1 GPQ-MAN-07 Product Assurance Audit Checklist GPQ-MAN-07 MSM-GP/27 APR 2001
2 I. General Product Assurance 1. Organisation and Staff 1.1 Does the contractor have a formally established PA organisation with the elements of Safety, Reliability, Maintainability, S/W PA, Quality Parts, Materials and Processes, Configuration Management? 1.2 Are the Product Assurance functions independent of Manufacturing, Engineering and other organisation? 1.3 Are there formulated objectives of the organisation? 1.4 Is management emphasis on prevention rather than detection of quality problems? 1.5 Are the responsibilities of supervisors and managers, etc. formally defined? 1.6 Does the person responsible for Product Assurance on a project have access to higher management for the focussing on and resolution of problems? 1.7 Are the PA functions staffed to the proper complement? 1.8 Does the Product Assurance organisation have sufficient facilities, equipment and tools for appropriate evaluation of materials and hardware quality? 2. Procedures 2.1 Does the contractor have a Product Assurance Manual or a set of procedures covering Product Assurance? 2.2 Do procedures identify who does what, when, how and where? 2.3 Are PA functions and responsibilities performed by other groups identified? 2.4 Do procedures identify information flow, forms and instructions for completing the forms? 2.5 Do procedures contain management approval signatures, dates of issue and revisions and change C = Compliant NC = Not Compliant Page 2 of 28
3 designators? 2.6 Is the distribution controlled and obsolete procedures removed from use? 2.7 Are procedures available at the appropriate workstations? 2.8 Are procedures kept updated? 2.9 Do detailed procedures exist for the performance of inspections and tests? 3. QA audits 3.1 Are systematic internal and external audits performed? 3.2 Are audits performed? a) According to an established plan? b) Using checklists? 3.3 Are internal audits conducted on an impartial basis by qualified personnel? 4. Receiving Inspection 4.1 Is the contractor's receiving inspection flow and activities documented? 4.2 Are facilities clean, proper lighting exist, and storage and handling practices followed? 4.3 Are all incoming supplies inspected and tested prior to use against the requirements of procurement documents? (appropriate drawings, specifications and technical instructions) 4.4 Are receiving inspections performed in accordance with established procedures and instructions? 4.5 Is the following verified? a) Identification / configuration? b) Supplier s documentation? 4.6 When supplies are accepted on the basis of certification or test report: a) Are test reports checked 100% against procurement C = Compliant NC = Not Compliant Page 3 of 28
4 documents requirements? b) Are reports and certification retained? 4.7 When supplies are accepted on the basis of certification or test report, are checks performed to confirm conformance? 4.8 Do receiving inspection records indicate date of receipt, inspections, tests, documents utilised, number accepted/rejected? 4.9 Is traceability maintained between materials and certificates, reports and receiving inspection documents? 4.10 Are there separated storage areas for materials waiting receiving inspection and materials already inspected and accepted? 5. Packaging and Handling Packaging 5.1 Are parts, assemblies and materials verified for cleanliness before packaging and properly packaged? 5.2 Are parts having critical or highly finished surfaces protected against damage? 5.3 Are leads of electrical parts protected from contamination which will effect solderability? 5.4 Are packaging operations covered by written procedures / instructions, which include at least the following: a) Selection of packaging materials? b) Inner protection? c) Mechanical protection? d) Cleanliness and contamination control? 5.5 Are packaging operations inspected and are items controlled before shipping for proper packaging, marking and accompanying documentation? C = Compliant NC = Not Compliant Page 4 of 28
5 Handling 5.6 Do handling procedures and instructions exist? 5.7 Are items leaving a controlled area or being transported between work/test areas carried in appropriate containers or fixtures to provide adequate protection from damage or contamination? 5.8 Do the operators have the proper tools to support the assembly while performing work/test on it? 6. Cleanliness and Contamination Control 6.1 Are there procedures available systematically covering cleanliness and contamination control aspects? 6.2 Are there specific instructions for: a) Entering and leaving clean rooms (personnel and equipment)? b) Cleaning of clean rooms, including: 1. Cleaning materials? 2. Cleaning methods? c) Cleaning of equipment to be entered in the clean rooms? d) Clean rooms maintenance? e) Control of clean room parameters? f) Actions in case of alarm including: 1. Stop work? 2. Shield critical items? 6.3 Are items tested and inspected for cleanliness such as (visual examinations, wipe tests, check for alkaline and acids) and are the appropriate methods used? 6.4 Are access control instructions posted, visitors sign in log properly dated and enforced as appropriate? 6.5 Are smock retention areas provided? 6.6 Are clean smocks available? 6.7 Are floor mats placed at all entrances? C = Compliant NC = Not Compliant Page 5 of 28
6 6.8 Are floor coatings peeling or generating dust particles avoided? 6.9 Is the shedding of sponge, mop of cloth material evident? 6.10 Are smocks buttoned and worn by all personnel including visitors? 6.11 Is there food, beverages or smoking? 6.12 Are personal belongings out of sight and stored properly? 6.13 Is the use of wooden containers with untreated interior and exterior surfaces or cardboard boxes minimised? 6.14 Are periodic particle counts performed to verify if within required limits? 6.15 Are gloves, caps, booties and masks appropriate to the area and worn by all personnel? 6.16 Is the integrity of the environment and contamination control maintained in relation to the surrounding areas or to material and mobile equipment entering the area? 6.17 Are other requirements such as: laminar airflow, vacuum shoe cleaners, air bath entrances, special waste disposals, etc. enforced? 6.18 Are clean room environment conditions, temperature, humidity, pressure controlled and recorded? 6.19 Is temperature maintained nominally at 20ºC+/-2ºC or meet a specific product specification? 6.20 Are positive pressure differentials maintained between clean room and surrounding area at 6mm Hg and between clean room and entrance lock at 2mm Hg with pressure monitors? 6.21 Is humidity maintained, preferably at 30-50% or as specified in a product specification and monitored with a hygrometer periodically calibrated? C = Compliant NC = Not Compliant Page 6 of 28
7 7. Manufacturing and Testing Manufacturing and Testing 7.1 Are manufacturing operations and inspections planned and described in manufacturing documents? (Shop travellers, work orders)? 7.2 Do shop travellers include: a) Revision status / date, release date? b) Item identification and configuration? c) Materials / parts to be used? 7.3 Are shop travellers identified / traceable to the contract no. / purchase order? 7.4 Are support documents to be used referenced? (e.g. drawings, work instructions)? 7.5 Are rework / repair plans used to document rework / repair manufacturing / inspections operations? Are they adequate? Are they archived? Manufacturing Control 7.6 Is shop traveller kept with product during manufacturing / inspection operations? 7.7 Are inspection, fabrication and assembly operations traceable to the individual performing the operation? 7.8 Are all articles inspected to applicable / controlled documents and are the documents available at the inspector s workstation? 7.9 Are unauthorised, marked-up, illegible or defaced drawings or work instructions being used? 7.10 Is the sequence of operations being followed as defined in the planning? 7.11 Are accepted and rejected items properly identified and tagged? 7.12 Are part lists complete for assembly work? 7.13 Are adequate inspection records generated and C = Compliant NC = Not Compliant Page 7 of 28
8 maintained and do they indicate the status of articles and inspections performed? 7.14 Are assembly operations performed in sequence with inspection operations? 7.15 Are torquing operations satisfactory? Calibrated tools? Test Documents 7.16 Does the contractor have standardised procedures and methods for the preparation, format, content, review and control of test procedures? 7.17 Are text procedures formally released and controlled with change and revision pages? 7.18 Do procedures include as applicable the following: a) Nomenclature and identification of the test article? b) Characteristics and design criteria to be inspected or tested, including values and tolerances for acceptance and rejection? c) Detailed steps and operations to be taken in sequence including verifications to be made before proceeding? d) Cross-reference of characteristics with measuring and/or NDT equipment to be used, specifying range and type? e) Details or instructions for operation of special data recording equipment of other automated test equipment? f) Layout and interconnection of test equipment and articles? g) Identification of hazardous situations or operations? h) Precaution to comply with established safety requirements, to ensure safety of personnel and to prevent damage or degradation of articles and measuring equipment? C = Compliant NC = Not Compliant Page 8 of 28
9 i) Environments and other conditions to be maintained? j) Constraints? k) Instructions for reporting non-conformance, anomalous occurrences or results? 7.19 Are test procedures formally approved by PA? Test Control 7.20 Are provisions made to protect personnel and items from physical damage and environmental hazards? 7.21 Is the test item inspected to determine evidence of damage or loose parts? 7.22 Are discrepancies or anomalies resolved prior to testing? 7.23 Are the following activities performed by PA as applicable: a) Witness each test and verify test performances? b) Observation? Perform surveillance or monitor periodically the test being performed as directed by explicit instructions? c) Data review? Review the procedure and recorded data at the conclusion of the test cycle verifying requirements and data entries are compatible? 7.24 Do all documents bear necessary approval signatures inspection stamps? 7.25 Is rework, repair or modification occurring to the testing properly documented? 7.26 Are test discrepancies, failures and non-conformance s reported, analysed and corrective action implemented? 8. Measurements and Test Equipment 8.1 Does the contractor have up-to-date written procedures defining his calibration system encompassing measuring and test equipment, standards, calibration C = Compliant NC = Not Compliant Page 9 of 28
10 and maintenance prescribed intervals and metrology laboratory environmental controls 8.2 Does the calibration system include all equipment used to verify the quality of the processes and products being manufactured? 8.3 Do calibration procedures exist for each equipment type and include: a) Equipment characteristics and identification? b) Location? c) Frequency of periodic checks? d) Acceptance criteria? 8.4 Is all measurement and test equipment subjected to a visual, dimensional and operational inspection upon receipt and at periodic intervals thereafter? 8.5 Are calibration labels used and do they include at least the following: a) Identifier? b) Due date for re-calibration? c) Control stamp? 8.6 Is the necessity for and/or frequency of periodic inspections based on objective evidence of the stability and continued accuracy of the equipment? Is there any interval exceeding 1 year of validity? 8.7 Is all measurement and test equipment checked against a standard of greater accuracy? 8.8 Are temperature, humidity, vibration and cleanliness controlled to the extent necessary to assure calibration and continued product measurements of the required accuracy? 8.9 Is it ensured that errors of measuring and test equipment do not exceed 10% of the highest tolerance of any items to be checked with that equipment? C = Compliant NC = Not Compliant Page 10 of 28
11 8.10 Are standards against which test and measurement equipment are periodically checked traceable to National or International Standards? 8.11 Are standards supported by certificates, report, variables data sheets attesting to the date, accuracy and conditions under which the results were obtained? 8.12 Is the calibration organisation staffed with sufficient qualified technical personnel? 8.13 Are tri-dimensional measuring machines and laboratory testing machines periodically calibrated by a qualified organisation? 9. Non-Conformance Control 9.1 Is a procedure available which describes the nonconformance system? 9.2 Are non-conformances initially reported on local records (discrepancy notes)? Who takes decision for further processing? Is PA involved? 9.3 Do NCR records reflect causes and responsibilities for the discrepancies and show corrective and preventive actions taken? 9.4 Is the internal organisation responsible for causing the discrepancy informed? And does it concur to identify preventive actions? 9.5 Are logs and records maintained of all NCR issued and MRB meetings? 9.6 Are there adequate provisions for segregation, removal and identification of non-conforming materials? Is the access to holding areas controlled? 9.7 Are NCRs identified on relevant shop travellers and quality records? 9.8 Are NCRs properly filled out and complete? 9.9 Are NCRs closed by PA after verification of successful C = Compliant NC = Not Compliant Page 11 of 28
12 remedial actions implementation? 9.10 Are preventive actions implementation tracked? (Correction of technical documents, modification of tools and work instruction?) 9.11 Are non-conformances classified according to applicable project rules? 9.12 Are the following dispositions applied? a) Use-as-is? b) Rework? c) Repair? d) Scrap? e) Return to supplier? 9.13 Are major non-conformances notified to ESA within 1 working day after the review by the local MRB? 9.14 Is a RFW issued if the non-conformance disposition affects the product configuration? 10 Process Control 10.1 Are standard / established processes classified in accordance to Project rules? 10.2 Is each process covered by a specification? 10.3 Do process specifications include QA provisions, methods for inspection and test, number of samples, accept / reject criteria? 10.4 Does the company maintain documented evidence of processes validation status? 10.5 Are changes to process implemented through established Configuration Control procedures? 10.6 Are the personnel who perform critical processes or evaluate process performance numerically adequate, trained and certified? 10.7 Are materials, equipment, computer systems and software and procedures involved in the performance of C = Compliant NC = Not Compliant Page 12 of 28
13 critical processes validated? 10.8 Are non-destructive-inspections (NDI) treated in the same way of critical processes? 10.9 Are representative NDI standards available for equipment calibration and to monitor equipment performance? Are NDI inspection records maintained? Are process equipment periodically checked (as applicable) for: a) Temperature uniformity? b) Integrity / precision of thermo-couple lines? c) Integrity of vacuum related features (lines, etc.)? d) End-to-end instruments calibration? e) Effectiveness of contamination control means? For each process performed are records maintained of main process parameters and of related laboratory samples tests results? Are there provisions in case of interruption of main power supply during operation? 11 Procurement Control 11.1 Does the contractor maintain a list of approved subcontractors and suppliers supported with qualitative and quantitative data? 11.2 Has formal assessment including periodic follow-up been accomplished on subcontractors and suppliers? 11.3 Does the contractor continually evaluate subcontractor / supplier s history / results and implement corrective actions when appropriate? 11.4 Are project peculiar requirements identified in order that quality personnel reviewing purchase documents have adequate project and technical data to perform the review? C = Compliant NC = Not Compliant Page 13 of 28
14 11.5 Does the contractor maintain and implement a system of effectively passing on contract / project quality requirements to the subcontractors and suppliers? 11.6 Do procurement documents contain Product Assurance provisions for the following as appropriate: a) Applicable ESA contractor PA specifications? b) Chemical and/or physical test results (raw mat.)? c) Accompanying specimen for incoming tests? d) Age control of limited life products? e) Characteristics to be inspected or tested? f) Requirements for inspection and test records? g) Processing of non-conforming materials? h) Requirements for source inspection and MIPs? i) Right of access and planned surveillance activities? j) Cleanliness and contamination control? k) Acceptance data package and delivery? l) Preservation, packaging and shipping? m) Critical process requirements? 11.7 Are purchase documents reviewed and approved by PA? 11.8 Does the contractor have a policy or rules for source inspection? 11.9 Are adequately trained personnel available for source inspection? Does the contractor maintain records of source activities, status deficiencies and action items? 12 Training and Certification 12.1 Are personnel performing critical processes and nondestructive testing trained and certified according to a documented training programme? 12.2 Are national or international training programmes and standards applied? C = Compliant NC = Not Compliant Page 14 of 28
15 12.3 Are NDT personnel trained and certified according to MIL-STD-410 or equivalent? 12.4 Is re-certification performed periodically according to an established programme or following extensive interruption of work or unsatisfactory performance? 12.5 Are quantitative tests used to verify the proficiency of the trained personnel? 12.6 Are records documenting personnel training maintained? 13 Stamp Control 13.1 Does a documented system exist for the usage of stamps? (inspection, fabrication, test, etc.) 13.2 Do records exist allowing traceability to the responsible individuals and defining the authority / limitations in use? 14 Design Control 14.1 Are there standards and procedures available for preparation and maintenance of engineering drawings and specifications? 14.2 Are there procedures for tracking and documentation of requirements verification? 14.3 Do QA personnel participate in internal design reviews to ensure that: a) Technical documents comply with procedures and standards? b) Required inspections and tests are appropriate and feasible? 14.4 Is QA participation to internal design reviews documented? 14.5 In support of formal design reviews with the customer does the PA function ensure that: a) Documents are complete and consistent? C = Compliant NC = Not Compliant Page 15 of 28
16 b) Analyses clearly identify the related baseline? c) Safety, reliability and maintainability are factored into the design? d) The design is producible, inspectable, testable? II. Reliability 1. Reliability 1.1 Does a system exist for ensuring that designers are aware of part derating criteria with which they are expected to comply? 1.2 Does a procedure exist describing the FMECA approach of the contractor? 1.3 Does the FMECA approach focus on: a. Identification and control of single point failure? b. Critical interfaces? c. Methods by which redundancy is implemented? d. Product design (e.g. layout of PCBs, trace width, pad sizes and other failure causes related to mechanical configuration?) 1.4 Is a functional FMECA performed at system (payload) level? 1.5 Does the FMECA include the identification of methods by which the existence of failure modes can be determined during operations? 1.6 Does the FMECA adequately reference basic design documentation such as specifications, design reports, drawings, circuit diagrams, part lists and operating procedures? III. Maintainability 1. Maintainability 1.1 Is the contractor aware of basic maintainability C = Compliant NC = Not Compliant Page 16 of 28
17 principles and techniques? 1.2 Is the contractor familiar with maintenance concepts, planning and supporting elements? 1.3 Do procedures exist to perform maintainability studies and maintainability predictions? 1.4 Is maintainability a design parameter monitored for compliance throughout the design process? IV. Safety 1. Safety 1.1 Are NASA and ESA safety related documents (specifications, standards, handbooks) available? 1.2 Has an adequate program of training, safety motivation and awareness been instituted? 1.3 Is the contractor able to support his subcontractors for safety related issues? 1.4 Are there adequate safety plans produced covering: a. Scope of safety effort? b. Emphasis on safety analyses and reviews? c. Hazard control procedures? d. Involvement of PA and safety personnel throughout design and development? e. Safety design criteria? f. Safety verification program? 1.5 Does a detailed procedure exist to establish and maintain a safety verification program? And does it allow for coordination of all interested contractor's functions so to provide prompt feedback to ESA? 1.6 Are safety related inspections and tests performed by or under direct surveillance of the PA and Safety function? 1.7 Does the PA and Safety function have review authority C = Compliant NC = Not Compliant Page 17 of 28
18 over all test plans with adequate lead time to identify and control associated hazards? 1.8 Is the generation of safety documents for a project well defined and scheduled? 1.9 Do the safety analyses make maximum use of FMECA results? V. Software PA 1. Organisational Structure 1.1 For each project involving software development, is there a designated software manager? 1.2 Does the project software manager report directly to the project manager? 1.3 Is there a software PA function for each project that involves software development? 1.4 Is there a software configuration control function for projects that involve software development? 1.5 Which responsibilities are assigned to the software PA function in the various phases of the software life cycle? 1.6 How is the independence of the software PA function assured? 1.7 Is the test organisation independent from the development? (unit, integration, system) 1.8 Who decides in case of conflict between different organisational units? 1.9 Is Product Assurance approval mandatory prior to software release? 2. Resources, personnel and training 2.1 Does each software developer have private computersupported workstation/terminal? 2.2 Are project managers familiar with software project C = Compliant NC = Not Compliant Page 18 of 28
19 management disciplines? 2.3 Is there a required software engineering training program for software developers? 3. Software engineering experience 3.1 What is the median number of years of applicable experience of software project managers? 3.2 What is the median number of years of applicable experience of software integration and test managers? 3.3 What is the median number of years of software development experience of the software staff? 3.4 What percentage of the software staff has at least one year of development experience with the design and implementation languages to be used? 3.5 Of those with experience, what is the median number of years of experience with those languages? 3.6 What is the median size, in source lines of code, of software development projects completed in the last five years? 3.7 What is the size of the smallest project? 3.8 What is the size of the largest project? 4. Documented standards and procedures 4.1 Does the software organisation use a standardised and documented software development process on each project? 4.2 Does the standard software development process documentation describe the use of tools and techniques? 4.3 Is a formal procedure used to assure periodic management review of the status of each software development project? 4.4 Is there a mechanism for assuring that software subcontractors, if any, follow a disciplined software C = Compliant NC = Not Compliant Page 19 of 28
20 development process? 4.5 Are standards used to specify the content of software documents (files/folders)? 4.6 Are inspections conducted during the software development process? 4.7 Are coding standards applied to the software development process? 4.8 Are standards applied to the preparation of unit/integration/system test cases? 4.9 Are code maintainability standards applied? 4.10 Are internal design review standards applied? 4.11 Are code inspection standards applied? 4.12 Are software classification rules applied? 4.13 Is a formal procedure applied to estimate software size? 4.14 Is a formal procedure applied to produce software development schedules? 4.15 Are formal procedures applied to estimating software development cost? 4.16 Is a mechanism used for ensuring that the software design teams are familiar with the software requirements? 4.17 Are man-machine interface standards applied to each appropriate software development project? 5. Process metrics 5.1 Are software staffing profiles maintained (actual staffing versus planned staffing)? 5.2 Are profiles of software size maintained for each software configuration item, over time? 5.3 Are statistics on software code and test errors gathered? 5.4 Are design/coding errors projected and compared to actual? C = Compliant NC = Not Compliant Page 20 of 28
21 5.5 Are profiles maintained of actual versus planned designed software units, over time? 5.6 Are profiles maintained of actual versus planned tested software units, over time? 5.7 Are profiles maintained of actual versus planned integrated software units, over time? 5.8 Are processor memory utilisation estimates versus actual size tracked? (sizing figures) 5.9 Are target processor throughput utilisation estimates versus actual used, tracked? (timing figures) 5.10 Are design and code review coverage measured and recorded? 5.11 Is test coverage measured and recorded for each phase of functional testing? 5.12 Are the action items resulting from software reviews tracked to closure? 5.13 Are software problem reports resulting from testing tracked to closure? 5.14 Are the action items resulting from design/code inspections tracked to closure? 5.15 Is test progress tracked for each deliverable software unit/component? 6. Data management and analysis 6.1 Has a managed and controlled process database been established to process metrics data across all projects? 6.2 Are the review data gathered during software reviews analysed? 6.3 Is the error data from code inspections and tests analysed to determine the likely distribution and characteristics of the remaining errors in the product? 6.4 Are analyses of errors conducted to determine their process related causes? C = Compliant NC = Not Compliant Page 21 of 28
22 6.5 Is a mechanism used for error cause analysis? 6.6 Are the error causes reviewed to determine the process changes required to prevent them? 6.7 Is a mechanism used for initiating error prevention action? 7. Process control 7.1 Does management have a mechanism for the regular review of the status of software development projects? 7.2 Is a mechanism used for periodically assessing the software engineering process and implementing improvements? 7.3 Is a mechanism used for identifying and resolving system engineering issues that could affect software? 7.4 Is a mechanism used for regular technical interchanges with the customer? 7.5 Is a mechanism used for ensuring compliance with the software engineering standards? 7.6 Is a mechanism used for ensuring traceability between the software requirements and top-level design? 7.7 Is a mechanism used for controlling changes to the software requirements? 7.8 Is configuration management implemented? (Baselines, Identification, Libraries, Release and version control) 7.9 Is a mechanism used for ensuring traceability between the software top-level and detailed designs? 7.10 Are internal software design reviews conducted? 7.11 Is a mechanism used for controlling changes to the software design? 7.12 Is a mechanism used for ensuring traceability between the software detailed design and code units / components? 7.13 Is a mechanism used for ensuring traceability between C = Compliant NC = Not Compliant Page 22 of 28
23 the software detailed design and code units/components? 7.14 Are software code reviews conducted? 7.15 Is a mechanism used for controlling changes to the code? (Who can make changes and under which circumstances?) 7.16 Is a mechanism used for configuration management of the software tools used in the development process? 7.17 Is a mechanism used for verifying that the samples examined by Software Product Assurance are truly representative of the work performed? 7.18 Is there a mechanism for assuring that regression testing is routinely performed? 7.19 Is there a mechanism for assuring the adequacy of regression testing? 7.20 Are formal test case reviews conducted? 7.21 Do the company's procedures describe tasks and responsibilities for different test types? 7.22 Is module (integration, system) level testing covered by these procedures? 7.23 Are test coverage measurements defined? 7.24 Is there an approach for formal qualification testing? 7.25 Are nonconformances properly documented, including dispositions and retesting? 8. Tools and Technology 8.1 Is automated configuration control and track change activity throughout the software development process? 8.2 Are computer tools used to assist in tracing software requirements to software design? 8.3 Are design methodologies used in program design? 8.4 Are computer tools used to assist in tracing the software design to the code? C = Compliant NC = Not Compliant Page 23 of 28
24 8.5 Which languages are used in software developments? 8.6 What is the percentage of software developments implemented in high-order language? 8.7 What is the percentage of software developments implemented in assembler language? 8.8 Are automated test input data generators used for testing? 8.9 Are computer tools used to measure test coverage? (tool for dynamic analyses) 8.10 Are computer tools used to track every required function and assure that it is tested/verified? 8.11 Are automated tools used to analyse the size and change activity in software components? 8.12 Are automated tools used to analyse software complexity? (tools for static analyses) 8.13 Are interactive source-level debuggers used? 8.14 Are computer tools used for tracking and reporting the status of the software in the software development library? 8.15 Are prototyping methods used in designing the critical elements of the man-machine interface? 8.16 Which other SDE tools are currently used? 9. Procurement of COTS 9.1 Is there a procedure for COTS procurement? 9.2 Is the supplier's capability or ensuring COTS maintenance taken into account when procuring software? 9.3 Are licensing arrangements taken into consideration when procuring software 9.4 What is the documentation policy for procured COTS to be used together with company's developed software? C = Compliant NC = Not Compliant Page 24 of 28
25 VI. Configuration Management 1. Organisation 1.1 Is a configuration Manager the single-point contact for all matters relating to CM? 1.2 Is there a clear statement of responsibilities and authority for the CM function? 1.3 Is the organisational placement of CM at appropriate level? 2. Subcontractor's CM 2.1 Do procedures provide for the application of CM requirements to subcontractors? 2.2 Does the change control system provide for input of subcontractor-initiated changes, processing and change authorisation? 3. Function of CM office 3.1 Does the CMO perform the following functions: a. Preparation and maintenance of CM procedures and plans? b. Release authority for engineering documents? c. Operation of the CCB? d. Support to design reviews? e. Processing and release of changes and waivers? 4. Configuration identification 4.1 Is the concept of Configuration Item used and implemented? (CI-specification-drawing list-design reviews-qualification) 4.2 Are criteria for selection of CIs provided? 4.3 Do procedures establish a standard identification system for drawings, specifications, hardware and S/W? 5. Configuration data management 5.1 Do procedures or manual provide instructions for C = Compliant NC = Not Compliant Page 25 of 28
26 format and content of drawings and specifications? 5.2 Do procedures or manuals establish methods for amendments and revisions to specifications and drawings? 5.3 Is the CMO function responsible for identification numbers assignment? 5.4 Are end-item serial numbers provided by CMO for configuration and change traceability? 5.5 Are there prescribed procedures for release of configuration documentation that provide, as a minimum, establishment of records and impound of originals? 5.6 Is there a defined approval procedure for configuration documentation prior to release? 5.7 Is release of configuration documentation by the applicable release system required prior to manufacture or procurement? 5.8 Do procedures provide for release of software documentation? 5.9 Is the S/W Library used as the release function and is there an established procedure for its operation? 5.10 Does the impound system provide adequate security to prevent unauthorised changes and provide disaster protection? 5.11 Do procedures provide for a S/W repository for permanent retention of delivered software? 5.12 Is CM applied to CAD/CAM software and software tools? 6. Configuration Control 6.1 Are there procedures for application of baseline identification and control? 6.2 Are baselines established at system, subsystem and C = Compliant NC = Not Compliant Page 26 of 28
27 equipment level? 7. Configuration Control Board 7.1 Does the system provide for a CCB with membership that will ensure a comprehensive impact analysis? 7.2 Is a Software CCB provided with appropriate membership to evaluate and disposition S/W changes? 7.3 Are clearly defined interfaces between the system CCB and S/W CCB hardware/software changes? 7.4 Is the CCB in charge of reviewing and controlling the design baselines? 7.5 Are CCB Directives issued? 8. Change Evaluation 8.1 Does the system provide for impact analysis prior to approval/disapproval? 8.2 Does change impact analysis include all aspects of engineering, manufacturing, logistics costs, schedule? 8.3 Are changes and implementation documents marked with the class? 8.4 Are changes and waivers submitted to the approval authority established by the contract, before implementation? 8.5 Are changes and waivers released by the same release system used for initial drawing and specification release? 8.6 Is the interchangeability status marked on the changes? 8.7 Is there a procedure for the re-identification of noninterchangeable items? 8.8 Does the system provide for the preparation and presentation of waiver? 8.9 Are waivers processed through the customer's CCB? 9. Configuration Status Accounting C = Compliant NC = Not Compliant Page 27 of 28
28 9.1 Does the CM system provide for the documentation of the 'as-designed' standard by means of a CIDL (Configuration Item Data List)? 9.2 Do procedures prescribe the function responsible for CIDL inputs? 9.3 Does the CIDL contain as a minimum the list of released: a. Drawings? b. Specification? c. Test procedures? d. EEE parts list? e. Material list? f. Processes list? 9.4 Does the system provide for the preparation of 'as-built' lists and establish the responsibility for preparation and data input? C = Compliant NC = Not Compliant Page 28 of 28
GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS
GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS APPLICABLE FOR: AIRBUS DEFENCE AND SPACE - SPACE BUSINESS UNIT ORBITAL ISSUE: 02c RELEASE DATE:
More informationAssociation of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017
Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program
More informationDesk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT
Desk Audit of Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT-90-5001-02.1 Reviewed by: Element Requirements Applicable 1. Is a quality policy defined
More informationINS QA Programme Requirements
Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued
More informationCQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015
CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,
More informationQuality Manual. Specification No.: Q Revision 07 Page 1 of 14
Page 1 of 14 Quality Manual This Quality Manual provides the overall quality strategy and objectives of Pyramid Semiconductor s quality system. It is based on the requirements of ISO 9000. This manual
More informationFlorida Department of Transportation Office of Freight, Logistics and Passenger Operations Part 4 QUALITY ASSURANCE PROVISIONS #TRIPS-17-CA-RFP
QUALITY ASSURANCE PROVISIONS #TRIPS-17-CA-RFP 4.1.0 CONTRACTORS IN-PLANT QUALITY ASSURANCE REQUIREMENTS 4.1.1 QUALITY ASSURANCE ORGANIZATION Manufacturer shall establish and maintain an effective in-plant
More informationNR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26
Company Name/Certificate Number: Page 1 of 26 a. Organization a.1. Has the Organizational Structure of the program identified the levels of management responsible for the Quality System Program, including
More informationQUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A
Page 1 1 of 57 President Design Engineering Production Production Engineering Materials Control Purchasing Service Marketing Sales Contracts Human Resources Quality Assurance Quality Control Production
More informationQuality Manual ISO 9001:2000
Quality Manual ISO 9001:2000 Page 2 of 23 TABLE OF CONTENTS COVER PAGE...1 TABLE OF CONTENTS...2 SIGNATURES...3 QUALITY POLICY...4 INTRODUCTION...5 CORPORATE PROFILE...9 4.O QUALITY MANAGEMENT SYSTEM...10
More informationBELDEN QUALITY SYSTEM OVERVIEW
BELDEN QUALITY SYSTEM OVERVIEW Table of Contents 1.0 Introduction 2.0 Quality Management System 3.0 Resource Management 4.0 Product Realization 5.0 Measurement, Analysis, and Improvement 1.0 Introduction
More informationI. Development, Submittal, and Acceptance of a Quality Management System
I. Development, Submittal, and Acceptance of a Quality Management System 1. Scope Under the Contract, quality assurance and quality control management are the responsibility of the Contractor. The Contractor
More informationTASK REQUIREMENTS. Supplier Quality Requirements
This document is applicable only to suppliers of Production Items as defined below and their subtier suppliers. Non-Production Item suppliers are not subject to this document. This document specifies the
More informationManufacturing Supplier Requirements Manual
Page: 1 of 15 TABLE OF CONTENTS SECTION TITLE PAGE... Table of Contents... 2... Log of Revisions... 3... List of Effective Pages... 3 1.0...Cost of Poor Quality... 4 2.0... Process Control... 4 3.0...
More informationSummary of TL 9000 R4.0 Requirements Beyond ISO 9001:2000
This summary identifies the additional TL 9000 Release 4.0 requirements beyond those stated in ISO 9001:2000. See the TL 9000 R4.0 Handbook for the actual TL 9000 R4.0 requirements. ISO 9001:2000 section
More informationDocument Rev: 18 State: RELEASED see Smarteam for approval authorities TASK REQUIREMENTS. Supplier Quality Requirements
Document 0000000000000045 Rev: State: RELEASED see Smarteam for approval authorities This document is applicable only to suppliers of Production Items as defined below and their sub-tier suppliers. Non-
More informationCopyright JnF Specialties. All rights reserved worldwide.
Copyright JnF Specialties, LLC. All rights reserved worldwide. www.quality-control-plan.com/copyright.htm Revisions Rev: Letter E.O. Number - Description Date Used On Prepared By: President: Quality: Your
More informationEVANS CAPACITOR COMPANY
DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution
More informationReference Paragraphs. Appendix B AQS Auditor Handbook
Introduction Auditing is a basic tool to assess effective implementation of and conformity to Quality Management System (QMS) requirements. In addition to the determination of conformity, this handbook
More informationRevision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C
1 of 29 Quality Manual Multilayer Prototypes Compliant to ISO 9001-2008 / AS9100 Rev C This Quality Manual sets forth the quality system policies and Defines compliance with the ISO 9001-2008 SAE AS 9100
More informationTrident Precision Manufacturing
Trident Precision Manufacturing QASQC Rev. A 6/7/06 Title: Supplier Quality Clauses Author: April V. Lusk Director of Quality General Suppliers are responsible for compliance to all stated Quality Clauses
More informationSELLER QUALITY REQUIREMENTS QCS-001 PROCESSING SOURCES
Page 1 SELLER QUALITY REQUIREMENTS QCS-001 PROCESSING SOURCES Notice: A hard copy of this document may not be the document currently in effect. The current version is always the version on the Lockheed
More informationSECTION COMMUNICATIONS SYSTEMS QUALITY ASSURANCE & TESTING
SECTION 16707 COMMUNICATIONS SYSTEMS QUALITY ASSURANCE & TESTING PART 1 - GENERAL 1.01 SECTION INCLUDES A. These quality control (QC) system requirements define characteristics, in addition to those in
More informationKLINGE COATINGS. 3.1 Deviation A deviation addresses material, which has not been produced or has a known material substitution.
the latest, approved revision of this document please refer to the website (external) or master list (internal). Replaces: QP-06-200 Original issue date: May 22, 2003 1.0 PURPOSE 1.1 The Objective of this
More informationTo establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC.
1.0 PURPOSE To establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC. 2.0 APPLICATION When (QAM) Appendix 8.4 is specified on the purchase order,
More informationPercival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0)
TABLE OF CONTENTS INTRODUCTION... 4 1. Purpose... 4 2. Scope... 4 3. References... 4 4 Terminology and Definitions... 5 4.1.1 Subcontractor... 5 4.1.2 Significant Subcontractor... 5 4.1.3 Manufacturers...
More informationQM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope
SECTION 1 Page 1/1 1.0 INTRODUCTION 1.1 Scope The purpose of the Quality Manual is to provide a documented quality management system for BOLTEX mfg. The manual includes the organization structure, responsibilities,
More informationINSPECTION SYSTEM REQUIREMENTS
MILITARY SPECIFICATIONS MIL-I-45208A INSPECTION SYSTEM REQUIREMENTS This specification has been approved by the Department of Defense and is mandatory for use by all Agencies. 1. SCOPE 1.1 Scope. This
More informationU. S. Department of Energy. Consolidated Audit Program Treatment, Storage and Disposal Facilities. Checklist 1 Quality Assurance Management Systems
U. S. Department of Energy Consolidated Audit Program Treatment, Storage and Disposal Facilities Checklist 1 Quality Assurance Management Systems Revision 1.3 December 2013 Audit ID: Date: Quality Assurance
More informationProcurement Quality Assurance Requirements
1. REQUIREMENTS 1.1 Quality System This document provides the minimum Quality System Requirements to externally provided processes, products and services to Superior Thread Rolling (STR). Suppliers must
More informationANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION
PRODUCT REALISATION Document Control Revision History PAGE REASON FOR CHANGE REV. REVIEWER / AUTHORISED BY: RELEASE DATE: ALL NEW DOCUMENT A J.BENTINK 5/08/2016 Revision Approval: J.BENTINK Signature:
More informationPPI/TZ Standard Quality Requirements for Suppliers -SQRS-
PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: March 19, 2014 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact
More informationESCC NON-CONFORMANCE CONTROL SYSTEM. ESCC Basic Specification No
Page 1 of 16 ESCC NON-CONFORMANCE CONTROL SYSTEM ESCC Basic Specification Issue 2 January 2014 Document Custodian: European Space Agency see https://escies.org PAGE 2 LEGAL DISCLAIMER AND COPYRIGHT European
More informationNUCLEAR QUALITY ASSURANCE MANUAL
NUCLEAR QUALITY ASSURANCE MANUAL COLUMBIANA HI TECH 1621 Old Greensboro Road, Kernersville, NC 27284 INTRODUCTION The Columbiana Hi Tech. Nuclear Quality Assurance Manual for 10 CFR Part 71, Subpart H,
More informationUNCONTROLLED DOCUMENT
Rheem Manufacturing Company Fort Smith, Arkansas Original Release: 4/06/09 Revision Date: 10/25/16 Quality Management System D. Presley 05 1 of 1 Manual Contents A. Johnson 10/25/16 0 Section Title Revision
More informationIBS Electronics, Inc.
******************************* *** Quality Policy Manual ISO9001:2015 Uncontrolled When Printed 3506-D W. Lake Center Dr. Santa Ana, Ca 92704 U.S.A. 714.751.6633 800.527.2888 714.751.8159 FAX. E-mail:
More informationSTANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS
1. GOVERNMENT/CUSTOMER SOURCE INSPECTION: a. Government/Customer inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government/Customer representative
More informationCORPORATE QUALITY MANUAL
Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance
More informationCOMPLETED QUALITY SYSTEMS QUESTIONNAIRE
COMPLETED QUALITY SYSTEMS QUESTIONNAIRE Section I Introduction: SUPPLIER: Qualiseal Technology Phone (708) 887-6080 7319 West Wilson Ave. Fax (708) 887-8854 Harwood Heights, IL 60706 General Manager: Rob
More informationQuality Assurance Manual
McGarvin Engineering Inc. 35 Maple St. Lowell Ma. 01852 ph. 978-454-2741 fx. 978-459-7999 Quality Assurance Manual 1 Table of Contents Section Element 1.0 Scope and Policy 2.0 Organization 3.0 Quality
More informationQuality System Manual - Section 00
Quality System Manual - Section 00 INDEX AND REVISION STATUS Issued by: Quality Assurance Eff. Date: 06/10/2014 Rev.: A Pg. 1 of 4 QUALITY SYSTEM MANUAL SECTION 0 - INDEX AND REVISION STATUS SECTION 1
More informationc) Have personnel been appointed to supervise the production operations across all shifts in order to ensure the product quality?
Factory s Quality Assurance Ability 1 Responsibilities and Resources 1.1 Responsibilities a) Have the responsibilities and interrelation of various personnel involved in quality activities been defined?
More informationTUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME
TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME Copyright TUV SUD BABT 2017 A Certification Body of: Page 1 of 33 Contents AMENDMENT RECORD 3 0. INTRODUCTION 3 1. PRE-CONDITIONS TO SUPPORT PRODUCTION
More informationQUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.
REF ONLY-DATA MANAGEMENT: 1 ST (2) PAGES IS NOT PART OF FORM 1135. QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised. FORM 1135 QUALITY ASSURANCE CLAUSES
More informationMANUAL QUALITY CONTROL & QUALITY ASSURANCE
MANUAL QUALITY CONTROL & QUALITY ASSURANCE METROTEC ENGINEERING LLC P.O. BOX: 26045, DUBAI U.A.E TEL : 043889771 FAX:043889772 E Mail: metrotecengg@yahoo.com info@metrotec.ae Web: www.metrotec.ae 2 TABLE
More informationTURBO MACH A DIVISION OF VT SAA
TERMS AND CONDITIONS PAGE: 1 OF 5 1. PURPOSE To define specific terms and conditions for the purchase of product, materials and services. 2. SCOPE All products, materials and services purchased for use
More informationSUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality
SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: Gear Technology 10671 Civic Center Drive Rancho Cucamonga, CA 91730 GENERAL INFORMATION Attn: Manager of Quality
More informationAEROJET PURCHASE ORDER QUALITY CLAUSES (FULL TEXT) CONTENTS
AEROJET PURCHASE ORDER QUALITY CLAUSES (FULL TEXT) CONTENTS Page 1. GENERAL REQUIREMENTS 4 2. QUALITY SYSTEM 2.1 MIL-STD-45208A 5 2.2 MIL-Q-9858A 5 2.3 ISO 9001 5 2.4 ISO9002 5 2.5 NHB5300.4 (1B) 5 2.6
More informationPMA Quality Assurance Manual Rev. 2 Date 12 Feb 2016
PMA Quality Assurance Manual Date Aviation Technical Services, Inc. 3121 109 th Street SW Everett, WA 98204 425-423-3371 2600 West Casino Road Everett, WA 98204 10315 Airport Road Everett, WA 98204 www.atsmro.com
More informationNRC INSPECTION MANUAL
NRC INSPECTION MANUAL QVIB INSPECTION PROCEDURE 70702 PART 52, INSPECTION OF PREOPERATIONAL TEST PERFORMANCE PROGRAM APPLICABILITY: 2504 70702-01 INSPECTION OBJECTIVES 01.01 To provide guidance for inspection
More informationPage 1 / 11. Version 0 June 2014
Page 1 / 11 CORRESPONDENCE MATRIX NQSA NSQ-100 version 0 NUCLEAR SAFETY AND QUALITY MANAGEMENT SYSTEM REQUIREMENTS Model for quality management in design & development, manufacturing, erection, commissioning
More informationPurchase Order Quality Clause SCC40 Revision G, Effective 1/20/2015
Clause A - Quality System Requirements All references to the term Government in any of the documents referenced below shall be replaced with the term Curtiss-Wright and/or the Government. All references
More informationPERFORMANCE SPECIFICATION PRINTED CIRCUIT BOARD/PRINTED WIRING BOARD, GENERAL SPECIFICATION FOR
NOT MEASUREMENT SENSITIVE MIL-PRF-31032 1 November 1995 PERFORMANCE SPECIFICATION PRINTED CIRCUIT BOARD/PRINTED WIRING BOARD, GENERAL SPECIFICATION FOR This specification is approved for use by all Departments
More informationBeaver Machine. Quality Manual
Beaver Machine Quality Manual This manual has been written to the ISO 9001:2000 International Quality Standard Beaver Machine Inc. 5273 Hanson Court Minneapolis, MN 55429 763-535-2204 www.beavermachine.com
More informationQuality Manual. This manual has been written to the ISO 9001:2000 International Quality Standard
Sceptre CNC Machining Inc. Quality Manual This manual has been written to the ISO 9001:2000 International Quality Standard Sceptre CNC Machining Inc. Unit 401 1485 Coast Meridian Road Port Coquitlam, B.C.
More informationAS9100 PMA and 14 CFR 21 QUALITY HANDBOOK
AS9100 PMA and 14 CFR 21 QUALITY HANDBOOK Origination Date: XXXX Document Identifier: Date: Document Status: Document Link: Latest Revision Date Draft, Redline, Released, Obsolete Location on Server (if
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS
USACE / NAVFAC / AFCEC / NASA UFGS-01 45 00.00 40 (November 2017) ----------------------------------- Preparing Activity: NASA Superseding UFGS-01 45 00.00 40 (November 2014) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationEPICOR, INCORPORATED QUALITY ASSURANCE MANUAL
EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:
More informationOsprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -
February 8, 2015 1 Osprey Technologies, LLC Quality Manual ISO9001:2008 Rev - February 8, 2015 Released by Dave Crockett President 6100 S. Maple Avenue, Suite 117 Tempe, AZ 85283 www.osprey-tech.com February
More informationPurchase Order Quality Requirement Clauses
Purchase Order Quality Requirement Clauses Section I: Administrative. 1. Scope. This document lists the quality purchase requirements (QPRs) that JEM Engineering uses in business agreements such as purchase
More informationPurchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015
Clause A - Quality System Requirements All references to the term Government in any of the documents referenced below shall be replaced with the term Curtiss-Wright and/or the Government. All references
More informationPRECISION MACHINE INC. Quality Commitment. Quality Management System Manual AS9100
N&P PRECISION MACHINE INC Quality Commitment Quality Management System Manual AS9100 This printed copy is uncontrolled Page 1 of 44 Revision B N&P Precision Machine, Inc. Quality Management System Manual
More informationQUALITY POLICY MANUAL
C. L. HANN INDUSTRIES, INC. 1020 TIMOTHY DR. SAN JOSE CA 95133 QUALITY POLICY MANUAL Quality Policy Manual Rev. 1 8.18.97 MISSION STATEMENT C. L. Hann Industries, Inc. is designed to meet the precision
More informationOrbital ATK Corporation Launch Vehicles Division 1. QP SUPPLIER S RESPONSIBILITIES FOR CONTINUOUS APPROVAL AS AN ORBITAL ATK SUPPLIER
1. QP 0112 - SUPPLIER S RESPONSIBILITIES FOR CONTINUOUS APPROVAL AS AN ORBITAL ATK SUPPLIER a. Does your organization have a documented process to ensure employees directly related to product realization
More informationQuality Management System
Quality Management System 6.1 Quality Q-Codes () 6.1 Quality Q-Codes Quality Clauses The following quality control clauses apply when specifically noted on the Gear Technology purchase order: Q1- Material
More informationQuality Flow-Down Requirements to Suppliers
1.0 Calibration System: Seller s (herein referred to as Supplier) calibration system shall meet the requirements or standards of; ISO 9001, ISO 10012-1, or AS9100, and ANSI-Z540-1, or MIL-STD-45662. 2.0
More informationAERO GEAR, INC. SUPPLIER QUALITY MANUAL
AERO GEAR, INC. SUPPLIER QUALITY MANUAL REVISION HISTORY REVISION EFFECTIVE DATE SUMMARY OF CHANGES A 30-JAN-1998 Original Issue B 17-OCT-2002 Added note re: subcontractors may not subcontract to another
More informationBrumund Foundry Inc.
QUALITY ASSURANCE 1st TIER MANUAL Brumund Foundry Inc. 4400 West Carroll Ave. Chicago, IL 773-287-9250 PER ANSI/ASQC Q9002-1994 Page 1 of 7 THE PRESIDENT HAS DIRECTED THAT THE FOLLOWING POLICIES BE IMPLEMENTED
More informationQuality Assurance Manual
Quality Assurance Manual December 14, 2016 Revision Level A Pillar Machine 5000 South 1810 West Taylorsville, UT 84129 Document Revision History Revision Revision Initials Description of Changes Level
More informationNMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual
NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Table of Contents Introduction 5 Documentation Scheme..
More informationSTANDARD QUALITY REQUIREMENTS FOR SUPPLIERS F05-QP008 Rev A Dated 08/12/2010
For questions concerning Standard Quality Requirements for Suppliers (F05-QP008), please contact your APC buyer. 1. SCOPE This document establishes requirements for supplier s quality control systems.
More informationSpace product assurance
ECSS-Q-ST-10C Space product assurance Product assurance management ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Standard is one of the series of
More informationThese requirements apply to all suppliers:
Page 1 of 5 These requirements apply to all suppliers: A. Right of Entry Tri Models, Tri Model s customer and their customers or applicable regulatory agencies shall have right of access to all facilities,
More informationPROCUREMENT QUALITY REQUIREMENTS
PROCUREMENT QUALITY REQUIREMENTS S-TEC Corporation One S-Tec Way Mineral Wells, TX 76067 940-325-9406 The supplier including manufacturers and distributors shall follow S-TEC Procurement Quality Requirements
More informationSupplier Quality Clauses
Requirement Name Management System Design, Process, or Material Changes Submission of Nonconforming Material to POC Deviation / Waiver Resubmission of Material Notification of Previous Delivery of Defective
More informationOPW Engineered Systems
1 of 5 1.0 Purpose 1.1 The purpose of this manual is to promote a clear understanding of OPW Engineered Systems (OPW-ES) expectations and requirements for suppliers. This manual explains the process OPW-
More informationSECURE COMMUNICATION SYSTEMS INC. (Secure) QUALITY CLAUSES
SECURE COMMUNICATION SYSTEMS INC. (Secure) QUALITY CLAUSES These quality clauses, when referenced on a Secure s Purchase Order, are considered contractual requirements, in addition to any Purchase Order
More informationWeb Address. Contact Personnel (Include the President, Sales Manager, AR, and Quality Interface at a minimum) Service Years.
General Information Web Address Supplier Address City State Zip Contact Personnel (Include the President, Sales Manager, AR, and Quality Interface at a minimum) Name Service Years Title Total # Employees
More informationQuality Flow-Down Requirements to Suppliers
1.0 Calibration System Seller s (herein referred to as Supplier) calibration system shall meet the requirements or standards of; ISO 9001, ISO 10012-1, or AS9100, and ANSI-Z540-1, or MIL-STD-45662. 2.0
More informationPURCHASING QUALITY CLAUSES
Page 1 of 5 These requirements apply to all suppliers A. Right of Entry Tri Models, Tri Model s customer and their customers or applicable regulatory agencies shall have right of access to all facilities,
More informationWEAPON QUALITY POLICY
NNSA POLICY LETTER NAP-24 Approved: 6-20-13 WEAPON QUALITY POLICY NATIONAL NUCLEAR SECURITY ADMINISTRATION Office of Defense Programs AVAILABLE ONLINE AT: http://hq.na.gov INITIATED BY: Weapon Quality
More informationISO 9001 PMA and 14 CFR 21 QUALITY POLICIES HANDBOOK
ISO 9001 PMA and 14 CFR 21 QUALITY POLICIES HANDBOOK Origination Date: XXXX Document Identifier: Date: Document Revision: QMS-00 QMS Quality Policies Handbook Latest Revision Date Orig Abstract: This quality
More informationPURCHASE ORDER ATTACHMENT Q-201 SOFTWARE QUALITY SUBCONTRACTOR REQUIREMENTS TASK DESCRIPTIONS - PURCHASE CATEGORY "A"
PURCHASE ORDER ATTACHMENT Q-201 SOFTWARE QUALITY SUBCONTRACTOR REQUIREMENTS TASK DESCRIPTIONS - PURCHASE CATEGORY "A" 1. SOFTWARE QUALITY PROGRAM. This attachment establishes the software quality requirements
More informationNQA-1 Graded Approach, 55-Gallon Drum Summary
1, Organization 2, Quality Assurance program 3, Design 4, Procurement Document 5, Instructions, procedures, and Drawings 100 Basic 200 Structure and Responsibility 201 General 202 Delegation of Work 300
More informationABC Metals, Inc. NONFERROUS METALS PRECISION SLITTING
SCOPE This section describes the responsibility, authority, and management structure of the facility. 1.1 QUALITY POLICY The President has the ultimate responsibility for the facility s products and services.
More informationPrice Electronics,LLC Quality Assurance Manual
Price Electronics,LLC QUALITY POLICY INTRODUCTION The purpose of this manual is to document the company s quality system, to instruct and guide employees whose actions affect product quality and to inform
More informationThe Following Clauses are applicable only as noted on the Purchase Order, either by Quality Clause Code or Itemized Quality Clauses:
Quality Clauses shall be specified on procurement documents using either the Quality Clause Code or a listing of the actual Quality Clauses defined herein. Table below provides a cross reference between
More informationQuality Management Manual Revision 19
Quality Management Manual Revision 19 959 Concord Street Framingham, MA 01701 508-875-2121 www.epm-inc.com with offices in Knoxville, TN and Raleigh, NC Rev. 19 PROPRIETARY INFORMATION NOTICE Page ii
More informationAPPENDIX A QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS
APPENDIX A QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS A-1 QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS Prepared/Approved By: Director of Quality Assurance Sr. Production/Sr. Supply Chain Manager Micro
More informationSUPPLIER QUALITY REQUIREMENTS (SQR S)
SUPPLIER QUALITY REQUIREMENTS (SQR S) Q01 Q02 Q03 Q04 Q05 Q06 MANDATORY AMRO SOURCE INSPECTION When specified on individual Purchase Orders, Amro Source Inspection shall be performed at supplier s facility
More informationCorrespondence between ICMED criteria and ISO 13485: 2012
Annexure A (Informative) Correspondence between ICMED 13485 criteria and ISO 13485: 2012 Green Font is additional ICMED 13485 criteria requirement. Additional ICMED 13485 criteria Requirements are also
More informationSUPPLIER QUALITY ASSESSMENT
Supplier Organization Name: Supplier Number: Street Address: Date of This Audit: City, State, Zip Code: Date of Last Audit: Country: of Employees: Main Phone Number: of Buildings/Size: Fax Number: Principal
More informationGKN Aerospace Advanced Composite Structure
1.0 PURPOSE To communicate GKN and/or customer specification requirements to the supplier based on all Group I and Group II purchase Orders. 2.0 SCOPE This procedure and the use of GKN Procurement Quality
More informationSupplier Quality Requirements
1 Surveillance and Auditing 1.1 The Supplier s Quality System is subject to initial and annual audits/surveys and acceptance by Texas Almet, its customers, and government regulatory agencies (e.g. The
More informationTITLE: TEKTRONIX COMPONENT SOLUTIONS SUPPLIER QUALITY MANUAL
DATE OF RELEASE: 02-Jun-2017 Page 1 of 9 TITLE: TEKTRONIX COMPONENT SOLUTIONS SUPPLIER QUALITY MANUAL Change History: REV ECO ECO Completion/ Finished Date Summary of Change A01 S6-10550 29-JUL-15 Initial
More informationTÜV SÜD BABT Production Quality Certification Scheme
TÜV SÜD BABT Production Quality Certification Scheme The Production Quality Certification Scheme for Manufacturers A Certification Body of Copyright TÜV SÜD BABT 2014 Page 1 of 38 CONTENTS Page AMENDMENT
More informationComparison ISO/TS (1999) to QS 9000, 3 rd edition (1998)
1 SCOPE QS 9000: new: Introduction, applicability In addition to the applicability for supplier sites for production and services and their subcontractors for: - parts or materials, or - services like
More informationQUALITY MANUAL RED CHECK DENOTES THIS IS A CONTROLLED COPY. APPROVED BY: (President) APPROVED BY: (Production Manager) APPROVED BY: (Quality Manager)
PNC, Inc. QUALITY MANUAL, Rev. 6 Date: 11-10-08 Page 1 of 17 QUALITY MANUAL RED CHECK DENOTES THIS IS A CONTROLLED COPY APPROVED BY: (President) APPROVED BY: (Production Manager) APPROVED BY: (Quality
More informationQUALITY ASSURANCE REQUIREMENTS
SPACE AT MUCKLENEUK CAMPUS PRETORIA QUALITY ASSURANCE REQUIREMENTS SPACE AT MUCKLENEUK CAMPUS, PRETORIA Page 1 1.1 QUALITY ASSURANCE REQUIREMENTS In undertaking the works (including all incidental services
More informationGeneral Accreditation Guidance. ISO/IEC 17025:2017 Gap analysis. April 2018
General Accreditation Guidance Gap analysis April 2018 Copyright National Association of Testing Authorities, Australia 2018 This publication is protected by copyright under the Commonwealth of Australia
More information