Terms and conditions for laboratories appointed to undertake the testing of compost under the Compost Certification Scheme aligned to PAS 100 and the

Size: px
Start display at page:

Download "Terms and conditions for laboratories appointed to undertake the testing of compost under the Compost Certification Scheme aligned to PAS 100 and the"

Transcription

1 Terms and conditions for laboratories appointed to undertake the testing of compost under the Compost Certification Scheme aligned to PAS 100 and the Compost Quality Protocol Renewable Energy Assurance Limited Compost Certification Scheme Version 1 Issued: November 2014 Come into effect: 1 st January 2015

2 1 INTRODUCTION INDEPENDENCE CONTRACTING WITH AN APPOINTED LABORATORY QUALITY ASSURANCE AND CONTROL INDEPENDENT ASSESSMENT OF CONFORMITY WITH THESE T&CS TERMINATION OF APPOINTMENT SUB-CONTRACTORS UKAS ACCREDITATION FEES COMPOST SAMPLING AND ANALYSES REQUEST TEMPLATES REPORTING TO COMPOSTER PRODUCERS AND REPORT FORMAT REPORTING TEST RESULTS TO REAL PRE-ARRANGED INTER-LABORATORY TRIALS SPOT LAB CHECKS METHODS OF TEST FOR COMPOST SAMPLES LABORATORIES SAMPLE PREPARATION, STORAGE AND TRANSIT CONDITIONS APPOINTED LABORATORIES LIST REAL S RESPONSIBILITIES

3 Foreword Renewable Energy Assurance Limited (REAL) has established these Terms and Conditions (T&Cs) for laboratories appointed to undertake testing under the Compost Certification Scheme (CCS). These terms and conditions set out the respective responsibilities of REAL and the appointed laboratories. These latter include: performance and compliance criteria provisions for samples transport, storage, and preparation participation in inter-laboratory trials, spot checks and proficiency testing schemes reporting of test results When appointed by REAL, a laboratory agrees to comply with all the terms and conditions set out in this agreement at all times. A laboratory s appointment will be dependent on the laboratory s compliance with all the terms and conditions set out in this agreement. If REAL should have evidence that a laboratory has not complied with these terms and conditions, its appointment may be terminated immediately on written notice. 3

4 1 INTRODUCTION The Compost Certification Scheme (CCS) is administered by Renewable Energy Assurance Limited (REAL). REAL is a wholly-owned subsidiary company of Renewable Energy Association (REA). The CCS assesses and verifies compost producers conformance with: the British Standards Institution (BSI) s Publicly Available Specification (PAS) for Composted Materials (BSI PAS 100:2011) the Quality Protocol for the production and use of quality compost from sourcesegregated biodegradable waste (the CQP, adopted in England, Wales and Northern Ireland); REAL Scheme Rules (latest version); and SEPA s Composting Position Statement (latest version). The CCS requires participating compost producers to send compost samples for testing to appointed laboratories (Appointed Laboratories) only. Responsibility for appointing laboratories to test compost samples under the CCS can be found in section 17 of this document and rests with REAL. A list of Appointed Laboratories (List) can be found at 2 INDEPENDENCE In order to ensure the credibility of the CCS, an Appointed Laboratory is required to be impartial in testing and reporting the quality of compost samples. An Appointed Laboratory must declare any commercial or corporate link with a compostproducing organisation or other conflict of interest, this and demonstrate how it can guarantee impartiality. If a commercial or corporate link should arise during the term of appointment the Appointed Laboratory must inform REAL as soon as it becomes aware of it. 3 CONTRACTING WITH AN APPOINTED LABORATORY Appointed Laboratories must inform REAL of any changes to their contact details so that REAL can promptly update the List. 4

5 4 QUALITY ASSURANCE AND CONTROL 4.1 Laboratory s management system The Appointed Laboratory must develop, implement and maintain a management system for its testing and calibration activities in line with the requirements of EN ISO/IEC 17025: Laboratory s quality control Routine procedures for quality assurance and control must be in place at the Appointed Laboratory and any sub-contracted laboratory it uses to improve the quality of the results reported by the laboratory. Internal quality control measures must be monitored and acted upon to improve data variability within an expected margin of error. The principles of quality control monitoring described in NS 30 (A manual on analytical quality control for the water industry) must be followed 1. The manual describes all necessary actions and procedures needed to maintain control for data reporting. These include: ensuring sample homogeneity, representative sub-sampling, use of validated methodology for the appropriate test matrix, use of blanks, replicates and control samples and monitoring of this data using Shewhart control charts. Quality control is a measure of precision, or how well the measurement system reproduces the same result over time and under varying operating conditions. Laboratory quality control material must be run at the beginning of each shift, after an instrument is serviced, when reagent lots are changed, after calibration, and whenever results seem inappropriate. Quality control material should approximate the same matrix as that required to be tested, taking into account its physical chemical properties. Interpretation of quality control data must include graphical and statistical methods (e.g. Control Charts). Laboratories should produce a dried bulk internal reference or control sample that should be included in all test batches. Control charts like Shewhart charts must be set up to record the results of the internal reference or control sample to provide a continuing check on analytical performance. These charts are used to identify random step changes or longer term data trends that may be due to equipment maintenance or failure. Regular monitoring of these charts will ensure prompt remedial action. 1 Please note that NS30 is based on a test medium (water) which is very different from composted products as it has much fewer degrees of variability between aliquots of the same sample than composted products. What is important is the principles set out in the manual. 5

6 4.3 Technical competence The staff of an Appointed Laboratory must be competent to provide the requisite testing services, to perform the relevant test methods and to produce technically valid data and results. The Appointed Laboratory will be responsible for the competence and behaviour of its staff, and for the staff of those acting on its behalf. 4.4 Internal audits An Appointed Laboratory (and any sub-contractors it may use) must conduct and record internal audits at planned intervals, at least annually, or sooner if required, to determine whether: the correct procedures are being followed, any changes need to be made to improve accuracy, repeatability and reproducibility, equipment performance and efficacy, and the terms and conditions set out in this document are being complied with. The Appointed Laboratory must make these records available to REAL when requested. 4.5 Standard Operating Procedures An Appointed Laboratory (and any sub-contractors it may use) must have Standard Operating Procedures (SOPs) setting out instructions on how to carry out the required tests using the specified methodologies. The SOPs must not deviate from the test methodologies specified in PAS 100 or any other instructions specified by REAL. 4.6 Validation of test methods Each test method carried out by an Appointed Laboratory (and any sub-contracted laboratory) under REAL appointment must be initially validated for the specific test matrix (compost). The responsibility for validating a test method and using an appropriate validation method lies with the Appointed Laboratory. Method validation seeks to quantify the likely accuracy of results by assessing the magnitude of both systematic and random effects (see NS30). Typically this is undertaken on a selection of representative samples which would comprise: (i) a blank sample (to facilitate estimation of the method limit of detection); (ii) two standard solutions or samples at the lower and upper range of interest,(iii) a sample and a spiked sample (where possible) to facilitate estimation of recovery and precision on real samples. Typically an experimental 6

7 design of 11 batches analysed on a separate occasion in duplicate for each sample is required (DWi, 2012) 2. ISO covers procedures suited to microbiological analysis. 4.7 Re-validation of test methods/procedures An Appointed Laboratory (and any sub-contractor it may use) must re-validate the specified test methods it uses should there be a change to it (for example, a change to the test method specified in PAS 100 or an improvement to the test method made by the method owner). The responsibility for validating the test method and using an appropriate validation method lies with the Appointed Laboratory. See recommended procedures described in section 4.6. An Appointed Laboratory must inform REAL every time it changes the specification of the equipment it uses to carry out a test method and, in such a circumstance, it may be required to re-validate the test method. An Appointed Laboratory may be required to take part in inter-laboratory trials as part of the re-validation of the test method or new equipment or, if appropriate, to take part in one or more proficiency scheme testing rounds, as may be defined by REAL from time to time. 4.8 Complaint procedures An Appointed Laboratory must follow a process to identify if a corrective action is required or not and, if required, implement any necessary corrective action following any complaints or concern expressed by any interested parties, including operatives, customers, clients, certification bodies, the Scheme Owner or regulatory authorities about the quality of their services. An Appointed Laboratory must record: a) name and contact details of the person who expressed concern or made a complaint; b) specific subject(s) of the concern or complaint; c) date and time communicated to the lab and name of the person to whom it was communicated; d) nature and date(s) of any actions and checks and who carried them out; e) nature and date of any response to the person who expressed a concern or made the complaint; and f) name of the person who communicated the response. 2 DWi, Guidance on the Implementation of the Water Supply (Water Quality) Regulations 2000 (as amended) in England, version 1.1, March 2012, Appendix A, Section

8 5 INDEPENDENT ASSESSMENT OF CONFORMITY WITH THESE T&CS The laboratory s initial appointment or appointment renewal is conditional upon demonstrated evidence of compliance with these T&Cs. 5.1 Annual audits For initial appointment and each 12 month renewal phase thereafter, REAL s assessment of conformity with these T&Cs shall include an independent assessment of the Appointed Laboratory. This assessment will include at least one visit to the premises of the Appointed Laboratory and of any sub-contractor it may use (unless this is already audited as an Appointed Laboratory). An audit report will be supplied by the independent auditor following the independent assessment listing any non-conformances and any other relevant observations/comments. The type of non-conformity assigned against any of these T&Cs shall be based upon evidence and observations made during the evaluation, whether done before the audit, during that visit, or afterwards when corrective action evidence is being evaluated. Within a week from receiving the audit report the Appointed Laboratory must supply to the independent auditor a list of corrective actions that will be taken to address any nonconformity and indicate the maximum timescale for the completion of such corrective actions. Non-conformities must be addressed in a timely manner and within a maximum of 28 days from the audit date. Depending on the type and nature of the non-conformity the independent auditor may request that the Appointed Laboratory takes corrective actions immediately or may establish that 28 days is not sufficient to complete the required corrective action and therefore extend the maximum allowed timescale. Depending on the type and nature of the non-conformity and whether this affects the validity of the test results, the independent auditor may suspend testing until the nonconformity has been fully resolved. Appropriate actions and maximum timescales for completion of such actions may also be identified by the Appointed Laboratory or required by the Independent Auditor in relation to observations or comments made by the Independent Auditor that are not reported as non-conformities. 5.2 Spot check visits REAL reserves the right to carry out one or more extra audits if these are required to verify that any non-conformity has been addressed by the Appointed Laboratory and any sub- 8

9 contractor it may use. The costs associated with any additional visits carried out shall be borne by the Appointed Laboratory, but shall be kept as low as reasonably possible. An Appointed Laboratory (and any sub-contractor it may use) must agree to co-operate with any planned or unannounced spot check external audits carried out by REAL or an external organisation appointed by REAL. 6 TERMINATION OF APPOINTMENT REAL reserves the right to terminate an Appointed Laboratory s appointment if it the Appointed Laboratory is in breach of any of the requirements specified in these T&Cs. If non-conformities have not been addressed within a maximum of 28 days from the audit date, or within the timescales specified by the independent auditor, the Appointed Laboratory will be informed by REAL in writing that the appointment will be terminated in 28 days from receipt of the notice letter. The laboratory will have the right to re-apply but it would not be readmitted until it could demonstrate that the non-conformities had been adequately addressed. 7 SUB-CONTRACTORS An Appointed Laboratory may sub-contract testing of one or more compost parameters to another laboratory, provided the sub-contracted laboratory complies with all requirements specified in these terms and conditions. Appointed Laboratories must require any laboratories they sub-contract with to comply with these terms and conditions and this must be an express term of the sub-contract. The Appointed Laboratory will be responsible for ensuring that these T&Cs are met at all times. An Appointed Laboratory will be responsible for carrying out audits at any of its subcontracted laboratories it uses to ensure that these Terms and Conditions are adhered to. The outcome of such audits must be recorded. 8 UKAS ACCREDITATION An Appointed Laboratory must inform REAL if it or any sub-contracted laboratory it uses is accredited by UKAS to carry out microbiological testing of composts in accordance with the International Standard ISO FEES 9.1 Laboratories fees An Appointed Laboratory must inform REAL of the guide fees it will apply for carrying out each parameter test, for each suite of tests and for the analysis of multiple samples when REAL requests it. REAL may aggregate such information with that from other Appointed Laboratories and use it in an anonymised form as the basis of scheme guidance on typical 9

10 fees charged by Appointed Laboratories for compost testing in accordance with PAS 100 and the CQP. 9.2 REAL s annual fees REAL will require Appointed Laboratories to pay an appropriate annual fee. This fee will be a flat rate, calculated so as to cover the costs of: arranging inter-laboratory/ring trials and spot checks; appointing a suitably-qualified contractor to analyse the results of any trials; evaluating the results and writing recommendations following the inter-laboratory trials; appointing an auditor to check the Appointed Laboratory s compliance with these terms and conditions. This assessment will include at least one visit to the premises of the Appointed Laboratory and of any sub-contractor it may use (unless this is already audited as an Appointed Laboratory) 3 ; and evaluating the outcome of the auditor s checks and carry out any further checks required to verify that corrective actions have been taken by the Appointed Laboratories. The flat rate will be based on the assumption that all PAS 100 test methods are carried out at the Appointed Laboratory. REAL reserves the right to charge an appropriate fee to recover the cost associated with auditing any sub-contracted laboratories, when this is required. Where the Appointed Laboratory sub-contracts tests to another Appointed Laboratory, a separate audit of the sub-contractor may not be required. In the event that a planned inter-laboratory trial shows that results precision, trueness, intra-laboratory repeatability and/or inter-laboratory reproducibility is inadequate, REAL reserves the right to charge an extra fee to cover for any additional assessment required to check the laboratory s performance. 10 COMPOST SAMPLING AND ANALYSES REQUEST TEMPLATES 10.1 Compost sampling and analysis request templates accompanying routine samples Test results must not be reported to the compost producer unless the sample is accompanied by the relevant Compost Sampling and Analysis Request record template correctly completed. In the event of this record template not being provided by the compost producer with the sample or being only partially completed, the Appointed 3 Note that the time spent by the independent auditor in carrying out the independent assessment and the associated fee will take into account the number and type of tests carried out at the appointed lab and whether any sub-contracted laboratory is already a laboratory appointed by REAL in its own right. 10

11 Laboratory must advise the composter that the associated results will not be reported until the fully completed record template has been supplied Compost sampling and analysis request templates accompanying spot and independent samples The CCS has introduced a programme of independent sampling and spot sampling. As a result, an Appointed Laboratory may occasionally receive spot or independent samples which are accompanied by a clearly identified Independent Sampling and Analysis Request form or a Spot Sampling Analysis Request form. For any clarification on spot or independent samples and associated analysis request forms, the appointed laboratory should contact REAL. An Appointed Laboratory should not seek such clarification or any instructions from the compost producer that is the subject of independent sampling or spot sampling Charges for independent and spot samples An Appointed Laboratory will charge the compost producer who was the subject of independent sampling at the standard rate, unless otherwise specified in the Independent sampling and analysis request form. This needs to be part of the contract / agreement between lab and compost producer. In a similar way, an Appointed Laboratory will charge the organisation indicated in the Spot sampling and request form at the standard rate. This may be either REAL or the compost producer that was the subject of the spot sampling. Spot samples will normally be tested as a part of an investigation into a complaint concerning the quality of the compost sampled. 11 REPORTING TO COMPOSTER PRODUCERS AND REPORT FORMAT REAL requires each Appointed Laboratory to use its Analysis Report ~ Composted Material template document, or to modify its reporting system in such a way that the format and information is presented as shown in the REAL s template. An Appointed Laboratory must always provide test results in a PDF format alongside any other format requested by the compost producer (e.g. excel or data files (.cav) for inclusion in bespoke databases). For any parameter test not carried out on a compost sample but shown on the report template, the report s corresponding result cell should display N/D, meaning not determined. An Appointed Laboratory must retain test reports supplied to the compost producer for a minimum of three years. 11

12 12 REPORTING TEST RESULTS TO REAL An Appointed Laboratory must collate all PAS 100 test results related to the compost producers and supply them to REAL whenever requested. These may include test results obtained for: For initial validation purposes; On-going testing to verify the continued efficacy of the PAS 100 quality management system and compost compliance with PAS 100 minimum quality criteria and any other criteria specified and agreed with the customer; Archive samples that have been tested to verify compliance with PAS100; and Re-sample test results that have been tested to verify corrective actions efficacy. 13 PRE-ARRANGED INTER-LABORATORY TRIALS In addition, REAL reserves the right to carry out inter-laboratory trials at any time to check Appointed Laboratories performance. In particular, inter-laboratory trials will be designed to check the test results repeatability, reproducibility and trueness. Participation in such trials will be compulsory. An Appointed Laboratory is required to bear the following costs: The cost of sampling by a suitable sampling provider appointed by REAL; The cost of testing, reporting and implementing any required corrective actions; and The cost of the time spent by REAL s staff in setting up and project managing the trial, evaluating the ring trials results and checking the implementation of any corrective actions. The above costs are already included in the fees outlined in section 7.2. REAL will carry out inter-laboratory trials as a minimum every two years, unless participation in proficiency schemes is regarded as sufficient to assess Appointed Laboratories performance. An Appointed Laboratory must implement at its cost and within the prescribed timescales any recommendations or corrective actions identified as a result of inter-laboratory trial. An Appointed Laboratory must record any corrective action or improvement made by the laboratory. Inter-laboratory trials are announced, unlike spot inter lab checks referred to in clause SPOT LAB CHECKS REAL reserves the right to carry out an unlimited number of unannounced spot checks at the Appointed Laboratory and any laboratory it sub-contracts. 12

13 15 METHODS OF TEST FOR COMPOST SAMPLES The test methods used by the Appointed Laboratories must be those specified in the latest version of the PAS 100. Appointed Laboratories must follow the instructions specified in the test methods and any additional instructions specified in the laboratory s own validated standard operating procedures. Appointed Laboratories may subcontract one or more tests to another laboratory. In such scenario the Appointed Laboratory will be responsible for ensuring these T&Cs are met at all times E.coli An Appointed Laboratory must be registered on and participate in the VLA QAS Proficiency Scheme PT0164 for E.coli ( Vetqas@ahvla.gsi.gov.uk). If an Appointed Laboratory is removed from the PT0164, it shall notify REAL within 5 working days and will no longer remain appointed by REAL to carry out E.coli testing. REAL is set by the VLA as a viewer, this is allowed to view the proficiency scheme test results and associated VLA reports. When a VLA QAS tabulation of the E.coli test results shows that incorrect values have been reported by an Appointed Laboratory, this laboratory shall carry out an investigation to understand why it happened and apply corrective actions to ensure incorrect results are not reported in future distributions. A record of the investigation shall be made and kept by the laboratory and provided to REAL when requested. The record shall include: Reference to the VLA QAS sample distribution period; The reason for the incorrect reported result; and The action/s taken by the laboratory to address the cause of the incorrectly reported result. The VLA QAS will send a repeat set of samples for E.coli to ensure the laboratory s corrective actions have been effective. REAL reserves the right to suspend the lab appointment to carry out E.coli testing in the event the Appointed Laboratory fails to meet the requirements set out above. REAL reserves the right to require any appointed laboratories in future to participate in an alternative proficiency scheme, if this is regarded as more suitable than the one specified above. 13

14 15.2 Salmonella An Appointed Laboratory must participate in the VLA QAS Proficiency Scheme PT0164 for Salmonella ( If an Appointed Laboratory is removed from the PT0164, it shall notify REAL within 5 working days and will no longer remain appointed by REAL to carry out Salmonella testing. REAL is set by the VLA as a viewer, this is allowed to view the proficiency scheme test results and associated VLA reports. When a VLA QAS tabulation of the E.coli test results shows that incorrect values have been reported by an Appointed Laboratory, this laboratory shall carry out an investigation to understand why it happened and apply corrective actions to ensure incorrect results are not reported in future distributions. A record of the investigation shall be made and kept by the laboratory and provided to REAL when requested. The record shall include: Reference to the VLA QAS sample distribution period; The reason for the incorrect reported result; and The action/s taken by the laboratory to address the cause of the incorrectly reported result. The VLA QAS will send a repeat set of samples for Salmonella to ensure the laboratory s corrective actions have been effective. REAL reserves the right to suspend the lab appointment to carry out Salmonella testing in the event an Appointed Laboratory fails to meet the requirements set out above. REAL reserves the right to require any appointed laboratories in future to participate in an alternative proficiency scheme, if this is regarded as more suitable than the one specified above Stability Within laboratory precision for this parameter achieved during the development of this test method (Llewelyn, 2005) is to 2.0 mg CO2/g VS/day Potentially Toxic Elements An Appointed Laboratory must participate in any proficiency scheme specified by REAL for all above parameters. Indicative precision and bias limits for heavy metals are: 7.5% precision, and 10% bias. 14

15 These values are in line with the precision and bias limits for metals specified in the Environment Agency s Performance Standard for Laboratories undertaking Chemical Testing of Soil (March 2012, Version 4). If and when an appropriate proficiency scheme becomes available, REAL reserves the right to extend this agreement to require appointed laboratories to participate in a proficiency scheme All other parameters specified in the PAS 100 or the Compost Quality Protocol REAL appointed laboratory or its sub-contracted laboratory shall register and participate in any proficiency scheme specified by REAL for the above parameters. Such a proficiency scheme is not available at the time of writing. If and when such a proficiency scheme becomes available, REAL reserves the right to extend this agreement to require appointed laboratories to participate in a proficiency scheme Re-testing at appointed labs When the analytical procedure that has been used to test a sample at the appointed lab returns a test failure, a replicate of the same sample shall not be re-tested for the failed parameter, unless the laboratory is confident that a failure in the analytical procedure has occurred, resulting in an invalid result. Even when the laboratory is confident that a failure in the analytical procedure has occurred, a replicate of the sample shall only be re-tested if this has been stored according the conditions and the maximum timescales specified in clause LABORATORIES SAMPLE PREPARATION, STORAGE AND TRANSIT CONDITIONS 16.1 Storage conditions and max timescales An Appointed Laboratory must test samples as soon as possible after arrival for stability, plant response, weed seeds, E.coli and Salmonella parameters. SALMONELLA AND E.COLI: Appointed Laboratories must ensure that the time between the test samples arriving at the Appointed Laboratory and the start of the test procedures does not exceed 48 hours.. ALL PAS 100 PARAMETERS OTHER THAN SALMONELLA AND E.COLI: Appointed Laboratories must endeavour to ensure that the time between the test samples arriving at the Appointed Laboratory and the start of the test procedures does not exceed 48 hours. In no circumstances the time between the test samples arriving at the Appointed Laboratory and the start of the test procedures (at the Appointed Laboratory or its subcontracted Laboratory) shall exceed one week. 15

16 For all parameters (including Salmonella and E.coli) an Appointed Laboratory must not freeze samples. It must store them in a refrigerator or in cool conditions in a similar contained, dark space in order to minimise any changes to the characteristics of the sample over time Transit conditions and max timescales When an Appointed Laboratory arranges for the samples to be collected from the composter s premises, the laboratory must provide cool boxes and ice packs to facilitate suitable and sufficient storage and handling of the sample prior to being received at the lab. When an Appointed Laboratory sub-contracts another laboratory, transit of compost samples from the main appointed laboratory to the sub-contracted laboratory shall never exceed the timescales specified in clause Samples must be delivered to the sub-contracted laboratory in cool, darkboxes with ice packs, to facilitate suitable transport and handling of the sample prior to being received at the sub-contracted lab and to minimise any changes in sample characteristics over transit. The laboratory must check upon receipt of the sample that the compost sample has been transported in the correct conditions and within the maximum specified timescales 4. If samples are not delivered in the correct conditions or have not been sent by the composter within the correct timescales, the laboratory shall make aware the customer that the associated results may be deemed void by the certifying body. Any courier transporting ABP derived compost to be tested for Salmonella and E.coli must be registered AB117 for the transport of ABP material ( When the laboratory arranges sample collection on behalf of the composter, it shall agree with the composter in writing the timescales for compost sample collection in compliance with this clause and agree actions in the event the compost sample collection has been missed or has not taken place within the agreed timescales. 4 Each sample tested in order to demonstrate compliance with this PAS shall be sent by the composter to an appropriate laboratory within 1 working day after the sample was taken. REA strongly recommends that the composter uses a service that will deliver the sample to the laboratory within 48 hours. Samples should be delivered to the laboratory in a cool box with icepacks and in dark, to minimise any changes in sample characteristics over transit. 16

17 16.3 Subsampling and sample preparation Laboratory sub-sampling and sample preparation is an essential process that underlies all subsequent work and final test results reliability. Laboratory sub-sampling and sample preparation procedures must ensure that the sample subject to the analytical procedure is representative of the original sample provided by the composter. The Appointed Laboratory s management system, and that of any sub-contracted laboratory it uses, must describe sub-sampling and sample preparation procedures and demonstrate that these meet the objectives stated above. Sample preparation for all test parameters must be done in accordance with BS EN 13040, Soil improvers and growing media Sample preparation for chemical and physical tests, determination of dry matter content, moisture content and laboratory compacted bulk density Replicate numbers The number of replicates tested when performing a test method must be as set out in the relevant test method. An appropriate document within the Appointed Laboratory s management system must state the number of replicates routinely tested when performing the test method. When the minimum number of replicates is not set out in the test method instructions, in addition to specifying the minimum number of replicates used, the laboratory s management system must justify the basis on which the number has been chosen and demonstrate how this will ensure that reliable results are obtained. 17 APPOINTED LABORATORIES LIST REAL s public list of its appointed laboratories and their sub-contractors shall be in the format shown below and contains as a minimum the following information: Laboratory s name Laboratory s address Laboratory s main contact and associated details 18 REAL S RESPONSIBILITIES REAL is responsible for: Make a list of Appointed Laboratories publicly available and keep the list up to date Carry out or appoint an independent competent organisation to carry out external audits to ensure the Appointed Laboratories comply with all T&Cs in this agreement Update the Appointed Laboratories on the scheme on changes to standards, scheme rules, test methods and associated documentation. 17

Terms and conditions for laboratories appointed to undertake the testing of compost under the Compost Certification Scheme aligned to PAS 100 and the

Terms and conditions for laboratories appointed to undertake the testing of compost under the Compost Certification Scheme aligned to PAS 100 and the Terms and conditions for laboratories appointed to undertake the testing of compost under the Compost Certification Scheme aligned to PAS 100 and the Compost Quality Protocol Renewable Energy Assurance

More information

DECISION TO ACCREDIT

DECISION TO ACCREDIT DECISION TO ACCREDIT Determine the requirements of the regulator, legislation and customer s needs prior to deciding on the standard to implement. Process is based on the following: Top management s decision

More information

RAJESH NAIR DIRECTOR CALF-NDDB, ANAND, GUJARAT

RAJESH NAIR DIRECTOR CALF-NDDB, ANAND, GUJARAT RAJESH NAIR DIRECTOR CALF-NDDB, ANAND, GUJARAT 1 Coverage Need of AQC in food testing laboratories Analytical quality system of food testing laboratories Relationship between Quality System, Quality Assurance

More information

A02 Assessment Rating Guide Revision 2.9 August 21, 2016

A02 Assessment Rating Guide Revision 2.9 August 21, 2016 Revision 2.9 August 21, 2016 Laboratory Name: Assessment Date: (Lead) Assessor: Signature: ! TABLE OF CONTENTS 1.0! INTRODUCTION... 1 2.0! ASSESSOR NOTES ON THE USE OF CALA A02 ASSESSMENT RATING GUIDE...

More information

QP 02 Audit and Certification Procedure

QP 02 Audit and Certification Procedure 1. AUDIT PROGRAMME [9.1.1] The audit programme shall be conducted in stages within a 3-year certification cycle as follows; Initial audit: Two stage process Surveillance audit: Conducted in the first and

More information

Measurement Assurance and Certification Scotland

Measurement Assurance and Certification Scotland Measurement Assurance and Certification Scotland Performance Standard MACS-WAT-02 Sample and data management Version 2 August 2017 Record of amendments Version Date Amendment(s) 1 October 2016 First issue.

More information

The Compost Certification Scheme interpretation of PAS100, Compost Quality Protocol and the CCS Scheme Rules requirements

The Compost Certification Scheme interpretation of PAS100, Compost Quality Protocol and the CCS Scheme Rules requirements The Compost Certification Scheme interpretation of PAS100, Compost Quality Protocol and the CCS Scheme Rules requirements This document has been developed to assist you to comply with the Compost Certification

More information

Laboratory Quality Assurance Manager & Laboratory Assessor RULES & HANDBOOK

Laboratory Quality Assurance Manager & Laboratory Assessor RULES & HANDBOOK EOQ Personnel Registration Scheme Laboratory Quality Assurance Manager & RULES & HANDBOOK Prepared by: Dr. Eugenia Soboleva, Quality Austria In accordance with the working group on EOQ product development

More information

SAI Global Full Service Team

SAI Global Full Service Team General information regarding elements of the certification process is described below. A degree of flexibility and options in the certification process are available so please feel free to contact us

More information

MODULE 2A GENERAL MANAGEMENT SYSTEM REQUIREMENTS

MODULE 2A GENERAL MANAGEMENT SYSTEM REQUIREMENTS MODULE 2A GENERAL MANAGEMENT SYSTEM REQUIREMENTS 2A.1 SCOPE (See ISO/IEC 17025:2005, Section 1) Laboratories shall meet all requirements of the ISO/IEC 17025:2005 International Standard and other AIHA-LAP,

More information

The Hashemite Kingdom of Jordan Jordan Institution for Standards & Metrology. Jordanian Quality Mark

The Hashemite Kingdom of Jordan Jordan Institution for Standards & Metrology. Jordanian Quality Mark The Hashemite Kingdom of Jordan Jordan Institution for Standards & Metrology Jordanian Quality Mark Amman in February, 1997 1 Abstract Article (18) of the Law of Standards & Metrology; law no. (15) for

More information

Guidelines for the assessment of the appropriateness of small interlaboratory comparisons within the process of laboratory accreditation

Guidelines for the assessment of the appropriateness of small interlaboratory comparisons within the process of laboratory accreditation Publication Reference EA-4/21 INF: 2018 Guidelines for the assessment of the appropriateness of small interlaboratory comparisons within the process of laboratory accreditation PURPOSE This paper provides

More information

Microgeneration Installation Standard: MCS 001. MCS Contractor certification scheme requirements Issue 2.5

Microgeneration Installation Standard: MCS 001. MCS Contractor certification scheme requirements Issue 2.5 Microgeneration Installation Standard: MCS 001 MCS Contractor certification scheme requirements Issue 2.5 This Microgeneration Installation Standard is the property of Department of Energy and Climate

More information

UKAS Supplement for the Accreditation of Environmental Verifiers for EMAS (the EU Eco Management and Audit Scheme Regulation 1221/2009)

UKAS Supplement for the Accreditation of Environmental Verifiers for EMAS (the EU Eco Management and Audit Scheme Regulation 1221/2009) CIS 11 Edition 1 September 2016 UKAS Supplement for the Accreditation of Environmental Verifiers for EMAS (the EU Eco Management and Audit Scheme Regulation 1221/2009) CIS 11 / Edition: 1 Page 1 of 7 Contents

More information

APLAC GUIDANCE ON REFERENCE MATERIAL USE AND PRODUCTION

APLAC GUIDANCE ON REFERENCE MATERIAL USE AND PRODUCTION APLAC GUIDANCE ON REFERENCE MATERIAL USE AND PRODUCTION Issue 6 Issue Date: 2018/02 Page 1 of 18 PURPOSE Reference Materials (RMs) are used in all stages of the measurement process, for method validation,

More information

General Accreditation Guidance. ISO/IEC 17025:2017 Gap analysis. April 2018

General Accreditation Guidance. ISO/IEC 17025:2017 Gap analysis. April 2018 General Accreditation Guidance Gap analysis April 2018 Copyright National Association of Testing Authorities, Australia 2018 This publication is protected by copyright under the Commonwealth of Australia

More information

STATIONARY SOURCE AUDIT SAMPLE PROGRAM [VOLUME 1, MODULE 2] GENERAL REQUIREMENTS FOR AN ACCREDITOR OF STATIONARY SOURCE AUDIT SAMPLE PROVIDERS

STATIONARY SOURCE AUDIT SAMPLE PROGRAM [VOLUME 1, MODULE 2] GENERAL REQUIREMENTS FOR AN ACCREDITOR OF STATIONARY SOURCE AUDIT SAMPLE PROVIDERS [V1M2-2009]-Rev0.2 STATIONARY SOURCE AUDIT SAMPLE PROGRAM [VOLUME 1, MODULE 2] GENERAL REQUIREMENTS FOR AN ACCREDITOR OF STATIONARY SOURCE AUDIT SAMPLE PROVIDERS TNI Standard P.O. Box 2439 Weatherford,

More information

The TNI National Environmental Field Activities Program (TNI NEFAP)-Accreditation Procedure

The TNI National Environmental Field Activities Program (TNI NEFAP)-Accreditation Procedure PJLA offers third-party accreditation services to Conformity Assessment Bodies (i.e. Testing and/or Calibration Laboratories, Reference Material Producers, Field Sampling and Measurement Organizations

More information

ISCC 204 AUDIT REQUIREMENTS AND RISK MANAGEMENT. Version 3.0

ISCC 204 AUDIT REQUIREMENTS AND RISK MANAGEMENT. Version 3.0 ISCC 204 AUDIT REQUIREMENTS AND RISK MANAGEMENT Version 3.0 II Copyright notice 2016 ISCC System GmbH This ISCC document is protected by copyright. It is freely available from the ISCC website or upon

More information

Sterling Accreditation Energy Assessor Guidance QA Auditing of EPCs

Sterling Accreditation Energy Assessor Guidance QA Auditing of EPCs Sterling Accreditation Energy Assessor Guidance QA Auditing of EPCs Practices and Procedures Manual Version 1.1 The Sterling Accreditation quality auditing manual has been created to support Energy Assessors

More information

IL AC-G22:2004. Use of Proficiency Testing as a Tool for Accreditation in Testing

IL AC-G22:2004. Use of Proficiency Testing as a Tool for Accreditation in Testing IL AC-G22:2004 Use of Proficiency Testing as a Tool for Accreditation in Testing Copyright ILAC 2004 ILAC encourages the authorised reproduction of its publications, or parts thereof, by organisations

More information

TNI s NATIONAL ENVIRONMENTAL LABORATORY ACCREDITATION PROGRAM (NELAP) Changing to the 2009 Standard

TNI s NATIONAL ENVIRONMENTAL LABORATORY ACCREDITATION PROGRAM (NELAP) Changing to the 2009 Standard TNI s NATIONAL ENVIRONMENTAL LABORATORY ACCREDITATION PROGRAM (NELAP) Changing to the 2009 Standard THE NEW NELAP STANDARDS Four Volumes = Four Standards Volume 1: Requirements for Laboratories 7 Modules

More information

Accreditation Session

Accreditation Session ISTA Annual Meeting 2006 Welcome to the Accreditation Session - June 2006 - Projects and tasks in 2005/2006 Audit Programme Organising repeat and new accreditation audits -> (26 audits in 2005, 35 scheduled

More information

Complaints, Feedback, Corrective and Preventive Action

Complaints, Feedback, Corrective and Preventive Action PAGE 1 of 7 PROCESS OBJECTIVE : To effectively manage all feedback (as defined in QM-00-01 / 02) and associated correction and corrective action in an effective and objective manner. Feedback includes

More information

ISO General Requirements for Competence of Testing Laboratories Procedure

ISO General Requirements for Competence of Testing Laboratories Procedure Competence of Testing Laboratories Page: 1 of 24 ISO 17025 General Requirements for Competence of Testing Laboratories Procedure Competence of Testing Laboratories Page: 2 of 24 Table of Contents Para.

More information

Percival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0)

Percival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0) TABLE OF CONTENTS INTRODUCTION... 4 1. Purpose... 4 2. Scope... 4 3. References... 4 4 Terminology and Definitions... 5 4.1.1 Subcontractor... 5 4.1.2 Significant Subcontractor... 5 4.1.3 Manufacturers...

More information

Document 2007 Rev 0 December 2005 Page 1 of 8

Document 2007 Rev 0 December 2005 Page 1 of 8 Document 2007 Rev 0 December 2005 Page 1 of 8 1. Scope... 2 2. Definitions... 2 a. LabTest...2 b. Factory Location/ Manufacturer's Premises...2 c. Manufacturer...2 d. Subcontractor...2 e. f. Out-Worker...2

More information

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies Accreditation International Association for Certifying Bodies Guidance on the Application of ISO / IEC 17020 Guidance on the Application of ISO/IEC 17020 Page 1 of 16 Introduction This guidance document

More information

ISTA Accreditation Standard for Seed Testing and Seed Sampling

ISTA Accreditation Standard for Seed Testing and Seed Sampling INTERNATIONAL SEED TESTING ASSOCIATION (ISTA) Secretariat, Zürichstrasse 50, 8303 Bassersdorf, CH-Switzerland Phone: +41-44-838 60 00, Fax: +41-44-838 60 01, Email: ista.office@ista.ch, http://www.seedtest.org

More information

The Role of Quality Assurance in Water Quality Assessment

The Role of Quality Assurance in Water Quality Assessment The Role of Quality Assurance in Water Quality Assessment Deborah Chapman, UNEP GEMS/Water Capacity Development Centre, University College Cork, Ireland Overview: The Role of Quality Assurance in Water

More information

YOUR CERTIFICATION PROCESS EXPLAINED

YOUR CERTIFICATION PROCESS EXPLAINED ISO 22000 FOOD SAFETY MANAGEMENT SYSTEMS FSSC 22000 FOOD SAFETY SYSTEM CERTIFICATION This document outlines the audit process for the above referenced standard. It outlines the stages to audit and gives

More information

The Quality Protocol for the production and use of quality compost from source-segregated biodegradable waste. Frequently Asked Questions

The Quality Protocol for the production and use of quality compost from source-segregated biodegradable waste. Frequently Asked Questions The Quality Protocol for the production and use of quality compost from source-segregated biodegradable waste Frequently Asked Questions The Quality Protocol for the production and use of quality compost

More information

Animal Products Notice

Animal Products Notice Animal Products Notice Specifications for Laboratories.. An animal products notice issued under the Animal Products Act 1999 TITLE Animal Products Notice: Specifications for Laboratories COMMENCEMENT This

More information

General requirements for the competence of testing and calibration laboratories. In this presentation:

General requirements for the competence of testing and calibration laboratories. In this presentation: General requirements for the competence of testing and calibration laboratories ISO/IEC 17025:2017 In this presentation: Explanation New requirement Interpretation / Examples / Questions Agenda Welcome

More information

Overview of Good Food Laboratory Practices

Overview of Good Food Laboratory Practices Overview of Good Food Laboratory Practices Dr. Anne Bridges Technical Director, AACC International International Workshop & Training Program On Good Food Laboratory Practices Jointly Organized By Food

More information

Section No.: PM 22 Issue No. 01 Issue Date Page 1 of 9 Rev. No. 03 Rev. Date: Procedure for Audit of a Multi-site Organization

Section No.: PM 22 Issue No. 01 Issue Date Page 1 of 9 Rev. No. 03 Rev. Date: Procedure for Audit of a Multi-site Organization Page 1 of 9 Rev. No. 03 Rev. Date: 01-10-2016 1.0. Purpose: To document, establish, implement and maintain the system for conducting the audit of a multi -site organization, in accordance with requirements

More information

For Use By Certification Bodies Performing SAAS Accredited SA8000:2014 Certification Audits

For Use By Certification Bodies Performing SAAS Accredited SA8000:2014 Certification Audits 1 2 3 4 5 6 SAAS Procedure 201A Accreditation Requirements 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 For Use By Certification Bodies Performing SAAS Accredited SA8000:2014 Certification Audits October

More information

REGULATIONS FOR PRODUCT/SERVICE CERTIFICATION

REGULATIONS FOR PRODUCT/SERVICE CERTIFICATION CONTENTS 1. PURPOSE AND SCOPE 2. REQUIREMENTS FOR CERTIFICATION 3. GENERAL PRINCIPLES AND GUARANTEES FOR THE CLIENT 4. STATUTORY AND REGULATORY REQUIREMENTS AND LEGALITY CONTROL LIMITS 5. CERTIFICATION

More information

DC 102 FACTORY INSPECTION PROCEDURES AND TESTS. Requirements for Manufacturers

DC 102 FACTORY INSPECTION PROCEDURES AND TESTS. Requirements for Manufacturers FACTORY INSPECTION PROCEDURES AND TESTS Requirements for Manufacturers Warszawa, February 1, 2012 CONTENTS Page No. FOREWORD 2 1 INTRODUCTION 2 2 DEFINITIONS 2 2.1 Factory Location/Manufacturer s Premises

More information

The new ISO/IEC 17025:2017

The new ISO/IEC 17025:2017 The new ISO/IEC 17025:2017 By Dr. George Anastasopoulos Director, Conformity assessment, IAS Email: ganastasopoulos@iasonline.org Introduction - Background information ISO/IEC 17025 was first issued in

More information

Microgeneration Installation Standard: MCS 001. MCS Contractor certification Scheme requirements Issue 3.0

Microgeneration Installation Standard: MCS 001. MCS Contractor certification Scheme requirements Issue 3.0 Microgeneration Installation Standard: MCS 001 MCS Contractor certification Scheme requirements Issue 3.0 This Microgeneration Installation Standard is the property of Department of Energy and Climate

More information

Preparation Approval Authorisation Application date. Directive Council The President

Preparation Approval Authorisation Application date. Directive Council The President Title Proficiency Testing Reference RT-24 Revision 02 Date 2015-10-27 NOTE: The present document represent the English version of document under reference at the specified revision. In case of conflict

More information

STATIONARY SOURCE AUDIT SAMPLE PROGRAM [VOLUME 1, MODULE 1] GENERAL REQUIREMENTS FOR STATIONARY SOURCE AUDIT SAMPLE PROVIDERS

STATIONARY SOURCE AUDIT SAMPLE PROGRAM [VOLUME 1, MODULE 1] GENERAL REQUIREMENTS FOR STATIONARY SOURCE AUDIT SAMPLE PROVIDERS [V1M1-2014]-Rev2.0 STATIONARY SOURCE AUDIT SAMPLE PROGRAM [VOLUME 1, MODULE 1] GENERAL REQUIREMENTS FOR STATIONARY SOURCE AUDIT SAMPLE PROVIDERS TNI Working Draft Standard P.O. Box 2439 Weatherford, TX

More information

OP-19 (9) Certification Process & Decision

OP-19 (9) Certification Process & Decision OP-19 (9) Certification Process & Decision Purpose: To provide guidance on certification granting and decision making process. Scope: Guidelines for all kind of audits that comes under the ISO 22000 standards.

More information

MGD 001. Guidance Document for MCS 001. Version 1.0

MGD 001. Guidance Document for MCS 001. Version 1.0 MGD 001 Guidance Document for MCS 001 Version 1.0 This Microgeneration Installation Standard is the property of Department of Energy and Climate Change (DECC), 3 Whitehall Place, London,SW1A 2HH. DECC

More information

Level 6 NVQ Diploma in Construction Site Management (Construction)

Level 6 NVQ Diploma in Construction Site Management (Construction) Level 6 NVQ Diploma in Construction Site Management (Construction) Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification structure 4 Centre requirements

More information

Nordic requirements for quality control of industrially Protected wood

Nordic requirements for quality control of industrially Protected wood Nordic requirements for quality control of industrially Protected wood Part 3: Heartwood of Scots pine and other durable woods NTR Document no. 3 Part 3:2017 Nordic Wood Preservation Council 2017 Nordic

More information

Dutch Accreditation Council (RvA) Explanatory notes on EN-ISO/IEC 17025

Dutch Accreditation Council (RvA) Explanatory notes on EN-ISO/IEC 17025 Dutch Accreditation Council (RvA) Explanatory notes on EN-ISO/IEC 17025 Document code: RvA-T015-UK Version 6, 13-4-2018 Rv A explanatory notes describe the policy and/or the procedures of the Rv A concerning

More information

SADCAS POLICY ISO/IEC 17020:2012 TRANSITION

SADCAS POLICY ISO/IEC 17020:2012 TRANSITION SADCAS POLICY ISO/IEC 17020:2012 TRANSITION Prepared by: SADCAS Approved by: SADCAS CEO Approval Date:2012 09 25 Effective Date: 2012 10 01 Page 1 of 11 Table of Contents Page 1. INTRODUCTION... 3 2. TRANSITION

More information

CEN Keymark Scheme Rules for Thermostatic Radiator Valves. 2 nd Edition

CEN Keymark Scheme Rules for Thermostatic Radiator Valves. 2 nd Edition CEN Keymark Scheme Rules for Thermostatic Radiator Valves 2 nd Edition Content Foreword... 3 Introduction... 3 1 Scope... 4 2 References... 4 3 Terms and Definitions... 4 4 Application... 5 4.1 Product

More information

ISO/IEC 17025:2017 Working Document Instruction Page

ISO/IEC 17025:2017 Working Document Instruction Page Instruction Page NOTES: 1. This working document is intended as a checklist for the assessor when conducting Testing and Calibration Laboratory and Sampling Organization Assessments according to ISO/IEC

More information

Internal Auditing and Control of Nonconforming Work

Internal Auditing and Control of Nonconforming Work Internal Auditing and Control of Nonconforming Work ISO/IEC 17025, clauses 4.14 and 4.9 www.aphl.org What will be covered in this training? Internal Auditing What is it? Who performs it? What are the possible

More information

GLP/SC/01 Basic statistical tools for analytical chemistry (2 days)

GLP/SC/01 Basic statistical tools for analytical chemistry (2 days) GLP Consulting http://consultglp.com Courses on offer (See outlines below) GLP/SC/01 Basic statistical tools for analytical chemistry (2 days) GLP/SC/02 The GUM bottom-up evaluation technique of measurement

More information

Guide to Part P and Registration

Guide to Part P and Registration Guide to Part P and Registration All you ll ever need for Part P www.elecsa.co.uk Welcome to the ELECSA Part P self-certification scheme If you are involved in domestic electrical installation work, you

More information

Audits must be conducted with due concern for employee safety and environmental protection.

Audits must be conducted with due concern for employee safety and environmental protection. Standard Operating Procedure Title: GMP Audit Procedure Related Documents TEM-080 Internal Audit Report Template TEM-120 Vendor Audit Report Template Form-385 Vendor Audit Questionnaire Form-445 EHS Workplace

More information

General Accreditation Criteria Equipment assurance, in-house calibration and equipment verification

General Accreditation Criteria Equipment assurance, in-house calibration and equipment verification General Accreditation Criteria Equipment assurance, in-house calibration and equipment verification January 2018 Copyright National Association of Testing Authorities, Australia 2009 This publication is

More information

GUIDANCE FOR CERTIFICATION OF MANAGEMENT SYSTEMS Date of Establish: October 12, 2007

GUIDANCE FOR CERTIFICATION OF MANAGEMENT SYSTEMS Date of Establish: October 12, 2007 Rev. No. 10 Date of Approval 2018.06.10 GUIDANCE FOR CERTIFICATION OF MANAGEMENT SYSTEMS Date of Establish: October 12, 2007 This Guidance is intended to provide guidelines as to details of the requirements

More information

Quality Management in Construction Projects 6. Dr. Nabil El Sawalhi

Quality Management in Construction Projects 6. Dr. Nabil El Sawalhi Quality Management in Construction Projects 6 Dr. Nabil El Sawalhi 1 Integrated Quality Management A quality system is a framework for quality management. It embraces: The organizational structure, procedure,

More information

SQF 2000 Code. 6th Edition AUGUST A HACCP-Based Supplier Assurance Code for the Food Manufacturing and Distributing Industries

SQF 2000 Code. 6th Edition AUGUST A HACCP-Based Supplier Assurance Code for the Food Manufacturing and Distributing Industries SQF 2000 Code A HACCP-Based Supplier Assurance Code for the Food Manufacturing and Distributing Industries 6th Edition AUGUST 2008 Safe Quality Food Institute 2345 Crystal Drive, Suite 800 Arlington, VA

More information

CRITERIA FOR VALIDATION OF METHODS USED BY CHEMICAL LABORATORIES AND RELATED INDUSTRIES

CRITERIA FOR VALIDATION OF METHODS USED BY CHEMICAL LABORATORIES AND RELATED INDUSTRIES Document No: SADCAS TR 17 Issue No: 1 CRITERIA FOR VALIDATION OF METHODS USED BY CHEMICAL LABORATORIES AND RELATED INDUSTRIES Prepared by: SADCAS Advisory Committee TLAP Approved by: SADCAS CEO Approval

More information

DESIGN AND OPERATION OF AN INTERLABORATORY COMPARISON SCHEME

DESIGN AND OPERATION OF AN INTERLABORATORY COMPARISON SCHEME DESIGN AND OPERATION OF AN INTERLABORATORY COMPARISON SCHEME R.M. VOICULESCU, M. C. OLTEANU, V.M. NISTOR Institute for Nuclear Research Pitesti, Romania, ramona.voiculescu@nuclear.ro ABSTRACT The competence

More information

Green Product Mark Certification Scheme

Green Product Mark Certification Scheme Green Product Mark Certification Scheme www.tuv.com FOREWORD Product environmental labels are claims regarding the environmental impact of a product. They provide information about the product s overall

More information

IIW Manufacturer Certification Scheme for the Management of Quality in Welding

IIW Manufacturer Certification Scheme for the Management of Quality in Welding IIW Manufacturer Certification Scheme for the Management of Quality in Welding ANBCC s Assessment of Manufacturers of Welded Products Copyright EWF 2008 IIW MCS IIW Manufacturer Certification Scheme for

More information

A2LA. R231 Specific Requirements: Threat Agent Testing Laboratory Accreditation Program. December 6, 2017

A2LA. R231 Specific Requirements: Threat Agent Testing Laboratory Accreditation Program. December 6, 2017 Laboratory Page 1 of 17 Laboratory December 6, 2017 2017 by A2LA All rights reserved. No part of this document may be reproduced in any form or by any means without the prior written permission of A2LA.

More information

Thorough examination and testing of lifts

Thorough examination and testing of lifts Thorough examination and testing of lifts Simple guidance for lift owners Thorough examination and testing of lifts Simple guidance for lift owners Health and Safety Introduction The Lifting Operations

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

Hazardous. Scheme. the power behind your business

Hazardous. Scheme. the power behind your business Hazardous Areas Scheme YOUR GUIDE TO REGISTRATION the power behind your business GUIDE TO REGISTRATION REQUIREMENTS Electrical work in potentially explosive atmospheres (hazardous areas) is not included

More information

CORPORATE MANUAL OF INTEGRATED MANAGEMENT SYSTEM

CORPORATE MANUAL OF INTEGRATED MANAGEMENT SYSTEM CORPORATE MANUAL OF INTEGRATED MANAGEMENT SYSTEM SIAD Macchine Impianti, the Company leader of SIAD Group's Engineering Pag. 1 di 20 Contents INTRODUCTION... 4 FOREWORD... 4 1. SCOPE... 5 2. REFERENCES...

More information

ISO GUIDE 34: 2009 WORKING DOCUMENT

ISO GUIDE 34: 2009 WORKING DOCUMENT GUIDE 34: 2009 WORKING DOCUMENT NOTES: 1. This working document is intended as a checklist for the assessor when conducting Reference Material Producer (RMP) Accreditation Assessments according to ISO

More information

CMI Guidance Document

CMI Guidance Document CMI Guidance Document for Product Quality Plan Requirements Reference CMI-GD-PQP This document has been produced by the Administration Department of CertMark International (CMI). For technical information

More information

PROOF Pasture Raised On Open Fields. Contents. Certification Rules July 2017

PROOF Pasture Raised On Open Fields. Contents. Certification Rules July 2017 PROOF Pasture Raised On Open Fields Certification Rules July 2017 Contents PROOF Pasture Raised On Open Fields... 1 1. Scope... 2 2. Definitions... 2 3. Certification Trade Mark... 4 4. Licenses... 4 5.

More information

TECHNICAL REQUIREMENTS (CLAUSE 5)

TECHNICAL REQUIREMENTS (CLAUSE 5) LECTURE 4 THE ELEMENTS OF ISO/IEC 17025 - TECHNICAL REQUIREMENTS (CLAUSE 5) Slide 1 ISO 17025 - RELATIONSHIP OF EACH REQUIREMENTS Management System Organization Quality system Continual Improvement Management

More information

Part II: Requirements for the Management of Schemes

Part II: Requirements for the Management of Schemes Version 6.4 Contact address: Global Food Safety Initiative Foundation c/o The Consumer Goods Forum 22/24 rue du Gouverneur Général Eboué 92130 Issy-les-Moulineaux FRANCE Secretariat email: gfsinfo@theconsumergoodsforum.com

More information

SRI RESEARCH/RATING QUALITY STANDARD

SRI RESEARCH/RATING QUALITY STANDARD April 2008, CSRR-QS 2.1, page 1/15 Association for Independent Corporate Sustainability & Responsibility Research SRI RESEARCH/RATING QUALITY STANDARD CSRR-QS 2.1 Description: CSRR-QS 2.1 is a quality

More information

Level 6 NVQ Diploma in Construction Site Management (Construction)

Level 6 NVQ Diploma in Construction Site Management (Construction) Level 6 NVQ Diploma in Construction Site Management (Construction) Qualification Specification ProQual 2014 Contents Page Introduction 3 The Qualifications and Credit Framework (QCF) 3 Qualification profile

More information

Water NSW Reporting Manual

Water NSW Reporting Manual Water NSW Reporting Manual Operating Licence 2017-2022 Reporting Manual Water July 2017 Independent Pricing and Regulatory Tribunal of New South Wales 2017 This work is copyright. The Copyright Act 1968

More information

PALCAN Policy on Use of Proficiency Testing as a Tool for Accreditation in Testing (ILAC-G22:2004)

PALCAN Policy on Use of Proficiency Testing as a Tool for Accreditation in Testing (ILAC-G22:2004) PALCAN Policy on Use of Proficiency Testing as a Tool for Accreditation in Testing (ILAC-G22:2004) CAN-P-1624 PALCAN POLICY ON USE OF PROFICIENCY TESTING AS A TOOL FOR ACCREDITATION IN TESTING (ILAC-G22:2004)

More information

REQUIREMENTS FOR ACCREDITATION OF INSPECTION BODIES

REQUIREMENTS FOR ACCREDITATION OF INSPECTION BODIES NATIONAL CENTRE FOR ACCREDITATION REQUIREMENTS FOR ACCREDITATION OF INSPECTION BODIES according to SM SR EN ISO/IEC 17020:2013 Code DR-OI-07 Edition 2 Page 1/15 Approved by Technical Certification Committee

More information

Rules for Ship Recycling Management System Certification

Rules for Ship Recycling Management System Certification Rules for Ship Recycling Management System Certification Effective from July 1 st 2009 RINA Società per azioni Via Corsica, 12-16128 Genova - Italy Tel.: +39 01053851 - Fax: +39 0105351000 www.rina.org

More information

Rev. No.: 7 Page 1 of 14. Issue Date Rev. No. Summary Of Amendments 06/11/ /11/ /12/ /06/ /09/2015

Rev. No.: 7 Page 1 of 14. Issue Date Rev. No. Summary Of Amendments 06/11/ /11/ /12/ /06/ /09/2015 Page 1 of 14 Issue Date Rev. No. Summary Of Amendments 06/11/2012 19/11/2012 04/12/2012 18/06/2014 08/09/2015 29/03/2016 17/07/2016 21/08/2016 16/05/2017 0 0 1 2 3 4 5 6 7 First draft for comments Final

More information

From purpose based interpretation to appropriate application of Calibration and Interlaboratory comparison results

From purpose based interpretation to appropriate application of Calibration and Interlaboratory comparison results From purpose based interpretation to appropriate application of Calibration and Interlaboratory comparison results Mulugeta Derebew mulugetaderebew@yahoo.com Test & Measurement 2017, Conference and Workshop,

More information

R205: SPECIFIC REQUIREMENTS: CALIBRATION LABORATORY ACCREDITATION PROGRAM. December 2011

R205: SPECIFIC REQUIREMENTS: CALIBRATION LABORATORY ACCREDITATION PROGRAM. December 2011 Page 1 of 12 R205: SPECIFIC REQUIREMENTS: CALIBRATION LABORATORY ACCREDITATION PROGRAM December 2011 2011 by A2LA All rights reserved. No part of this document may be reproduced in any form or by any means

More information

Guidance Document. A Guide for the Validation and Approval of New Marine Biotoxin Test Methods. 10 April 2017

Guidance Document. A Guide for the Validation and Approval of New Marine Biotoxin Test Methods. 10 April 2017 Guidance Document A Guide for the Validation and Approval of New Marine Biotoxin Test Methods A guidance document issued by the Ministry for Primary Industries Title Guidance Document: Validation and Approval

More information

Appendix 1 SCDOT Aggregate QC/QA Policy

Appendix 1 SCDOT Aggregate QC/QA Policy Appendix 1 SCDOT Aggregate QC/QA Policy 1. General SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION POLICY FOR QUALIFICATION OF COARSE AGGREGATE SOURCES (AGGREGATE QC/QA PROGRAM) AUGUST 30, 2012 Only coarse

More information

AB. OUR ISO CONFORMANCE AUDIT QUESTIONNAIRES 8. ASSESS HOW WELL YOU CONFORM TO ISO S REMEDIAL REQUIREMENTS

AB. OUR ISO CONFORMANCE AUDIT QUESTIONNAIRES 8. ASSESS HOW WELL YOU CONFORM TO ISO S REMEDIAL REQUIREMENTS 8.1 PLANNING REQUIREMENTS 1 Do you plan monitoring, measurement, and analytical processes? 2 Do you plan how monitoring will be used to ensure conformity and effectiveness? 3 Do you plan how it will be

More information

PALCAN Guidance for the Validation of Test Methods

PALCAN Guidance for the Validation of Test Methods PALCAN Guidance for the Validation of Test Methods CAN-P-1629 PALCAN GUIDANCE FOR THE VALIDATION OF TEST METHODS POLITIQUE DU PALCAN CONCERNANT LA VALIDATION DES MÉTHODES D ESSAIS CAN-P-1629 Copyright

More information

IECEE OPERATIONAL DOCUMENT

IECEE OPERATIONAL DOCUMENT IECEE OD-2048 Edition 1.5 2017-05-17 IECEE OPERATIONAL DOCUMENT IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components (IECEE System) Utilization of Customers Testing

More information

QSS 0 Products and Services without Bespoke Contracts.

QSS 0 Products and Services without Bespoke Contracts. QSS 0 Products and Services without Bespoke Contracts. Use: Typically Sub 50k processes without a bespoke contract. Amendment History Version Date Status V3 June 2018 Updated for 2018 deployment Contents

More information

Guidance for Airport Operators Designating Known Suppliers of Airport Supplies

Guidance for Airport Operators Designating Known Suppliers of Airport Supplies Aviation Security Guidance for Airport Operators Designating Known Suppliers of Airport Supplies CAP 1260 Published by the Civil Aviation Authority 2015 Civil Aviation Authority Aviation House Gatwick

More information

TruckSafe Operator Business Rules and Code of Conduct

TruckSafe Operator Business Rules and Code of Conduct Operator Business Rules and Code of Conduct Contents 1.0 Business Rules and Code of Conduct 3 2.0 Decision Making Bodies 4-6 3.0 Purpose 6 4.0 How the Rules will be amended 6 5.0 Introduction 6 6.0 Entry

More information

Measuring Instruments Directive 2014/32/EU Assessment of Notified Bodies in Charge of Type Examination Presumption of Conformity based on EN 17065

Measuring Instruments Directive 2014/32/EU Assessment of Notified Bodies in Charge of Type Examination Presumption of Conformity based on EN 17065 WELMEC 8.5, 2017 Measuring Instruments Directive 2014/32/EU Assessment of Notified Bodies in Charge of Type Examination Presumption of Conformity based on EN 17065 For information: This guide is available

More information

Service Suppliers Engaged in Renewal Survey Examination of Mooring Chain Intended for Mobile Offshore Units

Service Suppliers Engaged in Renewal Survey Examination of Mooring Chain Intended for Mobile Offshore Units pproval of rvc upplrsno. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Approval of Service Suppliers No. 413 Service Suppliers Engaged in Renewal Survey Examination of Mooring Chain Intended for Mobile

More information

4. General requirements 4.1 Impartiality and independence F Organisation s SANAS No/s. Date/s of evaluation

4. General requirements 4.1 Impartiality and independence F Organisation s SANAS No/s. Date/s of evaluation Generic Checklist for Accreditation of Measurements and Verification of Energy Savings Inspection Bodies to ISO/IEC 17020: 2012 incorporating TR 81: Technical Requirements for the application of SANS/ISO/IEC

More information

Domestic Energy Assessor audit requirements England and Wales Effective Date 1 st June 2018

Domestic Energy Assessor audit requirements England and Wales Effective Date 1 st June 2018 Domestic Energy Assessor audit requirements England and Wales Effective Date 1 st June 2018 Audit volume As specified in the government s Scheme Operating Rules, Elmhurst is required to undertake a desk

More information

Medical Cannabis Laboratory Approval Program

Medical Cannabis Laboratory Approval Program Medical Cannabis Laboratory Approval Program APPLICATION PROCESS AND REQUIRED DOCUMENTATION The Medical Cannabis Laboratory Application consists of three-steps to thoroughly assess applying laboratories.

More information

Implementing the New TNI Standard. April 7, 2011

Implementing the New TNI Standard. April 7, 2011 Implementing the New TNI Standard April 7, 2011 On July 1, 2011, the 2009 TNI standard, Volume 1: Management and Technical Requirements for Laboratories Performing Environmental Analysis, will become effective

More information

Air Monitoring Directive Chapter 5: Quality System

Air Monitoring Directive Chapter 5: Quality System Air Monitoring Directive Chapter 5: Quality System Version Dec 16, 2016 Amends the original Air Monitoring Directive published June, 1989 Title: Air Monitoring Directive Chapter 5: Quality System Number:

More information

Reflection paper on guidance for laboratories that perform the analysis or evaluation of clinical trial samples

Reflection paper on guidance for laboratories that perform the analysis or evaluation of clinical trial samples 1 2 3 26 August 2010 EMA/INS/GCP/532137/2010 GCP Inspectors Working Group 4 5 6 Reflection paper on guidance for laboratories that perform the analysis or evaluation of clinical trial samples Draft Adoption

More information

Procedures on Management System Certification

Procedures on Management System Certification 1. Purpose Procedure PR-005 describes the roles, responsibilities and processes in a certification body according to ISO 17021 involved in the certification of management systems (MS). The certification

More information

Microgeneration Installation Standard: MIS 3007

Microgeneration Installation Standard: MIS 3007 Microgeneration Installation Standard: MIS 3007 REQUIREMENTS FOR MCS CONTRACTORS UNDERTAKING THE DESIGN, SUPPLY, INSTALLATION, SET TO WORK, COMMISSIONING AND HANDOVER OF A HEATING SYSTEM CONTAINING A MICRO-COGENERATION

More information