1 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program and Manual Requirements 2.4 Management Responsibility 2.5 Production, Inspection, and Test Planning 2.6 Corrective and Preventative Actions 2.7 Document Control 2.8 Measuring and Testing Equipment 2.9 Purchasing and Contracting 2.10 Incoming Inspection 2.11 In-Process Inspection 2.12 Final Inspection 2.13 Inspection Status 2.14 Identification and Traceability 2.15 Process Control 2.16 Preservation, Packaging and Shipping 2.17 Quality Records 2.18 Nonconformance Control 2.19 Quality Program Review and Manual Revision 2.20 Process Capability/Statistical Methods 2.21 Internal Quality Audits 2.22 Training 2.23 Contract Review 2.24 Design Control Page 1

2 Has the contractor established a quality assurance program that includes all elements of the AAR M-1003 specification? Is it established and maintained by the contractor for the purpose of ensuring that materials, products, and services conform to contract requirements? Are all specified requirements fulfilled? Are nonconforming items prevented, detected early, and properly disposed? Is there evidence of continuous improvement of the items produced, the processes producing them and/or the services provided? Does the documentation sufficiently outline requirements affecting quality in activities covered by this standard in order to verify that materials, products, and services meet contract, statutory, and regulatory requirements? OBJECTIVE of the QUALITY ASSURANCE PROGRAM Are the principal objectives of a quality program addressed as follows: APPLICABILITY and SCOPE Does the contractor's quality assurance program apply throughout all areas of contract performance including, as appropriate, the procurement, identification, stocking, inspection, and issuing of material; the entire process of manufacture including design control, fabrication, processing, inspection, and assembly; and the packaging, storing, and shipping of material; and the maintenance of equipment that affects quality? Does the program provide that measures be implemented to plan work and prevent defects? Does the program identify nonconformances and initiate corrective action to eliminate their causes and potential for reoccurrence as early in the process as possible? Page 2

3 Does the contractor establish, implement, and maintain a quality assurance program according to the requirements of this specification? Does the contractor prepare a quality assurance manual covering the requirements of this specification? Does the quality assurance manual: Include or make reference to the quality program s procedures? Outline the structure of the documentation used in the quality program to plan and perform work so that nonconformities are prevented and those that do occur are detected and resolved? Provide the means for its effective implementation and continuous improvement of the quality program? Does a senior management official approve the QA Manual, and is this approval documented? Does the quality assurance manual contain, at a minimum: A description of the organization? An inspection and test plan in accordance with paragraph 2.5? A statement for reviewing and updating the manual? QUALITY ASSURANCE PROGRAM and MANUAL REQUIREMENTS System function descriptions for paragraphs 2.6 through 2.24 that document purpose (intent of what is expected to be accomplished), scope (what activities and processes are included), and an outline of what shall be done? Does the contractor maintain a current subscription to AAR Circular Letters or demonstrate a system that provides access to current AAR Circular Letter information as it pertains to the contractor's operation? Does the contractor maintain a current copy of AAR Specification M-1003? Page 3

4 MANAGEMENT RESPONSIBILITY Policy and Objectives Does the contractor: Define and document the organization's policy for quality, including objectives for quality and its commitment to quality? Ensure that this policy is understood, implemented, and maintained at all levels of the organization? Ensure that quality assurance requirements are not subordinated to manufacturing or construction? Define the responsibility, authority and interrelationship of personnel who manage, perform and verify work affecting quality? Is this personnel interrelationship shown on organization charts or clearly described in writing? Responsibility and Authority Does the contractor appoint a management representative who, irrespective of other responsibilities, has the responsibility, organizational freedom and authority to: Ensure that a quality program is established, implemented, and maintained in accordance with specification M-1003? Periodically review the performance of the quality program with senior management as a basis for improvement of the program? Initiate action to prevent the occurrence of any nonconformities relating to product, process, and quality program? Identify and record any problems relating to the product, process, and quality program? Initiate or recommend solutions to problems through designated channels? Verify the implementation of solutions? Control further processing, delivery, or installation of nonconforming product until the deficiency or unsatisfactory condition has been corrected? Page 4

5 Management? Performance of work? Verification activities, including internal quality audits? Training? Resources Does the (contractor's) organization ensure that adequate resources are identified and provided, including the assignment of trained personnel for the following: Management Review Does the contractor's management holding executive responsibility: Review the quality program at least annually to ensure its continuing suitability and effectiveness in satisfying the requirements of this specification and the contractor s quality policy and objectives? Does the review include at least the following: Internal and External quality audits? Internal and external nonconformances and/or Chapter 7 criteria? Corrective and Preventative Actions? Previous management review and action items? Changes to the quality system? Inspection results for example scrap rates, rework status, inspection data, and on-time delivery? Have records of such reviews been maintained? Page 5

6 Plan the production activities? Plan the inspection and test activities? Develop an inspection and test plan in accordance with paragraph 2.5.2? Update the plan to reflect inspection and test revision? PRODUCTION, INSPECTION, and TEST PLANNING Does the contractor do the following: The inspection and test plan may be of any format to suit the contractor s program as long as all criteria from incoming inspection through packaging and shipping are addressed. Does it do at least the following: Indicate each inspection and test point and its relative location in the processing cycle, including incoming inspection, preservation of items, packaging, and site inspection and testing? The contractor may include additional in-process inspection points for its own evaluation of quality. Identify the characteristics to be inspected, examined, and tested at each point & specify acceptance criteria to be used? Identify inspection and test points where measurement and test records are maintained so that assessments required by paragraph can be met? Indicate mandatory hold points that require witnessing or verification of selected characteristics of an item or process, and beyond which the work shall not proceed? Define or refer to sampling plans and statistical process control, including the criteria for selection, if proposed, and indicate where they will be used? Define or refer to how verification of compliance to process procedures will be accomplished and documented? Where applicable, specify where lots or batches will be used? Indicate where subcontractor services will be employed? Page 6

7 CORRECTIVE and PREVENTATIVE ACTION Does the contractor continuously improve the effectiveness of the quality program through the use of corrective action, preventive action internal audit results (refer to 2.21) and actions resulting from management reviews (refer to 2.4.4)? Has the contractor implemented procedures for corrective action that include the following: Handling of customer complaints and reports of product/service nonconformance? Investigation of the root cause of the nonconformity relating to product, process, and quality program and recording of the results of the investigation? Determination of the corrective action needed to permanently eliminate the root cause of the nonconformity? Documenting assignment of responsibility to ensure corrective actions are implemented? Assignment and tracking of expected completion dates for corrective actions? Application of controls to ensure that corrective action is taken and is effective? Has the contractor implemented procedures for preventive action that include the following: The use of appropriate sources of information, such as process and work operations, that affect product quality, concessions, audit results, quality records, service reports, and customer complaints to detect, analyze, and eliminate causes of potential nonconformity? Initiation of preventive action and application of controls to ensure that the procedure is effective? Confirmation that relevant information on actions taken is submitted for management review? Have records of corrective and preventive actions been maintained? Page 7

8 DOCUMENT CONTROL Has the contractor done the following: Establish and maintain documented procedures to control all documents affecting quality, including, to the extent applicable, documents of external origin such as standards and customer drawings? Establish and maintain a master list or equivalent documentcontrol procedure identifying the current revision status of documents? (This list or procedure must be available to preclude the use of invalid and/or obsolete documents.) Have documents been reviewed and approved for adequacy by authorized personnel prior to use? Does the contractor establish controls to ensure the following: That the applicable issues of appropriate and understandable documents are available at all functional areas and inspection and test points where operations essential to the effective functioning of the quality program are performed? Applicable standards, internal procedures, and forms necessary to demonstrate compliance with this specification and any related technical requirements must be maintained in English, as well as the appropriate language for the user. Per Appendix C: M-1003 Certified companies are required to maintain current English language versions of applicable standards, internal procedures, and forms used in the quality program. With respect to completed forms, inspection and test results need not be translated into both English and the appropriate language; however, a blank form in English must be available for use by the auditor. That invalid and/or obsolete documents are promptly removed from all points of issue or use or otherwise assured against unintended use? That any obsolete documents retained for legal and/or reference purposes shall be suitably identified and assured against unintended use? Page 8

9 2.7.5 When changes are made to documents, does the contractor do the following: Ensure that changes to documents receive the same level of authorization as the original documents? Process all changes in writing so they are acted on promptly at the specified locations? Maintain a record of changes and, where practical, identify the nature of the changes? Are written notes on documents made by authorized persons according to established procedures? Does the contractor revise and reissue documents after a practical number of changes have been issued? Page 9

10 Does the contractor establish and maintain documented procedures to control, calibrate, and maintain all measuring and test equipment and devices used to verify item quality and to monitor special processes? Does the contractor, at prescribed intervals or prior to use, calibrate and adjust measurement and test equipment against certified equipment having a known valid relationship to nationally recognized standards? Where no national standard exists, does the contractor document the basis employed for calibration? This can include industry or user standards. Does the contractor maintain calibration documents that include the following: Date of the calibration? Reference to standard applied? Equipment type? Identification number? Location? MEASURING AND TEST EQUIPMENT Frequency of checks? Description of check method? Acceptance criteria? Action to take when results are unsatisfactory? Page 10

11 Does the contractor identify measuring and testing equipment with a tag, sticker, or other suitable indicator to show the calibration status? Does the contractor maintain calibration records for measuring and test equipment? Does the contractor assess and document the validity of previous inspection and test results when measuring and test equipment are found to be out of calibration? Does the contractor ensure that environmental conditions are suitable for calibrations being carried out? Does the contractor ensure that the handling, storage, and preservation of measuring and testing equipment is such that the accuracy and fitness for use are maintained? Does the contractor safeguard all measuring and testing equipment from adjustments that would invalidate the calibration setting? Page 11

12 PURCHASING AND CONTRACTING Does the contractor do the following: Identify products to be purchased or subcontracted? Does the contractor determine for those subcontracted items and purchased products an appropriate method of verifying that the products/services conform to specified requirements? Typical methods include but are not limited to: Inspection by subcontractor Source inspection by contractor Incoming inspection Objective evidence, such as certificates of compliance Surveillance of subcontractor. Evaluate and select subcontractors based on documented assessments of their ability to meet contract and quality requirements? Survey and audit subcontractor's verification of quality at the Subcontractor s plant or the site of processing as and when required? Maintain quality records of acceptable subcontractors? Do purchasing documents contain data clearly describing the items ordered, including the following, where applicable: The type, class, grade, or other precise identification, including AAR specification, drawings, or other technical specifications? The title or other positive identification, and applicable issues, of specifications, drawings, process requirements, inspection instructions, and other relevant technical data, including requirements for approval or qualification of items, procedures, process equipment, and personnel? The title, number, and issue of the quality standard to be used? The verification arrangements and method of product release? Page 12

13 2.9.3 Does the contractor review and approve purchasing documents for adequacy of the specified requirements prior to release? When specified in the contract, are the contractor's customers afforded the right to verify at the subcontractor's plant and on the contractor's premises that subcontracted items conform to specified requirements? Verification by the customer shall not absolve the contractor of the responsibility to provide acceptable service, nor shall it preclude subsequent rejection by the customer. Page 13

14 INCOMING INSPECTION Does the contractor inspect, test, and identify incoming items as required by the inspection and test plans? Does the contractor check the objective evidence provided by subcontractors and suppliers as a means of verifying quality per the requirements of paragraph ? Does the contractor hold incoming items until the required inspection and tests are completed or the necessary inspection and test reports are received and verified (except when items are released under positive recall)? IN-PROCESS INSPECTION Does the contractor inspect, test, and identify items as required by the inspection and test plan? Where inspection is not feasible, does the contractor monitor process methods? Does the contractor hold items until the required inspections and tests are complete or necessary reports are received and verified (except when items are released under positive recall)? Release under positive recall shall not preclude inspection, testing and identification as specified in paragraph Does the contractor identify nonconforming items? Does the contractor maintain documented procedures for the verification, storage, and preservation of the customer-supplied part(s)? Are any customer-supplied part(s) that are lost, damaged, nonconforming, or otherwise unsuitable for use recorded and reported to the customer? Page 14

15 2.12 FINAL INSPECTION Does the contractor inspect, test, and identify the final items as required by the inspection and test plan? Does the contractor review all inspection and test records and verify that the item has been inspected at all points shown in the inspection and test plan and that these records are complete? Does the contractor retain all inspection records as specified in paragraph 2.17? INSPECTION STATUS Does the contractor provide means for ensuring that required inspections and tests are performed and that the acceptability of items with regard to inspections and tests performed is known throughout processing? Does the contractor establish and maintain a system for tags or stamped impressions on the item or its container or other physical means that indicates final acceptance of items? Final acceptance indicators, in-process indicators, and incoming inspection indicators must not be identical Does the contractor show the identity of the contractor and its inspector on any inspection stamps used? Does the contractor provide measures for controlling status indicators, including the authority for application and removal of tags, stamps, or other physical means of indicating the inspection status? Page 15

16 IDENTIFICATION and TRACEABILITY Where appropriate, does the contractor establish and maintain systems that identify each item (lot, component, or part) to the applicable drawing, specification, or other technical document, from receipt through processing and shipping? Where traceability is specified, does the contractor assign to each item a unique identification that shall distinguish those items that are otherwise identical but that have been processed in separate batches? Does the contractor record this identification on all process, inspection, and test records? PROCESS CONTROL 2.15 Does the contractor identify and plan the production, installation, and servicing processes that directly affect quality and ensure that these processes are conducted under controlled conditions? Adhering to documented procedures defining the work process where the absence of such procedures could adversely affect quality? Employing suitable process equipment in a suitable working environment? Complying with applicable codes, standards, specifications, documented procedures, and/or inspection and test plans (Paragraph 2.5)? Monitoring and control applicable process parameters and product characteristics? Approving procedures, processes, and equipment? Do controlled conditions include, but are not limited to, the following: Establishing workmanship criteria in the clearest appropriate manner (written/reference standards, pictures, etc.)? Maintaining equipment with documented preventative maintenance to ensure continuing conformity to product requirements? Page 16

17 Ensuring that special processes (including but not limited to welding, heat treating, plating, and non-destructive testing) are performed under controlled conditions in accordance with applicable codes, standards, specifications, and governmental and contractual requirements by qualified personnel using qualified equipment and procedures? Ensuring that the qualification of personnel, procedures, and equipment complies with the requirements of applicable codes, standards, and specifications? Ensuring that documentation for currently qualified personnel, processes, or equipment is maintained in accordance with the requirements of pertinent codes, standards, & specifications? Defining those special processes not covered by applicable codes, standards, or specifications? Where item quality requirements exceed the requirements of established codes, standards, and specifications, describe the necessary qualifications of personnel, procedures, and equipment? Ensuring that any required AAR or other technical requirements have been obtained and understood and are maintained. This includes verification that the requirements of applicable AAR standards, specifications, recommended practices, or other technical requirements are being met. Page 17

18 PRESERVATION, PACKAGING, AND SHIPPING Does the contractor establish and maintain documented procedures for handling, storage, preservation, and delivery of product? Does the contractor provide methods of handling and storing product that prevent damage? Does the contractor control packing, packaging, storing, shipping and marking processes? Do procedures apply to ensure conformance to specified requirements, including, as applicable, materials used, rotation of dated materials, consideration of environmental factors affecting product, and technical requirements? Does the contractor apply appropriate methods for preservation and segregation of product when the product is under contractor control? Does the contractor arrange for the protection of the quality of the product after final inspection and test? Where contractually specified, is this protection extended to include delivery to destination? Page 18

19 QUALITY RECORDS Does the contractor maintain quality records as evidence of the following: The item or material meets this standard and contractual requirements? Personnel, procedures, and equipment for special processes are qualified as required by paragraph ? Selection and surveillance of subcontractors are met as required by paragraph 2.9.1? Does the contractor include in paragraph inspection and test records that identify the following: Either the reference drawing number and revision number or part number of the item? Applicable requirements? Specific inspections performed and results obtained? (If measurements are not required, include the basis of acceptance.) Nonconformance reports (see paragraph )? The date of inspection or test? The identity of the inspector or data recorder? Make quality records available for analysis and review? Identify, index, and file quality records for easy retrieval? Does the contractor do the following: Retain quality records for as long as necessary; at a minimum ensure compliance to applicable contractual, legal and/or technical specification requirements? Provide suitable environment for records to minimize deterioration or damage and to prevent loss? If electronic records are used does the contractor address, at a minimum, frequency of backups, type of media to be used for backups, and storage requirements? Page 19

20 Does the contractor control nonconforming conditions and continuously improve the effectiveness of the quality program? Define the responsibility and authority of those who dispose of nonconforming items? Detect and record nonconformance? Identify and hold nonconforming items for evaluation? Develop a disposition that has the concurrence of all responsible parties? Implement accepted disposition? Provide requirements for reinspecting and retesting repaired and reworked items? NONCONFORMANCE CONTROL Does the contractor establish and maintain measures for controlling nonconforming items that do the following: Advise the initiator and the AAR through the online AAR material nonconformance reporting website at of the final disposition of returned/recalled materials identified as nonconforming to preclude unauthorized use as per Chapter 7? Is the contractor complying with all Chapter 7 requirements of AAR M-1003? Is the contractor properly using Forms QA-7.1, QA-7.2 and QA-7.3 as detailed in Chapter 7 of AAR M-1003? Are records of this activity maintained for three years as required by Chapter 7 of AAR M-1003? Does the contractor designate a Chapter 7 nonconformance reporting contact? Does the contractor provide holding areas or methods for segregating nonconforming items to prevent unauthorized use, shipment, or mixing with conforming items? Where physical segregation is not practical, tagging, marking or other positive means of identification are acceptable. Does the contractor maintain records identifying nonconforming items, the nature and extent of nonconformance, its disposition, and objective evidence that repaired and reworked items have been reinspected or retested according to applicable documented procedures? Page 20

21 QUALITY PROGRAM REVIEW and MANUAL REVISION Does the contractor review the quality assurance program and manual at least annually? Does the contractor maintain a completed Quality Assurance System Evaluation (QASE) Checklist, identifying the corresponding line item from their program that addresses each requirement in the current Specification M-1003? Following the review does the contractor update the quality assurance program and manual accordingly to reflect current quality assurance practices? Does the contractor submit revisions to the quality assurance program and manual to the AAR QA Program Coordinator or agent prior to 60 days before a scheduled M-1003 audit? Does the contractor prepare and submit more frequent upgrades in procedures and clarity in accordance with these specifications when deficiencies are identified and documented by the Quality Assurance Committee? PROCESS CAPABILITY/STATISTICAL METHODS Does the contractor use statistical methods to evaluate and control the variability of processes that may include rework/repair, status, scrap rates, and inspection data? If not what do they do? Does the contractor use statistical process control to evaluate the capability and capacity to ensure materials, products, and services conform to contract requirements? If not what do they do? Does the contractor identify where statistical methods are used for control and continuing improvement of key product/process characteristics? (Suppliers shall then identify and classify product, process, and service characteristics for which statistical techniques will be used as a basis for the assurance and control of quality and acceptance or rejection of lots.) Page 21

22 Evaluate and control the variability of processes? Control key product/process characteristics for continuous improvement? Measure key performance indicators of the quality program? Does the contractor maintain documented procedures to implement and control the application of the statistical methods? Does the contractor carry out internal quality audits to verify compliance with Specification M-1003 and the contractor s current quality assurance practices? Does the contractor schedule audits as follows: On the basis of the status and importance of the activity? They occur minimally once per year? They encompass a review of all 24 elements contained in Chapter of this specification within a 12-month period? Are audits performed in accordance with documented procedures (using appropriate checklists) by trained personnel who have the organizational freedom to record results and deficiencies as they are required? Are audit results recorded and do they include evidence of conformance or nonconformance of a product, process or procedure to specified requirements? Does the contractor identify the need for the application of statistical methods to accomplish the following: INTERNAL QUALITY AUDITS Are the results of audits documented and brought to the attention of the personnel having responsibility in the area audited? Does management personnel responsible for audited areas with noted nonconformances take timely corrective action (paragraph 2.6.2) on the deficiencies found by internal audits? Do follow-up activities verify and record the implementation and effectiveness of the action taken? Page 22

23 TRAINING Does the contractor establish and maintain approved procedures for identifying training needs, providing the training, and evaluating the effectiveness of that training of all personnel involved in activities affecting quality? Does the contractor create and maintain job descriptions? Are basic job responsibilities and qualification requirements defined? Do personnel involved in special or key processes (including, but not limited to, welding, heat treating, painting, coating, pressure treating, product inspection, internal quality auditing, etc.) have both function-specific training and applicable work experience to be considered qualified? Are training records maintained for qualified personnel as long as they remain qualified or as required by other regulatory requirements? Does the contractor define the measures to ensure that personnel are aware and knowledgeable of their specific responsibilities for quality? Does the contractor provide the necessary instruction and means whereby those personnel can develop, achieve, and maintain proficiency? Page 23

24 CONTRACT REVIEW Does the contractor establish and maintain documented procedures for contract review such that, before submission of an offer by the contractor, or at the acceptance of a contract or order (statement of requirement), the offer, contract, or order is reviewed by the contractor to ensure the following: The requirements are adequately defined and documented? Where no written statement of requirement is available for an order received by verbal means, does the contractor ensure that the order requirements are agreed to before their acceptance? Any differences between the contract or accepted order requirements and those in the offer are resolved? The contractor has the capability to meet the contract or accepted order requirements? When servicing is specified in the contract or order, has the contractor established and maintained documented procedures for performing, verifying, and reporting that the servicing meets the specified requirements? Does the contractor identify how an amendment to a contract is made and correctly transferred to the responsible personnel within the contractor's organization? Does the contractor maintain records of contract reviews? Page 24

25 DESIGN CONTROL Does the contractor establish and maintain documented procedures to control and verify the design and development planning of the product in order to ensure that the specified requirements are met? Where product design, redesign, or modifications are not usually performed, do the design procedures address how adherence to existing design criteria is maintained? Where product design, redesign, or modifications are not usually performed, does the contractor define the procedure when a design change is required? Does the contractor prepare plans for each design and development activity? Do the plans include the review, verification and validation requirements that are appropriate to each design and development activity? Do the plans describe or reference these activities and define responsibility for their implementation. Are the design and development activities assigned to qualified personnel equipped with adequate resources? Are the plans updated as the design evolves? Are organizational and technical interfaces between different groups who contribute to the design process defined and the necessary information documented, transmitted, and regularly reviewed? Does the contractor manage the interfaces between the different groups to ensure effective communication and clear assignment of responsibility? Page 25

26 Are design and development input requirements relating to the product, including applicable statutory and regulatory requirements, functional and performance requirements and where applicable, information derived from previous similar designs and other requirements essential for design and development identified and documented and their selection reviewed for adequacy by the contractor? Are incomplete, ambiguous, or conflicting requirements resolved with those responsible for imposing these requirements? Does design input take into consideration the results of any contract review activities? Is planning output updated as appropriate, as the design and development activity progresses? Is design and development output documented and expressed in terms that can be verified against design input requirements and validated (see paragraph )? Meet the design and development input requirements? Contain or make reference to acceptance criteria? Does design and development output do the following: Identify those characteristics of the design that are crucial to the safe and proper functioning of the product (e.g., operating, storage, handling, maintenance, and disposal requirements)? Provide appropriate information for purchasing, production, and servicing provision? Are design and development output documents reviewed before release? Page 26

27 At appropriate stages of design, are formal documented reviews of the design and development results planned and conducted, to evaluate the ability of the results to meet design and development input requirements? Does the review identify any problems and propose appropriate resolution actions? Do design reviews include representatives of functions concerned with the design and development stage(s) being reviewed? Are records of such reviews maintained? Are necessary actions documented? At appropriate stages of design, is design verification performed to ensure that the design and development output meets the design and development input requirements? Are the design and development verification measures and any necessary actions recorded? Is design validation performed to ensure that product conforms to defined user needs and/or requirements? If specified application or intended use are known, is the resulting product capable of meeting the requirements of the intended use? Does the contractor do the following: Complete validation prior to the delivery or implementation of the product, wherever practicable? Maintain records of the results of validation and any necessary actions? Are all design and development changes and modifications identified, documented, reviewed, and validated as appropriate, and then approved by authorized personnel? Does the review include evaluation of the effect of the changes on constituent parts and product already delivered? Does the contractor maintain records of the review of changes and any necessary actions? Page 27

QUALITY SYSTEM REQUIREMENTS FOR Manufacturer YFTFC001

QUALITY SYSTEM REQUIREMENTS FOR Manufacturer YFTFC001 PURPOSE: This specification outlines the Quality System requirements for Young & Franklin/Tactair Fluid ontrols suppliers. It is intended to assure that articles purchased from approved suppliers are as

More information

Brumund Foundry Inc.

Brumund Foundry Inc. QUALITY ASSURANCE 1st TIER MANUAL Brumund Foundry Inc. 4400 West Carroll Ave. Chicago, IL 773-287-9250 PER ANSI/ASQC Q9002-1994 Page 1 of 7 THE PRESIDENT HAS DIRECTED THAT THE FOLLOWING POLICIES BE IMPLEMENTED

More information

DEC STD ISO Quality Systems - Model for Quality Assurance in Design /Development, Production, Installation and Servicing

DEC STD ISO Quality Systems - Model for Quality Assurance in Design /Development, Production, Installation and Servicing Digital Internal Use Only DEC STD 017-1 - ISO 9001 - Quality Systems - Model for Quality Assurance in Design /Development, Production, Installation and Servicing DOCUMENT IDENTIFIER: A-DS-EL00017-01-0000

More information

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:

More information

Quality Assurance Policy and Procedures

Quality Assurance Policy and Procedures 650 Montana Ave, Suite A Las Cruces, NM 88001 (575) 522-0430 www.rmgovernmentservices.com Quality Assurance Policy and Procedures PURPOSE. The purpose of this policy is to outline the quality assurance

More information

YFTFC002 QUALITY SYSTEM REQUIREMENTS

YFTFC002 QUALITY SYSTEM REQUIREMENTS Machining YFTF002 PURPOSE: This specification outlines the Quality System requirements for Young & Franklin/Tactair Fluid ontrols suppliers. It is intended to assure that articles purchased from approved

More information

Plastics and Concepts of Connecticut Inc. Quality Manual

Plastics and Concepts of Connecticut Inc. Quality Manual Plastics and Concepts of Connecticut Inc. Quality Manual Nature of Changes For This Issue: 1. Initial Release 8/14/2000 2. Reformatted and grammatical errors corrected 6/11/02 3. Minor grammatical errors

More information

UPGRADE ASSESSMENT CHECKLIST

UPGRADE ASSESSMENT CHECKLIST Checklist Instructions : Prior to auditing each element, the auditor shall review the documentation and mark a 0 in each box where functions /departments are referenced. As each function/department is

More information

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

MANUAL QUALITY CONTROL & QUALITY ASSURANCE MANUAL QUALITY CONTROL & QUALITY ASSURANCE METROTEC ENGINEERING LLC P.O. BOX: 26045, DUBAI U.A.E TEL : 043889771 FAX:043889772 E Mail: metrotecengg@yahoo.com info@metrotec.ae Web: www.metrotec.ae 2 TABLE

More information

INS QA Programme Requirements

INS QA Programme Requirements Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued

More information

EVANS CAPACITOR COMPANY

EVANS CAPACITOR COMPANY DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

Vendor Qualification Survey

Vendor Qualification Survey 1200 West 96 th St Minneapolis, MN 55431 Ph: 952-888-7900 Fax: 952-888-2719 Vendor Qualification Survey Vendor Information Company Name: Date: Address: City: Phone Number: email address: Product or Service

More information

Quality Commitment. Quality Management System Manual

Quality Commitment. Quality Management System Manual Quality Commitment Quality Management System Manual This printed copy is uncontrolled Page 1 of 30 Thor Machining Quality Management System Manual Section 1 TABLE OF CONTENTS Page # 1 Introduction 5 2

More information

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT Desk Audit of Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT-90-5001-02.1 Reviewed by: Element Requirements Applicable 1. Is a quality policy defined

More information

BELDEN QUALITY SYSTEM OVERVIEW

BELDEN QUALITY SYSTEM OVERVIEW BELDEN QUALITY SYSTEM OVERVIEW Table of Contents 1.0 Introduction 2.0 Quality Management System 3.0 Resource Management 4.0 Product Realization 5.0 Measurement, Analysis, and Improvement 1.0 Introduction

More information

UNCONTROLLED DOCUMENT

UNCONTROLLED DOCUMENT Rheem Manufacturing Company Fort Smith, Arkansas Original Release: 4/06/09 Revision Date: 10/25/16 Quality Management System D. Presley 05 1 of 1 Manual Contents A. Johnson 10/25/16 0 Section Title Revision

More information

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C 1 of 29 Quality Manual Multilayer Prototypes Compliant to ISO 9001-2008 / AS9100 Rev C This Quality Manual sets forth the quality system policies and Defines compliance with the ISO 9001-2008 SAE AS 9100

More information

HFI Fluid Power Products Quality Manual Revision # 5 dated 02/07/10. HFI FLUID POWER PRODUCTS A Division of Hydraulic Fittings, Inc.

HFI Fluid Power Products Quality Manual Revision # 5 dated 02/07/10. HFI FLUID POWER PRODUCTS A Division of Hydraulic Fittings, Inc. HFI FLUID POWER PRODUCTS A Division of Hydraulic Fittings, Inc. ISO9001-2008 QUALITY MANUAL SCOPE HFI Fluid Power Products is a full line stocking distributor/manufacturer for both hydraulic and pneumatic

More information

QUALITY SYSTEM REQUIREMENTS FOR Raw Material YFTFC004

QUALITY SYSTEM REQUIREMENTS FOR Raw Material YFTFC004 Raw Material YFTF004 PURPOSE: This specification outlines the Quality System requirements for Young & Franklin/Tactair Fluid ontrols suppliers. It is intended to assure that articles purchased from approved

More information

QUALITY SYSTEM MANUAL

QUALITY SYSTEM MANUAL QUALITY SYSTEM MANUAL This Manual is a Proprietary Document and any Unauthorized Reproduction is prohibited. ISSUE DATE July 26, 2012 AUTHORIZED BY: Quality Management Representative Eric Hoff Managing

More information

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,

More information

The Hashemite Kingdom of Jordan Jordan Institution for Standards & Metrology. Jordanian Quality Mark

The Hashemite Kingdom of Jordan Jordan Institution for Standards & Metrology. Jordanian Quality Mark The Hashemite Kingdom of Jordan Jordan Institution for Standards & Metrology Jordanian Quality Mark Amman in February, 1997 1 Abstract Article (18) of the Law of Standards & Metrology; law no. (15) for

More information

Page 1 / 11. Version 0 June 2014

Page 1 / 11. Version 0 June 2014 Page 1 / 11 CORRESPONDENCE MATRIX NQSA NSQ-100 version 0 NUCLEAR SAFETY AND QUALITY MANAGEMENT SYSTEM REQUIREMENTS Model for quality management in design & development, manufacturing, erection, commissioning

More information

QUALITY ASSURANCE AND QUALITY CONTROL MANUAL

QUALITY ASSURANCE AND QUALITY CONTROL MANUAL 1 QUALITY ASSURANCE AND QUALITY CONTROL 2 TABLE OF CONTENTS SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 SECTION 7 SECTION 8 SECTION 9 SECTION 10 QUALITY POLICY & AUTHORITY MANAGEMENT RESPONSIBILITY

More information

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy QM001 Page 1 of 19 Quality Manual QM001 Page 2 of 19 Table of Contents Page Company Profile 4 Approval 4 Revision History 4 Distribution List 4 1.0 Scope 5 Section 2: Normative Reference 6 2.0 Quality

More information

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX In completing your Documented Quality Management System Review, it is important that the following matrix be completed and returned to us as soon as possible. This will save time during the review and

More information

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip UHV SPUTTERING INC Page 1 of 18 ECO REVISION HISTORY ECO# REVISION DATE MGR QA 1001 A 2/25/2008 R.Clement J.Haislip 1017 B 6/17/2008 T.Finneran J.Haislip 1071 C 1/13/2011 R.Clement J.Haislip 1078 D 5/15/2013

More information

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26 Company Name/Certificate Number: Page 1 of 26 a. Organization a.1. Has the Organizational Structure of the program identified the levels of management responsible for the Quality System Program, including

More information

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A Page 1 1 of 57 President Design Engineering Production Production Engineering Materials Control Purchasing Service Marketing Sales Contracts Human Resources Quality Assurance Quality Control Production

More information

ROTEK. IIInnInstI Instrument Corp. ISO 9001 Quality System Manual

ROTEK. IIInnInstI Instrument Corp. ISO 9001 Quality System Manual ROTEK IIInnInstI Instrument Corp. ISO 9001 Quality System Manual QSM900100-01 REV O MANUAL NO: 10 ISSUED TO: Rotek Web Site DATE OF ISSUE: 17 July 2002 APPROVALS: ORIGINATOR: Lawrence E. Weissbach Lawrence

More information

AS 9100 Rev C Quality Systems Manual AS-050C-QM

AS 9100 Rev C Quality Systems Manual AS-050C-QM AS 9100 Rev C Quality Systems Manual AS-050C-QM Innovative Control Systems, Inc. 10801 N. 24 th Ave. Suite 101-103 Phoenix, AZ 85029 U.S.A. www.icsaero.com +01-602-861-6984 VOICE +01-602-588-9440 FAX Table

More information

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 2 of 18 REVISION HISTORY DATE CHANGE DESCRIPTION 10/11/06 Original release 10/21/09 Revised to ISO9001:2008

More information

4. Quality Management System 4.1 GENERAL REQUIREMENTS

4. Quality Management System 4.1 GENERAL REQUIREMENTS Checklist Instructions : Prior to auditing each element, the auditor shall review the documentation and mark an 0 in each box where functions /departments are referenced. As each function/department is

More information

Reference Paragraphs. Appendix B AQS Auditor Handbook

Reference Paragraphs. Appendix B AQS Auditor Handbook Introduction Auditing is a basic tool to assess effective implementation of and conformity to Quality Management System (QMS) requirements. In addition to the determination of conformity, this handbook

More information

External approval and/or acknowledgment requirements apply prior to issuance or revision of this document: Yes No. Yes PROPRIETARY DOCUMENT No

External approval and/or acknowledgment requirements apply prior to issuance or revision of this document: Yes No. Yes PROPRIETARY DOCUMENT No TITLE: EECTIVE DATE: 09/18/2014 External approval and/or acknowledgment requirements apply prior to issuance or revision of this document: Yes No Yes PROPRIETARY DOCUMENT No TABLE O CONTENTS QUALITY POLICY

More information

KLINGE COATINGS. 3.1 Deviation A deviation addresses material, which has not been produced or has a known material substitution.

KLINGE COATINGS. 3.1 Deviation A deviation addresses material, which has not been produced or has a known material substitution. the latest, approved revision of this document please refer to the website (external) or master list (internal). Replaces: QP-06-200 Original issue date: May 22, 2003 1.0 PURPOSE 1.1 The Objective of this

More information

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA Page 1 of 42 VERTECHS ENTERPRISES, INC. Dba LUCHNER TOOL ENGINEERING 10051 OLD GROVE RD. SAN DIEGO, CA 92131 Ph No. 1-858-578-3900. Fax No. 1-858-578-2910 Reviewed and Approved By: Geosef (Joey) Straza

More information

ISO9001 QUALITY POLICY MANUAL

ISO9001 QUALITY POLICY MANUAL 1 OF 26 Metalife Industries, Inc. Serial No.: Master Revision: 1 Issue Date: October 14, 2011 Originator: Becky Wentling ISO9001 QUALITY POLICY MANUAL Prepared By (Document Controller): Becky Wentling

More information

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler.

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler. Polycraft, Inc. QM - 10 Title: Polycraft, Inc. Quality Manual Copy Approval: D. Wheeler This Quality Manual is the sole property of Polycraft, Inc. and intended for exclusive use by the organization. This

More information

QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL. Revision 10

QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL. Revision 10 QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL Revision 10 Page: 1 of 54 TABLE OF CONTENTS 1. DOCUMENT REVISION HISTORY... 5 2. INTRODUCTION... 6 2.1 Purpose... 6 2.2 Scope... 7 Figure 1: Sequence and Interaction

More information

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland. Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland. Table of Contents Contents 1. Introduction... 3 1.1. Process Approach...

More information

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing AEROSPACE STANDARD AS9100 Technically equivalent to AECMA pren 9100 Issued 1999-11 Revised 2001-08 Superseding AS9100 REV. A Quality Systems - Aerospace - Model for Quality Assurance in Design, Development,

More information

Quality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24

Quality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24 Quality Manual Page 1 of 24 ISO 9001:2015 Standard to Quality Manual Section Matrix ISO 9001:2015 Quality Manual Section 1 Scope 1 Scope 1.1 General 4 Context of the organization 4 Quality management system

More information

PRECISION MACHINE INC. Quality Commitment. Quality Management System Manual AS9100

PRECISION MACHINE INC. Quality Commitment. Quality Management System Manual AS9100 N&P PRECISION MACHINE INC Quality Commitment Quality Management System Manual AS9100 This printed copy is uncontrolled Page 1 of 44 Revision B N&P Precision Machine, Inc. Quality Management System Manual

More information

Corporate Quality Manual. Table Of Contents. ANSI/ISO/ASQ Q9001:2008 and SAE AS9100C

Corporate Quality Manual. Table Of Contents. ANSI/ISO/ASQ Q9001:2008 and SAE AS9100C Table Of Contents Table Of Contents... 1 Introduction... 4 NEW AGE METAL FABRICATING COMPANY Corporate Profile... 5 Section 1 Scope... 7 General... 7 Application... 7 Section 2 References... 8 Section

More information

PRINTED COPY IS NOT CONTROLLED

PRINTED COPY IS NOT CONTROLLED Quality Manual We Deliver Quality on Time Form 1217 (01.16.2018) Rev. 12 SOR Inc. sorinc.com SOR QUALITY MANUAL Page 1 of 18 Table of Contents Quality Manual 8701-001 Revision 12 Introduction....4 1.0

More information

Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008

Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008 Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008 This document belongs to Luminus Devices, Inc. It cannot be reproduced without authorized authority. Area: Quality System Document Page

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 9001 Third edition 2000-12-15 Quality management systems Requirements Systèmes de management de la qualité Exigences Reference number ISO 9001:2000(E) ISO 2000 Contents Page

More information

25 D.L. Martin Drive Mercersburg, PA (717)

25 D.L. Martin Drive Mercersburg, PA (717) QUALITY MANUAL D. L. MARTIN CO. 25 D.L. Martin Drive Mercersburg, PA 17236 (717) 328-2141 Revision 14 August 2012 Michael A. White Manager, QA & Engineering D.L. Martin Co. Quality Manual UNCONTROLLED

More information

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev - February 8, 2015 1 Osprey Technologies, LLC Quality Manual ISO9001:2008 Rev - February 8, 2015 Released by Dave Crockett President 6100 S. Maple Avenue, Suite 117 Tempe, AZ 85283 www.osprey-tech.com February

More information

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS Project Procedure INTERNAL QUALITY AUDITS 09/21/2012 PAGE 1 OF 8 1.0 PURPOSE The purpose of this procedure is to establish the requirements for a comprehensive system of planned and documented internal

More information

ISO9001:2008 SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM SYSTEM KARAN ADVISER & INFORMATION CENTER

ISO9001:2008 SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM   SYSTEM KARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM WWW.SYSTEMKARAN.COM 1 www.systemkaran.org Foreword... 5 Introduction... 6 0.1 General... 6 0.2 Process approach... 6 0.3 Relationship

More information

Quality Assurance Manual, Revision F Page 1 of 20

Quality Assurance Manual, Revision F Page 1 of 20 Quality Assurance Manual, Revision F Page 1 of 20 AUTOMATION TECHNOLOGY QUALITY ASSURANCE MANUAL Prepared By: Joseph Pollard Date: 7/6/2015 Quality Assurance Manager Quality Management System Representative

More information

ABC Metals, Inc. NONFERROUS METALS PRECISION SLITTING

ABC Metals, Inc. NONFERROUS METALS PRECISION SLITTING SCOPE This section describes the responsibility, authority, and management structure of the facility. 1.1 QUALITY POLICY The President has the ultimate responsibility for the facility s products and services.

More information

Quality Assurance Manual

Quality Assurance Manual McGarvin Engineering Inc. 35 Maple St. Lowell Ma. 01852 ph. 978-454-2741 fx. 978-459-7999 Quality Assurance Manual 1 Table of Contents Section Element 1.0 Scope and Policy 2.0 Organization 3.0 Quality

More information

SECTION COMMUNICATIONS SYSTEMS QUALITY ASSURANCE & TESTING

SECTION COMMUNICATIONS SYSTEMS QUALITY ASSURANCE & TESTING SECTION 16707 COMMUNICATIONS SYSTEMS QUALITY ASSURANCE & TESTING PART 1 - GENERAL 1.01 SECTION INCLUDES A. These quality control (QC) system requirements define characteristics, in addition to those in

More information

Supplier Quality Requirements SQR-1.0 Rev. 3

Supplier Quality Requirements SQR-1.0 Rev. 3 Supplier Quality Requirements Rev. 3 Approved By: Brian Brown, Quality Manager The current issue of this document is maintained on LSP Technologies, Inc. s Internet Web Site at http://www.lspt.com/resources-supplier_requirements.asp.

More information

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14 Page 1 of 14 Quality Manual This Quality Manual provides the overall quality strategy and objectives of Pyramid Semiconductor s quality system. It is based on the requirements of ISO 9000. This manual

More information

OPERATIONS MANUAL ISO 9001 Quality Management System

OPERATIONS MANUAL ISO 9001 Quality Management System OPERATIONS MANUAL * ISO 9001 Quality Management System Page: 1 of 19 Revision History Date Change Notice Change Description 5/30/2012 Original Original Release. 9/20/2012 005 Clarify post-delivery exclusion

More information

QUALITY POLICY MANUAL

QUALITY POLICY MANUAL C. L. HANN INDUSTRIES, INC. 1020 TIMOTHY DR. SAN JOSE CA 95133 QUALITY POLICY MANUAL Quality Policy Manual Rev. 1 8.18.97 MISSION STATEMENT C. L. Hann Industries, Inc. is designed to meet the precision

More information

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Table of Contents Introduction 5 Documentation Scheme..

More information

KEVLIN CORPORATION DIVISION OF COBHAM DEFENSE ELECTRONIC SYSTEMS

KEVLIN CORPORATION DIVISION OF COBHAM DEFENSE ELECTRONIC SYSTEMS 1.doc KEVLIN CORPORATION DIVISION OF COBHAM DEFENSE ELECTRONIC SYSTEMS QUALITY POLICY MANUAL QPM 4. 596 Lowell St Methuen, MA 01844 USA 2.doc TABLE OF CONTENTS Clauses Procedure Description of Contents

More information

Railroad Friction Products Corporation

Railroad Friction Products Corporation Railroad Friction Products Corporation Our Quality Philosophy: "At Railroad Friction Products Corporation we will consistently provide products that meet and exceed customer and regulatory requirements

More information

Percival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0)

Percival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0) TABLE OF CONTENTS INTRODUCTION... 4 1. Purpose... 4 2. Scope... 4 3. References... 4 4 Terminology and Definitions... 5 4.1.1 Subcontractor... 5 4.1.2 Significant Subcontractor... 5 4.1.3 Manufacturers...

More information

Quality Systems Manual

Quality Systems Manual Quality Systems Manual ISO9001:2008 Prepared By: Date: 06/28/2013 President Approved by: Date: 06/28/2013 Quality Assurance Manager Introduction Cal-Tron Corp has developed and implemented a Quality Management

More information

I. Development, Submittal, and Acceptance of a Quality Management System

I. Development, Submittal, and Acceptance of a Quality Management System I. Development, Submittal, and Acceptance of a Quality Management System 1. Scope Under the Contract, quality assurance and quality control management are the responsibility of the Contractor. The Contractor

More information

Quality Manual Revision: C Effective: 03/01/10

Quality Manual Revision: C Effective: 03/01/10 TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL

More information

Quality Manual ISO 9001:2008 ISO 9001:2015

Quality Manual ISO 9001:2008 ISO 9001:2015 Quality Manual ISO 9001:2008 ISO 9001:2015 SAE CIRCUITS, INC. 4820 63 rd Street Suite 100 Boulder, CO 80301 USA www.saecircuits.com Table of Contents 1. Company Information 3 2. QMS Scope and Exclusions

More information

Quality Manual. AARD Spring & Stamping Quality Manual

Quality Manual. AARD Spring & Stamping Quality Manual Quality Manual Page 1 of 25 AARD Spring & Stamping QM/5.0 Title: QM 5.0 AARD Spring & Stamping Quality Manual Copy Approval Date: 1/27/2011 Reviewer(s): Sign / Print Title Date Dan Wheeler Document Originator

More information

To establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC.

To establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC. 1.0 PURPOSE To establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC. 2.0 APPLICATION When (QAM) Appendix 8.4 is specified on the purchase order,

More information

Parsippany, NJ QUALITY ASSURANCE MANUAL. QM-01 Rev. 6

Parsippany, NJ QUALITY ASSURANCE MANUAL. QM-01 Rev. 6 Parsippany, NJ QUALITY ASSURANCE MANUAL 1 TABLE OF CONTENTS SECTION REFERENCE TITLE PAGE 0.1 Title Page. 1 0.2 Table of Contents 2 0.3 Forward 5 0.4 Document Control 6 0.5 Statement of Authority 7 0.6

More information

PRECISION SENSORS QUALITY ASSURANCE MANUAL THIS DOCUMENT IS CONTROLLED ONLY IF COPY IS STAMPED CONTROLLED IN RED INK

PRECISION SENSORS QUALITY ASSURANCE MANUAL THIS DOCUMENT IS CONTROLLED ONLY IF COPY IS STAMPED CONTROLLED IN RED INK SAE AS9100 DOCUMENT PRECISION SENSORS QUALITY ASSURANCE MANUAL THIS DOCUMENT IS CONTROLLED ONLY IF COPY IS STAMPED CONTROLLED IN RED INK REV. 005 10/27/10 Page 2 Page 4 Page 5 Page 6 Page 7 Page 8 Page

More information

AEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE

AEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE AEROSPACE STANDARD AS9003 Issued 2001-10 Revised 2012-07 REV. A Superseding AS9003 (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE This standard

More information

ISO 9001:2000 The International Quality Management Business System

ISO 9001:2000 The International Quality Management Business System ISO 9001:2000 The International Quality Management Business System Table of Contents What is ISO 9000? Page 1 The Benefits of ISO 9001:2000 Page 1 Why an ISO 9001:2000 System? Page 2 Major Steps to Implementation

More information

TRUCK TRAILER TRANSIT, INC.

TRUCK TRAILER TRANSIT, INC. TRUCK TRAILER TRANSIT, INC. Quality Assurance Policy Manual Corporate Office: 1601 Theodore Detroit, MI 48211 800-631-1144 313-832-0020 TRUCK TRAILER TRANSIT, INC. Quality Assurance Manual Index Statement

More information

QUALITY SYSTEM REQUIREMENTS FOR Dis tributor YFTFC005

QUALITY SYSTEM REQUIREMENTS FOR Dis tributor YFTFC005 PURPOSE: This specification outlines the Quality System requirements for Young & Franklin/Tactair Fluid Controls suppliers. It is intended to assure that articles purchased from approved suppliers are

More information

The following is an example systems manual from a low volume (TE, but not an automotive supplier) company.

The following is an example systems manual from a low volume (TE, but not an automotive supplier) company. The following is an example systems manual from a low volume (TE, but not an automotive supplier) company. You will note that this is essentially a copy of ISO 9001:2000. I take this path because long

More information

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL AERO SUPPLY USA 21941 US HWY 19 NORTH Clearwater, FL. 33765 USA P.(727) 754-4915 F.(727) 754-4920 Website: www.aerosupplyusa.com Email: sales@aerosupplyusa.com QUALITY MANAGEMENT SYSTEM QUALITY MANUAL

More information

NATO STANDARD AQAP-2110 NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION

NATO STANDARD AQAP-2110 NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION NATO STANDARD AQAP-2110 NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION Edition D Version 1 JUNE 2016 NORTH ATLANTIC TREATY ORGANIZATION ALLIED QUALITY ASSURANCE PUBLICATION

More information

ISO 9001:2008 Quality Management System QMS Manual

ISO 9001:2008 Quality Management System QMS Manual 2501 Kutztown Road Reading, PA, 19605 Tel. 610-929-3330 Fax 610-921-6861 ISO 9001:2008 Quality Management System QMS Manual The information contained in this document is Fidelity Technologies Corporation

More information

ISO 9001:2000 Revision G

ISO 9001:2000 Revision G ISO 9001:2000 Revision G 1531 W. 17 th Street, Tempe AZ 85281 Table of contents Section Title Page Index 1 Revision History and Distribution 2 Introduction 3 Quality Policy / Mission Statement 4 Organizational

More information

Proprietary Document Disclosure Restricted To Employees and Authorized Holders

Proprietary Document Disclosure Restricted To Employees and Authorized Holders Revision Level: A Page 1 o f 33 Revision Level: A Page 2 o f 33 (This page left blank intentionally.) Revision Level: A Page 3 o f 33 S i g n a t u r e P a g e Reviewed By Management Representative: 1

More information

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title:

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner A. SCOPE This document contains requirements for conducting business with Tri Star Metals, LLC and its customers. It is applicable to suppliers that provide

More information

The Skyworks Quality Management System strives to:

The Skyworks Quality Management System strives to: Skyworks has embraced a workplace where Quality is the number one differentiator to achieve Customer Loyalty. Skyworks has adopted a single Quality Management System which drives efficiency, consistency

More information

Price Electronics,LLC Quality Assurance Manual

Price Electronics,LLC Quality Assurance Manual Price Electronics,LLC QUALITY POLICY INTRODUCTION The purpose of this manual is to document the company s quality system, to instruct and guide employees whose actions affect product quality and to inform

More information

NUMBER OF EMPLOYEES TOTAL ENGINEERING MANUFACTURING QUALITY SUPPLIER IN-HOUSE SPECIAL PROCESS CAPABILITIES

NUMBER OF EMPLOYEES TOTAL ENGINEERING MANUFACTURING QUALITY SUPPLIER IN-HOUSE SPECIAL PROCESS CAPABILITIES Kearfott/ACA SUPPLIER QUALITY SYSTEM SURVEY SUPPLIER NAME SUPPLIER CODE DATE ADDRESS & ZIP CODE AREA CODE & PHONE QUALITY MANAGEMENT (NAME & TITLE) PRODUCT LINE (DESCRIBE) NUMBER OF EMPLOYEES TOTAL ENGINEERING

More information

INSPECTION SYSTEM REQUIREMENTS

INSPECTION SYSTEM REQUIREMENTS MILITARY SPECIFICATIONS MIL-I-45208A INSPECTION SYSTEM REQUIREMENTS This specification has been approved by the Department of Defense and is mandatory for use by all Agencies. 1. SCOPE 1.1 Scope. This

More information

0. 0 TABLE OF CONTENTS

0. 0 TABLE OF CONTENTS QUALITY MANUAL Conforming to ISO 9001:2008 0. 0 TABLE OF CONTENTS Section Description ISO 9001 Clause Page 0 TABLE OF CONTENTS n/a 2 1 PIMA VALVE, INC. DESCRIPTION n/a 3 2 QUALITY MANUAL DESCRIPTION 4.2.2

More information

RULES FOR A QUALITY STANDARDS SYSTEM (QSS) IN MARITIME ACADEMIES/INSTITUTIONS

RULES FOR A QUALITY STANDARDS SYSTEM (QSS) IN MARITIME ACADEMIES/INSTITUTIONS RULES FOR A QUALITY STANDARDS SYSTEM (QSS) IN MARITIME ACADEMIES/INSTITUTIONS I. Introduction 1. Background The international Convention on Standards of Training, Certification and Watchkeeping (STCW)

More information

Machined Integrations, LLC

Machined Integrations, LLC QUALITY MANUAL Machined Integrations, LLC ISO9001: 2008 Electronically Controlled by Quality Representative, Rev2, January 2014 Page 2 of 25 TABLE OF CONTENTS SECTION ELEMENT PAGE No A Revision and Approval

More information

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R.

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R. ISO 9001 The Standard Illustrations The International Standard for Quality Management Systems Year 2000 Edition Leland R. Beaumont ISO 9001, The Standard Illustrations Figures excerpted from ISO 9001,

More information

SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality

SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: Gear Technology 10671 Civic Center Drive Rancho Cucamonga, CA 91730 GENERAL INFORMATION Attn: Manager of Quality

More information

Atlantic Technical Systems, Inc. 415 Headquarters Drive # 2 Millersville, MD USA Office: (410) Fax: (410)

Atlantic Technical Systems, Inc. 415 Headquarters Drive # 2 Millersville, MD USA Office: (410) Fax: (410) ISO 9001 Page: 1 of 29 Quality Assurance Manual ISO 9001:2008 Atlantic Technical Systems, Inc. 415 Headquarters Drive # 2 Millersville, MD 21108 USA Office: (410) 507-2779 Fax: (410) 451-9609 APPROVALS

More information

Sensor Scientific, Inc.

Sensor Scientific, Inc. Sensor Scientific, Inc. 6 Kings Bridge Road Fairfield, New Jersey Quality Manual Revised: 26 September, 2012 Authorized By: G. R. Brinley Page 1 of 21 Table of Contents Page 1. Introduction 3 2. Purpose

More information

Ideal Instrument Company, Inc.

Ideal Instrument Company, Inc. Ideal Instrument Company, Inc. Quality Control Manual Prepared By: Richard Ballantyne Quality Control Department Ideal Instrument Company, Inc. 863 Washington Canton, Ma. 020212513 Cage Code OOEU5 MCTDA

More information

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3 CONTENTS QUALITY MANUAL 1.0 INTRODUCTION... 2 2.0 POLICY AND OBJECTIVES... 2 3.0 DEFINITIONS... 2 4.0 SCOPE... 3 5.0 QUALITY SYSTEM... 3 6.0 ORGANISATIONAL CHARTS... 4 6.0 BRISBANE HEAD OFFICE... 4 6.1

More information

ISO 9001:2015. Quality Management System. Manual

ISO 9001:2015. Quality Management System. Manual ISO 9001:2015 Quality Management System Manual Introduction Company has made the Strategic Business Decision to develop and implement an effective Quality Management Systems (QMS) across all areas of the

More information

Quality Management System Manual

Quality Management System Manual SpecSys, Inc. recognizes its responsibility as a provider of quality products and services. To this end, SpecSys, Inc. has documented, implemented and maintains a System that complies with ISO 9001 2000.

More information

Supplier Quality Requirements

Supplier Quality Requirements 1 Surveillance and Auditing 1.1 The Supplier s Quality System is subject to initial and annual audits/surveys and acceptance by Texas Almet, its customers, and government regulatory agencies (e.g. The

More information