1 Customer Communication: New QTA Facility January 2019

2 Key Milestones New manufacturing site selection. Jan 2019 New pressing, layup, and finishing equipment on order. Jan 2019 Exit treating in Chandler. January 2019 Customer qualifications complete. March 2019 Master sheet inventory in place in Ridgeway. April 2019 Ridgeway plant preparations for interim service period. April 2019 Exit pressing in Chandler. May

3 Interim Ridgeway Support Prepreg Sales: - For imported HSD prepreg support. Adding a Rosenthal sheeter, installation complete by 2/1/2019 Adding a new vacuum bagger, installation complete by 2/1/2019 Ridgeway's current volume is 28,000 panels per day representing 72% utilization. Transferring Chandler's current panel volume of 12,000 panels per day will increase utilization by 85%. With the above additions Ridgeway's new volume will be 40,000 panels per day. Laminate Fabrication: Activate a currently idle robust slitter and packing line Adding a 3rd shift to robust cutting and inspecting line Increase packing from 2 shifts to 3 shifts Adding two shifts on the specialty finishing line total addition of 17,000 panels per week Staffing: Direct labor increase of 11 people, 8 of which are transferring from the Chandler facility Adding additional scheduler and incoming receiving 3

4 Production Logistics Product Name Process Transferred from Chandler Transfer Location and Process for Interim Period Production once QTA is Operational A11 Entire Process Ridgeway - Entire Process Ridgeway - Entire Process IS620 Entire Process Ridgeway - Entire Process Ridgeway - Entire Process 370HR Pressing and Finishing Ridgeway - Pressing and Finishing QTA - Pressing and Finishing FR408HR Entire Process YangMei - Entire Process QTA - Pressing and Finishing I-Speed Entire Process YangMei - Entire Process QTA - Pressing and Finishing FR408 Tachyon Entire Process Entire Process TaoYuan - Entire Process YangMei - Pressing and Finishing YangMei - Entire Process Ridgeway - Finishing QTA - Pressing and Finishing QTA - Pressing and Finishing I-Tera MT40 Entire Process YangMei - Treating and Pressing Ridgeway - Finishing QTA - Pressing and Finishing I-Tera MT40 (RF) Finishing Duren - Treating and Pressing Ridgeway Finishing QTA - Finishing ASTRAMT77 Finishing Duren - Treating and Pressing Ridgeway - Finishing QTA - Finishing Tachyon 100G Entire Process YangMei - Treating and Pressing Ridgeway - Finishing QTA - Pressing and Finishing 4

5 Key Service and Support Information The following information pertains to the temporary interim period, defined as the time between the exit from the Chandler plant to the start up of the new QTA facility, planned for May 2019 to March Master laminate sheets and panels as well as master prepreg roll inventory will be in place at the Ridgeway plant during the temporary interim period. Inventory will include: Tachyon 100G, I-speed, I- Tera MT40, FR408HR, Astra MT77, I-Tera MT40 RF. Additional investment in inventory $1M+ Tachyon 100G, I-Speed, I-Tera MT40 and FR408HR will be supported with QTA lead times from Taiwan for non-inventory items. Astra MT77 and I-Tera MT40 RF product will be supported from Germany for non-inventory items. Lead time schedule is defined on the following slides. Communication resources will be available during normal business hours in all North American time zones. This includes support from Ridgeway and our Asia Plants. Direct order entry into our Asian plants will speed up response time to 6 hours vs. the normal 48 hours. 5

6 Service and Support Lead-time Schedules Ridgeway, SC Produced 370HR, FR406, Poly, per standard lead times. *, ** 370HR, FR406 per the standard QTA program hours. QTA premiums apply A11 two treating campaigns per year Ridgeway, SC Master Sheet Supermarket Taiwan Germany FR408HR, FR408, I-Speed, I-Tera MT40, IS680, Astra MT77, Tachyon 100G Standard Lead Time 2-3 business days for sheets in stock QTA hours for sheets in stock. QTA premiums apply Standard products stocked in Prepreg rolls and Laminate sheets, 24 hours. QTA premiums apply Standard products supported by B-Stage supermarket, Prepreg 24 hours, Laminate 72 hours Standard and non standard products requiring treating, Prepreg 48 hours, Laminate 5 business days Standard products stocked in Prepreg rolls and Laminate sheets, 72 hours Standard and non-standard products requiring treating, 10 business days * Edge Beveling, Rigid, Heavy Copper add 24 to 48 hours ** Based upon daily ATP Capacity 6

7 New QTA Facility Three presses Ten openings each Two hot oil and one cold 50x56 maximum plate size Fully automated lay-up line Prepreg cold storage and fabrication Two fully automated finishing lines Facility lease to be finalized Jan 2019 Layup, press, and finishing equipment on order Jan

8 THANK YOU isola-group.com