2-year delay in the physical implementation of the project. Lastly, the PCR rated the project less likely sustainable. While the Ministry of Water Resources and Land Reclamation (MWRLR) carried out maintenance on project infrastructure in primary and secondary systems, tertiary systems that were the responsibility of WUAs had little or no maintenance, due to a shortfall in the levy paid by farmers. 5 Further, the demonstration farms were rated less likely sustainable because farmers were less likely to pay to attend field days after project completion. 6 The PCR did not rate the impact of the project, but nonetheless assessed it as having a notable impact on living standards in the project areas. 7. The PCR validation report (PVR) conducted by the Independent Evaluation Department in October 2011 concurred with the PCR s successful, relevant, efficient, and less likely sustainable ratings of the project. 7 The PVR rated the project relevant in that it addressed poverty in the poorest part of the country and was consistent with government and ADB objectives. The project was rated effective in that the physical 3 The independent evaluation mission was fielded to Tajikistan on April ADB Completion Report: Agriculture Rehabilitation Project in Tajikistan. Manila. 5 Primary irrigation systems comprise the main or primary canal that taps water from a source such as lake or reservoir. Secondary structures are smaller canals that branch out from the main canal to distribute water to the tertiary canals, which are even smaller. It is the tertiary canals that irrigate the farmers fields. 6 Farmers operating the demonstration farms received support under the project and provided advice, but it was expected that the effort and costs of providing this service would eventually deter farmers from continuing to provide it for free. 7 Independent Evaluation Department Validation Report: Agriculture Rehabilitation Project in Tajikistan. Manila: ADB.

15 Introduction 3 targets were met for rehabilitation of irrigation and drainage infrastructure, expansion of the command area, and improvements to water supply systems. The PVR rated the project efficient although it noted a methodological error in the recalculation of the EIRR in the PCR. 8 The magnitude of benefits from the water supply component was not quantified, which would likely have resulted in a high EIRR. The sustainability of the project was rated less likely in view of the failure of WUAs to properly maintain the rehabilitated infrastructure, and the fact that farmers were unlikely assume the costs of operating the demonstration farms for free. The PVR rated the impact of the project substantial. 8 The PCR EIRR calculation was based on crop production only. No separate EIRR calculation was done for the potable water supply component, which resulted in significant economic benefits. Further, the PCR stated that the numeraire was the domestic price and a standard conversion factor was used for shadow pricing. The PVR pointed out that this was incorrect because traded goods should be adjusted by the shadow exchange rate factor when domestic price is the numeraire.

16 CHAPTER 2 Design and Implementation A. Formulation Improving the performance of irrigated agriculture required rehabilitating irrigation and drainage systems and implementing more efficient water management The project aimed to support the Government of Tajikistan in the rehabilitation of selected irrigation and draining facilities 8. At the time of appraisal in November 2002, the project was consistent with the government s rural development strategy that focused on (i) continuing the farm reorganization program, (ii) improving the efficiency of irrigation water use, (iii) developing a rural credit system, (iv) rehabilitating key irrigation facilities, and (v) implementing a poverty reduction program with a substantial agricultural component. The interim operational strategy for Tajikistan approved by ADB in 1998 was formulated prior to the Poverty Reduction Strategy of 2002, and thus did not have an explicit poverty focus. Nonetheless, the interim strategy for Tajikistan included agriculture as one of the key sectors for support. 9. The project was formulated by a technical assistance (TA) project carried out in February July The TA was built on the previously completed Agriculture Sector Assessment Project. 10 The formulation of the project addressed a key constraint to agricultural production by rehabilitating defective irrigation facilities. The other key constraints identified were poor water resource management, limited agricultural support services and lack of access to potable water in many rural communities. B. Rationale 10. At the time the project was formulated, agriculture in Tajikistan contributed about 20% of gross domestic product and provided a livelihood for 52% of the workforce (footnote 1). About 73% of the population lived in rural areas. Agricultural production depended on irrigation, without which the land had little production potential. Extensive irrigation systems, mostly built during the former Soviet era, covered nearly half of the country s relatively flat land. The irrigation and associated drainage systems rapidly deteriorated due to poor management during the civil war, and the lack of maintenance. Improving the performance of irrigated agriculture required rehabilitating irrigation and drainage systems and implementing more efficient water management. Accumulated debts were widespread across farms due to poor loan administration and a drop in the world price of cotton fiber. Widespread poverty, inefficiency of traditional farm structures, and weak fiscal capacity slowed the progress of agricultural reforms. The reform process needed to be expanded and deepened to restore farmers incentives, enhance the productivity and profitability of agriculture, and improve the living conditions of the rural population. 11. In this context, the project aimed to support the Government of Tajikistan in the rehabilitation of selected irrigation and draining facilities, provision of associated farm production support services, and construction of rural water supply in the main cotton production regions of Khatlon and Sughd. In parallel with these, the project 9 ADB Technical Assistance to Tajikistan for Agriculture Rehabilitation Project. Manila. 10 ADB Technical Assistance to Tajikistan for Agriculture Sector Assessment Project. Manila.

17 Design and Implementation 5 aimed to accelerate the agricultural reform process by building the capacity of public sector agencies and farmers organizations. C. Cost, Financing, and Executing Arrangements 12. The project cost was estimated at $43.75 million, comprising $24.43 million in foreign exchange costs and $19.32 million in local currency costs (Appendix 2, Table A2.1). It was to be financed by an ADB Special Fund loan of $35 million, government funds of $7 million, and contributions from beneficiaries of $1.75 million. The actual project cost was $49.97 million, comprising foreign exchange costs of $34.50 million, and local currency costs of $15.47 million. ADB financed $40.10 million, 11 the government $8.11 million, and the beneficiaries $1.76, mainly in the form of labor during construction and rehabilitation works. The emergency assistance to rehabilitate the Dehkanabad canal and reconstruct the embankment on the Pyanj River amounted to $7.94 million. Technical assistance of $960,000 was approved to provide advisory support to the project, of which $918,941 (96%) was utilized. 13. The implementation arrangements as proposed at appraisal were followed. The MWRLR was the executing agency, responsible for the overall management and implementation of the project. The Agriculture Academy of Sciences was responsible for implementing the subcomponent on farm demonstrations and promotion of improved seeds. A high-level project steering committee was established and functioned during project implementation to facilitate interministerial coordination and to provide oversight and guidance on implementation. A project management office (PMO) was established within the MWRLR to manage project activities on a daily basis, and to liaise with ADB and the coordinating bodies. Three project implementation units (PIUs), one in each project area, were set up for project implementation and maintaining liaison with the PMO, local administration, and beneficiary organizations. D. Procurement, Construction, and Scheduling 14. ADB Procurement Guidelines (2013, as amended from time to time) were followed in the procurement of goods and services. In total, 155 contracts were awarded amounting to $48.29 million (Appendix 2, Table A2.2). Of these, 78 civil works contracts worth $35.90 were awarded. Only one was awarded through international competitive bidding procedures, while the remaining 77 civil works contracts were awarded through national competitive bidding. Agricultural equipment costing $2.90 million was procured for use by the FMUs through international competitive bidding and shopping. Equipment, machinery and vehicles amounting to $5.8 million were procured by direct purchase, shopping, and limited international bidding. Contracts for consulting services amounted to $2.55 million. International competitive bidding was used to contract international consultants. 15. The schedule for project implementation was for 6 years, Loan effectiveness was slightly delayed to 14 August 2003 from the expected date of 31 July 2003, due to the time involved in obtaining the borrower s legal opinion. Deployment of staff was delayed for the PMO and PIU, which began to function fully only in mid- December This delayed consultant recruitment, which in turn delayed the implementation of civil works. Specifically, the rehabilitation of the Vakhsh irrigation scheme was delayed by 21 months, while for the Khojabakirgan scheme it was delayed 11 The increase in the dollar-denominated loans was due to the decline in the dollar special drawing right rate.

18 6 Tajikistan: Agriculture Rehabilitation Project Training was provided to 960 farmers on seeds selection, crop diversification, use of fertilizers, and on-farm water management The assistance provided to dehkan farms was limited to the duration of the project and no mechanism was set in place to ensure sustainability beyond the life of the project by 12 months. The rehabilitation of the Kyzylsu-Yakhsu scheme was on schedule, as it was not due until the third quarter of These delays caused further delays in the implementation of other components. The implementation of agricultural support for dehkan farms was 12 months behind schedule. As regards the component on improving PWS, the delays in constructing water supply systems ranged from 15 to 30 months. To compensate for the start-up delays, a revised implementation schedule was approved by ADB. Closing of the loan was scheduled for 30 September 2009, but a grace period of 3 months was allowed to ensure payments for expenditures incurred prior to the closing date. E. Design Changes 17. On 15 February 2006, a major change in scope was approved by ADB to reallocate loan proceeds to fund the emergency rehabilitation of the Dehkanabad canal in the Chubek irrigation system that was damaged by severe flooding in Khamadoni District. The flooding damaged about 600 homes, of which 148 were completely destroyed, and 16,000 people were evacuated. The supply of drinking water to the population was also interrupted. Specifically, the change in project scope included (i) rehabilitation of 10.4 kilometers (km) of the Dehkanabad canal and (ii) strengthening of 4.4 km of flood embankment along the Pyanj River. F. Outputs 18. The outputs of the four project components are discussed below. Appendix 3 presents the project framework and achievements. 1. Agricultural Support for Dehkan Farms 19. The component on agricultural support for dehkan farms was envisaged to promote improved farm technologies, establish demonstration farms, and to set up three FMUs. The Agricultural Academy of Sciences was the implementing agency for the subcomponents on farm demonstrations and promotion of improved seeds. During project implementation, eight demonstration farms of 10 ha each were established for soil and seed improvement and crop husbandry trials. 12 Training was provided to 960 farmers on seeds selection, crop diversification, use of fertilizers, and on-farm water management. The demonstration farms and training provided to farmers helped increased farm productivity, and increased farmers knowledge on improved farm technologies, diversified cropping, and better use of land. It was envisaged that the activities of the demonstration subprogram would continue after project completion. However, this was not realized. The assistance provided to dehkan farms was limited to the duration of the project and no mechanism was set in place to ensure sustainability beyond the life of the project. The demonstration farms and support services to dehkan farms ceased to operate after the project was completed. Most of the demonstration farms were later distributed to the population by the government As envisaged at appraisal, three FMUs were established. Subsidiary loan agreements of $1.0 million each were made with the Ministry of Finance (MOF) to each of the three FMUs, one in each project system. These FMUs were to provide farm 12 Three in Khojabakirgan, three in Vakhsh, and two in Kyzylsu-Yakhsu. 13 For example, a 439-ha demonstration farm in Vakhsh visited by the independent evaluation mission was distributed to individual and family dehkan farms after completion of the project.

19 Design and Implementation 7 machinery services to dehkan farms collecting service charges determined on a commercial basis, and were to become eligible for privatization once their loans from the MOF had been repaid. Initially, the demand for services was adequate for FMUs to repay their loans on time. However, the increased availability of leased agricultural farm equipment and machinery reduced the demand for FMU services. Farmers began to have the option to use more modern, mobile, and relatively cheaper equipment through lease agreements. Over time, FMUs were not able to generate sufficient revenues to recover costs, resulting in failure to pay their loans on time Rehabilitation of Irrigation and Drainage Systems 21. The project fully rehabilitated the irrigation and drainage facilities of three major systems comprising: (i) Khojabakirgan irrigation system in B Gafurov and J Rasulov districts of Sughd region, (ii) Vakhsh irrigation system in Bokhtar, Vakhsh, and Kolkhozabad districts of Kurgan-Tyube Zone in Khatlon region, (iii) the Kyzylsu-Yakhsu irrigation system in Vose district of Kulyab region. The construction and rehabilitation undertaken by the project met the target of providing a steady supply of irrigation water to 85,000 ha of land. As of the end of December 2012, the area covered by the three rehabilitated irrigation systems had increased to 93,000 ha (Appendix 4, Table A4.1). 22. In terms of outreach, the target of 471,000 beneficiaries reached by the improved irrigation and drainage system was met, as project areas were rehabilitated as expected at appraisal. As of the end of December 2012, the number of beneficiaries covered by the rehabilitated infrastructure had increased to 521,000 (Appendix 4, Table A4.1). 23. Following the rehabilitation of irrigation infrastructure, the average yields of cotton increased from about 1.9 tons/ha to 2.7 ton/ha, exceeding the targets of tons/ha set at appraisal. 15 However, total production of cotton in project areas declined and was not at the level expected at appraisal (Appendix 4, Figure A4.1). In the Khojabakirgan scheme total production fell from 52,800 tons in 2003 to 31,057 tons in 2011 (Appendix 4, Table 4.2). In Vakhsh, total production decreased from 69,681 tons in 2003 to 52,528 tons in In the Kyzylsu-Yakhsu scheme, total production also declined from 25,556 tons in 2003 to 19,323 tons in The general decline in production of cotton was mainly due to the reduction in area planted with cotton, as farmers diversified to more profitable crops. The government s policy of allowing farmers freedom in crop selection encouraged this diversification (paras ). In , there was an increasing trend in the production of crops other than cotton, such as wheat, cereals, vegetables, fruits, potatoes, melons and gourds in the five project districts (Appendix 4, Figures A4.1 A4.2). Nonetheless, cotton and wheat continue to dominate the cropping pattern. In 2003, when the project started, the two crops together accounted for 93% of the area cultivated, and in 2008 accounted for 89% The rehabilitation of the Dehkanabad canal and strengthening of the embankment along the Pyanj River was an emergency response to severe flooding in Following the rehabilitation of irrigation infrastructure, the average yields of cotton increased from about 1.9 tons/ha to 2.7 ton/ha, exceeding the targets of tons/ha set at appraisal 14 Repayment of loans was agreed over a 20-year period, to be made in semi-annual payments. As of April 2013, Khojabakirgan FMU made its last payment in September 2008, Vakhsh FMU in August 2010, and Kyzylsu-Yakhsu FMU in December Based on data derived from focus group discussions with farmers representing the three irrigation systems, and from the MWRLR. 16 Based on data derived from the government completion report, 2009.

20 8 Tajikistan: Agriculture Rehabilitation Project The number of WUAs in project areas rose to 36 on account of the government s continued efforts to transfer management of irrigation and drainage systems to beneficiaries The water supply infrastructure constructed in selected communities of five districts expanded the area covered by the water supply distribution network Khamadoni District and was not included as a component at appraisal. The physical targets for this assistance were met, in rehabilitating 10.4 km of the Dehkanabad canal and strengthening 4.4 km of flood embankment. 25. The project envisaged the establishment of 30 WUAs in six districts. During implementation, it was agreed with ADB that 20 WUAs rather than the 30 originally agreed would be established in five districts, to better reflect hydrological factors such as the borders of irrigation and command areas, and the boundaries of administrative units. These WUAs covered 327 dehkan farms totaling 42,620 ha and 304,700 farm household beneficiaries. 17 The WUA boards and staff were trained in WUA establishment, operation, financial management, and collection of fees. About 27% of the combined board membership of these WUAs was made up of women. As of the end of December 2012, the number of WUAs in project areas rose to 36 on account of the government s continued efforts to transfer management of irrigation and drainage systems to beneficiaries. To support operation and maintenance (O&M) of irrigation and drainage systems, WUAs collect fees from members based on the volume of water used, which includes a markup over the rate charged by the MWRLR to WUAs. On top of this, WUAs also charge a flat fee per hectare cultivated by farmer members. 26. To build institutional capacity in water management, 15 water resource management agencies within the MWRLR were supported with equipment and vehicles. 18 Yearly training was also conducted during on the promotion of water resources management, to build the capacity of these agencies. 3. Improvement of Water Supply Systems 27. The project aimed to improve PWS systems within the command areas of the designated irrigation systems, to serve 87,000 beneficiaries who did not have a safe source of water. The proposed works included the installation of 225 pumps for lifting groundwater in Vakhsh District. However, due to the high mineral content found in 80% of the groundwater, it was decided to rehabilitate the main water pipeline in Vakhsh, which used to supply water to most areas of southwest Vakhsh but had fallen into disrepair due to lack of maintenance. This extended the area supplied with potable water and increased the number of beneficiaries in Vakhsh District to 23,630 people from the target of 9,200 people. 28. The water supply infrastructure constructed in selected communities of five districts expanded the area covered by the water supply distribution network increasing the number of beneficiaries. At project completion, the estimated number of people reached by improved water supplies was 180,546, of which more than 66,000 were women. The number of beneficiaries is more than twice the appraisal estimate of 87,000 (Appendix 5, Table A5.1). Seven WSCs were established to manage and operate the delivery of potable water to these beneficiaries. The project provided further support to sanitary and epidemiological stations of the Ministry of Health in the five project districts through building refurbishment and provision of office and laboratory equipment. 17 Household members engaged in farming are considered members of their WUA. WUAs cover only areas where farms have been privatized. 18 Support for equipment included measurement devices, communication facilities, electrical equipment, and computers.

21 Design and Implementation 9 4. Project Management, Monitoring, and Evaluation 29. As envisaged in the project design, the PMO and three PIUs one in each of the three project areas were established on 13 May A high-level project steering committee chaired by the first deputy Prime Minister was established and functioned in providing policy guidance and facilitating interministerial coordination during implementation. The PMO was led by a project director and the PIUs by deputy project directors. 30. A monitoring and evaluation (M&E) unit was established within the PMO to monitor the environmental and social impact of the project. This monitoring program was developed for the project implementation period and was not continued after project completion. G. Consultants 31. ADB Guidelines on the Use of Consultants (2013, as amended from time to time) were used in the selection of consultants. A $2.5-million consulting services contract, including input of 87 international person-months and 1,862 national personmonths was awarded to Louis Berger Group (LBG) in June The consultants began to perform their duties in July In accordance with their contract, in September 2004, LBG subcontracted the design institute of Tojikgiprovodkhoz to conduct field surveys; prepare designs, drawings, and bills of quantities; and estimate the costs for the irrigation and drainage rehabilitation works. The institute provided experienced staff and adequate field equipment to carry out the tasks. As a result, consultants were not needed for this work and therefore the national consultant inputs were reduced by 154 person-months. To support the emergency flood rehabilitation works on the Dehkanabad canal 6.65 international person-months and national person-months of consulting services were added. At the completion of the contract, international person-months and 1, national person-months of consulting services had been utilized. The consultants demonstrated flexibility in adjusting the structure of consultancy inputs to the needs of the project and delivered satisfactory outputs. On the whole, the performance of the consultants was satisfactory. H. Loan Covenants 33. The covenants were relevant and were complied with except for one that is ongoing (Appendix 6). The ongoing covenant pertains to developing a program for the recovery of O&M costs of the irrigation and drainage systems on a phased basis over 10 years. The MWRLR sources funds for the O&M of primary and secondary systems from water charges and annual budgetary allocations. Without the budgetary allocations, the water charges are not sufficient to fully recover the cost of O&M. Likewise, WUAs rely on the markup over the rate charged by the MWRLR and on the flat fee charged per hectare cultivated by members. These have been inadequate to fully recover the cost of O&M. The consultants demonstrated flexibility in adjusting the structure of consultancy inputs to the needs of the project and delivered satisfactory outputs I. Policy Framework 34. The project was formulated within the context of the government s reform initiative to transform the agriculture sector into a competitive market-led economy.

Uzbekistan: Land Improvement Project

Uzbekistan: Land Improvement Project Validation Report August 2017 Uzbekistan: Land Improvement Project Reference Number: PVR-504 Project Number: 37536 Loan/Grant Numbers: 2245, 2246, and 0080 ABBREVIATIONS ADB Asian Development Bank DMF

More information

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1 Horticulture Value Chain Development (RRP UZB 47305) SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1 A. Sector Performance, Problems, and Opportunities 1. During 2010

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Irrigation Management Improvement Project (RRP BAN 45207) A. Approach and Methodology 1. Approach ECONOMIC AND FINANCIAL ANALYSIS 1. The economic and financial analysis of the Irrigation Management Improvement

More information

Krueng Aceh Irrigation Project

Krueng Aceh Irrigation Project Indonesia 1. Project Profile and Japan s ODA Loan Krueng Aceh Irrigation Project Report Date: March 2001 Field Survey: August 2000 Location Map of Project Area Headwork Constructed by this Project (1)

More information

SECTOR ASSESSMENT (SUMMARY): IRRIGATION. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): IRRIGATION. 1. Sector Performance, Problems, and Opportunities Community-Managed Irrigated Agriculture Sector Project Additional Financing (RRP NEP 33209) SECTOR ASSESSMENT (SUMMARY): IRRIGATION 1. Sector Performance, Problems, and Opportunities 1. Agriculture is

More information

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES Country Partnership Strategy: Tajikistan, 2016 2020 SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES Sector Road Map A. Sector Performance, Problems, and Opportunities 1. Context. Tajikistan

More information

Summary - Project/Program Concept Note for the Use of Additional PPCR Resources. XPCRTJ040A SPCR endorsement date: 10 November 2010

Summary - Project/Program Concept Note for the Use of Additional PPCR Resources. XPCRTJ040A SPCR endorsement date: 10 November 2010 PILOT PROGRAM FOR CLIMATE RESILIENCE Summary - Project/Program Concept Note for the Use of Additional PPCR Resources 1. Country/Region: Tajikistan 2. CIF Project ID#: XPCRTJ040A ---- -- 3. SPCR endorsement

More information

Minipe and Nagadeepa Irrigation Rehabilitation Project

Minipe and Nagadeepa Irrigation Rehabilitation Project Sri Lanka Minipe and Nagadeepa Irrigation Rehabilitation Project 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: September 2000 The Philippines Manila Cebu Project Site Map

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Community-Managed Irrigated Agriculture Sector Project Additional Financing (RRP NEP 33209) A. Approach and Methodology 1. Approach ECONOMIC AND FINANCIAL ANALYSIS 1. The economic analysis of the Community-Managed

More information

Proposed additional financing to the Kingdom of Cambodia for the Tonle Sap Poverty Reduction and Smallholder Development Project

Proposed additional financing to the Kingdom of Cambodia for the Tonle Sap Poverty Reduction and Smallholder Development Project Document: EB 2017/LOT/P.20 Date: 17 November 2017 Distribution: Public Original: English E President s memorandum Proposed additional financing to the Kingdom of Cambodia for the Tonle Sap Poverty Reduction

More information

ECONOMIC ANALYSIS. 2. Economic rationale. The investment program economic rationale is as follows:

ECONOMIC ANALYSIS. 2. Economic rationale. The investment program economic rationale is as follows: Urban Services Improvement Investment Program (RRP GEO 43405) ECONOMIC ANALYSIS 1. Methodology. The economic analysis for the Urban Services Improvement Investment Program followed the Guidelines for the

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 47181-002 September 2016 Proposed Loan, Grant, and Administration of Grant and Technical Assistance Grant Republic of

More information

ASIAN DEVELOPMENT BANK TAR: INO 32359

ASIAN DEVELOPMENT BANK TAR: INO 32359 ASIAN DEVELOPMENT BANK TAR: INO 32359 TECHNICAL ASSISTANCE (Cofinanced by the Japan Special Fund) TO THE REPUBLIC OF INDONESIA FOR PREPARING THE PARTICIPATORY IRRIGATION SECTOR PROJECT December 2001 CURRENCY

More information

Cambodia: Stung Chinit Irrigation and Rural Infrastructure Project

Cambodia: Stung Chinit Irrigation and Rural Infrastructure Project Validation Report Reference Number: PVR 185 Project Number: 29257 Loan Number: 1753 November 2012 Cambodia: Stung Chinit Irrigation and Rural Infrastructure Project Independent Evaluation Department ABBREVIATIONS

More information

Philippines: Electricity Market and Transmission Development Project

Philippines: Electricity Market and Transmission Development Project Validation Report Reference Number: PVR-310 Project Number: 36018 Loan Number: 1984 June 2014 Philippines: Electricity Market and Transmission Development Project Independent Evaluation Department ABBREVIATIONS

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Water Resources Management Sector Development Program (RRP CAM 38558) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. This document summarizes the economic and financial analyses of the core subprojects

More information

Summary of Preparatory Study for Development Study

Summary of Preparatory Study for Development Study Summary of Preparatory Study for Development Study Creation Date: 30 March 2007 1. Full title of the Project The Study for Sustainable Rural Drinking Water Supply in the Southern Khatlon Oblast in the

More information

ECONOMIC ANALYSIS. A. Introduction

ECONOMIC ANALYSIS. A. Introduction Shanxi Urban Rural Water Source Protection and Environmental Demonstration Project (RRP PRC 48274) ECONOMIC ANALYSIS A. Introduction 1. The economic analysis was conducted to assess the economic viability

More information

WORLD TRADE ORGANIZATION

WORLD TRADE ORGANIZATION WORLD TRADE ORGANIZATION Working Party on the Accession of the Republic of Tajikistan RESTRICTED 5 October 212 (12546) Original: English ACCESSION OF TAJIKISTAN Domestic Support and Export Subsidies in

More information

ECONOMIC ANALYSIS. Regional Upgrades of Sanitary and Phytosanitary Measures for Trade (RRP MON 46315)

ECONOMIC ANALYSIS. Regional Upgrades of Sanitary and Phytosanitary Measures for Trade (RRP MON 46315) Regional Upgrades of Sanitary and Phytosanitary Measures for Trade (RRP MON 46315) ECONOMIC ANALYSIS 1. This economic analysis of the Regional Upgrades of Sanitary and Phytosanitary Measures for Trade

More information

ASSESSMENT OF AGRICULTURE AND RURAL DEVELOPMENT

ASSESSMENT OF AGRICULTURE AND RURAL DEVELOPMENT CAPE Tajikistan, Linked Document 8 ASSESSMENT OF AGRICULTURE AND RURAL DEVELOPMENT A. Introduction 1. This report documents the findings of an assessment of the Asian Development Bank (ADB) support to

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Karnataka Integrated and Sustainable Water Resources Management Investment Program (RRP IND 43253) A. Background ECONOMIC AND FINANCIAL ANALYSIS 1. The Karnataka Integrated and Sustainable Water Resources

More information

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, and RUDAL DEVELOPMENT. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, and RUDAL DEVELOPMENT. 1. Sector Performance, Problems, and Opportunities Pehur High Level Canal Extension Project (RRP PAK 47024) SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, and RUDAL DEVELOPMENT Sector Road Map 1. Sector Performance, Problems, and Opportunities

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Amu Bukhara Irrigation System Rehabilitation Project (RRP UZB 44458) A. Approach and Methodology ECONOMIC AND FINANCIAL ANALYSIS 1. The output of the project, mainly reflected in the analysis is project

More information

Validation Report. Nepal: Crop Diversification Project. Independent Evaluation Department

Validation Report. Nepal: Crop Diversification Project. Independent Evaluation Department Validation Report Reference Number: PCV: NEP 2010-25 Project Number: 30228 Loan Number: 1778-NEP(SF) August 2010 Nepal: Crop Diversification Project Independent Evaluation Department ABBREVIATIONS A DB

More information

Report date: March 2001 Field survey: October Project Profile and Japan s ODA Loan

Report date: March 2001 Field survey: October Project Profile and Japan s ODA Loan Myanmar South Nawin Irrigation Project Report date: March 2001 Field survey: October 2000 1. Project Profile and Japan s ODA Loan Project site Site Map: Bago administrative division, Myanmar Irrigation

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY SECTOR ASSESSMENT (SUMMARY): ENERGY Country Partnership Strategy: Nepal, 2013-2017 A. Overview 1. Nepal has long recognized the development of its large hydropower potential as an important cornerstone

More information

People s Republic of China: Research on Innovative Mechanism for Open Agricultural Investment

People s Republic of China: Research on Innovative Mechanism for Open Agricultural Investment Technical Assistance Report Project Number: 50005-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Research on Innovative Mechanism for Open Agricultural Investment

More information

Mongolia: Ulaanbaatar Heat Efficiency Project

Mongolia: Ulaanbaatar Heat Efficiency Project Validation Report Reference Number: PVR 212 Project Number: 29629 Loan Number: 1548 December 2012 Mongolia: Ulaanbaatar Heat Efficiency Project Independent Evaluation Department ABBREVIATIONS ADB Asian

More information

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT Road Asset Management Project (RRP AFG 50062-001) Sector Road Map SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT 1. Sector Performance, Problems, and Opportunities 1. Background. Afghanistan s fragile and

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Greater Mekong Subregion East West Economic Corridor Agriculture Infrastructure Sector Project (RRP LAO 44138) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS 1. The Greater Mekong Subregion East West

More information

Bangladesh: Emergency Flood Damage Rehabilitation Project

Bangladesh: Emergency Flood Damage Rehabilitation Project Validation Report Reference Number: PCV: BAN 2009-16 Project Number: 38625 Loan Number: 2156-BAN (SF) December 2009 Bangladesh: Emergency Flood Damage Rehabilitation Project Independent Evaluation Department

More information

TECHNICAL ASSISTANCE

TECHNICAL ASSISTANCE TECHNICAL ASSISTANCE Additional Financing of Food and Nutrition Social Welfare Project (RRP MON 42322) A. Introduction 1. Background. The Government of Mongolia requested the Asian Development Bank (ADB)

More information

Agricultural reform in Uzbekistan

Agricultural reform in Uzbekistan Agricultural reform in Uzbekistan National team: Dildora Tadjibaeva Igor Pugach Yuliy Yusupov Zafar Berdinazarov Halle, Germany April 2015 www.iamo.de/agriwanet Total area - 448,978 square kilometer -

More information

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES 1

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES 1 Country Partnership Strategy: Philippines, 2011 2016 SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES 1 A. Sector Performance, Problems, and Opportunities 1. Sector importance and growth

More information

Integrated Participatory Development and Management of Irrigation Project (IPDMIP) Negotiated financing agreement

Integrated Participatory Development and Management of Irrigation Project (IPDMIP) Negotiated financing agreement Document: EB 2015/116/R.19/Sup.1 Agenda: 9(c)(i) Date: 15 December 2015 Distribution: Public Original: English E Republic of Indonesia Integrated Participatory Development and Management of Irrigation

More information

Proposed Results-Based Loan Republic of Indonesia: Integrated Participatory Development and Management of Irrigation Program

Proposed Results-Based Loan Republic of Indonesia: Integrated Participatory Development and Management of Irrigation Program Initial Poverty and Social Analysis Project Number: 43220 May 2016 Proposed Results-Based Loan Republic of Indonesia: Integrated Participatory Development and Management of Irrigation Program The views

More information

Social Safeguard Due Diligence Report

Social Safeguard Due Diligence Report Water Resource Management in Pyanj River Basin (RRP TAJ 47181) Supplementary Document 19 Social Safeguard Due Diligence Report Document Stage: Draft Project Number: 47181-002 September 2016 Republic of

More information

Pakistan: Bahawalpur Rural Development Project

Pakistan: Bahawalpur Rural Development Project Validation Report Reference Number: PCV: PAK 2009-46 Project Number: 26479 Loan Number: 1467-PAK December 2009 Pakistan: Bahawalpur Rural Development Project Independent Evaluation Department ABBREVIATIONS

More information

CHAPTER SIX PROBLEMS OF SMALL-SCALE IRRIGATION DEVELOPMENT AND MANAGEMENT SYSTEM

CHAPTER SIX PROBLEMS OF SMALL-SCALE IRRIGATION DEVELOPMENT AND MANAGEMENT SYSTEM CHAPTER SIX PROBLEMS OF SMALL-SCALE IRRIGATION DEVELOPMENT AND MANAGEMENT SYSTEM This section of the study paid a particular attention to the assessment of small scale irrigation management activities

More information

評価調査結果要約表 ( 英文 ) Summary of Terminal Evaluation

評価調査結果要約表 ( 英文 ) Summary of Terminal Evaluation I. Outline of the Project Country: Republic of Mozambique Issue/Sector: Agricultural Development Division in charge: Rural Development Department Period of Cooperation From January 15, 2011 to January

More information

Maldives: Employment Skills Training Project

Maldives: Employment Skills Training Project Validation Report Reference Number: PVR-396 Project Number: 33217 Loan Numbers: 2028 February 2015 Maldives: Employment Skills Training Project Independent Evaluation Department ABBREVIATIONS ADB Asian

More information

Azerbaijan: North-East Development Project

Azerbaijan: North-East Development Project Azerbaijan: North-East Development Project Loan No. 637-AZ Project Id. 1289 Board Date 09 September 200 Effectiveness Date 12 July 2006 Original Closing Date 31 March 2012 Final Closing Date 31 march 2012

More information

ECONOMIC ANALYSIS. series-3 based on data from the Labor Force Surveys ( , , 2010), conducted by the National Statistical Office.

ECONOMIC ANALYSIS. series-3 based on data from the Labor Force Surveys ( , , 2010), conducted by the National Statistical Office. Additional Financing of Agriculture and Rural Development Project (RRP MON 393229) ECONOMIC ANALYSIS 1. The economic analysis of the additional financing of the Agriculture and Rural Development Project

More information

Evaluation Approach Project Performance Evaluation Report for Tianjin Wastewater Treatment and Water Resources Protection Project March 2010

Evaluation Approach Project Performance Evaluation Report for Tianjin Wastewater Treatment and Water Resources Protection Project March 2010 Asian Development Bank. 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 5467; Fax +63 2 636 2163; evaluation@adb.org; www.adb.org/evaluation Evaluation Approach Project Performance

More information

Safeguards Due Diligence Report

Safeguards Due Diligence Report Safeguards Due Diligence Report Project Number: 47181-002 January 2019 Republic of Tajikistan: Water Resources Management in Pyanj River Basin-5 Project Implementation and Monitoring Consulting Services

More information

Mongolia: Preparing the Vegetable Production and Irrigated Agriculture Project

Mongolia: Preparing the Vegetable Production and Irrigated Agriculture Project Technical Assistance Report Project Number: 51423-001 Transaction Technical Assistance (TRTA) October 2018 Mongolia: Preparing the Vegetable Production and Irrigated Agriculture Project This document is

More information

Pamarayan Ciujung Irrigation System Rehabilitation Project

Pamarayan Ciujung Irrigation System Rehabilitation Project Indonesia Pamarayan Ciujung Irrigation System Rehabilitation Project 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: August 2000 Location Map of Project Area Overall View

More information

People s Republic of China: Capacity Building to Combat Land Degradation Project

People s Republic of China: Capacity Building to Combat Land Degradation Project Validation Report Reference Number: PCV: PRC 2011-39 Project Number: 36445 Grant Number: 4357 November 2011 People s Republic of China: Capacity Building to Combat Land Degradation Project Independent

More information

ECONOMIC ANALYSIS. Table 1: Background Information of States in the National Capital Region GSDP Population below poverty line FY2000 a (%)

ECONOMIC ANALYSIS. Table 1: Background Information of States in the National Capital Region GSDP Population below poverty line FY2000 a (%) National Capital Region Urban Infrastructure Financing Facility (RRP IND 41598-01) ECONOMIC ANALYSIS A. Overview of the Economy of National Capital Region 1. The National Capital Region (NCR) comprises

More information

People s Republic of China: Songhua River Basin Water Pollution Control and Management Project

People s Republic of China: Songhua River Basin Water Pollution Control and Management Project Validation Report Reference Number: PVR-480 Project Number: 40665-013 Loan Number: 2487 December 2016 People s Republic of China: Songhua River Basin Water Pollution Control and Management Project Independent

More information

Japanese ODA Loan. Ex-Ante Evaluation

Japanese ODA Loan. Ex-Ante Evaluation Japanese ODA Loan Ex-Ante Evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Haor Flood Management and Livelihood Improvement Project Loan Agreement: June 16, 2014 Loan

More information

TERMS OF REFERENCE FOR CONSULTANTS

TERMS OF REFERENCE FOR CONSULTANTS Preparing the Inclusive Health Project TajikistanTA 51010 Individual Consultants TERMS OF REFERENCE FOR CONSULTANTS 1. International facility masterplan and rationalization specialist (3 person-months,

More information

Completion Report. Tajikistan: Rural Development Project. Project Number: Loan Number: 2313 Grant Numbers: 0072 and 0111 September 2015

Completion Report. Tajikistan: Rural Development Project. Project Number: Loan Number: 2313 Grant Numbers: 0072 and 0111 September 2015 Completion Report Project Number: 37530-013 Loan Number: 2313 Grant Numbers: 0072 and 0111 September 2015 Tajikistan: Rural Development Project This document is being disclosed to the public in accordance

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:PHI 30546 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE REPUBLIC OF THE PHILIPPINES FOR INSTITUTIONAL STRENGTHENING FOR THE DEVELOPMENT OF THE NATURAL GAS

More information

Maintenance and Sustainability

Maintenance and Sustainability chapter 10 Since its inception, the MVP has made substantial progress in addressing the infrastructure and energy indicators outlined in the Millennium Development Goals. Looking ahead at the next five

More information

ECONOMIC AND FINANCIAL ANALYSES I. ECONOMIC ANALYSIS

ECONOMIC AND FINANCIAL ANALYSES I. ECONOMIC ANALYSIS A. Background SASEC Bangladesh India Electrical Grid Interconnection Project Additional Financing (BAN RRP 44192-14) ECONOMIC AND FINANCIAL ANALYSES I. ECONOMIC ANALYSIS 1. The Bangladesh India Electrical

More information

ASIAN DEVELOPMENT BANK PPA: INO 22048

ASIAN DEVELOPMENT BANK PPA: INO 22048 ASIAN DEVELOPMENT BANK PPA: INO 22048 PROJECT PERFORMANCE AUDIT REPORT ON THE SECOND IKK WATER SUPPLY SECTOR PROJECT (Loan 1069-INO) IN INDONESIA November 2001 At Appraisal (September 1990) CURRENCY EQUIVALENTS

More information

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name Balochistan Small Scale Irrigation Project Region SOUTH ASIA

More information

Borrower IDA Credit Arab Republic of Egypt. Principal Bank for Development and. Agricultural Credit (PBDAC) Contact Dr. Hassan Khedr, Chairman,

Borrower IDA Credit Arab Republic of Egypt. Principal Bank for Development and. Agricultural Credit (PBDAC) Contact Dr. Hassan Khedr, Chairman, Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID7086 Project Name Egypt-Private Sector and Agricultural (+) Development

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 68418 v6 I. Introduction Gross agricultural output in Tajikistan grew by 64% in real

More information

Maldives: Employment Skills Training Project

Maldives: Employment Skills Training Project Validation Report Reference Number: PVR-396 Project Number: 33217 Loan Numbers: 2028 February 2015* Maldives: Employment Skills Training Project Independent Evaluation Department *Revised May 2015. ABBREVIATIONS

More information

AGRICULTURE IN BANGLADESH A NOTE ON FOOD SECURITY BY ENHANCING PRODUCTIVITY

AGRICULTURE IN BANGLADESH A NOTE ON FOOD SECURITY BY ENHANCING PRODUCTIVITY AGRICULTURE IN BANGLADESH A NOTE ON FOOD SECURITY BY ENHANCING PRODUCTIVITY Summary Awami League s Election Manifesto 2008 appropriately recognizes the importance of ensuring food security for all in Bangladesh.

More information

Energy Conservation Project (Loan 1492-MON[SF]) in Mongolia

Energy Conservation Project (Loan 1492-MON[SF]) in Mongolia Performance Evaluation Report PPE: MON 29012 Energy Conservation Project (Loan 1492-MON[SF]) in Mongolia November 2005 Operations Evaluation Department Asian Development Bank CURRENCY EQUIVALENTS Currency

More information

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1 Horticulture Value Chain Development Sector Project (RRP AFG 51039) SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1 Sector Road Map 1. Sector Performance, Problems,

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems and Opportunities

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems and Opportunities Ha Noi and Ho Chi Minh City Power Grid Development Sector Project (RRP VIE 46391) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems and Opportunities 1. The Ministry of

More information

India: Chhattisgarh Irrigation Development Project

India: Chhattisgarh Irrigation Development Project Completion Report Project Number: 37056-013 Loan Number: 2159 August 2015 India: Chhattisgarh Irrigation Development Project This document is being disclosed to the public in accordance with ADB s Public

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Country Partnership Strategy: Azerbaijan, 2014 2018 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map A. Sector Performance, Problems, and Opportunities 1. Azerbaijan is rich in energy resources. The

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 46476 Policy and Advisory Technical Assistance (PATA) December 2012 People s Republic of Bangladesh: Improving Public Administration and Services Delivery through

More information

ECONOMIC ANALYSIS. excluded from subproject economic analysis, but were included in the project assessment.

ECONOMIC ANALYSIS. excluded from subproject economic analysis, but were included in the project assessment. Assam Integrated Flood and Riverbank Erosion Risk Management Investment Program (RRP IND 38412) ECONOMIC ANALYSIS A. Introduction 1. The economic analysis examines the economic viability of the three subprojects

More information

Cambodia: Irrigated Agriculture Improvement Project Cofinanced by Project Readiness Improvement Trust Fund

Cambodia: Irrigated Agriculture Improvement Project Cofinanced by Project Readiness Improvement Trust Fund Technical Assistance Report Project Number: 51159-001 Transaction Technical Assistance (TRTA) July 2017 Cambodia: Irrigated Agriculture Improvement Project Cofinanced by Project Readiness Improvement Trust

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Port Vila Urban Development Project (RRP VAN 42391) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The current state of urban infrastructure and services is one of the major impediments to sustainable

More information

Philippines: Southern Philippines Irrigation Sector Project

Philippines: Southern Philippines Irrigation Sector Project Validation Report Reference Number: PVR-257 Project Number: 27245 Loan Number: 1668 December 2013 Philippines: Southern Philippines Irrigation Sector Project Independent Evaluation Department ABBREVIATIONS

More information

Mongolia: Reforms in Technical and Vocational Education and Training in Mongolia (Preparing the Skills for Employment Project)

Mongolia: Reforms in Technical and Vocational Education and Training in Mongolia (Preparing the Skills for Employment Project) Technical Assistance Report Project Number: 45010 Project Preparatory Technical Assistance (PPTA) December 2012 Mongolia: Reforms in Technical and Vocational Education and Training in Mongolia (Preparing

More information

FOCUS ASSESSMENT LAO/027. Lao-Luxembourg Health Sector Support Programme - Phase II

FOCUS ASSESSMENT LAO/027. Lao-Luxembourg Health Sector Support Programme - Phase II FOCUS ASSESSMENT LAO/027 Lao-Luxembourg Health Sector Support Programme - Phase II PROJECT SUMMARY DATA Country Long project title Short project title LuxDev Code LAO People s Democratic Republic Lao-Luxembourg

More information

Session II: Case Studies in Green Technology PPP Projects. Water Irrigation in Rural Areas

Session II: Case Studies in Green Technology PPP Projects. Water Irrigation in Rural Areas Session II: Case Studies in Green Technology PPP Projects Water Irrigation in Rural Areas UNECE Team of Specialists for PPPs Presented by: Art Smith Chairman, UNECE TOS-PPP asmith@mainet.com November 8,

More information

Kingdom of Thailand: Piloting Public Private Partnerships in the Social Sectors

Kingdom of Thailand: Piloting Public Private Partnerships in the Social Sectors Technical Assistance Report Project Number: 47141-002 Capacity Development Technical Assistance (CDTA) December 2013 Kingdom of Thailand: Piloting Public Private Partnerships in the Social Sectors The

More information

ECONOMIC ANALYSIS: PROJECT LOAN

ECONOMIC ANALYSIS: PROJECT LOAN Rajasthan Urban Sector Development Program (RRP IND 42267) ECONOMIC ANALYSIS: PROJECT LOAN A. Introduction 1. The economic analysis was conducted for water and wastewater subprojects in six project cities

More information

Completion Report. People s Republic of China: Hebei Zhanghewan Pumped Storage Project. Project Number: Loan Number: 1922 August 2014

Completion Report. People s Republic of China: Hebei Zhanghewan Pumped Storage Project. Project Number: Loan Number: 1922 August 2014 Completion Report Project Number: 28212 Loan Number: 1922 August 2014 People s Republic of China: Hebei Zhanghewan Pumped Storage Project This document is being disclosed to the public in accordance with

More information

Indonesia: Sustainable Aquaculture Development for Food Security and Poverty Reduction Project

Indonesia: Sustainable Aquaculture Development for Food Security and Poverty Reduction Project Completion Report Project Number: 35183-013 Loan Number: 2285-INO(SF) June 2015 Indonesia: Sustainable Aquaculture Development for Food Security and Poverty Reduction Project This document is being disclosed

More information

SECTOR ASSESSMENT (SUMMARY): 1 WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES

SECTOR ASSESSMENT (SUMMARY): 1 WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES Country Partnership Strategy: Fiji, 2014 2018 SECTOR ASSESSMENT (SUMMARY): 1 WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1. Sector Performance, Problems, and Opportunities 1. Fiji s urban centers

More information

Bangladesh: Second Small-Scale Water Resources Development Sector Project

Bangladesh: Second Small-Scale Water Resources Development Sector Project Validation Report Reference Number: PVR-312 Project Number: 30209 Loan Number: 1831 July 2014 Bangladesh: Second Small-Scale Water Resources Development Sector Project Independent Evaluation Department

More information

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES Jaffna and Kilinochchi Water Supply and Sanitation Project (RRP SRI 37378) SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES A. Sector Road Map 1. Sector Performance,

More information

Proposed Asian Development Fund Grant Islamic Republic of Afghanistan: Agriculture Market Infrastructure Project

Proposed Asian Development Fund Grant Islamic Republic of Afghanistan: Agriculture Market Infrastructure Project Draft and Monitoring Framework Project Number: 39370 October 2008 Proposed Asian Development Fund Grant Islamic Republic of Afghanistan: Agriculture Market Infrastructure Project A design and monitoring

More information

Project Name Angola-Luanda Water Supply and Sanitation (+)

Project Name Angola-Luanda Water Supply and Sanitation (+) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID6060 Project Name Angola-Luanda Water Supply and Sanitation (+) Region

More information

Recent changes in Uzbekistan s cotton procurement: Implications and reform agenda ahead

Recent changes in Uzbekistan s cotton procurement: Implications and reform agenda ahead Recent changes in Uzbekistan s cotton procurement: Implications and reform agenda ahead December 2018 Nodir Djanibekov 1 and Martin Petrick 1,2 1 Leibniz Institute of Agricultural Development in Transition

More information

Lao People s Democratic Republic: Northern Community-Managed Irrigation Sector Project

Lao People s Democratic Republic: Northern Community-Managed Irrigation Sector Project Completion Report Project Number: 34188-01 Loan Number: 2086-LAO(SF) November 2011 Lao People s Democratic Republic: Northern Community-Managed Irrigation Sector Project CURRENCY EUIVALENTS Currency Unit

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 46159-001 Capacity Development Technical Assistance (CDTA) October 2013 People s Republic of China: Innovations in Credit Risk Management and Financial Service

More information

Improvement District Conversion Guide

Improvement District Conversion Guide Improvement District Conversion Guide Ministry of Community, Aboriginal and Women s Services 2004 Table of Contents Introduction 2 Reasons for Conversion 2 Participants in the Conversion Process 3 Regional

More information

TAJIKISTAN PUBLIC EMPLOYMENT FOR SUSTAINABLE AGRICULTURE AND WATER MANAGEMENT PROJECT (PAMP)

TAJIKISTAN PUBLIC EMPLOYMENT FOR SUSTAINABLE AGRICULTURE AND WATER MANAGEMENT PROJECT (PAMP) TAJIKISTAN PUBLIC EMPLOYMENT FOR SUSTAINABLE AGRICULTURE AND WATER MANAGEMENT PROJECT (PAMP) Non-traditional Approaches to Addressing Risk and Vulnerability in Agriculture Europe and Central Asia Region

More information

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES (ENDANGERED RESERVOIRS) 1

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES (ENDANGERED RESERVOIRS) 1 Risk Mitigation and Strengthening of Endangered Reservoirs in Shandong Province Project (RRP PRC 40683) SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES (ENDANGERED RESERVOIRS) 1 A. Reservoir

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB7310 Project Name

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB7310 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB7310 Project Name National

More information

National Policy Dialogue on Integrated Water Resources Management in Tajikistan under the EU Water Initiative

National Policy Dialogue on Integrated Water Resources Management in Tajikistan under the EU Water Initiative National Policy Dialogue on Integrated Water Resources Management in Tajikistan under the EU Water Initiative Roadmap of the National Policy Dialogue on IWRM in the Republic Tajikistan (Updated as of April,

More information

Technical Assistance Islamic Republic of Afghanistan: Preparing the Commercial Agriculture Development Project

Technical Assistance Islamic Republic of Afghanistan: Preparing the Commercial Agriculture Development Project Technical Assistance Report Project Number: 39370 November 2005 Technical Assistance Islamic Republic of Afghanistan: Preparing the Commercial Agriculture Development Project CURRENCY EQUIVALENTS (as of

More information

FACILITATING SMALLHOLDER FARMERS MARKET ACCESS IN THE OIC MEMBER COUNTRY SUDAN PRESENTAION

FACILITATING SMALLHOLDER FARMERS MARKET ACCESS IN THE OIC MEMBER COUNTRY SUDAN PRESENTAION FACILITATING SMALLHOLDER FARMERS MARKET ACCESS IN THE OIC MEMBER COUNTRY SUDAN PRESENTAION 1 Background Although Sudan is agriculture based economy, economic growth has been driven by oil since 1999.Oil

More information

ODA Loan Project Ex-Post Monitoring Report

ODA Loan Project Ex-Post Monitoring Report ODA Loan Project Ex-Post Monitoring Report (Field survey; June, 2007) Evaluator: Yasuichiro Ishimori (Value Frontier Limited) Project Name: South Sumatra Swamp Improvement Project, Indonesia (L/A No. IP-389)

More information

Ex-Post Monitoring for Completed ODA Loan Projects

Ex-Post Monitoring for Completed ODA Loan Projects (Onsite evaluation: July 2006) ExPost Monitoring for Completed ODA Loan Projects Evaluator: Kenji Momota (IC Net, Ltd.) Project Name: Indonesia: Bila Irrigation Project Phases (I) (II) (L/A No. IP364,

More information

Ensuring the food Security of a Populous Nation

Ensuring the food Security of a Populous Nation Ensuring the food Security of a Populous Nation Zhen Zhong, Kong Xiangzhi, Mu Nana School of Agricultural Economics and Rural Development Renmin University of China The national grains security strategy

More information

CARTAGENA, COLOMBIA. Case Study (Water) Project Summary:

CARTAGENA, COLOMBIA. Case Study (Water) Project Summary: CARTAGENA, COLOMBIA Case Study (Water) Project Summary: Cartagena is a city of almost 900,000 people on the northern coast of Colombia, and serves as the capital of one of the country s departments (states),

More information

LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA

LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA Additional Financing of Local Government Enhancement Sector Project (RRP SRI 42759) LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA A. Eligible Local Authority and Subprojects 1. Unless otherwise agreed

More information