1 STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Désirée Number: CZ 2003/ Title: Strengthening Institutional and Administrative Capacity in the Phytosanitary area (diagnostics, testing activities, registration of plant protection products-ppps and monitoring of harmful organisms) 1.3. Sector: Agriculture 1.4. Location: Czech Republic 2. Objectives 2.1 Overall objective Ability to take on the obligations of member ship including adherence to the aims of political, economic and momentary union 2.2 Project purpose There are two different sectors involved: harmful organisms and plant protection products. Strengthen and complete the central regulatory capacity and the appropriate technical capacity of the State Phytosanitary Administration/SPA/ for adopting and implementing the acquis communautaire -in the field of plant health-harmful organisms-council Directives 2000/29 in particular, and -in the field of testing of plant protection products, Council Directive 91/414/EEC in particular/including diagnostics and special SW for registration of PPPs, -Improvement of the management and training conditions of SPA inspectors 2.3 Accession Partnership and NPAA priority AP: short term priorities agriculture/phytosanitary/ sector: continue alignment and upgrade inspection arrangement. NPAA: short/medium term agriculture: improvement of the management and training conditions of SPA 2.4 Contribution to National Development Plan n.a. 2.5 Cross Border Impact n.a. 3. Description 3.1 Background and justification The project concerns the main sectors of plant protections diagnostic of harmful organisms and also connections areas: - Pest risk analysis, plant passports, monitoring activities and generally new phytosanitary legislations and marketing directives and registration of plant protection products. The Czech Republic in the framework of the preparation to EU accession must carry out basic steps to harmonization of the plant diseases and pests diagnostic, prepare itself to rapid determination of the plant quarantine harmful organisms and other organisms potentionally harmful to plants/plant products and furthermore to monitoring of plant pests/diseases occurrence trends. Regarding this tasks, the State Phytosanitary Administration (SPA) is the responsible national authority in CZ. Obligatory laboratory tests are carried out for purposes, on one hand, of preventing the introduction and/or spread of quarantine harmful organisms on the territory of the whole Czech Republic and - under the EU membership in the future - on the territory of the Community; and, on the other hand, of the appropriate certification, thus enabling a free movement of plants, plant products and other relevant objects within the internal market. FILENAMECZ doc 1

2 A part of the phytosanitary (plant health) supervision in the protection of territory of the Community from any entry of plant quarantine harmful organisms. The project objective is strengthening the border checks of consignments of live plants and plant products by setting up the new diagnostic methods on the new laboratory equipment, which we have received from the previous Phare projects, and complete all quarantine system with connecting areas. The given project aim is full harmonization of the EU system and in accordance with the relevant rules in EU Member States, and achievement of full ability to diagnose phytosanitary and related problems and identify organisms of very different origins. The project is intended to complete adequate implementation diagnostic capacity for harmful organisms in accordance with the requirements of the Council Directives 2000/29, as well as the relevant Commission Guidance Documents and new additional Directives. The given project aim is in the field of registration of plant protection products also full harmonization in accordance with the relevant rules in EU Member States. 3.2 Linked activities Phare Project CZ (Strengthening Institutional and Administrative Capacity in Phytosanitary field) and Twinning Covenant CZ 99/IB/AG/01. The Project Phare 2001 in investment part fulfil additional diagnostic equipment which SPA need for extended work in laboratories/more samples will be processed and the equipment will be fully used as more staff will be recruited from the SPA regional offices to work in the laboratories of Prague and Olomouc. Phare Project CZ /Strengthening the Central Regulatory Capacity of Plant Protection Products registration/ have been investment for chemical laboratories for Department in Brno/responsible for registration of plant protection products/. Activities under point 1 are linked with this previous project. Delivery of equipment is focused for field-testing of plant protection products with is our interest to fulfil the gap in the plant protection system for several plants, mainly for vegetables. Phare Project CZ "Strengthening Capacity in the Phytosanitary area" is connected with the activity under point 2,3 and 4.for new proposed project Phare 2003 to improve every day work in the regional workplaces of SPA. Investment is focused to replace old equipment on the regional and local level of SPA.. Project Phare CZ is focused to special diagnostic methods for harmful organisms. This Project is connected with Activities under point 3,4, and Results 1. Testing plant protection products: The specialised department for testing in Olomouc (Division of diagnostics) is fully prepared and able to perform their tasks in the field of testing biological properties of plant protection products from the day of accession. 2. Registration of plant protection products: Special SW is fully able to transfer and collect technical data for registration of PPPs in SPA and also in NIHP. 3. Plant health harmful organisms: The diagnostic laboratories of SPA are equipped for testing Bacterial diseases of potato with new equipment according to the results of Twinning /Phare 1999 project and the advises of the Dutch twinner; the central laboratory in Olomouc is equipped with equipment necessary for implementing the main rules of good laboratory practice /GLP/ and quarantine requirements for their work and special SW for monitoring harmful organisms be able to transfer important information to all Member States 4. Administrative and training centre of SPA The centre is equipped in order to improve management and training conditions of SPA inspectors. 3.4 Activities 1. Supply of laboratory equipment (Phare budget: 0,4 mil. EUR) Delivery of equipment for the testing of biological properties of plant protection products to the specialised department of the Division of Diagnostics in Olomouc. Special Department, which is included to the Diagnostic Department in Olomouc, is responsible for field-testing of PPPs and the results are submitted to Department in Brno for registration procedure of PPPs. The new equipment will enable to acquire the exact data for registration procedure for minor crops.. 2. Technical assistance delivery of special SW (Phare budget 0,3 mil. EUR), supply of IT equipment (CZ co-financing 0,5 mil. EUR) Delivery of special SW for registration of PPPs/Department of SPA in Brno and NIHP Praha will enabe to integrate database system for registration of PPPs with EU Member States system and also will enable to FILENAMECZ doc 2

3 evaluate documentation for registration in simple way. Delivery of special SW for monitoring of harmful organisms 3. Supply of laboratory equipment (Phare contribution 0,7 mil EUR, CZ co-financing 0.1 mil EUR.) Delivery of equipment for the regional diagnostic laboratories of SPA/regional level/. As was mentioned above in point 3 the Dutch twinner recommended better equipment of regional laboratories, that are mainly responsible for testing Bacterial diseases of potato and increasing of number of samples for testing. 4. Supply of equipment for SPA administrative and training centre (Phare contribution 0.1 mil EUR), supply of equipment (CZ co-financing 0.15 mil EUR) Delivery of equipment for the SPA administrative and training centre, to improve the management and training conditions of SPA inspectors. 5. SPA administrative and training Centre, works (CZ co-financing 2.25 mil EUR) 3.5 Lessons learned All relevant recommendations from previous projects have been taken into account. 4. Institutional Framework State Phytosanitary Administration (SPA) is directly subordinated to the Ministry of Agriculture and functions as the national single and central authority of the Czech Republic in the phyto-sanitary field for the plant health (harmful organisms) and plant health (pesticides) sub-sectors, according to the Act No 147/1996 of the Law Book. The implementation of the project will ensure the full discharge of the responsibilities of the institution with the requirements of the EU and Czech legislation. 5. Detailed Budget (mil. ) Project Components Phare National Co Total Investment Support Institution Building Total Phare (=I+IB) financing contract 1 Supply laboratory equipment 0,4 0,4 0,4 contract 2 Technical Assistance 0,3 0,3 0,5 0,8 contract 3 0,7 0,7 0,1 0,8 Supply laboratory equipment contract 4 Supply equipment 0,1 0,1 0,15 0,25 contract 5 Construction works 2,25 2,25 Total 1,2 0,3 1,5 3,0 4,5 There will be parallel co-financing. Co financing from the state budget - chapter - MoA, year Implementation Arrangements 6.1 Implementing Agency Responsibility for the administration related to the procedural aspects of procurement, contracting accountancy will rest upon the CFCU, PAO: Mr. Jan Slavícek. Responsibility for the administration related to the preparation, technical control, implementation and monitoring will rest with the State Phytosanitary Administration. The contact person: Mr. Miroslav Husak State Phytosanitary Administration, Department of Phytosanitary Supervision, Tešnov 17, Praha 1, Tel.: , fax , miroslav.husak@srs.cz 6.2 Twinning n.a. 6.3 Non-standard aspects FILENAMECZ doc 3

4 n.a. 6.4 Contracts Contract 1 Supply of equipment 0,4 M Contract 2 Service contract 0,3 M Contract 3 Supply of equipment 0,7 M Contract 4 Supply of equipment 0,1 M 7. Implementation Schedule Supply of equipment (C1 + C3 + C4) Start of tendering 3Q/2003 Start of project activity 4Q/2003 Project Completion 2Q/2004 Technical assistance (C2) Start of tendering 3Q/2003 Start of project activity 4Q/2003 Project Completion 2Q/ Equal Opportunity Equal opportunity principles and practices in ensuring equitable gender participation in the Project will be guaranteed. 9. Environment n.a. 10. Rates of Return n.a. 11. Investment Criteria n.a. 12. Conditionality and Sequencing The project is conditional upon Czech co-financing. The equipment that should be supplied under activity no. 4 (equipment for the SPA centre) should be delivered when the building is ready. ANNEXES TO PROJECT FICHE 1. Logframe planning matrix 2. Detailed implementation chart 3. Contracting and disbursement schedule 4. Indicative List of equipment for SPA FILENAMECZ doc 4

5 Annex 2 LOGFRAME PLANNING MATRIX Project title: Strengthening Institutional and Administrative Capacity in the Phytosanitary area (diagnostics, testing activities, registration of plant protection products-ppps and monitoring of harmful organisms) Programme number: CZ 2003/ Contracting period expires: 31/10/2005 Disbursement period expires: 31/10/2006 Beneficiary institution: MoA SFA Total budget: mil. 4.5 Phare budget: mil. 1.5 Overall objective Objectively verifiable indicators Sources of Verification Ability to take on the obligations of membership Acknowledgement of the EC EC Monitoring Report including adherence to the aims of political, economic and monetary union Project purpose Objectively verifiable indicators Sources of Verification Assumptions There are two different sectors involved: harmful The SPA will have complete full technical Annual Report of the SPA Full transposition and organisms and plant protection products capacity established for application and Reports of Ministry of Agriculture enforcement of Council Strengthen and complete the central regulatory enforcement of Council Directives 2000/29, Reports of EC (Monitoring Report ) Directives 2000/29,and capacity and the appropriate technical capacity of 91/414/EEC and 93/71/EEC by IV. Q 2003 Project report 91/414/EEC, 93/71/EEC by the State Phytosanitary Administration (SPA) for with the particular regard to the The indicator will be verified by EU IV. Q 2003 adopting and implementing the acquis implementation of the EU acquis TAIEX experts no later than one year communautaire after finishing Project ) in the field of plant health - harmful organisms, Council Directives 2000/29 in particular, and 2) in the field of testing of plant protection products, Council Directive 91/414/EEC in particular, including diagnostics and special SW for registration of PPPs 3) Improvement of the management and training conditions of SPA inspectors. Results Objectively verifiable indicators Sources of Verification Assumptions 1.Testing plant protection products: The specialized department for testing in Olomouc (Division of diagnostics) is fully prepared and able to perform their tasks in the field of testing biological properties of plant protection products from the day of accession. Trained staff of SPA and full technical capacity established by Phare projects for application and enforcement of the Council Directive 91/414/EEC with particular regard to testing of plant protection products from the first day of accession. The SPA will be able to test biological properties of plant protection products above Internal SPA laboratories procedure control reports Project reports provided by SPA Diagnostics laboratories /immediately when all equipment will be operated/. Checks on the spot by Taiex experts. Full transposition and enforcement of Council Directives 2000/29,and 91/414/EEC, 93/71/EEC by IV. Q 2003 CZ docPAGE

6 2.Registration of plant protection products: Special SW is fully able to transfer and collect technical data for registration of PPPs in SPA and also in NIHP. 3.Plant health harmful organisms : The diagnostic laboratories of SPA are equipped for testing Bacterial diseases of potato with new equipment according to the results of Twinning /Phare 1999 project and the advises of the Dutch twinner; the central laboratory in Olomouc is equipped with equipment necessary for implementing the main rules of good laboratory practice /GLP/ and quarantine requirements for their work and special SW for monitoring harmful organisms be able to transfer important information to all Member States all in the minor indications is in place in the department for testing in Olomouc and trained staff of SPA for performing the testing biological properties of plant protection products in the same procedures like in EU by The regional diagnostic laboratories are equipped with the equipment necessary for more effective performance of methods for testing Bacterial diseases of potato and are technically prepared to fulfil the requirements of GLP and quarantine requirements for their work and the regional workplaces of SPA are equipped and able in an effective way fulfil the requirements of the relevant acquis from the first day of accession. 4.Administrative and training centre of SPA The centre is equipped and built up in order to improve management and training conditions of SPA inspectors. Activities Means Assumptions FILENAMECZ doc 6

7 Ad 1.) Delivery of equipment for the testing of biological properties of plant protection products to the specialised department of the Division of Diagnostics in Olomouc. Ad 2.) Delivery of special SW for registration of PPPs/Department of SPA in Brno and NIHP Praha and special SW for monitoring of harmful organisms Ad 3.) Delivery of equipment for the regional diagnostic laboratories of SPA/regional level/. Ad 4.) Delivery of equipment and construction of the SPA administrative and training centre. Ad 1.) Equipment for the specialised department for testing (Division of Diagnostics in Olomouc) Total costs Phare contribution: 0,4 mil. EUR (see Tab.1 for details) Ad 2.) Supply of special SW for registration of PPPs and monitoring of harmful organisms Phare contribution/ta: 0,3 mil. EUR, CZ co financing: 0,5 mil. EUR (see Tab. 4 for details). Total costs: 0,8 mil. EUR Ad 3.) Equipment for regional diagnostic laboratories of SPA (regional level) Phare contribution: 0.7 mil. EUR (see Tab. 2 for details), CZ co financing: 0,1 mil. EUR (see Tab 5 for details). Total costs: 0,8 mil. EUR Ad 4.) Supply of equipment for the SPA centre. Phare contribution: 0,1 mil. EUR (see Tab. 3 for details), CZ co financing: 0,15 mil. EUR (see Tab. 6 for details) + construction works 2,25 mil. EUR Total costs: 2,5 mil. EUR Availability of qualified staff. Technical specification will be reviewed by an independent expert (from DEC budget). INV CZ co-financing 3,0 mil. EUR Summary: Phare contribution: 1,5 mil. EUR Czech co-financing: 3,0 mil. EUR Total budget: 4,5 mil. EUR FILENAMECZ doc 7

8 Preconditions Investment Phare project 2000 CZ will be implemented by II.Q This project covers the supply of HW, SW and laboratory equipment, enabling to fulfil the EC requirements in the areas of the new diagnostic methods for distinguished harmful organisms. (Phare contribution: 2 M ) Twinning and Investment Phare project 2001 CZ from which SPA will receive new diagnostic equipment and SPA needs training on this equipment under Phare 2002 and also we need to recognise new diagnostic methods. In the list of harmful organisms are more than 300 pests. The twinning part focuses on specialist for registration. (Phare contribution: 1,75M ) Twinning Phare project 2002 CZ2002/ for diagnostic and quarantine specialists (Phare contribution: 0.75 M ) FILENAMECZ doc 8

9 DETAILED IMPLEMENTATION CHART ANNEX 2 Strengthening Institutional and Administrative Capacity in the Phytosanitary area Year Action J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D Tender Launch Contract X X X Contracts signature X X X Delivery of laboratory equipment X X X X Tender Launch Contract 2 Contract 2 signature Project completion Tender Launch Contract 4 Contract 4 signature Delivery of equipment X X X X X X X X X X X X X X X X X X X X FILENAMECZ doc 9

10

11 Annex 2 3 CONTRACTING AND DISBURSEMENT SCHEDULE Cumulative Quarterly Contracting Schedule (mil. ) Project 1Q/03 2Q/03 3Q/03 4Q/03 1Q/04 2Q/04 3Q/04 4Q/04 1Q/05 2Q/05 3Q/05 4Q/05 Total Strengthening Institutional and Administrative Capacity in the Phytosanitary area 1,5 1,5 Cumulative Quarterly Disbursement Schedule (mil. ) Project 1Q/03 2Q/03 3Q/03 4Q/03 1Q/04 2Q/04 3Q/04 4Q/04 1Q/05 2Q/05 3Q/05 4Q/05 Total Strengthening Institutional and Administrative Capacity in the Phytosanitary area 0,15 1,4 1,5 1,5 CZ docPAGE

12 Annex 4 Indicative List of equipment for SPA (PHARE 2003 financing) Note: Amounts stated in the tables below are only indicative and will be subject to specification in TS Tab. 1: Supply of equipment for the specialised department for testing (Division of Diagnostics) in Olomouc Equipment Piece/s Location Price (M ) Total (M ) Special manipulation building for testing department 1 Olomouc 0,200 0,200 Tractor (power kw) 1 Olomouc Machines for soil preparation 1 Olomouc Pneumatic seeder for precision sowing 1 Olomouc 0,065 0,065 Fertilizer distributor 1 Olomouc Trial plot sprayer 1 Olomouc Liquid/dry seed dresser for small quantities 1 Olomouc Sample divider 1 Olomouc Laboratory thresher 1 Olomouc Laboratory seed counting equipment 1 Olomouc Laboratory equipment for seed calibration 1 Olomouc Biological incubator 1 Olomouc Laboratory freezer 1 Olomouc Laboratory refrigerator 1 Olomouc Laboratory balances 1 Olomouc TOTAL Tab. 2: Supply of equipment for regional diagnostic laboratories (Division of Diagnostics) of SPA (regional level) Equipment Piece/s Location Price (M ) Total (M ) High capacity laboratory shaker with cooling 3 H. Brod, Tábor, Terezín Fluorescence microscope with filters for 3 H. Brod, Tábor, FITC and cyano Terezín Stomacher homogeniser 3 H. Brod, Tábor, Terezín Laboratory autoclave for controlled preparing 1 Olomouc of media incl. dosing of media Centralised monitoring of temperatures in cultivating and storing rooms and equipments 5 H. Brod, Tábor, Terezín Olomouc Praha-Ruzyne Olomouc Cooling rooms with lighting for growing of tested plants Technology for rooms for rearing of 1 Olomouc quarantine insects Centralised technology for autoclaving 1 Olomouc quarantine laboratory waste Equipment of laboratory for documentation 1 Olomouc and education TOTAL Tab. 3: Supply of equipment for the administrative and training centre of SPA Equipment Piece/s Location Price (M ) Total (M ) Airconditioning 1 AUD Stereomicroscope 2 DTC Frezer 1 DTC Biological microscope 2 DTC Refrigerator 1 DTC Laboratory shaker and 1+1 DTC minishaker Laboratory certifuge 1 DTC TOTAL FILENAMECZ doc 12

13 List of equipment for SPA (CZ co-financing) Note: Amounts stated in the tables below are only indicative and will be subject to specification in TS Tab. 4 : Special SW fo registration of PPPs and monitoring of harmful organisms/ cofinancing/ Equipment Piece/s Location Price (M ) Total (M ) RedHat Advanced Server 2 Brno Novell ZENworks 100 Brno GIS server for maping 1 Praha GIS SW for data preparing 3 Praha, Brno, Olomouc GIS mapa ZABAGED 1: Praha TOTAL Tab. 5: Supply of equipment for the regional workplaces of SPA Equipment Piece/s Location Price (M ) Total (M ) Biological microscope with camera and PC 2 Brno, Opava documentation system Digitalcamcorder 7 7 reg workplaces Stereomicroscope 7 7 reg workplaces Digital photocamera reg.workplaces Biological microscope 5 5 reg workplaces TOTAL Tab. 6: Supply of equipment for Auditorium (capacity of 60 persons) in administrative centre Equipment Piece/s Location Price (M ) Total (M ) Dataprojector with camera system, automatic 1 AUD controled screen Complete interpreter cabin 2 AUD Seat with turn table 60 AUD Conference set IR 60 AUD Overhead projector 1 AUD Slide projector (programmable) 1 AUD Copyboard 1 AUD Plasma screen inch 2 AUD Control and audio technic set 1 AUD Refreshment point 1 AUD TOTAL FILENAMECZ doc 13