ASSE International Product (Seal) Listing Program

Size: px
Start display at page:

Download "ASSE International Product (Seal) Listing Program"

Transcription

1 ASSE International Product (Seal) Listing Program ASSE Performance Requirements for Trap Seal Primer Drainage Types and Electric Design Types Manufacturer: Contact Person: Address: Laboratory: Laboratory File Number: Model # Tested: Model Size: Additional models report applies to: Additional Model Information (i.e. orientation, series, end connections, shut-off valves) Date models received by laboratory: Date testing began: Date testing was completed If models were damaged during shipment, describe damages: Prototype or production sample? Were all tests performed at the selected laboratory? Yes No If offsite, identify location: General information and instructions for the testing engineer: The results within this report apply only to the models listed above. There may be items for which the judgment of the test engineer will be involved. Should there be a question of compliance with that provision of the standard, a conference with the manufacturer should be arranged to enable a satisfactory solution of the question. Should disagreement persist and compliance remain in question by the test agency, the agency shall, if the product is in compliance with all other requirements of the standard, file a complete report on the questionable items together with the test report, for evaluation by the ASSE Seal Control Board. The Seal Control Board will then review and rule on the question of compliance with the intent of the standard then involved. Documentation of material compliance must be furnished by the manufacturer. The manufacturer shall furnish to the testing agency, a bill of material which clearly identifies the material of each part included in the product construction. This identification must include any standards which relate thereto. Page 1 of 8 pages Revised: 7Aug17

2 Section I 1.0 General 1.1 Does this device conform to the product stated in the standard? 1.2 Scope Which type of trap seal primer is the sample under evaluation? Fixture waste line tailpiece, grease not normally generated Used in conjunction with ballcock assemblies Receives flow from flushometer valves Electric trap seal primer upstream of air gap or vacuum breaker Fixture connected type What is the tubing size of the connected fixture? in ( mm) What is the makeup water supply connection size? in ( mm) Ballock connected type What is the makeup water supply connection size? in ( mm) Flushometer connected type What is the makeup water supply connection size? in ( mm) What is connection material? Electric type Inlet size: in ( mm) Outlet size: in ( mm) Device s minimum on time: sec What is the advertised working water pressure range of the device? Minimum: psi ( kpa) Maximum: psi ( kpa) Do all connections comply with the appropriate fitting standards? Fixture tailpiece trapseal primers What is the size of the tailpiece or trap assembly? in ( mm) Page 2 of 8 pages Revised: 7Aug17

3 1.2.9 Ballock trap seal primers The assembly consists of: Refill tube diversion mechanism Closed coupled tank bolt/drain assembly Related fittings for connection to closet tank and ballcock Tee fitting. Size of fitting: in ( mm) Check valve Flow restrictor Material of the refill tube: Inside diameter of the refill tube: in ( mm) Outside diameter of the closed-coupled tank connector tube: in ( mm) Is the device designed to be used in conjunction with an anti-siphon fill valve compliant to ASSE 1002 / ASME A / CSA B125.12? Flushometer tailpiece trap seal primers Tailpiece wall thickness: in ( mm) Size of connection: in ( mm) Is the device chrome-plated brass? Is the compression fitting in compliance with SAE J512? Is the device designed to be used in conjunction with flushometer valve compliant with ASSE 1037 / ASME A / CSA B and installed below the critical level? Page 3 of 8 pages Revised: 7Aug17

4 Electric type Does the device comply with UL 1951 or CSA C22.2 No 68? Is the device designed to be installed at the discharge point and comply with ASSE 1001 or ASME A ? Is the device compliant to all of section 1.2? Yes No N/A Questionable Section II 2.0 Test Specimens Number of samples received: Section III 3.0 Performance Requirements and Compliance Testing 3.1 Hydrostatic Test for Electric Type Trapseal primer pressurized to: psi ( kpa) Time at pressure: min Any indication of leaking? In compliance? Page 4 of 8 pages Revised: 7Aug17

5 3.2 Verification of Manufacturer s Performance Rating For Fixture Tailpiece Trapseal Primer Minimum discharge rate of flow through supply 20psi for 1 min per manufacturer: at 0.5 GPM of faucet flow: GPM ( L/min); at 2.5 GPM of faucet flow: GPM ( L/min). Discharge rate at 0.5 GPM of faucet flow: Trial 1: GPM ( L/min) Trial 2: GPM ( L/min) Trial 3: GPM ( L/min) Trial 4: GPM ( L/min) Trial 5: GPM ( L/min) Fixture Tailpiece Trapseal Criteria All trials met mfg s specified ratings? Yes No Questionable For Ballcock Trapseal Primer Make and model of closed coupled water closet: Flush volume of closed coupled water closet tank: gal/flush ( L/flush) Static line pressure: psi ( kpa) Number of flushes: Flowing line pressure: psi ( kpa) Number of flushes: Ballcock Trapseal Primer criteria Leakage from tank bolt? Reached minimum rated flow? Bowl reached full trap depth? Page 5 of 8 pages Revised: 7Aug17

6 For Flushometer Tailpiece/Trap Seal Primer Make and model of closed coupled water closet: Flush volume of closed coupled water closet tank: gal/flush ( L/flush) Flowing line pressure: psi ( kpa) Number of flushes: Flushometer Tailpiece/Trap Seal Criteria Any leakage? Reached minimum rated flow? For Electric Trap Seal Primer Device pressurized to: psi ( kpa) Cycle on time set to: sec Discharge volume: Trial 1: oz ( ml) Trial 2: oz ( ml) Trial 3: oz ( ml) Trial 4: oz ( ml) Trial 5: oz ( ml) Is device in compliance with section 3.2? Page 6 of 8 pages Revised: 7Aug17

7 3.3 Cycle Test for Electric Trap Seal Primer Procedure Water supply pressurized to: psi ( kpa) Number of cycles: Time between cycles: sec Any failure or leakage during cycle test? Yes No N/A Questionable Is device in compliance with section 3.3? Section IV 4.0 Performance Requirements and Compliance Testing 4.1 Materials Is potable water in contact with solder or flux with lead >0.2% by mass? 4.2 Are installation instructions included in the packaging? Instructions include: Data to guide installer to select appropriate amount of water Language to inform installer that electric-design trap seal primers shall be installed with adequate backflow protection meeting all local and state codes. 4.3 Are markings a permanently affixed label, stamped, or cast on the body of the trap seal primer? Markings include: Manufacturer s name or trademark Model number or other identification mark Page 7 of 8 pages Revised: 7Aug17

8 LISTED LABORATORY: ADDRESS: PHONE: TEST ENGINEER(S): FAX: If applicable: OUTSOURCED LABORATORY: ADDRESS: PHONE: TEST ENGINEER(S): Scope of outsourced testing: FAX: We certify that the evaluations are based on our best judgments and that the test data recorded is an accurate record of the performance of the device on test. Signature of the official of the listed laboratory: Signature Title of the official: Date: Page 8 of 8 pages Revised: 7Aug17