1 INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT Document Prepared By Inner Mongolia Xinjin Wind Power Co., Ltd. Project Title Inner Mongolia Hangjin Yihewusu Wind Power Project Version 2.0 Date of Issue 26/02/2013 Prepared By Contact Inner Mongolia Xinjin Wind Power Co., Ltd. Opera 67, 1507VH, Zaandam, Netherlands Contact Name: Nancy Chen Telephone: According to the VCS Standard version 3.3, For projects validated under the CDM, the cover page and sections 1.2, 1.3, 1.5, 1.6, 1.7, 1.9, 1.10, , , , and 1.13 of the VCS Project Description Template shall be completed. As per the proposed project has finished validation under CDM program, the cover page and sections 1.2, 1.3, 1.5, 1.6, 1.7, 1.9, 1.10, , , , and 1.13 of the VCS Project Description Template have be completed. 1

2 Table of Contents 1 Project Details Summary Description of the Project Sectoral Scope and Project Type Project Proponent Other Entities Involved in the Project Project Start Date Project Crediting Period Project Scale and Estimated GHG Emission Reductions or Removals Description of the Project Activity Project Location Conditions Prior to Project Initiation Compliance with Laws, Statutes and Other Regulatory Frameworks Ownership and Other Programs Additional Information Relevant to the Project Application of Methodology Quantification of GHG Emission Reductions and Removals Monitoring Environmental Impact Stakeholder Comments

3 1 PROJECT DETAILS 1.1 Summary Description of the Project 1.2 Sectoral Scope and Project Type Sectoral scope: 1. Energy (renewable/nonrenewable); Project type: Wind power project; The project is not a grouped project. 1.3 Project Proponent Role/ Responsibility: Project Owner Organization: Inner Mongolia Xinjin Wind Power Co., Ltd. Address: C Building in Shengli Residential Quarter, Shengli South Road, Xini Town, Hangjin County, Eerduosi City, Inner Mongolia Autonomous Region, P.R. of China, Contact name: WANG Zheng Tel: @qq.com 1.4 Other Entities Involved in the Project 1.5 Project Start Date 14/03/2008 (wind turbines put into operation) 1.6 Project Crediting Period The Project was put into operation on 14/03/2008, and registered as CDM Project on 18/12/2010, therefore, the Project Crediting Period is from 14/03/2008 to 17/12/2010, and covers three years, i.e. 2008, 2009 and Project Scale and Estimated GHG Emission Reductions or Removals Project Large project Yes 3

4 Years Estimated GHG emission reductions (tco 2 e) Year ,729 (14/03/200831/12/2008) Year ,411 (01/01/200931/12/2009) Year ,061 (01/01/201017/12/2010) Total estimated ERs 313,201 Total number of crediting years 3 Average annual ERs Description of the Project Activity 1.9 Project Location The proposed project is located in Hangjin County, Eerduosi City, West Inner Mongolia of China. Its diagonal geographical coordinates are Longitude , Latitude The detailed location of the proposed project is shown in Figure 1 below. Figure 1. Geographical Location of the Proposed Project 4

5 1.10 Conditions Prior to Project Initiation Prior to the start of implementation of the project activity, there is no power generation unit at the site of the proposed project. In absence of the project activity, electricity delivered to the grid by the project activity would have been generated by the power plants connected with the North China Power Grid, which is dominated by fossilfuel fired power plants Compliance with Laws, Statutes and Other Regulatory Frameworks 1.12 Ownership and Other Programs Right of Use The business license of the project owner is provided, in which the name of the Project owner is Inner Mongolia Xinjin Wind Power Co., Ltd., and LoA issued by NDRC is provided, which demonstrates that the project name is Inner Mongolia Hangjin Yihewusu Wind Power Project and the PP is Inner Mongolia Xinjin Wind Power Co., Ltd Emissions Trading Programs and Other Binding Limits The project does not take part in emission trading programs besides their status under CDM. However, the VCUs claimed are related to a different period (14/03/2008 to 17/12/2010, before the start of the CDM Crediting Period 18/12/2010) and therefore there is no double counting Participation under Other GHG Programs The project has finished CDM validation on 5 th Feb, 2010 with the Final Validation Report completed. The project started operation since 14 th Mar, 2008 which is less than two years before the validation completed. Therefore, the project fulfilled the Article of the VCS Standard version 3.3. The project initially uploaded on 8 th Feb, 2010, and then withdraws on behalf of the client. The project finally uploaded on 16 th Aug, Project has been registered as CDM project, the reference number is 3936, and linkage: The VCUs claimed are related to a different period (14/03/2008 to 17/12/2010, before the start of the CDM Crediting Period 18/12/2010) and therefore there is no double counting Other Forms of Environmental Credit The project neither has nor intends to generate any other form of GHGrelated environmental credit for GHG emission reductions or removals claimed under the VCS Program, or that any such credit has been or will be cancelled from the relevant program. 5

6 Projects Rejected by Other GHG Programs 1.13 Additional Information Relevant to the Project Eligibility Criteria The Project is not a grouped project. Leakage Management Accord to the ACM0002 (Version 11), no leakage emissions are considered Commercially Sensitive Information In this Project Description, there is no commercially sensitive information involved. Further Information There is no further information that may have a bearing on the eligibility of the project, the net GHG emission reductions or removals, or the quantification of the project s net emission reductions or removals. 2 APPLICATION OF METHODOLOGY 3 QUANTIFICATION OF GHG EMISSION REDUCTIONS AND REMOVALS 4 MONITORING 5 ENVIRONMENTAL IMPACT 6 STAKEHOLDER COMMENTS 6