In the world above the ceiling tiles Out of sight can be out of mind!
|
|
- Silas Chambers
- 6 years ago
- Views:
Transcription
1
2 In the world above the ceiling tiles Out of sight can be out of mind!
3
4 Openings that once were sealed may no longer be
5 Giant Red Flag!
6 Drywall Mud???
7
8 Rating Of The Barrier. Proper Barrier Construction. Proper Penetrating Item. Annular Space Requirements.
9 Throw more product at the problem. Get to the core of the problem and address it with a combination of: Management approaches Knowledge base (healthcare + firestop + construction) Products engineered for healthcare Superior technology U.L. testing base Support systems Training (FIT I & II) Tech support Tools (Paper-Electronic-Web Specialized Support
10 INTRO Competent Installations Require Understanding: 1. The Role of Barriers/Compartmentation 2. How Barriers Are Compromised 3. Following a UL System Approach 4. Understanding Basic Product Installation
11 Miss-Understanding of Products Miss-Understanding of Applications Miss-Understanding of Ratings No UL System Approach These Problems can be rectified with a solid technical training process as part of a Barrier Management Program.
12 Do you have a true Barrier Management Program? Does the protocol you have in place force accountability? Do you have an ongoing training process to insure that personnel involved have a complete understanding of what is expected?
13 Standardized Approach Integration with Existing Systems Training Tools
14 The BMP was designed to accomplish three things: 1. Insure the delivery of a compliant building 2. Adopt procedures to keep it in compliance 3. Documentation (evidence of compliance)
15 Proactive Approach to Maintaining Rated Wall Integrity. Stop Annual Outlay of Capital Once The Facility is Handed Over. Documentation!!!! Provide Avenues For Planning Pathways. (Cable Issues) Enforce Accountability! Surpass Inspection/Accreditation Expectations
16 Regulatory Compliance Insure Proper Installation (Per Code!) Stop Annual Outlay Of Capital Exhibit A Proactive Approach Prevent Property Loss Life Safety
17 A common theme with our HC partners. Cost Reduction Associated With Firestopping Issues. Lower Man Hours Spent Repairing Barriers. Lower Cost Associated With Documenting Infractions. Cost Savings Up Front Due To Re-enterable Systems.
18
19 Advance planning allows you to pick the right systems: Use of products and UL Systems that take into account the lifecycle requirements of your buildings Even bidding Standardization allows: Better pricing Adequate training Better manufacturer support Easier inspections Smoother job progress Statement of Conditions and Plan for Improvement reduction Maintenance becomes inspectors not installers
20 A full overview as to what is expected of anyone working in a rated barrier. This will go out with bid documents. Procedural requirements Performance requirements Submittal requirements Installation requirements Failure of any vendor to meet your SOC will result in contract termination
21 This permit will be given with a designated start. This will be determined by the facility. This permit will allow access above the ceiling. This permit will be displayed at all times.
22 This document would be picked up and returned to the firestop office. List all information of the installation. A log of Who, What, When and How. Use as an inspection tool. Accountability!
23 Accountability! Product Used Date Of Installation Contractor Information UL System#
24 A Detailed Specification For Individual Trades Insure That The Proper UL Systems & Products Are Being Used. Made available to your architectural firms and STI will meet with them to outline the program requirements and answer any questions.
25 A process for documenting barriers. A process for documenting penetrations. Utilizing bar-coding technology Ability to track other processes
26 Electronic Barrier Management Program s Should Provide The Tools For Managing Facility Vendors Managing Facility Access Utilizing Standardization Establishing Quality Control Procedures Providing Extensive Checks & Balances Providing Complete Documentation
27 Reporting & Documentation Report results of work activities Report deficiencies Plan & track corrections Provide Statement of Conditions (SOC) Schedule inspections, maintenance and repairs Custom reporting available
28
29 ebmp Overview *Use cursor to scroll over item and see bubble pop up of details
30 Reports That Mean Something By Floor By Contractor By Product Sealed vs. Unsealed Percentage of Sealed vs. Unsealed Grid Searches All Incomplete Penetrations Specific To Process (Dampers etc.) Permits For Any Work Performed Above The Ceiling. Sky Is The Limit!
31
32
33 Two levels Level 1 - on site Level 2 2 day training at STI training center in NJ Detailed training on the proper installation of standardized UL Systems & products Tested program requiring annual review Discussion Of Infection Control Discussion Of Patient Privacy Discussions Of BMP Paperwork Protocol
34 STI / Grainger Unparalleled Expert/Technical Knowledge Reduce Costs by: Standardization and Barrier Management Cost Effective Products and Systems Code Compliance. Deliver A Long Term Sustainable Facility.
35 Specified Technologies Has A proven Track Record of Success In Assisting Facilities With Barrier Management Grainger has A Proven Track Record Of Success In Assisting Facilities In All Facets! I Look Forward To Showing You What We Can Do As A Team! Thank You
Barrier Management. FCIA Barrier Management Series Barrier Management Policies
Barrier Management FCIA Barrier Management Series Barrier Management Policies Objective Keep Buildings Safe Barriers are for Safety DIIM Properly Designed and Specified Tested and Listed Systems Directories,
More informationFCIA Barrier Management Series. Barrier Management Policies
FCIA Barrier Management Series Barrier Management Policies Objective Keep Buildings Safe Barriers are for Safety DIIM Properly Designed and Specified Tested and Listed Systems Directories, Tables Specified
More informationUnique Fire Stop Online Certification Test
UFSP Installer Certification Test, Page 1 Unique Fire Stop Online Certification Test Please call us for clarification or questions: 251.960.5018 Certifications will be awarded for 100% scores only. The
More informationFCIA Recommended Practice Existing Building Firestop Systems Survey
FCIA Ad-Hoc Participating Committee Members Aedan Gleeson, Chair Eric Keeton Pat Tesche Kevin McLaughlin Randy Bosscawen Tony Gamble Why Develop this Practice? Provide Service Purchasers Differentiation
More informationUnique Fire Stop Online Certification Training Study Guide/Practice Test
UFSP Installer Certification Training- Study Guide/Practice Test, Page 1 Unique Fire Stop Online Certification Training Study Guide/Practice Test Please call or email Mike Tobias for clarification or questions:
More informationBarrier Management Systems. ASHE Region 2 Radisson Valley Forge May 13, 2014
Barrier Management Systems ASHE Region 2 Radisson Valley Forge May 13, 2014 DIIM Barriers are for Safety DIIM Properly Designed and Specified Tested and Listed Systems Directories, Tables Professional
More informationPre & Post Occupancy Fire Barrier Management
Pre & Post Occupancy Fire Barrier Management Pre & Post Occupancy Fire Barrier Management Event ID: OV SPEC NJ 1014 Course Length: 1 Hour AIA/CES Course #PPOFBM Specified Technologies Inc. is a Registered
More informationNYC Technical Bulletin
Building Owners Architects Engineers Quality Managers Safety Professionals Construction Industry NYC Technical Bulletin 2010-020 Special Inspection Requirements for Fire Resistant Rated Construction Life
More informationPHYSICAL FACILITIES Consultant s Handbook Specifications Division 07 Thermal and Moisture Protection 8400 Firestopping
1 General 1.1 The bidding requirements, contracting requirements, and applicable parts of Division 1 - General Requirements, as listed in the Table of Contents, shall be included in and made a part of
More informationCOMMERCIAL BUILDING PLAN REVIEW CHECKLIST
Department of Urban Planning & Codes Enforcement City of Coatesville - 1 City Hall Place - Coatesville, Pennsylvania 19320 Phone: 610.384.0300 Fax: 610.384.6051 COMMERCIAL BUILDING PLAN REVIEW CHECKLIST
More informationMANAGING THE CONSTRUCTION OF A NEW TXDOT FACILITY
MANAGING THE CONSTRUCTION OF A NEW TXDOT FACILITY Byron Hicks, P,E. Support Services Division Byron Heath Tibbets Support Services Division October 17, 2018 Presentation Topics Facilities Planning and
More informationA COMPLETE GUIDE TO HOSPITAL ANTEROOMS. A Complete Guide to Hospital AnteRooms
A COMPLETE GUIDE TO HOSPITAL ANTEROOMS TAKEAWAYS FROM THESE SLIDES, YOU WILL LEARN: What an anteroom is and why healthcare facilities need and utilize them Effective uses for an anteroom in the healthcare
More informationCommon Firestop Issues in Wood Framed Commercial Construction
Common Firestop Issues in Wood Framed Commercial Construction October 2014 At the July 24, 2014 Metro KC ICC Fire and Life Safety Training all day seminar, there were multiple questions pertaining to issues
More informationKey Points in Firestopping Fire Barrier Walls FCIA, DOHA
Key Points in Firestopping Fire Barrier Walls FCIA, DOHA Today we will cover 1. What is Firestopping & Firewalls 2. Major issues and examples a. Coordination b. Data c. Plastic Pipes d. Simple Through
More informationa physicians guide to security risk assessment
PAGE//1 a physicians guide to security risk assessment isalus healthcare isalus healthcare a physicians guide to security risk assessment table of contents INTRO 1 DO I NEED TO OUTSOURCE MY SECURITY RISK
More informationMASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 07 THERMAL AND MOISTURE PROTECTION
SECTION 078413 - PENETRATION FIRESTOPPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes through-penetration firestop systems for penetrations through fireresistance-rated constructions, including
More informationJean Vaillancourt Fire Protection Specialist Hilti (Canada) Corp.
Cable Management Firestop Jean Vaillancourt Fire Protection Specialist Hilti (Canada) Corp. FIRESTOPPING KNOWLEDGE FOR BETTER SPECIFICATION AND DESIGN OF FIRE-RATED CONSTRUCTION Presentation Topics and
More informationChimney and Fireplace Inspection Report
Chimney and Fireplace Inspection Report 91406 Inspection prepared for: Mr. and Mrs. Client Inspector: Greg Butler 27943 Seco Canyon Road, 560, Santa Clarita, CA 91350 NOTICE TO THIRD PARTIES: This report
More informationFirestopping & Compartmentation
Firestopping & Compartmentation 1 Designated Responsible Individual (DRI) FIT Level 2 Certified 2 3 1 Inspections/Consulting Firestopping Fire/Smoke Barriers Barrier Remediation SOC surveys Project Management
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-07 84 00 (May 2010) Change 1-08/13 ------------------------ Preparing Activity: USACE Superseding UFGS-07 84 00 (October 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationSPECIFICATION DIVISION 7 NUMBER SECTION DESCRIPTION DIVISION 07 THERMAL AND MOISTURE PROTECTION SECTION THROUGH-PENETRATION FIRESTOP SYSTEMS
BuildingName The Description of the Project P00000000 0000 DOCUMENTS Title Page Table of Contents Instruction to Bidders Form of Proposal Equal Opportunity Statement Form of Guarantee Supplemental General
More informationEnthusiastic customers We create success for our customers by Identifying their needs and providing Innovative and value adding solutions.
Our Purpose We passionately create enthusiastic customers and build a better future! We live our values The foundation of our culture is integrity, courage, teamwork and commitment. Enthusiastic customers
More informationTransit Center Waterproofing Systems. December 2015
Transit Center Waterproofing Systems December 2015 Agenda Waterproofing Systems Overview Roof Level Waterproofing Systems Physical Glass Monitoring Jar System Electronic Leak Monitoring Mesh System Fountain
More informationSUBPART 56-5 PHASE IA: ASBESTOS SURVEY PLANNING AND DESIGN
SUBPART 56-5 PHASE IA: ASBESTOS SURVEY PLANNING AND DESIGN 56-5.1 Asbestos Survey Requirements for Building/Structure Demolition, Renovation, Remodeling and Repair (a) (b) Asbestos Survey Required. An
More informationCSI. Spec/Build it Right & Barrier Management Policies FCIA 2017
FCIA @ CSI Spec/Build it Right & Barrier Management Policies FCIA 2017 TOTAL FIRE PROTECTION Effective Compartmentation Fire Barriers, Fire Walls/Floors, Smoke Barriers Firestopping, Fire Dampers, Swinging
More information2016 National Tribal Transportation Conference
Alaska Tribal Technical Assistance Program Center 2016 National Tribal Transportation Conference Construction Management Darrel Williams Introductions Introduction to Construction Administration Construction
More informationDIVISION 7 THERMAL AND MOISTURE PROTECTION SECTION PENETRATION FIRESTOPPING
DIVISION 7 THERMAL AND MOISTURE PROTECTION SECTION 07 84 13 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationAnd whoever saved one life, it is as though he saved entire mankind (5:32 Al Qur an) Leading the standards of Life-safety and Property-protection...
و م ن ا ح ي اه ا ف ك ا نم ا ا ح ي ا ال ناس ج م يع ا And whoever saved one life, it is as though he saved entire mankind (5:32 Al Qur an) Firestop Inspections? Fire Statistics at a Glance Global Data: 117
More informationCity of Westerville Guide to Commercial Inspections
City of Westerville Guide to Commercial Inspections FOOTINGS - After the excavation, with the form work and any required reinforcing steel in place. All footings shall have loose soil removed, reinforcing
More informationTECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE
TECHNICAL QUESTIONS FOR ITB-DOT-17/18-7004LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE Question 1: Question 2: Question 3: Question 4: Question 5: Question 6: When area configurations
More informationCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT Construction Management is not a new idea. The function of the Construction Manager is to work on behalf of the owner to complete a project within the plans and specifications provided.
More informationSafeWells. Custom built, ISO compliant total well integrity management software
SafeWells Custom built, ISO compliant total well integrity management software Leveraging software systems to support well integrity Well integrity refers to maintaining full control of fluids within a
More informationThis is a continuing series of articles, forms and helps for compliance with. FAR Part 145
Blue Tuna Docs Documenting the World of Aerospace This is a continuing series of articles, forms and helps for compliance with FAR Part 145 Maintaining Forms for the FAR Part 145 Repair Station Manual
More informationCommissioning Agent s Guide for Inspecting & Testing Access Floor Air Plenums
Access F l o o rs Commissioning Agent s Guide for Inspecting & Testing Access Floor Air Plenums Access Floors to the Power of 1 Proper inspection and testing of the underfloor air plenum is the best way
More information537 Total Miles of Public Sanitary Sewers (separated sewers and combined sewers)
PRIVATE LATERAL PROGRAM QUESTIONNAIRE The WEF Collection System Committee is primarily interested in successfully operating programs for work performed on the privately-owned portion of the lateral line;
More informationFIRESTOP 101: An Introduction to Firestopping
FIRESTOP 101: An Introduction to Firestopping Role of Firestop What is Firestopping? A process whereby certain materials, some of them specially manufactured, are used to resist (or stop) the spread of
More informationEx AC. Examination for Architects in Canada Examen des architectes du Canada
Ex AC Examination for Architects in Canada Examen des architectes du Canada General and Specific Objectives Theme 1 general objective specific objectives rogramming 1.1 Understand the process for the preparation
More informationUsing a CMMS to Manage an Effective BMP. An Introduction
Using a CMMS to Manage an Effective BMP An Introduction CONTENTS 1) A BMP DEFINED / 4 2) BMP INCLUSIONS & EXCLUSIONS / 5 3) STEPS TO AN EFFECTIVE BMP / 6 A) INVENTORY & DATA GATHERING / 6 B) SETUP THE
More informationUniversity of South Carolina Policy for Pest Control Procedures in Research Facilities
University of South Carolina Policy for Pest Control Procedures in Research Facilities I. POLICY Many pests can mechanically transmit disease pathogens and compromise the research environment. As such,
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 28 0000 SECURITY DESIGN CRITERIA PART 1 - GENERAL 1.1 RELATED DOCUMENT A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationCITY OF DEARBORN COMMERCIAL BUILDING & RENOVATION PERMIT
CITY OF DEARBORN COMMERCIAL BUILDING & RENOVATION PERMIT Commercial Building Permit- New commercial building, structure, or additional square footage. Commercial Renovation Permit- For interior or exterior
More informationSOLICITATION ADDENDUM NO. 1 RFP THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED.
Beaverton School District Capital Program Purchasing 16550 SW Merlo Road, Beaverton, OR 97006 Phone: 503-591-4539 SOLICITATION ADDENDUM NO. 1 RFP 15-0013 THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION
More informationGUARDRAIL & CABLE BARRIER INSPECTION AND MAINTENANCE
Approved: Effective: April 19, 2017 Review: February 13, 2017 Office: Maintenance Topic No.: 850-050-003-g Department of Transportation GUARDRAIL & CABLE BARRIER INSPECTION AND MAINTENANCE PURPOSE: To
More informationControlling Air Leakage from Raised Access Floor Cavities
Technical Bulletin #216 AIR LEAKAGE CONTROL Controlling Air Leakage from Raised Access Floor Cavities AIR LEAKAGE DEFINITION AND SIGNIFICANCE Air leakage is passage of pressurized air from an underfloor
More informationFirestop Special Inspection of Firestopping: Understanding and Complying with the 2012 IBC Requirements
Firestop 302 - Special Inspection of Firestopping: Understanding and Complying with the 2012 IBC Requirements Special Inspection of Firestopping 1 Firestop 302: Special inspection of firestopping: Understanding
More informationAcceptance and Testing for Quality Turnover to Sustainable Operations & Maintenance
Acceptance and Testing for Quality Turnover to Sustainable Operations & Maintenance PAUL M. RASCHILLA, PARTNER M B A, E P M, C H C, C B C P, L E E D A P, C M V P, C S D P AKF GROUP LLC AKF Group LLC is....
More informationSECTION THROUGH-PENETRATION FIRESTOP SYSTEMS
SECTION 07841 - THROUGH-PENETRATION FIRESTOP SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationSECTION FIRE RESISTIVE JOINT SYSTEMS
PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 07 84 43 FIRE RESISTIVE JOINT SYSTEMS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSECTION FIRESTOPPING
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 84 00 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph
More informationCS21793 Transition to Operations with Building Ops: The (Eye) in BIM
CS21793 Transition to Operations with Building Ops: The (Eye) in BIM Mark Mergenschroer Bernhard TME Learning Objectives Learn how to track maintenance data before taking ownership Learn how to increase
More informationOut of sight, out of mind: The importance of remote monitoring for off-grid and mini-grid energy systems
Out of sight, out of mind: The importance of remote monitoring for off-grid and mini-grid energy systems Stine Carlé Co-founder and VP Business Development CESP Mini-grid Workshop 14 November 2018 Outline
More informationLowe s Corporate Cargo Security Guidelines for Manufacturing and Warehouse Facilities
Lowe s Corporate Cargo Security Guidelines for Manufacturing and Warehouse Facilities Objective The purpose of this procedure is to ensure that LG Sourcing and its manufacturers and suppliers are in compliance
More informationCommissioning Communications
Commissioning Communications James Bochat Pro Services, a Linc Service Company Synopsis This paper describes the importance of communication in the commissioning process as well as basic commissioning
More informationPrimary Concerns and Defects
Primary Concerns and Defects Primary Concerns and Defects: Home Inspector Observations: Where to Look. What to Look For. What Observed condition may mean. Primary Concerns The points to be inspected per
More informationSchendt Engineering Corporation 2912 Beacon Street (719)
Schendt Engineering Corporation 2912 Beacon Street (719) 637-8850 Colorado Springs, CO 80907-9207 www.secengr.com ADDENDUM NUMBER 1 DATE: 5 July 2017 OWNER: PROJECT: University of Colorado Colorado Springs
More informationDemolition Plan A1 A3. Scale: 3/32" = 1'-0" Arch. Men N.I.C. Elev. Lobby. Stairs N.I.C. N.I.C. Women N.I.C. Issued for Tender.
inc. 400-7 avenue edmonton, alberta, canada tr y t: (780) 48 47 f: (780) 48 00 e: lesnider@shaw.ca 4 door to North Common Corridor doors to door to F. H. C. Men Women ELEC/TEL UP Stairs DN F. H. C. DN
More informationMassSAVE/Weatherization Home Energy
MassSAVE/Weatherization Home Energy State of the Programs Joint Presentation of the Program Administrators and the Residential EEAC Consulting Team May 11, 2010 {Draft} Agenda Program Design History Current
More informationWelcome. An Introduction to Fire-stopping Jonathan Cooney
Welcome An Introduction to Fire-stopping Jonathan Cooney TODAYS AGENDA 1. Introduction to Fireseal 2. What is Firestopping? 3. Product Range 4. Q&A Introduction to Fireseal Established in 1988 Largest
More informationDeveloped and Presented by: Wisconsin Healthcare Engineering Association
Infection Control Risk Assessment (ICRA) Developed and Presented by: Wisconsin Healthcare Engineering Association What is an ICRA? An Infection Control Risk Assessment is a tool devised to protect patients
More informationTexas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017
Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017 Automatic Fire Suppression - 210000 Without limiting the application of all of the Contract Documents to
More informationOberon Professional Wireless LAN Installation Solutions for Cisco Access Points
Oberon Professional Wireless LAN Installation Solutions for Cisco Access Points Copyright Oberon, Inc. 2017 Scott D. Thompson, Founder and CEO, Oberon, Inc. Improved WLAN Installation Solutions! OBJECTIVES
More informationVFA Data Maintenance Services
ENSURE AN ACCURATE FOUNDATION FOR CAPITAL PLANNING Once a capital program begins, original plans can quickly change as the project meets reality. Facility condition assessments provide a wealth of information
More informationNEW CONSTRUCTION (digital copy available Firestop Solutions Inc.) FIRESTOPPING SPECIFICATION SECTION FIRESTOPPING
NEW CONSTRUCTION (digital copy available Firestop Solutions Inc.) FIRESTOPPING SPECIFICATION SECTION 07840 - FIRESTOPPING PART 1 GENERAL 1.1 RELATED DOCUMENTS The BIDDING REQUIREMENTS, CONTRACTING REQUIREMENTS,
More informationFlooring Contractor QA/QC Plan Sample Selected pages (not a complete plan)
Flooring Contractor QA/QC Plan Sample Selected pages (not a complete plan) Part 1: Project Specific Quality Plan Part 2: Quality Manual Part 3: Submittal Forms Part 4: Inspection Checklist Forms Contact:
More informationRFP /ME - ADDENDUM 2
RFP 201013/ME - ADDENDUM 2 RFP Closing: February 5, 2015 at 2:00 PM (Local Time) Page 1 of 33 RFP Number: 201013/ME Date: January 28, 2015 RETURN PROPOSALS AS SHOWN BELOW Copies of proposal required: Eight
More informationSection 4: Managing the Construction Site
Section 4: Managing the Construction Site 4.1 Mobilization 33 4.1.1 Posting the SWPPP 33 4.1.2 Initial installation of BMP s 33 4.1.3 Mobilization Checklist for Initial Installation 34 4.2 Maintaining
More informationUtility Characteristics: 340,000 Number of Customers (approximately 2 million people) Number of Taps
PRIVATE LATERAL PROGRAM QUESTIONNAIRE The WEF Collection System Committee is primarily interested in successfully operating programs for work performed on the privately-owned portion of the lateral line;
More informationCity of Saskatoon #9 450 Ontario Avenue Asbestos Survey Report
City of Saskatoon #9 450 Ontario Avenue Asbestos Survey Report April 2016 Prepared For: City of Saskatoon Support Services 222 3 rd Avenue North, Saskatoon, SK. S7K 0J5 Attn: Lana Dodds Prepared By: Bersch
More informationCITY OF SASKATOON SURVEYOR S BUILDING ASBESTOS SURVEY REPORT
CITY OF SASKATOON SURVEYOR S BUILDING ASBESTOS SURVEY REPORT MAY 2013 Prepared For: City of Saskatoon Infrastructure Services Department 1101 Avenue P North, Saskatoon SK, Canada S7L 7K6 Attn: Brent Anderson
More informationRepair or replace section of driveway, approach, or sidewalk that are a trip hazard.
City of Gibraltar Pre-Sale Inspection Report Checklist FLATWORK: Repair or replace section of driveway, approach, or sidewalk that are a trip hazard. EXTERIOR PROPERTY: Fences/Sheds/Retaining walls: Repair,
More informationWSSC Embracing Web-based Construction Management. Keith Tyson, Technical Services Group
WSSC Embracing Web-based Construction Management Keith Tyson, Technical Services Group Agenda Background e-builder History Business Process Focus Benefits Lessons Learned Washington Suburban Sanitary Commission
More informationFCIA Webinar Gypsum Wall Patching
FCIA Webinar Gypsum Wall Patching Firestop Contractors International Association Hillside, IL +1-708-202-1108 - office Bill McHugh bill @ fcia.org Nestor Sanchez, USG Corp. nsanchez@usg.com DIIM Firestopping
More informationSafety Results Mirror Expectations at Westlake Petrochemicals New Grassroots Ethylene Plant
Safety Results Mirror Expectations at Westlake Petrochemicals New Grassroots Ethylene Plant Curtis R. Keller - Unit Manager, Westlake Petrochemicals (Presenter) ckeller@westlakegrp.com Karl Kolmetz - Sr.
More informationFacility Department Integration
Facility Department Integration FACILITIES DEPARTMENT INTEGRATION - CUSTODIAL, MAINTENANCE, AND CAPITAL IMPROVEMENTS The primary role of the District s Facilities Department is to support the students
More informationRoles & Responsibilities
Roles & Responsibilities Table of Contents Roles and Responsibilities... 2 Corporate Management, Total Energy Services Inc... 2 President/ CEO... 2 VP Legal & General Counsel... 2 Vice President, Operations...
More informationTENOCHCA HALL - FAN COIL UNITS, RESTROOM AND FINISH RENOVATION PROJECT NO
SECTION 26 05 00 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL REQUIREMENTS 1.1 RELATED DOCUMENTS A. The general conditions and Division 1 are part of this section and the contract for this work and
More informationTownship of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement
Township of Severn REQUEST FOR PROPOSAL Architectural & Professional Services Fire Station Replacement Deadline for proposal submission is June 15, 2017 at 2:00 p.m. Contact Person: Tim Cranney Director
More informationADDENDUM #1. February 2, 2018
ADDENDUM #1 February 2, 2018 PROJECT: Virginia Polytechnic Institute & State University McComas Hall Roof Replacement IFB# 0052154 Blacksburg, Virginia 24061 TO ALL BIDDERS: GENERAL: Addenda are part of
More informationCity Of Mendota Construction Procedures
City Of Mendota Construction Procedures Building Permit Application: A permit shall be obtained prior to commencing work of any type. Failure to do so may result in doubling the permit fees. At the time
More informationMEDICAL UNIVERSITY OF SOUTH CAROLINA DEPARTMENT OF PUBLIC SAFETY. EFFECTIVE DATE: 1 January 1999 PAGE 1 OF 10
MEDICAL UNIVERSITY OF SOUTH CAROLINA DEPARTMENT OF PUBLIC SAFETY POLICY AND PROCEDURE #82 SUBJECT: Card Access Program EFFECTIVE DATE: 1 January 1999 PAGE 1 OF 10 REVIEW DATE: 30 November 2017 APPROVED:
More informationATTACHMENT D SCOPE OF SERVICES
ATTACHMENT D SCOPE OF SERVICES OBJECTIVE Owner s Capital Improvement Program (major capital, minor construction, repair, and rehabilitation projects) includes numerous construction and renovation projects.
More informationWhat Will We discuss? Development Services A review from 2011 to present Brief introduction of the 2012 IBC Chp.17 changes and our adopted local amend
City of San Antonio: Special Inspections Program, Policies, and Procedures SEAoT State Conference 2012 Mike Shannon, PE, CBO Assistant Director, COSA DSD Ramiro Carrillo Building Inspection Supervisor,
More informationSend a Signal of Quality Care. Introducing the PURELL SOLUTION TM
Send a Signal of Quality Care Introducing the PURELL SOLUTION TM Take Credit for All You Do to Make Your Facility Great PURELL R products are universally recognized and trusted as a way to provide effective
More informationCeiling Tiles C200B - Specification
Ceiling Tiles C200B - Specification SECTION 09510 ACOUSTICAL CEILING TILES PART 1 GENERAL 1.00 GENERAL A. Sound Quality Acoustical Ceiling Tiles by Sound Seal, 50 H.P. Almgren Drive, Agawam, MA 01001;
More informationOUTLET PUTTY PADS SPECIFICATIONS
PART 1 - GENERAL OUTLET PUTTY PADS SPECIFICATIONS SECTION 07840 - FIRESTOPPING 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationFranklin Hall Renovation TABLE OF Document Indiana University Bloomington
VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...
More informationCity and County of San Francisco CONTRACT No A SFO - Data Center, Building 60 SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Cable Trays for Communications Cabling 1. Cable Trays 2. Cable Runways 3. Basket Tray B. Cable Tray Support
More informationThe power of the Converge platform lies in the ability to share data across all aspects of risk management over a secure workspace.
Converge Platform The transition to value-based care is breaking down the barriers between the CNO, CMO, and Chief Legal Counsel in managing enterprise risk. It s time to take a proactive systems approach
More information1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:
125 Syndicate Avenue, Thunder Bay, Ontario Page 1 of 5 Part 1 General 1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:.1 Removing asbestos-containing transite
More informationSan Antonio Water System Standard Specifications for Construction
ITEM NO. 903 Construction Qc/Qa Program Formatted: Font: 11.5 pt Formatted: Font: 11.5 pt 903.1 DESCRIPTION: This item shall govern the preparation and implementation of the Contractor s Construction Quality
More informationCommissioning at NYP. Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015
1 Commissioning at NYP Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015 Presentation Agenda 2 What is Commissioning Why Commission? Developing NYP s Commissioning Program
More informationWHITE PAPER PROTON THERAPY THREE STEPS TO ACHIEVE SUCCESSFUL MEP COORDINATION FOR PROTON THERAPY PROJECTS. May 2018
WHITE PAPER PROTON THERAPY THREE STEPS TO ACHIEVE SUCCESSFUL MEP COORDINATION FOR PROTON THERAPY PROJECTS May 2018 www.gilbaneco.com PROTON THERAPY White Paper THREE STEPS TO ACHIEVE SUCCESSFUL MEP COORDINATION
More informationEmergency Power Management System (EPMS) A system for assuring CMS compliance and reliability of Emergency Power Supply Systems (EPSS)
Emergency Power Management System (EPMS) A system for assuring CMS compliance and reliability of Emergency Power Supply Systems (EPSS) Developed As An Answer to EPSS Failures and Non-Compliance Issues
More informationComplete Mechanical Solution: NO sealant or putty required. Can be extended for thicker walls, and ganged for increased capacity.
For the Facility Owner... Self-Adjusting Sealing Mechanism: Nothing to remove, replace, adjust or tighten. Consistent Performance: Fire protection and smoke sealing not dependent on resealing. Retrofittable:
More informationCommissioning at NYP. Joseph Lorino, PE, LEED Corporate Director April 1, 2014
1 Commissioning at NYP Joseph Lorino, PE, LEED Corporate Director April 1, 2014 Presentation Agenda 2 What is Commissioning Why Commission? Developing NYP s Commissioning Program NYP Commissioning Process
More informationHILTI CP 645 Intumescent Fire Sleeve
Data Sheet HILTI CP 645 Intumescent Fire Sleeve The enclosed pages are taken from the Hilti Firestop Systems Manual Edition April 2011 Supported by additional standard details For Material Safety data
More informationSAMPLE PAGES. Construction Safety and Health Program. [Company name]
The safety and health of our employees is our top priority. Everyone goes home safe and healthy every day. Construction Safety and Health Program [Company name] [Date Authorized] [Version} 0 Contents Mission
More informationPrice Flat Faced Displacement Diffusers
Price Flat Faced Displacement Diffusers Division 23 Heating, Ventilating, and Air Conditioning Section 23 37 13 Diffusers, Registers, and Grilles PART 1 GENERAL 1.01 Section includes: A. Flat Faced Displacement
More informationBROADCAST: M BLOCKS, PLUGS, PLANKS NEW PRODUCT LAUNCH Date: June 16, 2016 Issued by: George Yoshida, Ted Colwell
BROADCAST: M16-001 BLOCKS, PLUGS, PLANKS NEW PRODUCT LAUNCH Date: June 16, 2016 Issued by: George Yoshida, Ted Colwell TITLE: DESCRIPTION: NEW PRODUCT LAUNCH 3M FIRE BARRIER BLOCKS, PLUGS AND PLANKS 3M
More informationModule 7: When Things Deviate from the Plan!
Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 7: When Things Deviate from the Plan! Sponsors: ODOT Local Technical Assistance Program (LTAP) November 2012 March
More information