GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

Size: px
Start display at page:

Download "GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT"

Transcription

1 GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT PARBATI(RINSI)MAJOR IRRIGATION PROJECT PROJECT FEASIBILITY REPORT (PFR) 2017 CHIEF ENGINEER CHAMBAL BETWA BASIN WATER RESOURCES DEPARTMENT BHOPAL (M.P)

2 PARBATI(RINSI)MAJOR IRRIGATION PROJECT 1 PROJECT AT A GLANCE 1.1 The Preliminary investigation of the PARBATI(RINSI)MAJOR Irrigation Project was started in the year 2017 with a view to construct storage reservoir across river PARBATI to irrigate the area coming under BIAORA, Narsinghgarh,Pachore tehsil of Rajgarh District Ha. and CHACHODA tehsil GUNA DISTRICT Ha. Berasia of Bhopal Distt Ha.shayampur tehsil of sehore district Ha. The Gross & Culturable Command Area under this project is Ha (GCA) and Ha (CCA) respectively. 1.2 LOCATION OF THE PROJECT: The PARBATI(RINSI)MAJOR Project Dam Site is located on the River Parbati which is a tributary of the River chambal which originates from vindhyachal mountain near Bagli village of distt. Dewas M.P. and it meets Chambal River in Yamuna basin) near Village- Rinsi(Resai) in Block- Narsinghgarh of District- Rajgarh Madhya Pradesh at Latitude '-49" N & Longitude '-21" E The project site can be approached by traveling 25 km from Narsinghgarh Tehsil Headquarter. travelling on NH 12, 8 km away From Chidi kho (Devgarh). The nearest railway station to project site is Biaora which is 60 km away from dam site. The distance of dam site from Bhopal is 72 km. 1.3 NECESSITY OF THE PROJECT:- Irrigation development in state of Madhya Pradesh is only 28.2 % which is below as compared to national average of 38.75%.The district of Rajgarh is located in Chambal region of MP, the irrigation development is below the state s average figure. Crop cultivation in this district is totally dependent on rainfall and on the vagaries of monsoon. Providing irrigation will improve the economic condition of the farmers and result in efficient utilization of soil and water resources of the region. State and the region are experiencing erratic rainfall, which has further worsened the situation. Fertile land is available in Narsinghgarh, Biaora, Pachore, Chachoda, Berasiya, Shyampur Tehsil where reliable irrigation system can make a great difference and yield of crop may increase many fold. Thus, this will result in overall development of the region. Also during summer season, the ground water table goes deep and the region suffers from the acute shortage of drinking water. Creation of water bodies and developing irrigation systems in the region will result in recharge of ground water and improvement in ecology and will have a great positive impact on the environment and wild life of the region. To improve the scenario and to have overall development of the Rajgarh Distt., Govt of Madhya Pradesh has planned Parbati (Rinsi) Major Irrigation Project to provide irrigation in areas of Narsinghgarh, Biaora, Pachore, Chachoda, Berasiya, Shyampur tehsil by storing the river flow from PARBATI River.

3 1.4 WATER AVAILABILITY:- The Catchment Area of the PARBATI (RINSI) Dam is 3302 Sq.Km. seven rain gauge stations are influencing this project area i.e. Ashta, Bairagarh, Berasiya,Ichhawar, Kannod, Sehore, Sonkatch. Rainfall data is availablefor all above mentioned rain gauge station for period of 35 years respectively. The rainfall statistics of the project area is as follows. Average Annual Rainfall Maximum annual Rainfall Minimum annual Rainfall = mm = mm year 2006 = mm in Year 2010 There is observed gauge & discharge data from Pilukhedi G.D. site available at upstream of the proposed dam site. Hence the yield is worked out R.R. relationship and adopted after comparing with other projects in the basin. Rainfall data is available for Pilukhedi G.D. station for period of 30years respectively. Weighted rainfall for the catchment is computed. This gives 75% dependable yield as MCM. 1.5 IRRIGATION PLANNING: The area is predominantly of Rabi as the principle crop. Based on the existing cropping pattern the following good yielding crops are proposed to irrigate during Rabi season. Wheat H.Y.V Rabi Particulars Ha. Wheat OLV Gram Pulse Annual Irrigation Total 7550 Ha Ha Ha. Intensity of Irrigation 100% The crop water requirements are worked out for 35 years as per Modified Pen-man method and based on the guide lines suggested by T.C No.25 (with upto date amendments), MPWRD Bodhi.) Flood : The computation of S.P.F. have been carried. The design peak flood values worked out as Cumec. Adopting a silt rate of 0.75 Acre ft./ Sq mile / Yr., But in this case of Proposed barrage the silt load is 9.25 Mcum The principal levels of PARBATI (RINSI) are as follows: i) T.B.L = RL M ii) F.R.L = RL M iii) iv) L.S.L = RL M River Bed Level = M

4 1.5.5 The Submergence area at F.R.L is Ha. out of which forest submergence area is Ha. revenue land submergence is Ha. and private land submergence is Ha. 1.6 Main Components of The Parbati Project:- Canal System is based on Lift irrigation system proposed to take-off from Rising main on both flanks of PARBATI (RINSI) PROJECT. The Probable Total length of main canal is Km. Total number of villages under this command area is 146 Nos. 1.7 Recommendation: The site is located in un-irrigated area of Narsinghgarh Tehsil Distt. Rajgarh. People are in acute need of water for irrigating their fields and for domestic use. Also it will generate employment during construction period. The unit wise cost of the project is estimated adopting USR (Govt. of Madhya Pradesh, Water Resource Deptt. in force from The estimated cost of the project works out to be Rs Lakhs. The cost per Ha on CCA works out to be Rs 3.56 Lakhs per Ha, cost per Ha on ICA (i.e Ha) works out to be Rs 3.56 Lakhs per Ha and cost per Ha on annual irrigation (i.e Ha) works out to be Rs 3.56Lakhs per Ha. Looking to current price the cost of scheme is reasonable. Therefore, the scheme is suitable for construction. It is therefore recommended that if the project is implemented, it will extend benefit to a large number of beneficiaries and it will improve the economic conditions of the project area and the nearby areas. The government is also keen for the developing the backward region. Hence the PARBATI (RINSI) Project is recommended for sanction & construction at an earliest.

5 PARBATI RINSI MAJOR PROJECT SALIENT FEATURES I II III Location State District Tehsil/Block Latitude Longitude River River Sub Basin River Basin Tribal/Non-tribal Madhya Pradesh Rajgarh Narsinghgarh / Narsinghgarh 23 o N 77 o E PARBATI CHAMBAL YAMUNA Non - Tribal Date of commencement 2017 Distance from Probable Estimated Cost CCA under project Cost Per ha. Hydrology Catchment area Maximum Flood Discharge(SPF) 25 Km from Narsinghgarh, District - Rajgarh Rs Crore 48663Ha. Rs 3.56 Lakhs Per Ha Sq.km Cumecs 75% dependable yield MCM Proposed Designed Flood Reservoir Data As per Norms. Gross storage Live storage Dead Storage Gross Area Of Submergence at FRL Private Land Revenue Land Forest Land MCM MCM 9.25MCM Ha Ha Ha Ha. No. of village Submerged 13 No.of family affected 864 IV Barrage Data Type of barrage Concrete Total Length of Barrage 1350 M Height of Barrage M.

6 V VI VII VIII Number of openings 22 Nos Size of Gates 15 M x M Crest Level M Thickness of Pier 3 M Control Levels Top Bund Level (TBL) M Full Reservoir Level (FRL) M Canals Length of Rising Main (Left) 5.00 KM Length of Rising Main (Right) 5.00 KM Dia. Of Rising Main (Left) 2.75 M Dia. Of Rising Main (Right) 1.60 M Lift (Left) 30 M Lift (Right) 30M Area Proposed Under Irrigation Crops proposed for irrigation H.Y.V Wheat, O.L.V Wheat, Gram & Pulses GCA (Left) Ha. GCA (Right) 9200 Ha. Total GCA Ha. CCA (Left) Ha. CCA (Right) Ha. Total CCA 48663Ha. Annual Irrigation Crop Kharif 00 ha. Crop Rabi Crop perennial Nil Annual irrigation Financial Aspects (Estimated Cost) Unit - I Unit - II Unit - III Total Rs Crores Rs Crores Rs Crores Rs Crores (Ankit Saraf) Sub Divisional Officer, K.C.S(Dudhi) H/W Sub Division, Narsinghgarh Distt. Rajgarh (M.P.) (A. K. Saxena) Executive Engineer, Water Resources Division, Narsinghgarh Distt. Rajgarh (M.P.)

7

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT SUTHALIYA PROJECT PRE FEASIBILITY REPORT ( PFR ) 2018 CHIEF ENGINEER CHAMBAL BETWA BASIN WATER RESOURCES DEPARTMENT BHOPAL (M.P) SUTHALIYA PROJECT

More information

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT TEM MEDIUM IRRIGATION PROJECT EXECUTIVE SUMMARY 2016 CHIEF ENGINEER CHAMBAL BETWA BASIN WATER RESOURCES DEPARTMENT BHOPAL (M.P) TEM MEDIUM IRRIGATION

More information

MAJHGAON MEDIUM PROJECT

MAJHGAON MEDIUM PROJECT GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT MAJHGAON MEDIUM PROJECT C.C.A 9900 Ha ESTIMATED COST 358.99 Crores BLOCK:- AJAIGARH DISTRICT:- PANNA CHIEF ENGINEER DHASAN KEN BASIN WATER RESOURCES

More information

Executive Summary of Bistan Lift IrrigationProject

Executive Summary of Bistan Lift IrrigationProject Executive Summary of Bistan Lift IrrigationProject INTRODUCTION:- 1.1 (i) AIM(S) OF THE PROJECT WORK : The main objective of Bistan Lift Irrigation Scheme is to provide irrigation facilities to the water-scare

More information

Head N E Ha

Head N E Ha Sr. No. PARTICULARS DETAILS A PREAMBLE 1. Project Name Ajansara Barrage Project 2. Project Proponent M/s. Vidharbha Irrigation Development Corporation 3. Screening Category Item 1 (C) in EIA Notification,

More information

BERKHEDA MEDIUM IRRIGATION PROJECT. Techno-Economic Feasibility Report

BERKHEDA MEDIUM IRRIGATION PROJECT. Techno-Economic Feasibility Report GOVERNMENT OF MADHYA PRADESH NARMADA VALLEY DEVELOPMENT AUTHORITY CHIEF ENGINEER Indira Sagar Project (Canals) Sanawad District West Nimar, Madhya Pradesh BALANCE MEDIUM AND MINOR PROJECTS IN NARMADA BASIN

More information

State. 2. Location: Madhya Pradesh. Total period for which the forest land is proposed to be diverted (in year). 3. Detail of user agency

State. 2. Location: Madhya Pradesh. Total period for which the forest land is proposed to be diverted (in year). 3. Detail of user agency F. No. 8-39/2018-FC Sub: Proposal for diversion of 55.3 ha. of forest land for construction of Parna Minor Irrigation Project, in favour of Water Resources Department, Damoh District Madhya Pradesh State.-regarding.

More information

Sl.No DETAILS HULICAL FOREBAY DAM A. GENERAL:

Sl.No DETAILS HULICAL FOREBAY DAM A. GENERAL: KARNATAKA POWER CORPORATION LIMITED VARAHI HYDRO ELECTRIC PROJECT INFORMATION FOR ENGINEERING DATA Sl.No DETAILS HULICAL FOREBAY DAM A. GENERAL: 1. Name of the dam/project. 2. Location. Hulical fore bay

More information

6) Penstocks 3.25m dia and 965m long to lead a design discharge of cumecs

6) Penstocks 3.25m dia and 965m long to lead a design discharge of cumecs Project: Sorang Hydro Electric Project - 100 MW Overview: M/s.Himachal Sorang Pvt.Ltd., Hyderabad, is developing the Run of the River Sorang Hydro Electric Project (100MW) in Kinnaur District of Himachal

More information

R.T.Thokal Head, Dept. of Irrigation and Drainage Engineering College of Agril Engg. And Tech., Dr.BSKKV, Dapoli Maharashtra State, INDIA

R.T.Thokal Head, Dept. of Irrigation and Drainage Engineering College of Agril Engg. And Tech., Dr.BSKKV, Dapoli Maharashtra State, INDIA Application of GIS-based SWAT framework for water management of irrigation project under rotational water supply S.D. Gorantiwar Head, Dept. of Irrigation and Drainage Engineering Dr. A. S. College of

More information

Fig: Alignment of a ridge or watershed canal (Head reach of a main canal in plains)

Fig: Alignment of a ridge or watershed canal (Head reach of a main canal in plains) SYSTEM OF IRRIGATION CANAL CHAPTER 6 Alluvial Soil and Non-Alluvial Soil The soil which is formed by transportation and deposition of silt through the agency of water, over a course of time, is called

More information

GOVERNMENT OF ANDHRA PRADESH WATER RESOURES DEPARTMENT CHINTHALAPUDI LIFT IRRIGATION SCHEME FEASIBILITY REPORT

GOVERNMENT OF ANDHRA PRADESH WATER RESOURES DEPARTMENT CHINTHALAPUDI LIFT IRRIGATION SCHEME FEASIBILITY REPORT GOVERNMENT OF ANDHRA PRADESH WATER RESOURES DEPARTMENT CHINTHALAPUDI LIFT IRRIGATION SCHEME FEASIBILITY REPORT SUBMITTED TO EXECUTIVE ENGINEER Indira Sagar Project, JANGAREDDYGUDEM West Godavari District.

More information

Enhancement of System performance through Benchmarking: Case Study of Samrat Ashok Sagar Irrigation Project, MP, India

Enhancement of System performance through Benchmarking: Case Study of Samrat Ashok Sagar Irrigation Project, MP, India Volume 1, No 2, 21 Copyright 21 All rights reserved Integrated Publishing services Research article ISSN 976 4399 Enhancement of System performance through Benchmarking: Case Study of Samrat Ashok Sagar

More information

ARHAM VEERAYATAN INSTITUTE OF ENGINEERING, TECHNOLOGY & RESEARCH Haripar (Mota Asambia), Bhuj Mandvi road, Mandvi Tal.

ARHAM VEERAYATAN INSTITUTE OF ENGINEERING, TECHNOLOGY & RESEARCH Haripar (Mota Asambia), Bhuj Mandvi road, Mandvi Tal. ARHAM VEERAYATAN INSTITUTE OF ENGINEERING, TECHNOLOGY & RESEARCH Haripar (Mota Asambia), Bhuj Mandvi road, Mandvi Tal. Kutch (Gujarat) Date: 19/10/2016, Wednesday Duration: 1 Day A FEEDBACK REPORT ON VISIT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

Impact of Bundelkhand Special Package for Drought Mitigation. National Rainfed Area Authority, Planning Commission, Government of India, New Delhi

Impact of Bundelkhand Special Package for Drought Mitigation. National Rainfed Area Authority, Planning Commission, Government of India, New Delhi Impact of Bundelkhand Special Package for Drought Mitigation National Rainfed Area Authority, Planning Commission, Government of India, New Delhi 1 Background of the Package The Package was initiated by

More information

DPR GUIDELINES FOR ERM OF IRRIGATION PROJECTS

DPR GUIDELINES FOR ERM OF IRRIGATION PROJECTS DPR GUIDELINES FOR ERM OF IRRIGATION PROJECTS 1.0 INTRODUCTION RAJEEV SINGHAL Director NWA, CWC, Pune Modernisation of Irrigation Project includes extension, renovation & modernisation components of existing

More information

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA S. Masood Husain Nitya Nand Rai Director Assistant Director Foundation Engineering & Special Analysis Directorate Central

More information

Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkata Patna Web: Ph:

Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkata Patna Web:     Ph: Serial : 01. SK_J+B_CE_Irrigation_090918 CLASS TEST (GATE) Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkata Patna Web: E-mail: info@madeeasy.in Ph: 011-451461 CLASS TEST 018-19

More information

Intra and Inter Basin Linking of Rivers in Water Resources Management

Intra and Inter Basin Linking of Rivers in Water Resources Management Journal of Scientific & Industrial Research Vol. 75, March 2016, pp. 150-155 Intra and Inter Basin Linking of Rivers in Water Resources Management A Verdhen Dronacharya College of Engineering, Gurgaon-

More information

POWER POTENTIAL STUDIES A CASE STUDY OF KULSI MUTLTIPURPOSE PROJECT

POWER POTENTIAL STUDIES A CASE STUDY OF KULSI MUTLTIPURPOSE PROJECT POWER POTENTIAL STUDIES A CASE STUDY OF KULSI MUTLTIPURPOSE PROJECT G.k.Hazarika B.E (civil) Asstt Executive Engineer Brahmaputra Board Dilip Goswami B.E (civil) Executive Engineer Brahmaputra Board The

More information

Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkata Patna Web: Ph:

Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkata Patna Web:     Ph: Serial : SK1_CE_U+I_Irrigation_091018 CLASS TEST Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkata Patna Web: E-mail: info@madeeasy.in Ph: 011-451461 CLASS TEST 018-19 CIVIL ENGINEERING

More information

Systematic and Early Development of Hydro Projects in Nepal. Development of Projects in Bheri Basin A Case Study

Systematic and Early Development of Hydro Projects in Nepal. Development of Projects in Bheri Basin A Case Study Systematic and Early Development of Hydro Projects in Nepal Development of Projects in Bheri Basin A Case Study 1 RIVER MAP: ORIGIN AND ITS CONFLUENCES Tallo Bheri HEP Thuli Bheri-1HEP NEPAL Bheri-III

More information

Command Area Management Study of Karjan Dam Gujarat, India using Remote Sensing and GIS

Command Area Management Study of Karjan Dam Gujarat, India using Remote Sensing and GIS IJSTE - International Journal of Science Technology & Engineering Volume 1 Issue 11 May 2015 ISSN (online): 2349-784X Command Area Management Study of Karjan Dam Gujarat, India using Remote Sensing and

More information

Competition for Water Demands, Management conflicts and Inter- related Issues in MalwathuOya Basin of Sri Lanka

Competition for Water Demands, Management conflicts and Inter- related Issues in MalwathuOya Basin of Sri Lanka Competition for Water Demands, Management conflicts and Inter- related Issues in MalwathuOya Basin of Sri Lanka Eng S M D L K De Alwis Resident Engineer, Nachchaduwa NARBO 4 th Training Programme 9 th

More information

Bishunpur Small Hydro Power Project

Bishunpur Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

The Chairman welcomed all the members of the Committee and thereafter agenda items were taken up for deliberations.

The Chairman welcomed all the members of the Committee and thereafter agenda items were taken up for deliberations. The 292 nd meeting of the State Expert Appraisal Committee (SEAC) was held on 16 th June, 2017 under the Chairmanship of Dr. R.B. Lal for the projects / issues received from SEIAA. The following members

More information

Overview of ITC s sustainability commitment. Water management approach. Water stewardship performance

Overview of ITC s sustainability commitment. Water management approach. Water stewardship performance ITC s Water Management Stewardship Presentation at the Environment & Energy Conclave, BCCI, Kolkata, 31 st August 2012 Presentation Plan Overview of ITC s sustainability commitment Water management approach

More information

Convergence of NREGS with Water Resource Department in the State of M.P. Date

Convergence of NREGS with Water Resource Department in the State of M.P. Date Convergence of NREGS with Water Resource Department in the State of M.P. Date 22.04.2009 OVER VIEW OF N.R.E.G.S. in MP State 1. Total District Notified 50 2. Total Janpad Panchayat 313 3. Total Gram Panchayats

More information

Sustainable Groundwater Management

Sustainable Groundwater Management Sustainable Groundwater Management Developing and promoting a more accurate understanding of the socio-ecological value of groundwater, and the nature and scale of the consequences of its unsustainable

More information

Solution for Irrigation Engineering

Solution for Irrigation Engineering Solution for Irrigation Engineering December 2015 Index Q.1) a). 2-3 b).3-5 c).5-6 d).6-8 e).9-10 Q.2) a).10-11 b). 12-14 c). 14-15 Q.3) a). 15-16 b). 17 c). 18 Q.4) a). N.A b). N.A c). N.A Q.5) a).20-22

More information

CHAPTER 4 STUDY AREA DESCRIPTION

CHAPTER 4 STUDY AREA DESCRIPTION 88 CHAPTER 4 STUDY AREA DESCRIPTION 4.1 GENERAL For the purpose of evaluating the impact of tank restoration on livelihoods, three restored tanks in two districts of Kancheepuram and Thiruvallur in Tamil

More information

SITE VISITED AT SARDAR SAROVAR DAM AT 24/08/2017 (3 RD, 5 TH AND 7 TH SEMESTER)

SITE VISITED AT SARDAR SAROVAR DAM AT 24/08/2017 (3 RD, 5 TH AND 7 TH SEMESTER) SITE VISITED AT SARDAR SAROVAR DAM AT 24/08/2017 (3 RD, 5 TH AND 7 TH SEMESTER) PREPARED BY: ASSISTANT PROFESSOR NILESH PRAJAPATI CIVIL ENGG. DEPARTMENT DJMIT MOGAR River Bed Power House (RBPH) RIVER BED

More information

D.A.DEGREE.ENGINEERING & TECHNOLOGY MAHEMADABAD

D.A.DEGREE.ENGINEERING & TECHNOLOGY MAHEMADABAD D.A.DEGREE.ENGINEERING & TECHNOLOGY MAHEMADABAD INDUSTRIAL VISIT REPORT 1 Name of the industry Sardar Sarovar Dam 2 Location Kevadiya Colony Bharuch, Gujarat 3 Date 18-7-2017 4 Time 11:00AM 5 Semester

More information

ISSUES & FUTURE PROSPECTS

ISSUES & FUTURE PROSPECTS SMALL DAMS IN PUNJAB ISSUES & FUTURE PROSPECTS SMALL DAMS ORGANIZATION ISLAMABAD POTHOHAR REGION BACKGROUND Pothohar region consist of 4 No. of districts namely Rawalpindi, Attock, Chakwal, Jhelum. Total

More information

Sugabandh Small Hydro Power Project

Sugabandh Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

GUIDELINES FOR REPAIR, RENOVATION AND RESTORATION WATER BODIES WITH EXTERNAL ASSISTANCE

GUIDELINES FOR REPAIR, RENOVATION AND RESTORATION WATER BODIES WITH EXTERNAL ASSISTANCE GUIDELINES FOR REPAIR, RENOVATION AND RESTORATION OF WATER BODIES WITH EXTERNAL ASSISTANCE Government of India Ministry of Water Resources 2009 I N D E X CONTENTS PAGE NO. 1. Introduction 1 2. Basic Features

More information

RL (+) 104m to RL (+) 108m. Ambient Temperature - 4 C to 42 C. Mostly Barren Land. Breakup of ownership:

RL (+) 104m to RL (+) 108m. Ambient Temperature - 4 C to 42 C. Mostly Barren Land. Breakup of ownership: Salient Features of Proposed Sites: The plant shall be designed in accordance with Power Purchase Agreement (PPA) for base load operation with the capability for part load operation. A. Paraspani-Godda:

More information

Water State at a Glance: Manipur, Vol. 1(8), 2016

Water State at a Glance: Manipur, Vol. 1(8), 2016 Water List of Tables 6.1: Distribution of Large Dams Completed 6.2: Live Storage Capacity of Large Dams/Reservoirs/Projects 6.3: Ultimate Irrigation Potential (UIP) 6.4: Plan-wise Financial Expenditure

More information

Medium and Minor Irrigation Works

Medium and Minor Irrigation Works Medium and Minor Irrigation Works Abstract: Sandela Haripriya, M.Tech Assistant Professor, Department of Civil Engineering, Balaji Institute of Technology & Sciences, Narsampet, Warangal, Telangana. As

More information

Agro-forestry in Bihar: Adaptation Strategy under a changing Climate

Agro-forestry in Bihar: Adaptation Strategy under a changing Climate Sustainable Lifestyle = Positive Climate Action Agro-forestry in Bihar: Adaptation Strategy under a changing Climate Devendra Kumar Shukla, IFS Principal Chief Conservator of Forests (HoFF), Department

More information

Crop Water Requirement Estimation by using CROPWAT Model: A Case Study of Halali Dam Command Area, Vidisha District, Madhya Pradesh, India

Crop Water Requirement Estimation by using CROPWAT Model: A Case Study of Halali Dam Command Area, Vidisha District, Madhya Pradesh, India Volume-5, Issue-3, June-2015 International Journal of Engineering and Management Research Page Number: 553-557 Crop Water Requirement Estimation by using CROPWAT Model: A Case Study of Halali Dam Command

More information

WATER RESOURCES MANAGEMENT IN URBAN AREAS A SUSTAINABLE SOLUTION THROUGH IBWT

WATER RESOURCES MANAGEMENT IN URBAN AREAS A SUSTAINABLE SOLUTION THROUGH IBWT WATER RESOURCES MANAGEMENT IN URBAN AREAS A SUSTAINABLE SOLUTION THROUGH IBWT G A Rajkumar 1, M K Srinivas 2, L R Ranganath 3, M D Kudale 4 1 Assistant Research Officer, Central Water & Power Research

More information

WATER RESOURCE ENNG.(NCE-702)

WATER RESOURCE ENNG.(NCE-702) Assignment: I (Unit 1) 1. Describe the concept of hydrologic cycle with the help of a neat sketch. What are the different components ofthe hydrologic cycle? What do you mean by hydrologic system? 2. A

More information

Impact of Jamda medium irrigation project on irrigeted land cover in its command area in Jalgaon district

Impact of Jamda medium irrigation project on irrigeted land cover in its command area in Jalgaon district 2017; 3(11): 304-308 ISSN Print: 2394-7500 ISSN Online: 2394-5869 Impact Factor: 5.2 IJAR 2017; 3(11): 304-308 www.allresearchjournal.com Received: 19-09-2017 Accepted: 20-10-2017 Assistant Professor,

More information

A VISIT REPORT ON SARDAR SAROVAR DAM. CIVIL 4 th SEM PREPARED BY: MISS. D.A.DAVE MR. H.A.MAULVI CIVIL ENGINEERING DEPARTMENT

A VISIT REPORT ON SARDAR SAROVAR DAM. CIVIL 4 th SEM PREPARED BY: MISS. D.A.DAVE MR. H.A.MAULVI CIVIL ENGINEERING DEPARTMENT A VISIT REPORT ON SARDAR SAROVAR DAM CIVIL 4 th SEM PREPARED BY: MISS. D.A.DAVE MR. H.A.MAULVI CIVIL ENGINEERING DEPARTMENT A.Y.DADABHAI TECHNICAL INSTITUTE-KOSAMBA 1 The Narmada River Narmada means ever-delightful,

More information

Strategy and Methodology for Improved IWRM

Strategy and Methodology for Improved IWRM Strategy and Methodology for Improved IWRM A Case Study of Tungabhadra River Basin in India S. Puttaswamaiah H. L. Shashidhara K. V. Raju Centre for Ecological Economics and Natural Resources Institute

More information

A Report on Industrial Visit at

A Report on Industrial Visit at Department of Civil Engineering A Report on Industrial Visit at Sardar Sarovar Dam Site & Dhanki Pumping Station (Dt.13-10-2015 & 14-10-2015) Prepared by: Jignesh Shah Details of Visit: Date: 13/10/2015

More information

PRESENTATION ON RIVER BASIN MANAGEMENT

PRESENTATION ON RIVER BASIN MANAGEMENT Welcome PRESENTATION ON RIVER BASIN MANAGEMENT Government of Karnataka,INDIA States of India Largest Democratic Country. 2nd Largest Populous. Population 1.18 Billion. 7th Largest By Area. Area 32,87,623

More information

Use of Space-based Systems for Water Resources Management In India

Use of Space-based Systems for Water Resources Management In India 49 th Session of UN-COPUOS (7-16 June 2006) Agenda Item 12: Space and Water Use of Space-based Systems for Water Resources Management In India Presentation by Dr. K. Radhakrishnan Indian Delegation . we

More information

A CASE STUDY ON RAIN WATER HARVESTING TECHNOLOGIES FOR TRIBAL AREA OF MADHYA PRADESH, INDIA

A CASE STUDY ON RAIN WATER HARVESTING TECHNOLOGIES FOR TRIBAL AREA OF MADHYA PRADESH, INDIA Plant Archives Vol. 16 No. 1, 2016 pp. 151-156 ISSN 0972-5210 A CASE STUDY ON RAIN WATER HARVESTING TECHNOLOGIES FOR TRIBAL AREA OF MADHYA PRADESH, INDIA Ghanshyam Deshmukh*, M. K. Hardaha 1 and S. K.

More information

Technical Manual. Determining, Regulating, and Enforcing Water Entitlements in Irrigation Projects of Maharashtra

Technical Manual. Determining, Regulating, and Enforcing Water Entitlements in Irrigation Projects of Maharashtra Technical Manual Determining, Regulating, and Enforcing Water Entitlements in Irrigation Projects of Maharashtra Maharashtra Water Resources Regulatory Authority Mumbai May 2015 About MWRRA Maharashtra

More information

Conflict resolution and institutional arrangements for flood disaster management on Indo Nepal fringe: Focus on Kosi basin

Conflict resolution and institutional arrangements for flood disaster management on Indo Nepal fringe: Focus on Kosi basin Conflict resolution and institutional arrangements for flood disaster management on Indo Nepal fringe: Focus on Kosi basin N.M.P. Verma 15 Ambedkar University Introduction Trans-boundary conflict is one

More information

1.1 Name of the Project : 1.2 Proposed Installed Capacity of the Project : MW

1.1 Name of the Project : 1.2 Proposed Installed Capacity of the Project : MW 1.0 GENERAL FORM NO.APP/P/PTB-2/1 PART B SECTOR SPECIFIC INFORMATION SMALL HYDRO POWER PROJECT 1.1 Name of the Project _ 1.2 Proposed Installed Capacity of the Project MW 1.3 Proposed location of the Project

More information

In the name of Allah - The most Beneficent & Merciful

In the name of Allah - The most Beneficent & Merciful In the name of Allah - The most Beneficent & Merciful GOVERNMENT OF PAKISTAN INDUS RIVER SYSTEM AUTHORITY PRESENTATION ON WATER RELATED DISASTER AND ITS MANAGEMENT IN PAKISTAN AN ASSESMENT OF WATER RELATED

More information

ARTIFICIAL RECHARGE PROJECT & AUGMENTATION OF SURFACE IRRIGATION IN THE COASTAL AREA OF VANUR TALUK, VILLUPURAM DISTRICT, TAMIL NADU, INDIA

ARTIFICIAL RECHARGE PROJECT & AUGMENTATION OF SURFACE IRRIGATION IN THE COASTAL AREA OF VANUR TALUK, VILLUPURAM DISTRICT, TAMIL NADU, INDIA ARTIFICIAL RECHARGE PROJECT & AUGMENTATION OF SURFACE IRRIGATION IN THE COASTAL AREA OF VANUR TALUK, VILLUPURAM DISTRICT, TAMIL NADU, INDIA by Auroville Water Harvest Phases of Hilden First Phase 2006-2007

More information

Flood Control by Reservoir Operation for Ukai Reservoir

Flood Control by Reservoir Operation for Ukai Reservoir GRD Journals Global Research and Development Journal for Engineering Recent Advances in Civil Engineering for Global Sustainability March 2016 e-issn: 2455-5703 Flood Control by Reservoir Operation for

More information

Tata Trusts. Impacting quality of life of poor communities

Tata Trusts. Impacting quality of life of poor communities Tata Trusts Impacting quality of life of poor communities Tata Trusts Sir Ratan Tata Trust, 1919 Navajbai Ratan Tata Trust Sir Dorabji Tata Trust, 1932 Other Allied Trusts: 7 of them Annual investment

More information

RIVER BASIN PENNAR [ INDIA

RIVER BASIN PENNAR [ INDIA RIVER BASIN PENNAR [ INDIA ] SCHEDULE A ASSESSMENT OF RIVER BASINS ORGANISATIONS (RBOs) IN SOUTH ASIA Sr. Details No. 1 Physical Features - General Information 1.1 Name of River basin (also indicate regional

More information

Maximizing the benefit by revival, mordenisation and rejuvenation of water harvesting sturcture (check Dam) in Dahod District of Gujarat

Maximizing the benefit by revival, mordenisation and rejuvenation of water harvesting sturcture (check Dam) in Dahod District of Gujarat Maximizing the benefit by revival, mordenisation and rejuvenation of water harvesting sturcture (check Dam) in Dahod District of Gujarat Lukhawada Check dam across River hadaf, Taluka : Limkheda Funded

More information

Additional Agenda Item No. 2

Additional Agenda Item No. 2 39 Additional Agenda Item No. 2 Sub: Diversion of 1835.14 ha of forest land for Parban Major Irrigation Project in favour of Water Resources Department, Rajast han in Baran and Jhalawar Forest Divisions

More information

Use of a distributed catchment model to assess hydrologic modifications in the Upper Ganges Basin

Use of a distributed catchment model to assess hydrologic modifications in the Upper Ganges Basin River Basin Management VI 177 Use of a distributed catchment model to assess hydrologic modifications in the Upper Ganges Basin L. Bharati 1, V. Smakhtin 2, P. Jayakody 2, N. Kaushal 3 & P. Gurung 1 1

More information

SCHEDULE A ASSESSMENT OF RIVER BASINS (RBs) IN SOUTH ASIA

SCHEDULE A ASSESSMENT OF RIVER BASINS (RBs) IN SOUTH ASIA SCHEDULE A ASSESSMENT OF RIVER BASINS (RBs) IN SOUTH ASIA Sr. No. Details 1 Physical Features - General Information 1.1 Name of River basin (also indicate regional names used in different countries, states

More information

CHAPTER I 1.1 Introduction

CHAPTER I 1.1 Introduction CHAPTER I 1.1 Introduction Pulses in India have long been considered as the poor man s source of protein. Pulses are grown in 22-23 million hectares of area with an annual production of 13-15 million tones

More information

Alpha College of Engineering. Fifth Semester B.E. Question Bank. Hydrology and irrigation engineering

Alpha College of Engineering. Fifth Semester B.E. Question Bank. Hydrology and irrigation engineering Alpha College of Engineering Fifth Semester B.E. Question Bank Hydrology and irrigation engineering UNIT 1: INTRODUCTION & PRECIPITATION 1.Explain in brief the different types of precipitation. 2.How do

More information

Sub. Code:

Sub. Code: Important Instructions to examiners: ) The answers should be examined by key words and not as word-to-word as given in the model answer scheme. ) The model answer and the answer written by candidate may

More information

State at a Glance: Arunachal Pradesh, Vol. 1(2), Water

State at a Glance: Arunachal Pradesh, Vol. 1(2), Water Water 6.1: Details of Inland Fishery Water Resources of Various Types in Arunachal Pradesh (A.P.) 6.2: Installation of off-grid/decentralized Renewable Energy Systems/Devices 6.3: Source wise Installed

More information

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION 1.1 General The Lower Erkhuwa hydropower Project is located in Kulung and Chauki Danda VDCs of Bhojpur District, in East Nepal. It is located

More information

Rainwater Harvesting Structures - A Case Study

Rainwater Harvesting Structures - A Case Study Rainwater Harvesting Structures - A Case Study C.L.Jejurkar 1, N.S.Naik 2 1 Asso.Professor, SRES College of Engineering, Kopargaon, Dist. Ahmed Nagar, India 2 Asst. Professor, SRES College of Engineering,

More information

Aao Jal Sanchay Karein. Boond - Boond se Dharti Bharein.

Aao Jal Sanchay Karein. Boond - Boond se Dharti Bharein. Aao Jal Sanchay Karein Boond - Boond se Dharti Bharein Ravindra Kumar ravindra53@yahoo.co.in Major GW Issues Quality Problems Declining Water Levels & Depleting first aquifer Over Exploitation of Ground

More information

THE PAMPA IRRIGATION PROJECT

THE PAMPA IRRIGATION PROJECT Chapter - 4 THE PAMPA IRRIGATION PROJECT 4.1 Introduction 4.1 Introduction 4.2 Description of the study area 4.3 Salient Features of the PIP 4.4 Context 4.5 Objectives of the Pampa Irrigation Project:

More information

Draft EIA for Panchamnagar Medium Irrigation Project, Sagar, Madhya Pradesh

Draft EIA for Panchamnagar Medium Irrigation Project, Sagar, Madhya Pradesh 11.0 SUMMARY & CONCLUSION Panchamnagar Medium Project is a Medium Project of Department of Water Resources in Bundelkhand Region of Madhya Pradesh with annual irrigation of 9900 Ha. It comprises two construction

More information

Water. List of Tables

Water. List of Tables Water List of Tables 6.1: Details of Inland Fishery Water Resources of various types in Uttarakhand 6.2: Installation of Off-Grid/Decentralized Renewable Energy Systems/Devices 6.3: Installed Capacity

More information

ASSESSMENT OF GROUNDWATER RESOURCES AND QUALITY IN BIST DOAB REGION, PUNJAB, INDIA

ASSESSMENT OF GROUNDWATER RESOURCES AND QUALITY IN BIST DOAB REGION, PUNJAB, INDIA ASSESSMENT OF GROUNDWATER RESOURCES AND QUALITY IN BIST DOAB REGION, PUNJAB, INDIA Anju Pant, M S Rao, Y S Rawat, P Purushothaman & Gopal Krishan Hydrological Investigation Division, National Institute

More information

Thethaitangar Small Hydro Power Project

Thethaitangar Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

(Pg. 59/c). (Pg. 61/c).

(Pg. 59/c). (Pg. 61/c). Sub.: File No. 8-36/ 2017-FC Proposal for diversion of 119.25 ha. of forest land in favour of Water Resources Department for Construction of Karam Medium Irrigation Project in Dhar District in the State

More information

Sinnar Taluka Overview and preparation for field trip. Pooja Prasad (Ph D scholar) 22/8/2017

Sinnar Taluka Overview and preparation for field trip. Pooja Prasad (Ph D scholar) 22/8/2017 Sinnar Taluka Overview and preparation for field trip Pooja Prasad (Ph D scholar) 22/8/2017 1 Topics Overview of Sinnar taluka Geo-morphology, cropping patterns Diversion based irrigation (DBI) system

More information

UTILIZATION OF AVAILABLE WATER RESOURCES IN UTTARANCHAL: AN APPRAISAL OF CURRENT STATUS AT THE DISTRICT SCALE INTRODUCTION

UTILIZATION OF AVAILABLE WATER RESOURCES IN UTTARANCHAL: AN APPRAISAL OF CURRENT STATUS AT THE DISTRICT SCALE INTRODUCTION UTILIZATION OF AVAILABLE WATER RESOURCES IN UTTARANCHAL: AN APPRAISAL OF CURRENT STATUS AT THE DISTRICT SCALE V. N. Sharda and P.R. Ojasvi* INTRODUCTION The study on water as a natural resource is inclusive

More information

WAPCOS LIMITED (A Government of India Undertaking) 76 C, Sector 18, Gurgaon , Haryana, INDIA

WAPCOS LIMITED (A Government of India Undertaking) 76 C, Sector 18, Gurgaon , Haryana, INDIA WATER RESOURCES DEPARTMENT GOVERNMENT OF MADHYA PRADESH EIA STUDY FOR BINA COMPLEX MULTIPURPOSE IRRIGATION PROJECT Volume-I : Final EIA Report WAPCOS LIMITED (A Government of India Undertaking) 76 C, Sector

More information

Model Lift Irrigation Scheme

Model Lift Irrigation Scheme Model Lift Irrigation Scheme (Lecture notes by Dr.S.S.Rao) Contents 1. Introduction... 2 2. Guideline lines for small lift irrigation schemes.... 3 2.1. Lift irrigation on surface water... 3 2.1.1 Size

More information

CE 2031 WATER RESOURCES ENGINEERING L T P C

CE 2031 WATER RESOURCES ENGINEERING L T P C CE 2031 WATER RESOURCES ENGINEERING L T P C 3 0 0 3 QUESTION BANK PART - A UNIT I GENERAL 1. Write short notes on Water Resources Survey. 2. How do you calculate Average Annual Runoff depth? 3. Write short

More information

The term rotation of crops is somewhat self explanatory. It implies that nature of the crop sown in a particular field is changed year after year.

The term rotation of crops is somewhat self explanatory. It implies that nature of the crop sown in a particular field is changed year after year. CROP ROTATION The term rotation of crops is somewhat self explanatory. It implies that nature of the crop sown in a particular field is changed year after year. Necessity for rotation The necessity for

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

LAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES

LAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES LAW OF NUMBER 7 OF 2004 REGARDING WATER RESOURCES BY THE GRACE OF THE ALMIGHTY GOD, THE PRESIDENT OF Considering : a. that water resources is the gift of the Almighty God which gives benefits for the realization

More information

ECOLOGICAL STUDIES OF NAREGAL TANK IN HAVERI DISTRICT, KARNATAKA. E B Sedamkar

ECOLOGICAL STUDIES OF NAREGAL TANK IN HAVERI DISTRICT, KARNATAKA. E B Sedamkar Lake 2010: Wetlands, Biodiversity and Climate Change ECOLOGICAL STUDIES OF NAREGAL TANK IN HAVERI DISTRICT, KARNATAKA E B Sedamkar Dept of Botany, KLE Society`s G H College, Haveri Email: ebsedamkargkl@gmail.com

More information

MANGLA DAM KEY FACTS. 380 ft. (above riverbed) Gross Storage Capacity: Live Storage Capacity: Year of Completion: 1967

MANGLA DAM KEY FACTS. 380 ft. (above riverbed) Gross Storage Capacity: Live Storage Capacity: Year of Completion: 1967 MANGLA DAM KEY FACTS Dam Type: Height: Length: Lake Area: Catchment Area: Gross Storage Capacity: Live Storage Capacity: Main Spillway Capacity: Earthfill 380 ft. (above riverbed) 10,300 feet 97.7 sq.

More information

UJJANI IRRIGATION PROJECT AND AGRICULTURAL LANDSCAPE

UJJANI IRRIGATION PROJECT AND AGRICULTURAL LANDSCAPE 57 CHAPTER III UJJANI IRRIGATION PROJECT AND AGRICULTURAL LANDSCAPE 3.1 Introduction With the introduction of irrigation facilities farmer is able to grow cash crops for gaining more benefits which bring

More information

BRIEF NOTE ON WATER CONSERVATION MISSION (NEERU-MEERU)

BRIEF NOTE ON WATER CONSERVATION MISSION (NEERU-MEERU) BRIEF NOTE ON WATER CONSERVATION MISSION (NEERU-MEERU) INTRODUCTION Water is a vital natural resource which forms the basis of all life. Further, water is a key resource in all economic activities ranging

More information

International Journal of Advance Research in Engineering, Science & Technology

International Journal of Advance Research in Engineering, Science & Technology Impact Factor (SJIF): 3.632 International Journal of Advance Research in Engineering, Science & Technology e-issn: 2393-9877, p-issn: 2394-2444 Volume 3, Issue 6, June-2016 Estimation of Evaporation Losses

More information

Agricultural Planning through Prediction of Rainfall Characteristics for Bilaspur Region of Chhattisgarh Plain in India

Agricultural Planning through Prediction of Rainfall Characteristics for Bilaspur Region of Chhattisgarh Plain in India 6 Agricultural Planning through Prediction of Rainfall Characteristics for Bilaspur Region of Chhattisgarh Plain in India B. L. Sinha, Assistant Professor (Soil and Water Engineering), BRSM College of

More information

ITC initiated a community-led water conservation initiative in Munger district of Bihar, titled- Water

ITC initiated a community-led water conservation initiative in Munger district of Bihar, titled- Water Request for Proposal on Assessment of Impact of Ahar Pynes (Traditional Water Harvesting Structures) Rehabilitation in Bihar Last date for submission of proposals: 15 th February, 2019 I. Introduction

More information

CHAPTER-4 WATER RESOURCES

CHAPTER-4 WATER RESOURCES CHAPTER-4 WATER RESOURCES 4.1 GENERAL Dibang Multipurpose project is proposed across river Dibang, a major tributary of river Brahmaputra, near Munli village in Lower Dibang Valley District of Arunachal

More information

Executive summary. Salient Features

Executive summary. Salient Features Executive summary 1. Introduction The head works are proposed at 25.50 km upstream of Sir Aurthur Cotton Barrage at Dowlaiswaram, on Akhanda Godavari Left Bank near Tadipudi village, of Tallapudi Mandal,

More information

A CASE STUDY OF WATERSHED MANAGEMENT OF A NAIKBOMWADI VILLAGE

A CASE STUDY OF WATERSHED MANAGEMENT OF A NAIKBOMWADI VILLAGE A CASE STUDY OF WATERSHED MANAGEMENT OF A NAIKBOMWADI VILLAGE Mr.Kalbhor Pravin S 1, Mr.Baravkar Amit B 2, Mr.Deokate Bhalerao S 3, Prof. Kasar Snehal P 4 1,2,3BE Civil SSPM COE Baramti 2 BE Civil SVPM

More information

How is Maharashtra Drought worse than the one in 1972?

How is Maharashtra Drought worse than the one in 1972? How is 2012-13 Maharashtra Drought worse than the one in 1972? Maharashtra is facing one of the worst droughts this year. Union Agriculture Minister Sharad Pawar as well as Chief Minister Prithviraj Chavan

More information

INVITATION OF BID (INTERNATIONAL COMPETITIVE BIDDING)

INVITATION OF BID (INTERNATIONAL COMPETITIVE BIDDING) INVITATION OF BID (INTERNATIONAL COMPETITIVE BIDDING) Bid Title : EPC Bid for Planning, detailed design& engineering, construction/manufacturing of civil, electro-mechanical, hydro- mechanical and switch

More information

THE CONTEXT. Chief Editor Wamankumar Wani

THE CONTEXT. Chief Editor Wamankumar Wani THE CONTEXT Interna onal, Peer Reviewed & Indexed Journal of Arts & Humani es UGC Approved Journal: S. No. 42344 Volume 4 Issue 1, July 2017 ResearcherID: K-3783-2017 Chief Editor Wamankumar Wani Parbhani

More information

JHARKHAND. Sundargarh. Jharsuguda. Deogarh. Baragarh. Sambalpur. Sonepur. Angul. Boudh. Phulbani. Ganjam. Rayagada. o f B. Gajapati ANDHRA PRADESH

JHARKHAND. Sundargarh. Jharsuguda. Deogarh. Baragarh. Sambalpur. Sonepur. Angul. Boudh. Phulbani. Ganjam. Rayagada. o f B. Gajapati ANDHRA PRADESH NATURE OF DISASTER: ORISSA DROUGHT 2002 With the failure of monsoon this year Orissa government has declared all the 30 districts and 283 blocks, with anticipated crop loss of 50 % and above during the

More information

A MANAGEMENT APPROACH TO INCREASE IRRIGATED AREA AND PRODUCTION IN MADHYA PRADESH, INDIA

A MANAGEMENT APPROACH TO INCREASE IRRIGATED AREA AND PRODUCTION IN MADHYA PRADESH, INDIA A MANAGEMENT APPROACH TO INCREASE IRRIGATED AREA AND PRODUCTION IN MADHYA PRADESH, INDIA R.S. Julaniya 1, Manish Singh 2, M.G. Choubey 3 and Shubhankar Biswas 4 ABSTRACT About 70% of the working population

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation

More information