1 Checklist for ERPAs and Possible Investment Structures for CDM Project What you should know Anne Hung, Partner Baker & McKenzie GJBJ Tokyo Aoyama Aoki Law Office (Gaikokuho Joint Enterprise) is a member firm of Baker & McKenzie International, a Swiss Verein with member law firms around the world. In accordance with the common terminology used in professional service organizations, reference to a partner means a person who is a partner, or equivalent, in such a law firm. Similarly,reference to an office means an office of any such law firm.

2 Possible Forms of Involvement 1. Advance Payment 2. Loan and ERPA 3. Equipment Supply 4. Equity Investment

3 1. Advance Payment ERPA Advance Payment Seller Buyer CER

4 1. Advance Payment ERPA (con t) Not as powerful as a typical lender in terms of indirectly controlling the project Complete exposure to project risk if no security is taken Advantage: may not attract withholding tax if no interest is charged; may avoid need to register/report as foreign loan Only recommendable to a strong credit rating seller

5 2. Loan and ERPA Funds Loan Agreement Seller (Borrower) Buyer (Lender) ERPA CER

6 2. Loan and ERPA (con t) Better to be a stand alone loan with a right to set off against ERPA than have an advance payment Enjoy all lender s rights including: - extensive representations and undertakings - tight reporting requirements - control over bank accounts/cash flow Need to decide whether it is a project specific loan project financing or general corporate loan

7 2. Loan and ERPA (con t) Project finance requires very tight control over performance of the relevant project suitable only if CER comes from specified projects Corporate financing means lender does not enjoy specific rights over specific assets or projects e.g. CER are coming from a pool with no designated projects

8 2. Loan and ERPA (con t) Developing countries usually present challenges re onshore security because: - poor registration system for security - unclear law on enforcement - step-in not meaningful unless you have capability to take over - project size too small to warrant extensive documentation and counterparty often too unsophisticated to understand - depending the type of project, e.g. equipment supply over existing project, difficult to obtain security over whole project

9 2. Loan and ERPA (con t) Other security: - offshore registration charge (if any) - blocked bank account (offshore/onshore) - parent guarantees - bank guarantees, letter of credit - NEXI - other insurance products (MIGA) or World Bank generally very expensive

10 2. Loan and ERPA (con t) Tax: - withholding tax consider tax treaty - possible penalty or restrictions on offset need to use block account - VAT for ERPA (already covered in ERPA discussion)

11 3. Equipment Supply (con t) Sub-license Agreement License Agreement Plant Owner CER Japanese Company Technology Licensor/Supplier CDM Project Agreement Purchase Agreement - Equipment installation - Sharing of CER

12 3. Equipment Supply (con t) Generally high risk, high return Need to line up technology and supply of equipment with plant Back to back license arrangement requires careful documentation Typical risks include: - construction risk - operational risk - legal risk - counterparty risk - Kyoto risk - country risk - tax

13 3. Equipment Supply (con t) Construction Risk basically all EPC contract issues are relevant: - what are possible cost overrun? - who is responsible for design? - who is responsible for installation? - what does the price cover? - what are the import requirements? - is it proven technology?

14 3. Equipment Supply (con t) - is there sufficient delay penalty note the need to deliver CER by 2012 delay may mean significant reduction in available CER - what is the role of plant owner? - what are the payment terms? - is liquidated damage sufficient? - what is the cap for liability? - are there any bankable bonds to back up performance - is there sufficient co-ordination between supplier and plant owner?

15 3. Equipment Supply (con t) Operational Risk: - who will operate the equipment? - if plant owner, how to ensure supervision? - any penalty clause to ensure production level? Is such clause enforceable? - is plant owner required to report regularly? - who is responsible for insurance does loss of profit cover loss of CER earning?

16 3. Equipment Supply (con t) Legal Risk (local law exposure): - ownership issue (is it registrable?) - who owns the equipment? - is it a lease arrangement? - right to access to/return of equipment - how to share CER (see tax issue below) - termination clause again need to be back to back with license agreement

17 3. Equipment Supply (con t) Counter Party Risk: - who is the counterparty? - if government status, does it enjoy sovereign immunity?

18 3. Equipment Supply (con t) Kyoto Risk: - need to align timing of equipment order with CDM procedures - who is responsible for application with UN? - who is responsible for local procedures? - is it a methodology already approved? - how does investor receive CER: is it as project participant is it as CER purchaser

19 3. Equipment Supply (con t) Country Risk: - what is the status of CDM law in the country where project will be located? - does it have established Designated National Authority/CDM procedures? - what are the foreign investment requirements? may need to observe both investment requirements and CDM procedures, e.g. China

20 3. Equipment Supply (con t) Tax: - each country is different - need to check withholding tax on license/loan - how would tax authority categorise CER sharing arrangement? - need to confirm if PE arises as a result of the arrangement - need to confirm VAT if there is an ERPA

21 4. Equity Investment (Project Participant) Investor A Japanese Investor (Project Participant) CER/Dividend Income CER/Dividend Income Plant Owner CDM Project Agreement CDM Project Company License Agreement Licensor/Equip ment Supplier - could also be power plant, methane capturing, etc.

22 4. Equity Investment (con t) Not many in the market difficult to achieve closing Same as any project work (massive documentation) but with additional UN procedures as CP Need to consider investment structure - possibility of offshore structuring - possibly using holding company to improve tax position but need to consider: non-annex 1 - requirements for CDM projects if it will generate CER Annex 1 - requirements if it will trade CER

23 4. Equity Investment (con t) Need to consider funding - Often require shareholders loan as well - ERPA can be used to repay shareholders loan but usually subordinated to senior debt Need to consider all project risks construction, operational, legal, counterparty, Kyoto, country, tax Need to consider how to take CER - Dividend-in-kind - ERPA - Question of whether dividend-in-kind of CER is permitted under local corporate law and tax if so, what is the tax implication or should it be treated as a sales or service arrangement?

24 4. Equity Investment (con t) Is project company capable of trading CER? If project company is a non-annex 1 country company, can only have a sub-account in the CDM registry and it can only forward CER to project participants which have letter of approval from their DNA not very practical to use it for trading purposes.

25 4. Equity Investment (con t) Non- Annex I Project Participan t (Letter of Approval required) Participan t Forwarding Request CDM EB Pendin g Account Permanen t Holding Account Participan t Internatio nal Transactio n Log ERPA/ Assignment Annex I National Registry Account (Letter of Approval required) Participa nt Internation al Transactio n Log ERPA Annex I National Registry Account (No Letter of Approval required) Annex I Project Participan t (Letter of Approval required) Forwarding Request Temporar y Holding Account Participa nt Forwarding Request Annex I National Registry Account Particip ant ERPA/ Assignment Annex I National Registry Account (No Letter of Approval required) Forwarding Forwarding Emissions Trading

Introduction to Emission Reduction Purchase Agreement (ERPA)

Introduction to Emission Reduction Purchase Agreement (ERPA) Introduction to Emission Reduction Purchase Agreement (ERPA) Definition and transaction type Parties seller and buyer Object CER, VER or other formal of emission reduction Type Forward contract Spot contract

More information

Introduction to the Project Cycle

Introduction to the Project Cycle Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank February 2007 Outline Introduction to the project cycle Illustrate concepts through

More information

Introduction to the Project Cycle

Introduction to the Project Cycle Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank Outline Introduction to the project cycle Illustrate concepts through the preparation

More information

CDM Risks and Mitigation

CDM Risks and Mitigation CDM Risks and Mitigation Carbon Markets Asia 23-24 June 2009, Meliá Hotel, Kuala Lumpur, Malaysia Arul Joe Mathias B.E., M.Engg., MBA (Managing Director) Dr. Balasankari B.E., M.Engg., Ph.D (Executive

More information

Legal Issues around Carbon Credit Transactions and Introduction to Emission Reduction Purchase Agreement (ERPA) Yisong Guan

Legal Issues around Carbon Credit Transactions and Introduction to Emission Reduction Purchase Agreement (ERPA) Yisong Guan Legal Issues around Carbon Credit Transactions and Introduction to Emission Reduction Purchase Agreement (ERPA) Yisong Guan Easy Carbon Consultancy Co. Ltd. Definition and transaction type Parties seller

More information

Developing host country legal frameworks for the Clean Development Mechanism

Developing host country legal frameworks for the Clean Development Mechanism Developing host country legal frameworks for the Clean Development Mechanism Lannette K Chiti Chiti & Partners Lusaka, Zambia lkchiti@chitipartners.co.zm Background Global CDM project development CDM growth

More information

The Clean Development Mechanism (CDM)

The Clean Development Mechanism (CDM) Jan. 28, 2005 The Clean Development Mechanism (CDM) Converting emission reductions to Certified Emission Reductions (CERs) under the rules governing the Kyoto Protocol Presentation s Outline Jan. 28, 2005

More information

European Investment Bank (EIB) Guidelines for the Climate Change Technical Assistance Facility (CCTAF) Operations

European Investment Bank (EIB) Guidelines for the Climate Change Technical Assistance Facility (CCTAF) Operations European Investment Bank (EIB) Guidelines for the Climate Change Technical Assistance Facility (CCTAF) Operations March 2006 CONTENTS CONTENTS...2 INTRODUCTION...3 1 BACKGROUND...4 1.1 The concept of CDM

More information

Becoming Green and Gold: Applying the CDM to Wind Energy

Becoming Green and Gold: Applying the CDM to Wind Energy Becoming Green and Gold: Applying the CDM to Wind Energy Introductory document Renewable Energy City Summit 13 14 May 2008 This report is solely for the use of client personnel. No part of it may be circulated,

More information

The World Bank s Carbon Finance Business Options for Thailand. September 29, 2004

The World Bank s Carbon Finance Business Options for Thailand. September 29, 2004 The World Bank s Carbon Finance Business Options for Thailand September 29, 2004 Climate Change and the World Bank The Bank s mission: poverty alleviation, sustainable development The Bank accepts IPCC

More information

Due Diligence Checklist

Due Diligence Checklist Due Diligence Checklist Company Registration Number Date Established Legal Status of Business Principal Bankers Auditors Attorneys Insurers OWNERSHIP Names and Holdings of Shareholders, Partners, Members

More information

Financing and use of the CDM by international finance institutions

Financing and use of the CDM by international finance institutions , Annex 2 Financing and use of the CDM by international finance institutions CDM EB 94 Bonn, Germany, 2 to 5 May 2017 UNFCCC Secretariat SDM programme Historical background CMP.3 (decision 3/CMP.1, Annex,

More information

Financing and use of the CDM by international finance institutions

Financing and use of the CDM by international finance institutions Financing and use of the CDM by international finance institutions Africa Carbon Forum 2017, 29 June 2017 El Hadji Mbaye DIAGNE, CDM EB member Historical background CMP.3 (decision 3/CMP.1, Annex, para

More information

Policy,Legal and Regulatory Frameworks

Policy,Legal and Regulatory Frameworks Policy,Legal and Regulatory Frameworks Anthony Smith Chairman PPP Experts Head of Legal Dept. Altra Capital Member United Nations PPP Team of Specialists Former Head of United Nations PPP Readiness Task

More information

Building a Supportive Environment for Social Enterprise

Building a Supportive Environment for Social Enterprise Building a Supportive Environment for Social Enterprise David LePage June 2009 What is a Social Enterprise? Social enterprises are businesses that sell goods or provide services in the market for the purpose

More information

Challenges for Renewable Energy Finance

Challenges for Renewable Energy Finance Challenges for Renewable Energy Finance Seminar on Food Security, Climate Change and Energy Issues: South-South Opportunities Presentation by Mr. Peter Jones May 5th, 2010 World Exchange Plaza. P.O. Box

More information

Trading Carbon Assets. Asia Carbon Exchange Pte Ltd A member of Asia Carbon Global

Trading Carbon Assets. Asia Carbon Exchange Pte Ltd A member of Asia Carbon Global Asia Trading Carbon Assets Asia Carbon Exchange Pte Ltd A member of Asia Carbon Global Basics of Emissions Trading What options are most cost-effective? Company A can reduce 1000 tons CO 2e at $2/ton =

More information

Treatment of CDM and JI in the National Accounts and Environmental Accounts

Treatment of CDM and JI in the National Accounts and Environmental Accounts LG/15/21 15 th Meeting of the London Group on Environmental Accounting Wiesbaden, 30 November 4 December 2009 Treatment of CDM and JI in the National Accounts and Environmental Accounts Cor Graveland,

More information

CDM Programme of Activities Call for Public Inputs

CDM Programme of Activities Call for Public Inputs CDM Programme of Activities Call for Public Inputs Pty Ltd August, 2008 2 Programmatic CDM The opportunity Cool nrg International welcomes the opportunity to provide input into the call for public comments

More information

Gia Schneider, Partner, EKO Asset Management. Carbon Sequestration on Farms & Forests Clayton Hall Newark, DE

Gia Schneider, Partner, EKO Asset Management. Carbon Sequestration on Farms & Forests Clayton Hall Newark, DE Carbon Offset Markets Gia Schneider, Partner, EKO Asset Management Carbon Sequestration on Farms & Forests Clayton Hall Newark, DE October 21, 2008 1 Agenda Current Carbon Market Role of Offsets Current

More information

German Corporate Governance Code

German Corporate Governance Code [Please note: Amendments to the Code compared with the version dated November 07, 2002 are highlighted in bold print and underlined] Government Commission German Corporate Governance Code Foreword This

More information

International Climate Change Negotiations

International Climate Change Negotiations International Climate Change Negotiations An update on COP 14 and COP/MOP 4 2008 CEEM Annual Conference Thursday 18 December 2008 Paul Curnow, Partner Global Climate Change Practice Baker & McKenzie International

More information

Marshall & Ilsley Corporation Investor Conference Call

Marshall & Ilsley Corporation Investor Conference Call Investor Conference Call statements Forward-Looking Statements This presentation contains certain forward-looking statements based on current management expectations. Those forwardlooking statements include

More information

Client Alert September 2017

Client Alert September 2017 Trade Jakarta Client Alert September 2017 The Government Issues New Regulation on Payment and Delivery of Goods in Export Import Activities For More Information: Riza Buditomo Partner +62 21 2960 8569

More information

Measuring Under-delivery Risk

Measuring Under-delivery Risk Measuring Under-delivery Risk 8.1 Introduction 8.1 Creating carbon credits from A/R projects involves risks. These risks can be put into two categories: (i) those stemming from the physical implementation

More information

Non-permanence. 3.1 Introduction

Non-permanence. 3.1 Introduction Non-permanence 3.1 Introduction 3.1 One of the main concerns of the parties to the Kyoto Protocol regarding the inclusion of forestry into the CDM was the potential reversibility of the carbon stored in

More information

Chapter 35 Developing a Business Plan. Section 35.1 The Business Plan Section 35.2 The Marketing and Financial Plans

Chapter 35 Developing a Business Plan. Section 35.1 The Business Plan Section 35.2 The Marketing and Financial Plans Chapter 35 Developing a Business Plan Section 35.1 The Business Plan Section 35.2 The Marketing and Financial Plans The Business Plan Key Terms business plan business philosophy trading area buying behavior

More information

German Corporate Governance Code

German Corporate Governance Code as amended on June 12, 2006 (convenience translation) Government Commission German Corporate Governance Code 1. Foreword 1 This German Corporate Governance Code (the "Code") presents essential statutory

More information

Clean Development Mechanism

Clean Development Mechanism Clean Development Mechanism Srikanth Subbarao Regional CDM Expert for the Pacific Islands (Consultant) Technical Support Facility (TSF) /Carbon Market Initiative Energy, Transport and Water Division Why

More information

Al-Shaheen CDM Project Experience

Al-Shaheen CDM Project Experience ١ LESSONS LEARNED FROM AL-SHAHEEN (ALS) OIL FIELD, GAS RECOVERY AND UTILIZATION PROJECT By Adnan Fahad Al-Ramzani Manager, Clean Development Mechanism HSE Regulation & Enforcement Directorate Contents

More information

Questions You Should Answer Before Starting a New Dairy Processing Enterprise

Questions You Should Answer Before Starting a New Dairy Processing Enterprise Questions You Should Answer Before Starting a New Dairy Processing Enterprise by Brian M. Henehan, senior extension associate, Department of Applied Economics, and Management (AEM) at Cornell University

More information

Questions to Ask Before Buying a Business

Questions to Ask Before Buying a Business Questions to Ask Before Buying a Business Advantages of Buying a Business Last Verified: January 2016 A clear advantage to buying a business rather than beginning from scratch is that you skip the risk-filled

More information

Chapter 35. developing a business plan. Section 35.1 The Business Plan. Section 35.2 Marketing and Financial Plans

Chapter 35. developing a business plan. Section 35.1 The Business Plan. Section 35.2 Marketing and Financial Plans Chapter 35 developing a business plan Section 35.1 Section 35.2 Marketing and Financial Plans PREDICT What might happen if a business were established without a plan? Explain the purpose and importance

More information

Financing Programmes for CDM Projects

Financing Programmes for CDM Projects Financing Programmes for CDM Projects November 2003 European Commission (Directorate-General for Energy and Transport) Contract no. NNE5/2002/52: OPET CHP/DH Cluster TITLE: Financing Programmes for CDM

More information

SELF-CERTIFICATION FORM

SELF-CERTIFICATION FORM OP/EUI/REFS/2017/003 SELF-CERTIFICATION FORM Tender for the provision of services for translating, editing, proof-reading, transcribing for administrative purposes and interpreting for the European University

More information

GCC VAT implementation roadmap are you ready?

GCC VAT implementation roadmap are you ready? GCC VAT implementation roadmap are you ready? www.kpmg.com/qa A brief introduction to VAT in the GCC The GCC states have worked together to develop a broad framework to introduce Value-Added Tax (VAT).

More information

Renewables in Vietnam OPPORTUNITIES FOR INVESTMENT

Renewables in Vietnam OPPORTUNITIES FOR INVESTMENT Renewables in Vietnam OPPORTUNITIES FOR INVESTMENT 1 Introduction The demand for electricity in Vietnam is rising rapidly to power the growing economy and forecasts predict an annual growth rate for electricity

More information

Course Description (Bachelor of Accounting) BA

Course Description (Bachelor of Accounting) BA وصوفات مساقات برنامج )بكالوريوس في المحاسبة( Course Description (Bachelor of Accounting) BA ACC 101 Principles of Accounting (1) This course deals with a number of accounting topics concerning the accounting

More information

Using CDM as a means to help promote investment in A&R projects

Using CDM as a means to help promote investment in A&R projects Using CDM as a means to help promote investment in A&R projects EU-India A&R Workshop Dehradun, India 15-17 June 2005 Adrian Stott Clean Energy Finance Committee Main types of annex 1 companies likely

More information

CFAMN2 Set and monitor financial targets for your business

CFAMN2 Set and monitor financial targets for your business Overview If you want to run a successful business you need to keep track of the money you use, save and spend. Setting financial targets and monitoring how well your business does against them will help

More information

REMUNERATION POLICY EDMOND DE ROTHSCHILD ASSET MANAGEMENT (LUXEMBOURG)

REMUNERATION POLICY EDMOND DE ROTHSCHILD ASSET MANAGEMENT (LUXEMBOURG) ASSET MANAGEMENT REMUNERATION POLICY EDMOND DE ROTHSCHILD ASSET MANAGEMENT (LUXEMBOURG) INTRODUCTION In application of the following texts: As a management company of UCITS o CSSF Regulation 10-4 transposing

More information

BCPA Program and the World Bank Carbon Finance Unit

BCPA Program and the World Bank Carbon Finance Unit BCPA Program and the World Bank Carbon Finance Unit Renewable Energy/Energy Efficiency and the CDM Jakarta. September 14, 2006. Lasse Ringius. World Bank Carbon Finance Unit. 1 Presentation Overview CDM

More information

Small-Scale CDM & Bundling: Criteria, Advantages & Status

Small-Scale CDM & Bundling: Criteria, Advantages & Status Small-Scale CDM & Bundling: Criteria, Advantages & Status Need for Small-Scale CDM introduced by CDM EB to encourage the development of smaller CDM projects typically would have been less attractive in

More information

Corporate Profile. Eagle Management Consultancy L.L.C.

Corporate Profile. Eagle Management Consultancy L.L.C. E a g l e M a n a g e m e n t Consultancy L.L.C Corporate Profile WELCOME TO EAGLE MANAGEMENT CONSULTANCY UNITED ARAB EMIRATE S LEADING ACCOUNTING, AUDIT & COMPLIANCE, VAT ADVISORY, MANAGEMENT CONSULTANCY

More information

Putting the D into the CDM workshop Part 6: CDM vs Voluntary; Programmatic vs Non- Programmatic

Putting the D into the CDM workshop Part 6: CDM vs Voluntary; Programmatic vs Non- Programmatic Making carbon history Putting the D into the CDM workshop Part 6: CDM vs Voluntary; Programmatic vs Non- Programmatic 15 June 2009!Prepared for the for the sole sole use use of Sindicatum of Climate InterChange

More information

Carbon Credits for Managing The Laguna De Bay Basin

Carbon Credits for Managing The Laguna De Bay Basin Sengupta, M. and Dalwani, R. (Editors). 2008 Proceedings of Taal2007: The 12 th World Lake Conference: 1164-1169 Carbon Credits for Managing The Laguna De Bay Basin Adelina C. Santos-Borja Research and

More information

Private Sector Investment in REDD: Minimum Conditions and Risks

Private Sector Investment in REDD: Minimum Conditions and Risks Private Sector Investment in REDD: Minimum Conditions and Risks EPRI Greenhouse Gas Emissions Offset Policy Dialogue Workshop 5 Reducing Emissions from Deforestation and Degradation, May 13, 2009 Ken Newcombe,

More information

Green Investment Schemes Legal and Regulatory Issues. Grzegorz Peszko. Senior Environmental Economist, Europe and Central Asia March, Minsk

Green Investment Schemes Legal and Regulatory Issues. Grzegorz Peszko. Senior Environmental Economist, Europe and Central Asia March, Minsk Green Investment Schemes Legal and Regulatory Issues Grzegorz Peszko Senior Environmental Economist, Europe and Central Asia 26-27 27 March, Minsk Overview General Principles of AAU Management, Coordination

More information

Philips Capital Your one-stop financing resource. Philips Capital May, 2016

Philips Capital Your one-stop financing resource. Philips Capital May, 2016 Your one-stop financing resource May, 2016 Contents How we can help grow your business Sources and solutions Long-term partnerships Best practises Case studies Summary 2 For more than 120 years, Philips

More information

Innovations in Business Solutions. Diploma in Accounting and Payroll. Accounting and Payroll I Week 1 to 11

Innovations in Business Solutions. Diploma in Accounting and Payroll. Accounting and Payroll I Week 1 to 11 Program Course Duration Diploma in Accounting and Payroll 33 weeks Accounting and Payroll I Week 1 to 11 Introduction to Accounting Fundamentals of Accounting Basic concepts of recording journal entry

More information

Legal aspects of linking emissions trading schemes

Legal aspects of linking emissions trading schemes Environment and Environmental Markets Legal aspects of linking emissions trading schemes Ashley Stafford Senior Associate Environmental Economic Research Hub, ANU CEEM, UNSW Climate Strategies Baker &

More information

GLOSSARY OF TERMS ENTREPRENEURSHIP AND BUSINESS INNOVATION

GLOSSARY OF TERMS ENTREPRENEURSHIP AND BUSINESS INNOVATION Accounts Payable - short term debts incurred as the result of day-to-day operations. Accounts Receivable - monies due to your enterprise as the result of day-to-day operations. Accrual Based Accounting

More information

CDM project review - technology and regulation aspects

CDM project review - technology and regulation aspects Pacific Regional CDM Capacity Building Workshop CDM project review - technology and regulation aspects Xianli Zhu 24-28, Jan 2011, Suva, Fiji Outline DNA Approval Expert support as part of the host country

More information

Convergence of FSRU and Power Projects The Challenge of LNG to Power. 2 nd Annual Japan Ship Finance Forum 7 th December 2017

Convergence of FSRU and Power Projects The Challenge of LNG to Power. 2 nd Annual Japan Ship Finance Forum 7 th December 2017 Convergence of FSRU and Power Projects The Challenge of LNG to Power 2 nd Annual Japan Ship Finance Forum 7 th December 2017 1 OUTLINE 1. Introduction 2. King & Spalding Overview 3. THE RIGHT TIME FOR

More information

BUSINESS STUDIES UNIT 1 KNOWLEDGE ORGANISERS

BUSINESS STUDIES UNIT 1 KNOWLEDGE ORGANISERS BUSINESS STUDIES UNIT 1 KNOWLEDGE ORGANISERS MARKETING 1.1 Part 1 BUSINESS A business is an organisation whose purpose is to produce goods and services to meet the needs of customers. QUALITATIVE DATA

More information

FINANCIAL VIABILITY INSTRUCTIONS Applicants and Providers of FEE-HELP and VET FEE-HELP assistance

FINANCIAL VIABILITY INSTRUCTIONS Applicants and Providers of FEE-HELP and VET FEE-HELP assistance FINANCIAL VIABILITY INSTRUCTIONS Applicants and Providers of FEE-HELP and VET FEE-HELP assistance Document publishing date (May 2015) Department of Education and Training Version control Version Date Summary

More information

Bulgarian JI Guidelines. 2006, September

Bulgarian JI Guidelines. 2006, September Bulgarian JI Guidelines 2006, September Table of Contents BULGARIAN JI GUIDELINES... 1 1. International Requirements... 1 2. JI Process in Bulgaria... 3 3. Participants... 4 Step 6: Request for Letter

More information

Project Financing for Biomass Power Plants experiences from technical due diligence in Thailand

Project Financing for Biomass Power Plants experiences from technical due diligence in Thailand Project Financing for Biomass Power Plants experiences from technical due diligence in Thailand Phil Napier-Moore, Project Manager Mott MacDonald Bangkok Topics for discussion Background Biomass power

More information

A CASE STUDY: ASJA S BELO HORIZONTE CDM PROJECT BRAZIL / KYOTO PROTOCOL

A CASE STUDY: ASJA S BELO HORIZONTE CDM PROJECT BRAZIL / KYOTO PROTOCOL Fordham University School of Law February 22nd, 2010 A CASE STUDY: ASJA S BELO HORIZONTE CDM PROJECT BRAZIL / KYOTO PROTOCOL Agostino Re Rebaudengo President arr@asja.biz INDEX KYOTO PROTOCOL AND EMISSION

More information

Fuel switch from coal to biomass residues

Fuel switch from coal to biomass residues Fuel switch from coal to biomass residues Fuel switch from coal to biomass residues in boilers for heat generation project The project will install 16 gasification stoves and transform 3 existing coal

More information

Project Finance Foundations

Project Finance Foundations Project Finance Foundations e-learning at your fingertips...when you need it Course Structure The Course is made up of 7 core modules: Introduction to Project Finance Project Risks Financing Projects Revenue

More information

Construction Webinar. A comparison of EPC and EPCM contracting and the key risk mitigation measures

Construction Webinar. A comparison of EPC and EPCM contracting and the key risk mitigation measures Construction Webinar A comparison of EPC and EPCM contracting and the key risk mitigation measures 28 January 2016 Overview Different procurement methods Engineer, Procure and Construct (EPC) Engineering,

More information

Integrated Report 2018 Audited Financial Report

Integrated Report 2018 Audited Financial Report Integrated Report 2018 Audited Financial Report Consolidated Statement of Financial Position 1 Consolidated Statement of Profit or Loss 3 Consolidated Statement of Comprehensive Income 4 Consolidated Statement

More information

Research Issues in Accounting for Cross-Border Organizations Shyam Sunder Yale School of Management

Research Issues in Accounting for Cross-Border Organizations Shyam Sunder Yale School of Management Research Issues in Shyam Sunder Yale School of Management Conference on Cross-Border Business Combinations and Strategic Alliances, Berlin, June 22-25, 2001 Levels of Analyses Economy National, Regional,

More information

Policies that Support New Nuclear Power Plant Development

Policies that Support New Nuclear Power Plant Development October 2009 Policies that Support New Nuclear Power Plant Development Executive Summary The Investment Challenge 1 Why Incentives are Needed 2 Energy Policy Act of 2005 Production Tax Credit 3 Standby

More information

After your registration is complete and your proctor has been approved, you may take the Credit by Examination for MONEY 1A.

After your registration is complete and your proctor has been approved, you may take the Credit by Examination for MONEY 1A. MONEY 1A Money Matters, First Semester #8383 (v.1.0) To the Student: After your registration is complete and your proctor has been approved, you may take the Credit by Examination for MONEY 1A. ABOUT THE

More information

1. REMUNERATION POLICY

1. REMUNERATION POLICY 1. REMUNERATION POLICY As from 1 st January, 2015, all Cyprus Investment Firms (CIFs) must comply with Directive DI144-2014-14 (the Directive ) of the CySEC for the Prudential Supervision of CIFs, regarding

More information

THE AMA HANDBOOK OF DUE DILIGENCE

THE AMA HANDBOOK OF DUE DILIGENCE This is a complete list of the nearly-400 ready-to-use forms you ll find in The AMA Handbook of Due Diligence, the most exhaustive guide available on how to properly perform a due dilgence investigation

More information

Second Section Procedures and Principles Regarding the Transfer of Management and Representation Authorities Article 4

Second Section Procedures and Principles Regarding the Transfer of Management and Representation Authorities Article 4 ANNEX BANK OF TOKYO-MITSUBISHI UFJ TURKEY ANONİM ŞİRKETİ Internal Directive Regarding The Partial Or Whole Transfer Of Management And Representation Authorities Dated 19/04/2016 And Numbered 3, Which Is

More information

TIF 101: Part 3 in a 3-part series: The TIF Contract and Financing Alternatives. By David Bushek and Rich Wood

TIF 101: Part 3 in a 3-part series: The TIF Contract and Financing Alternatives. By David Bushek and Rich Wood TIF 101: Advice for MUNICIPALITIES considering the first use of tax increment financing Part 3 in a 3-part series: The TIF Contract and Financing Alternatives By David Bushek and Rich Wood This is the

More information

CDM: A Perspective from a Project Developer

CDM: A Perspective from a Project Developer CDM: A Perspective from a Project Developer Roberto C. Yap, Ph.D 16 th Asia Pacific Seminar on Climate Change 5 th September 2006 Jakarta, Indonesia Environmental consultancy specializing in originating

More information

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 8-K/A

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 8-K/A UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 8-K/A CURRENT REPORT Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 Date of report (Date of earliest

More information

1. Introduction. 2. Background

1. Introduction. 2. Background 1. Introduction This document defines proposals for a draft Industry Empowerment Charter ( the Charter ) for the Management Consulting Industry. The Charter has been facilitated by the Institute of Management

More information

Table of Contents. Introduction...3. What is my goal?... 4

Table of Contents. Introduction...3. What is my goal?... 4 USER GUIDE USER GUIDE 2 Table of Contents Introduction...3 What is my goal?... 4 How do I make decisions?... 4 Policy Decisions... 4 R&D... 4 Marketing...5 Production... 8 Finance... 8 What information

More information

CLASS(2000)1 November 2000 Secretariat: CLASSIFICATION OF EXPENDITURE PUBLIC AND PRIVATE SECTORS:

CLASS(2000)1 November 2000 Secretariat: CLASSIFICATION OF EXPENDITURE PUBLIC AND PRIVATE SECTORS: H M Treasury CLASS(2000)1 November 2000 Secretariat: 020 7270 5337 CLASSIFICATION OF EXPENDITURE PUBLIC AND PRIVATE SECTORS: NEW BODIES, PARTNERSHIP, JOINT VENTURES, PRIVATISATION & NATIONALISATION Introduction

More information

Business Plan [Company Name] Date: [dd/mm/yy]

Business Plan [Company Name] Date: [dd/mm/yy] Business Plan [Company Name] Date: [dd/mm/yy] [Contact name] [Phone number] [Fax number] [Email address] [Web site address] Table of Contents Executive Summary... 3 Company Summary... 4 History and Ownership...

More information

UNBUNDLING OF DISTRIBUTION SYSTEM OPERATORS

UNBUNDLING OF DISTRIBUTION SYSTEM OPERATORS UNBUNDLING OF DISTRIBUTION SYSTEM OPERATORS GUIDE AND REQUIREMENTS FOR PRACTICAL IMPLEMENTATION 1. RATIONALE To create a level playing field at retail level, the activities of distribution system operators

More information

The North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison. NAFTA Chapter 10: Government Procurement

The North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison. NAFTA Chapter 10: Government Procurement The North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison NAFTA Chapter 10: Government Procurement Chapter Ten: Government Procurement Chapter Fifteen: Government

More information

Lexis PSL Commercial. Transition in outsourcing

Lexis PSL Commercial. Transition in outsourcing Transition in outsourcing 1 Please note that while this Practice Note is a comprehensive document, it does refer to some supplemental resources which are only available with a paid subscription to LexisPSL.

More information

The Austrian JI/CDM Programme

The Austrian JI/CDM Programme Martin Gauss Kommunalkredit Public Consulting GmbH The Austrian JI/CDM Programme UNFCCC/UNIDO Training of trainers workshop on preparing technology transfer projects for financing 1 October 2008 Austrian

More information

Edexcel GCSE Business Studies: Key Terms for Unit 1

Edexcel GCSE Business Studies: Key Terms for Unit 1 Unit 1: Introduction to Small Business Topic 1.1: Spotting a Business Opportunity 1.1.1 Businesses Edexcel GCSE Business Studies: Key Terms for Unit 1 Supplier Customer Consumer Markets A business which

More information

Clean Development Mechanism & Carbon Market

Clean Development Mechanism & Carbon Market Clean Development Mechanism & Carbon Market Expert Meeting on Trade & Environment Priorities in the Arab Region Cairo, Egypt, 11-13 October 2007 Dr. Sami Kamel, Senior Economist, UNEP RISOE Centre, Denmark

More information

Carbon Finance in Practice Public Heating Biomass Systems in Moldovan Rural Communities Project

Carbon Finance in Practice Public Heating Biomass Systems in Moldovan Rural Communities Project Carbon Finance in Practice Public Heating Biomass Systems in Moldovan Rural Communities Project Anatol Gobjila, World Bank February 28, 2007, Tirana, Albania Institutional Set-Up for Carbon Finance in

More information

TANZANIA PETROLEUM DEVELOPMENT CORPORATION TENDER NO. PA/031/ /C/10 FOR

TANZANIA PETROLEUM DEVELOPMENT CORPORATION TENDER NO. PA/031/ /C/10 FOR TANZANIA PETROLEUM DEVELOPMENT CORPORATION TENDER NO. PA/031/2018-2019/C/10 FOR CONSULTANCY SERVICES FOR FEASIBILITY STUDY FOR IMPLEMENTATION OF REGIONAL NATURAL GAS DISTRIBUTION PROJECT UNDER PPP MODEL

More information

Munksjö historical. Ahlstrom- Munksjö Net sales Other operating income Total income

Munksjö historical. Ahlstrom- Munksjö Net sales Other operating income Total income 1 APPENDIX: UNAUDITED PRO FORMA FINANCIAL INFORMATION The following unaudited pro forma consolidated financial information (the Pro forma financial information ) is presented for illustrative purposes

More information

ANNEX A THE IMPLEMENTATION ROADMAP TO DEVELOP SUCCESSFUL INFRASTRUCTURE PUBLIC-PRIVATE PARTNERSHIP (PPP) PROJECTS IN THE APEC REGION

ANNEX A THE IMPLEMENTATION ROADMAP TO DEVELOP SUCCESSFUL INFRASTRUCTURE PUBLIC-PRIVATE PARTNERSHIP (PPP) PROJECTS IN THE APEC REGION Beijing, the People s Republic of China, 22 October 2014 2014 APEC Finance Ministers Meeting Joint Ministerial Statement ANNEX A THE IMPLEMENTATION ROADMAP TO DEVELOP SUCCESSFUL INFRASTRUCTURE PUBLIC-PRIVATE

More information

DP WORLD LIMITED AND ITS SUBSIDIARIES CONSOLIDATED FINANCIAL STATEMENTS 31 DECEMBER 2010

DP WORLD LIMITED AND ITS SUBSIDIARIES CONSOLIDATED FINANCIAL STATEMENTS 31 DECEMBER 2010 DP WORLD LIMITED AND ITS SUBSIDIARIES CONSOLIDATED FINANCIAL STATEMENTS 31 DECEMBER 2010 1 Consolidated income statement for the year ended 31 December 2010 Year ended 31 December 2010 Year ended 31 December

More information

Lesson 10: CDM: Risks and opportunities for financial service providers

Lesson 10: CDM: Risks and opportunities for financial service providers Lesson 10: CDM: Risks and opportunities for financial service providers Lesson 10 Contents: Objectives Lesson Core Text o Differences between CDM projects and common projects o Specific risks of CDM projects

More information

CONTEXTS OF PROCUREMENT AND SUPPLY CIPS DIPLOMA LEVEL NOVEMBER EXAMINATIONS 2017

CONTEXTS OF PROCUREMENT AND SUPPLY CIPS DIPLOMA LEVEL NOVEMBER EXAMINATIONS 2017 CONTEXTS OF PROCUREMENT AND SUPPLY CIPS DIPLOMA LEVEL NOVEMBER EXAMINATIONS 2017 Lean Procurement 2017 Assessment criteria 4.3 Analyse the impact of the private sector on procurement or supply chain roles

More information

REDD and the Carbon Market. Agus Sari Ecosecurities ICRAF Workshop on REDD November 2009

REDD and the Carbon Market. Agus Sari Ecosecurities ICRAF Workshop on REDD November 2009 REDD and the Carbon Market Agus Sari Ecosecurities agus.sari@ecosecurities.com ICRAF Workshop on REDD November 2009 Carbon Market... in a nutshell Emissions Offset Reduction Credits Baseline / reference

More information

RECOMMENDATIONS COMMISSION. COMMISSION RECOMMENDATION of 30 April 2009 on remuneration policies in the financial services sector

RECOMMENDATIONS COMMISSION. COMMISSION RECOMMENDATION of 30 April 2009 on remuneration policies in the financial services sector L 120/22 Official Journal of the European Union 15.5.2009 RECOMMENDATIONS COMMISSION COMMISSION RECOMMENDATION of 30 April 2009 on remuneration policies in the financial services sector (Text with EEA

More information

FORTUNE BRANDS HOME & SECURITY, INC. ADJUSTED PRO FORMA INFORMATION (In millions, except per share amounts) (Unaudited)

FORTUNE BRANDS HOME & SECURITY, INC. ADJUSTED PRO FORMA INFORMATION (In millions, except per share amounts) (Unaudited) ADJUSTED PRO FORMA INFORMATION (In millions, except per share amounts) Three Months Ended December 31, Year Ended December 31, 2011 2010 % Change 2011 2010 % Change Net Sales (GAAP) Kitchen & Bath Cabinetry

More information

Mike Greer Homes NZ Limited - Position Description for the role of Chief Financial Officer

Mike Greer Homes NZ Limited - Position Description for the role of Chief Financial Officer Mike Greer Homes NZ Limited - Position Description for the role of Chief Financial Officer Reports to Chief Executive Officer (CEO) Location: Christchurch Direct reports: Accountants x 3, Accounts Clerks

More information

YTL POWER INTERNATIONAL BERHAD (Company No H) (Incorporated in Malaysia)

YTL POWER INTERNATIONAL BERHAD (Company No H) (Incorporated in Malaysia) Interim financial report on consolidated results for the quarter ended 31 March 2007. The figures have not been audited. CONDENSED CONSOLIDATED INCOME STATEMENTS INDIVIDUAL QUARTER CUMULATIVE PERIOD PRECEDING

More information

OAO Raspadskaya Pro Forma Consolidated Financial Information. Years ended December 31, 2005 and 2004 with Independent Accountants Examination Report

OAO Raspadskaya Pro Forma Consolidated Financial Information. Years ended December 31, 2005 and 2004 with Independent Accountants Examination Report Pro Forma Consolidated Financial Information Years ended December 31, 2005 and 2004 with Independent Accountants Examination Report Pro Forma Consolidated Financial Information Years ended December 31,

More information

Microgrids: Project Economics & Financing Strategies NESEA Building Energy 2014 March 6-8, 2014

Microgrids: Project Economics & Financing Strategies NESEA Building Energy 2014 March 6-8, 2014 Clean Energy Finance & Investment Authority Microgrids: Project Economics & Financing Strategies NESEA Building Energy 2014 March 6-8, 2014 Agenda What are Microgrids/District Energy? Approaching Project

More information

African Agribusiness Academy Regional Event

African Agribusiness Academy Regional Event African Agribusiness Academy Regional Event Presentation from CRDB BANK PLC on SME Agribusiness Financing Alpha Wilson Magubila Relationship Manager SME 14 th November 2011 1 Content Introduction Bank

More information

Principal Barriers/ Constraints to Successful Public-Private Partnerships

Principal Barriers/ Constraints to Successful Public-Private Partnerships High-level Expert Group Meeting on Infrastructure Public-Private Partnerships for Sustainable Development 11-13 November 2012 Tehran, Islamic Republic of Iran Principal Barriers/ Constraints to Successful

More information

A Look in the Energy Issues in the U.S. and Mexico

A Look in the Energy Issues in the U.S. and Mexico A Look in the Energy Issues in the U.S. and Mexico What could we expect in this key aspect of our bilateral relationship? Raul Felix Baker & McKenzie International is a Swiss Verein with member law firms

More information

Remuneration Policy (the Policy )

Remuneration Policy (the Policy ) Remuneration Policy (the Policy ) Adopted by The Board of Directors of Swedbank Management Company S.A. (hereinafter the Company ) Date of adoption 9 February 2018 Applies to Swedbank Management Company

More information