1 IMPLEMENTATION OF A GLOBAL RBI STANDARD EXPERIENCES AND CHALLENGES Maintech-konferansen 2016 Trondheim Roar Bye, Teekay Offshore Production

2 Topics Teekay Offshore Production Background The Ambition The Contract (SoW/contract strategy/organization) Experiences Piranema Spirit a case Looking forward & Key Success Factors 2

3 Teekay Offshore Production TOP 3

4 Our Fleet Solid Customers Portfolio TEEKAY OFFSHORE AT A GLANCE $ 30+ Years of Experience 60+ Offshore Vessels Employees 7 Offices Europe, Canada, Brazil, Philippines 4

5 11 FPSO units Largest independent operator of FPSOs in the North Sea 30+ years of experience Growing presence in Brazil Potential to competitively pursue FPSO projects anywhere in the world Petrojarl Foinaven (BP) Petrojarl Knarr (BG Norge) Petrojarl Varg (Talisman) Piranema Spirit (Petrobras) Petrojarl Cidade de Rio das Ostras (Petrobras) Petrojarl Banff (CNR) Voyageur Spirit (E.ON) Hummingbird Spirit (Centrica Energy) Petrojarl Cidade de Itajai (Petrobras) Petrojarl I* (QGEP) Libra** (Petrobras) (*upgrade ongoing) (**under conversion) 5 5

6 Background 6

7 Teekay Petrojarl 2011 RBI Contractors Petrojarl Banff (CNR) Petrojarl Foinaven (BP) Petrojarl Knarr (BG Norge) Petrojarl Varg (Talisman) Sevan Voyageur (E.ON Ruhrgas) Petrojarl I (StatoilHydro) Sevan Hummingbird (Centrica Energy) Petrojarl Cidade de Itajai (Petrobras) Petrojarl Cidade de Rio das Ostras (Petrobras) Sevan Piranema (Petrobras) 7

8 Asset Integrity Management in TOP Corrosion Management Corrosion management shall be addressed in all design phases and follow the sequence: Material selection Surface protection Internal surface protection Chemical treatment Monitoring (instrumentation, laboratory sampling, observations) Inspections (RBI) 8

9 The Ambition 9

10 The Ambition Establish a global TKPJ standard for Risk Based Inspections and handling of anomalies. Establish and implement best practice of integrity management of topside process plant (pipes and drums) Reduce risk of loss of containment and possible major accidents (ALARP) Establish a web based arena that encourages experience transfer across units and full transparency of integrity status Establish a partnership with a global RBI services supplier that has the same level of ambition wrt. operational excellence Establish a long long-term integrity focus in accordance with authorities expectations for long term integrity management of ageing units 10

11 The Ambition Oceaneering approach to Global RBI Contract Comprehensive and consistent service across the fleet and all locations Increased reliability and predictability in performance, risk and safety Access to global support and capability Cross fleet knowledge and experience transfer Enhanced vessel lifetime planning 11

12 The Contract (SoW/strategy/ organisation) 12

13 The contract SoW and strategy Scope of Work Contract startup Familiarisation, RBI analysis (initial and detailed), start-up and handover Onshore work RBI analysis (annual update) Inspection planning Reporting Support to TKPJ Operation (meetings etc.) Compensation Lump sum One-off payment Lump sum Annual payment Long term integrity management Offshore Work Inspection Reimbursable By the hour 13

14 The contract organisation (R&Rs) Contract Owner TOP contract Holder OAI Contract Holder Quality, standardisation, working principles, alignment TOP Technical Authority Integrity Engineering OAI Senior Corrosion Engineer/ OAI Senior Inspection Engineer Single point of contact - FPSO level TOP Maintenance Superintendent OAI Asset Responsible Inspection execution Fixed rotation Campaigns 14

15 Our Experiences 15

16 Experiences Documentation gathering and hand-over availability, traceability, quality, lack of, inconsistence in data/documentation No complete RBI or inspection history from incumbent contractors were handed over for any of the FPSOs Underestimation of complexity and workload of simultaneous operation support and establishment of RBI system Access to docs, data extraction, QA/QC 16

17 Experiences, cont. Steep learning curve for TOP: Integrity management capacity and competency (corporate and asset level) Governing documents revised during start-up o o o RBI procedure Anomaly management Document management 17

18 Experiences, cont. Rules and legislations differ from North Sea to Brazil E.g. NR-13 Inspection regime is different between NCS and UKCS: Offshore Inspection Engineer NDT Technician UK QA formal processes (Senior endorsement) Contract interpretations underestimated by both TOP and Oceaneering 18

19 Piranema Spirit a case 19

20 Piranema case preferential weld corrosion 20

21 Piranema case Weld repair project Welds inspected: ~ 1250 inspections Mainly phased array Radiography Repairs: Total: 256 welds o o 54 spools - 22 lines Pressure vessels 21

22 Looking forward & Key Success Factors 22

23 Improvement areas - TOP Review of: Governing documents RBI analyses Inspection Program/Plans Establish Global TOP RBI Forum Key personnel onshore and offshore Contract understanding Governing documents awareness Global RBI Workshop Key personnel in Oceaneering and TOP 23

24 Facsimile from DN

25 25

26 RBI Web page one stop shop 26

27 Barrier dashboard 27

28 Safety Case Monitoring Assurance Activities MAH s Asset Teekay Offshore Management Process Verification Scheme/ Performance Standards Barrier Strategy Safety Critical Elements Register 28

29 Key success factors Quality we never compromise on integrity Transparency close the loop Communication and alignment common understanding of the issues Efficiency remember the R in RBI 29

30 30

Sustainability report

Sustainability report Sustainability report Key figures People 2010 2011 2012 Health and safety Total recordable injury frequency 1 3.84 5.87 4.58 Lost time injuries 2 3 4 High potential incident frequency 2 3.84 3.26 1.72

More information

Sustainability report

Sustainability report Sustainability report Key figures 2009 2010 2011 People Health and safety Total recordable injury frequency 1 4.0 3.84 5.87 Lost time injuries 3 2 3 High potential incident frequency 2 4.57 3.84 3.26 Sick

More information

Teekay Partnerships TEEKAY CORPORATION

Teekay Partnerships TEEKAY CORPORATION // Teekay Partnerships Wells Fargo MLP Conference - December 10, 2013 TEEKAY CORPORATION Teekay Group Corporate and Asset Structure GP TEEKAY CORP. ( Teekay Parent ) NYSE: TK Project Developer Market Cap:

More information

KP4 AGEING & LIFE EXTENSION PROJECT INTERIM REPORT

KP4 AGEING & LIFE EXTENSION PROJECT INTERIM REPORT KP4 Manager 6 th November 2012 09:30 O&GUK Health and Safety Executive KP4 AGEING & LIFE EXTENSION PROJECT INTERIM REPORT Andy Duncan WHAT IS AGEING? AGEING IS NOT ABOUT HOW OLD YOUR EQUIPMENT IS; IT

More information

Benefits of a cylindrically shaped floater for an FPSO application in cyclone exposed environments

Benefits of a cylindrically shaped floater for an FPSO application in cyclone exposed environments Benefits of a cylindrically shaped floater for an FPSO application in cyclone exposed environments Presentation by: Fredrik Major, CBDO, Sevan Marine ASA for INTSOK DEEP WATER CONFERENCE Thursday 14 November

More information

ASSET MANAGEMENT SERVICES

ASSET MANAGEMENT SERVICES ASSET MANAGEMENT SERVICES Petrofac Engineering & Production Services 02 ASSET MANAGEMENT SERVICES ASSET MANAGEMENT SERVICES 03 Introducing Petrofac Asset Management Services Petrofac is an international

More information

Development of Pipeline Integrity Management System (PIMS)

Development of Pipeline Integrity Management System (PIMS) Presentation Development of Pipeline Integrity Management System (PIMS) 29 November 2016 & Dynamic Risk Presentation Outline 1. Identity Card Bureau Veritas 2. PIMS Definitions & Overall Process 3. Integrity

More information

GUIDANCE ON THE MANAGEMENT OF THIRD PARTY COMPETENCE FOR SAFETY CRITICAL POSITIONS OFFSHORE

GUIDANCE ON THE MANAGEMENT OF THIRD PARTY COMPETENCE FOR SAFETY CRITICAL POSITIONS OFFSHORE GUIDANCE ON THE MANAGEMENT OF THIRD PARTY COMPETENCE FOR SAFETY CRITICAL POSITIONS OFFSHORE Contents Page No Introduction 3 1.0 Background 4 1.1 Objective 4 1.2 Regulatory Background 5 2.0 Procedure 6

More information

Just around the corner. at 490 locations worldwide.

Just around the corner. at 490 locations worldwide. Just around the corner. at 490 locations worldwide. In our world wide branch offices, you can be sure to find the right competence. Regardless of how complex your requirements are, we ensure a wide range

More information

THINKING DIFFERENTLY ABOUT LATE LIFE ASSET MANAGEMENT AND DECOMMISSIONING

THINKING DIFFERENTLY ABOUT LATE LIFE ASSET MANAGEMENT AND DECOMMISSIONING THINKING DIFFERENTLY ABOUT LATE LIFE ASSET MANAGEMENT AND Petrofac Engineering & Production Services 02 03 Introducing Petrofac Petrofac is an international service provider to the oil and gas production

More information

Frazier Reliability Solutions

Frazier Reliability Solutions Frazier Reliability Solutions Mechanical Integrity Audit Checklist Location: Completed By: Date: MI Program Management Yes No Does the company and/or site have a documented MI policy? Does the MI program

More information

Job Description. Links in to Project Surveyors & Administration Coordinators

Job Description. Links in to Project Surveyors & Administration Coordinators Job Description Job Title: Reports To: Direct Reports: Job Purpose: Contract Surveyor Project Manager Links in to Project Surveyors & Administration Coordinators To assist the Project Manager in the delivery

More information

PERATIONS, AINTENANCE MODIFICATIONS

PERATIONS, AINTENANCE MODIFICATIONS PERATIONS, AINTENANCE MODIFICATIONS STORK IS THE EXPERT PROVIDER OF INTEGRATED OPERATIONS, MAINTENANCE AND MODIFICATIONS SUPPORT SERVICES TO THE GLOBAL OIL & GAS ENERGY INDUSTRIES. ASSET INTEGRITY PARTNER

More information

Asset integrity solutions. Improve integrity and reduce costs through more effective asset management. prime. Risk. Assessment.

Asset integrity solutions. Improve integrity and reduce costs through more effective asset management. prime. Risk. Assessment. Opportunity Asset integrity solutions Improve integrity and reduce costs through more effective asset management Risk Competency prime Training & Development Value Creation Risk Management 2 ASSET INTEGRITY

More information

Competence as a primary tool in the safety toolkit

Competence as a primary tool in the safety toolkit Competence as a primary tool in the safety toolkit Step Change Safety Share Fair Nick Hough, Technical Adviser 30 June 2010, Pittodrie stadium, Aberdeen What is IMCA? International Marine Contractors Association

More information

A commitment to excellence in Non-Destructive Testing & Inspection through to Integrity Management

A commitment to excellence in Non-Destructive Testing & Inspection through to Integrity Management A commitment to excellence in Non-Destructive Testing & Inspection through to Integrity Management www.applusrtd.com Welcome to the world of Applus RTD. A global leader in Non- Destructive Testing and

More information

MECHANICAL ENGINEERING ESSENTIALS SECTOR / ENGINEERING

MECHANICAL ENGINEERING ESSENTIALS SECTOR / ENGINEERING MECHANICAL ENGINEERING ESSENTIALS SECTOR / ENGINEERING TECHNICAL & CERTIFICATE OF ATTENDANCE TRAINING COURSE The Mechanical Engineering Essentials Training Course Will Enable Technical Personnel To Familiarise

More information

Seminar: March ADNEC Exhibition Center Abu Dhabi. Managerial and technical life-cycle of a pipeline system

Seminar: March ADNEC Exhibition Center Abu Dhabi. Managerial and technical life-cycle of a pipeline system 28-29 March 2018 ADNEC Exhibition Center Abu Dhabi Seminar: Managerial and technical life-cycle of a pipeline system Within the frame of 3rd PVPC EXPO 2018 ORGANIZED BY Euro Institute for Information a

More information

Contents. Who we are. Pg. 2.. History Pg. 3.. Our Services Pg. 4,5 & 6.. Our Partnerships Pg. 7.. Where we Work Pg. 8.. Our Customer Focus Pg. 9..

Contents. Who we are. Pg. 2.. History Pg. 3.. Our Services Pg. 4,5 & 6.. Our Partnerships Pg. 7.. Where we Work Pg. 8.. Our Customer Focus Pg. 9.. Contents Who we are. Pg. 2.. History Pg. 3.. Our Services Pg. 4,5 & 6.. Our Partnerships Pg. 7.. Where we Work Pg. 8.. Our Customer Focus Pg. 9.. History We are an experienced Oil & Gas professional company

More information

HSE s AGEING & LIFE EXTENSION KEY PROGRAMME (KP4) Andy Duncan, CEng KP4 Manager. Health and Safety Executive

HSE s AGEING & LIFE EXTENSION KEY PROGRAMME (KP4) Andy Duncan, CEng KP4 Manager. Health and Safety Executive Health and Safety Executive WEDNESDAY 8 TH MAY 2013 12:10 TO 12:25 SCIS AECC HSE s AGEING & LIFE EXTENSION KEY PROGRAMME (KP4) Andy Duncan, CEng KP4 Manager WHAT IS AGEING? AGEING It s about deterioration

More information

Asset Integrity Services. A commitment to excellence in Non-Destructive Testing & Inspection.

Asset Integrity Services. A commitment to excellence in Non-Destructive Testing & Inspection. Asset Integrity Services. A commitment to excellence in Non-Destructive Testing & Inspection. w w w. A p p l u s R T D. c o m This brochure is about the world of Applus RTD Its clients Its solutions Its

More information

LOUISIANA FABRICATION FACILITIES AND SERVICES

LOUISIANA FABRICATION FACILITIES AND SERVICES LOUISIANA FABRICATION FACILITIES AND SERVICES General Contractor Services Production and Drilling Topsides Onshore Fabrication Piping, Structural, Coating Offshore Hookup, Platform Integration, Facility

More information

NTEGRITY & NSPECTION

NTEGRITY & NSPECTION NTEGRITY & NSPECTION THE EXPERT PROVIDER OF ASSET INTEGRITY AND INSPECTION SERVICES TO THE GLOBAL OIL & GAS ENERGY INDUSTRIES. ASSET INTEGRITY PARTNER ASSET INTEGRITY PARTNER Integrity & INSPECTION Services

More information

ODFJELL DRILLING QHSE PROGRAMS Safety will never be compromised

ODFJELL DRILLING QHSE PROGRAMS Safety will never be compromised ODFJELL DRILLING QHSE PROGRAMS 2017 Safety will never be compromised Zero failures and incidents Despite the challenging economic climate, Odfjell Drilling delivered strong QHSE results for 2016. In 2017,

More information

FPSO Business Plan and Decommissioning Themes

FPSO Business Plan and Decommissioning Themes Marine Money Forum Brazil FPSO Business Plan and Decommissioning Themes Marine Money Forum Brazil Thiago Baraldi Ferreira Strategic Sourcing and Categories Management October 2018 Marine Money Forum Brazil

More information

Information Management on BP s projects for PCA meeting. David Hodgson Feb 2012

Information Management on BP s projects for PCA meeting. David Hodgson Feb 2012 Information Management on BP s projects for PCA meeting David Hodgson Feb 2012 1 Agenda Introduction & Welcome The Global Projects Organisation Some Information Management Themes Standardisation The Central

More information

SGS IS THE WORLD S LEADING INSPECTION, VERIFICATION, TESTING AND CERTIFICATION COMPANY

SGS IS THE WORLD S LEADING INSPECTION, VERIFICATION, TESTING AND CERTIFICATION COMPANY SGS IS THE WORLD S LEADING INSPECTION, VERIFICATION, TESTING AND CERTIFICATION COMPANY 1 AT A GLANCE Nº1 80,000 1,650 WORLD LEADER EMPLOYEES OFFICES AND LABORATORIES GLOBAL 14 SERVICE GLOBAL LOCAL INDUSTRIES

More information

January 2014 COMPANY PRESENTATION

January 2014 COMPANY PRESENTATION January 2014 COMPANY PRESENTATION INDEX 01 - COMPANY PROFILE 02 - COMPANY OVERVIEW 03 - QUALITY, ENVIRONMENT & SAFETY MANAGEMENT 04 - SITECNE ENGINEERING COMPANY INFORMATION 05 - COMPANY ORGANIZATION 06

More information

North Sea Offshore Authorities Forum

North Sea Offshore Authorities Forum North Sea Offshore Authorities Forum REPORT OF THE RESULTS OF THE 2001 / 2002 THEME AUDIT PROGRAMME State Supervision of M ines NSOAF Multi National Theme Audit 2001 / 2002 Composite Report 1. Introduction

More information

OWNER USER INTEGRITY MANAGEMENT SYSTEM WRITTEN DESCRIPTION CHECKLIST AB-512(b)

OWNER USER INTEGRITY MANAGEMENT SYSTEM WRITTEN DESCRIPTION CHECKLIST AB-512(b) Company Name: Written Description of QMS Title and Rev. Status: Person who is responsible for preparing the owner s QMS written description: Name: Title: Telephone No.: ( ) Fax No.: ( ) Cell No.: ( ) E-Mail:

More information

Policy. Document responsible Approved by Document No. Revision Date General Manager Prosafe SE. Revision No. Signed Signed 6

Policy. Document responsible Approved by Document No. Revision Date General Manager Prosafe SE. Revision No. Signed Signed 6 1 of 7 Approved date Document responsible Approved by Document No. Revision Date General Manager Board of Directors P-04 Revision No. Signed Signed 6 Title HSSEQ Table of Contents Chap. Subject Page 0.0

More information

2 ConocoPhillips Health, Safety and Environmental Management System

2 ConocoPhillips Health, Safety and Environmental Management System Section 2 summary 64 2.1 Overview 65 2.2 ConocoPhillips HSEMS Standard 65 2.2.1 Element 1: Policy and leadership 66 2.2.2 Element 2: Risk assessment 66 2.2.3 Element 3: Legal requirements and standards

More information

PIPELINE AND WELL INTEGRITY MANAGEMENT

PIPELINE AND WELL INTEGRITY MANAGEMENT FORCE Technology NORWAY AS Foto: BP - Valhall Lifetime assessment of pipelines and wells PIPELINE AND WELL INTEGRITY MANAGEMENT Speaker Håkon Hallem FORCE Technology NORWAY AS Head of Department Integrity

More information

Guidance on the Management of Ageing and Life Extension for UKCS Oil and Gas Installations. Issue 1 April 2012

Guidance on the Management of Ageing and Life Extension for UKCS Oil and Gas Installations. Issue 1 April 2012 Guidance on the Management of Ageing and Life Extension for UKCS Oil and Gas Installations Issue 1 April 2012 In preparing and publishing these guidelines, Oil & Gas UK gratefully acknowledges the contribution

More information

Inspection solutions Delivering value and improving equipment integrity, whilst focusing on real risks

Inspection solutions Delivering value and improving equipment integrity, whilst focusing on real risks Risk Opportunity Competency prime Training & Development Value Creation Risk Management BROCHURE Inspection solutions Delivering value and improving equipment integrity, whilst focusing on real risks 2

More information

Application Document Submittal for AISC Certification - Fabricators and Manufacturers

Application Document Submittal for AISC Certification - Fabricators and Manufacturers This document submittal checklist applies to Building Fabricators, Bridge Fabricators, Hydraulic Fabricators and Metal Component Manufacturers. The Fracture Critical endorsement is only available to Bridge

More information

Surface Operations Integrity Management. Bucharest March 13 th 2012

Surface Operations Integrity Management. Bucharest March 13 th 2012 Surface Operations Integrity Management Bucharest March 13 th 2012 OMV Petrom Group, the largest oil and gas producer in SEE Exploration and Production Romania and Kazakhstan 67.77 mn boe total hydrocarbon

More information

Decommissioning Delivery Programme

Decommissioning Delivery Programme Decommissioning Delivery Programme Contents 1. Foreword 3 2. Executive summary 4 3. Decommissioning Delivery Programme elements 6 3.1 Element 1: Cost certainty and reduction 7 3.2 Element 2: Delivery capability

More information

DARPETRO_PROFILE_ARTWORK.indd 1

DARPETRO_PROFILE_ARTWORK.indd 1 DARPETRO_PROFILE_ARTWORK.indd 1 DARPETRO_PROFILE_ARTWORK.indd 2 CEO We at DAR PETRO believe that our achievements are the result of our highest level of professional commitment to the field of oil, gas

More information

Excellence for the oil, gas and petrochemical industry.

Excellence for the oil, gas and petrochemical industry. Image: TÜV Rheinland Excellence for the oil, gas and petrochemical industry. Highly complex assets require a highly experienced partner. www.tuv.com 2 OIL, GAS AND PETROCHEMICAL INDUSTRY About TÜV Rheinland.

More information

Assured Joint Integrity

Assured Joint Integrity Assured Joint Integrity All leaks cost Loss of containment can have catastrophic results and negatively impact brand image, facilities, employees, and the environment. Unplanned shutdowns at hydrocarbon

More information

Valhall Corrosion Events and Management

Valhall Corrosion Events and Management Valhall Corrosion Events and Management Learning Pack Eldar Larsen, Head of Operations, BP Norway. Valhall Corrosion Events - Summary Summary Hydrocarbon leak HIPO on 6th March 2009 caused by Microbial

More information

ISO 9001:2015Certified

ISO 9001:2015Certified ISO 9001:2015Certified Introduction MCCS commenced business in 1993 as a small UK based Mechanical Completion and Commissioning company working mainly in the North Sea and Southern Europe on various projects

More information

DRAFT RAMBOLL-SUBC END-TO-END EPCIC SOLUTIONS FOR ENERGY PROJECTS

DRAFT RAMBOLL-SUBC END-TO-END EPCIC SOLUTIONS FOR ENERGY PROJECTS 05 DRAFT RAMBOLL-SUBC END-TO-END EPCIC SOLUTIONS FOR ENERGY PROJECTS 2 END-TO-END EPCIC SOLUTIONS FOR ENERGY PROJECTS List of contents Page 3 End-to-end EPCIC solutions Page 4 Integrated project execution

More information

Life Extension Services. Life Cycle Services

Life Extension Services. Life Cycle Services Life Extension Services Life Cycle Services ABS GROUP OVERVIEW The challenges of the competitive landscape require companies to find ways to maximize the return from their assets. Our lifetime extension

More information

Saudi International Petrochemical Company Reliability & Engineering Department

Saudi International Petrochemical Company Reliability & Engineering Department 1. Basic Function and Scope: a) Equipment Integrity The static equipment engineer is responsible for providing engineering support to inspection personnel for issues affecting the static equipment integrity.

More information

SSET INTEGRITY ND MAINTENANCE ERVICES

SSET INTEGRITY ND MAINTENANCE ERVICES SSET INTEGRITY ND MAINTENANCE ERVICES YOUR ASSET INTEGRITY MANAGEMENT AND MAINTENANCE PARTNER IN THE ASIA PACIFIC REGION SAFETY IS OUR CORE VALUE Stork is fully committed to ensuring all employees go home

More information

Rua São Bento, 8 2º Andar Centro Rio de Janeiro Brasil Phone.:

Rua São Bento, 8 2º Andar Centro Rio de Janeiro Brasil Phone.: technical and commercial support Rua São Bento, 8 2º Andar Centro Rio de Janeiro Brasil Phone.: +55 21 3799 1313 contato@paschoalin.com.br www.paschoalin.com.br Your Company Offshore Construction Services

More information

Schedule D3. Data Item Descriptions. Quality Assurance

Schedule D3. Data Item Descriptions. Quality Assurance DID, Front Cover QA Document Identifier Number: [* insert VSY Document #] Rev: 1 Title: DID Front Cover Quality Assurance Ship applicability: All Document Owner: [* insert name] Document Approver: [* insert

More information

Joined up thinking H&S Pre-qualification. RCA Forum 8 th May Martin McMullan NZTA

Joined up thinking H&S Pre-qualification. RCA Forum 8 th May Martin McMullan NZTA Joined up thinking H&S Pre-qualification RCA Forum 8 th May 2015 Martin McMullan NZTA NZTA / AT to adopt ISNet in 2016 Want to work with our suppliers to set the benchmark Reduce duplication and improve

More information

Materials Group Asset Integrity Management. Maximizing Return on Assets while Minimizing Risk

Materials Group Asset Integrity Management. Maximizing Return on Assets while Minimizing Risk Materials Group Asset Integrity Management Maximizing Return on Assets while Minimizing Risk 2010 AIM Objectives Asset Integrity Management, AIM, is a broad group of tools to maintain plant assets in a

More information

Brochure. Asset integrity solutions Improve integrity and reduce costs through more effective asset management

Brochure. Asset integrity solutions Improve integrity and reduce costs through more effective asset management Brochure Asset integrity solutions Improve integrity and reduce costs through more effective asset management Asset integrity solutions Companies need a cost effective way of maintaining production capability,

More information

Materials and Welding. Capability & Experience

Materials and Welding. Capability & Experience Materials and Welding Capability & Experience Capability Overview Materials and welding is a fundamental engineering discipline that supports key decisions through design phases to ensure successful project

More information

COMPRESSOR DESIGN, OPERATION & MAINTENANCE Hosted by Technology Support Limited Presented by Carmagen Engineering, Inc.

COMPRESSOR DESIGN, OPERATION & MAINTENANCE Hosted by Technology Support Limited Presented by Carmagen Engineering, Inc. Hosted by On September 18-20, Technology Support will be hosting the Compressor Design, Operation and Maintenance seminar. This remains in keeping with our strategy to maintain Technology Support s philosophy

More information

Overview of Technical Skills and Competencies

Overview of Technical Skills and Competencies Technical Skills (TSCs) Business and Organisational Budget Business Continuity Business Networking Business Planning Change Continuous Improvement Organisational Analysis Organisational Resource Procurement

More information

FABRIC MAINTENANCE & ACCESS SOLUTIONS

FABRIC MAINTENANCE & ACCESS SOLUTIONS FABRIC MAINTENANCE & ACCESS SOLUTIONS Your expert provider of intelligent fabric maintenance plans specific to your assets life expectancy WWW.STORK.COM 1 Stork has a proven track record, with over 40

More information

Deliverables list for Projects in the fertilizer industry

Deliverables list for Projects in the fertilizer industry Deliverables list for s in the fertilizer industry Document Development Guidance Department: s / Engineering Revision 1 August 2018 Doc. No: AKH01-GUI-ENG-LST-001 Contents 1. Synopsis... 2 2. Why develop

More information

THE 3 KEYS TO A SAFE, RELIABLE FLEET.

THE 3 KEYS TO A SAFE, RELIABLE FLEET. THE 3 KEYS TO A SAFE, RELIABLE FLEET. As the nation s leading experts in fleet maintenance and repair programs, we propose adopting these 3 keys to build a safer, more reliable, and ultimately more profitable

More information

Bottom-line Benefits through innovation in Process Safety KPI Management

Bottom-line Benefits through innovation in Process Safety KPI Management Bottom-line Benefits through innovation in Process Safety KPI Management Martin Sedgwick, Head of Asset Management, ScottishPower, Cathcart Business Park, Spean Street, Glasgow, G44 4BE Email: martin.sedgwick@scottishpower.com

More information

Mace - Hertford Office. Programme Management

Mace - Hertford Office. Programme Management Mace - Hertford Office Programme Management 2004 1 BACKGROUND - INTRODUCTION Hertfordshire County Council Contract to deliver Capital Works Programme (for projects over 100,000) based on anticipated HCC

More information

Sustainable Local Content

Sustainable Local Content Britcham International Energy Seminar Local Content in the Oil and Gas industry Sustainable Local Content The UK Experience Sue Whitbread PWX Limited Topics UK s O&G Supply Chain Dealing with Uncertainties

More information

ASSet InteGrIty MAnAGeMent PArtnerInG to ACHIeVe your InSPeCtIOn, MAIntenAnCe, AnD SAFety OBJeCtIVeS

ASSet InteGrIty MAnAGeMent PArtnerInG to ACHIeVe your InSPeCtIOn, MAIntenAnCe, AnD SAFety OBJeCtIVeS asset integrity management PARTNERING TO ACHIEVE YOUR INSPECTION, MAINTENANCE, AND SAFETY OBJECTIVES WWW.SGS.COM/AIM ASSET INTEGRITY MANAGEMENT - AIM An asset has integrity when it is operated and maintained

More information

SECTION CONTRACTOR QUALITY CONTROL

SECTION CONTRACTOR QUALITY CONTROL SECTION 01451 CONTRACTOR QUALITY CONTROL PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within

More information

1 Introduction. 2 Abbreviations and Definitions

1 Introduction. 2 Abbreviations and Definitions 1 Introduction This Guideline is intended to give guidance and explanation on the related European legal provisions for the Certification of ECMs. It cannot replace additional self study of the applicable

More information

SUPPLY CHAIN NEEDS IN DECOMMISSIONING NOW AND IN THE FUTURE

SUPPLY CHAIN NEEDS IN DECOMMISSIONING NOW AND IN THE FUTURE 8 September 2016 SUPPLY CHAIN NEEDS IN DECOMMISSIONING NOW AND IN THE FUTURE Sam Long Business Acquisition Manager, Decommissioning, Petrofac 1 Agenda: 1. Introduction and HSE 2. Petrofac: an introduction

More information

122 Norwegian Oil and Gas Recommended Guidelines for the Management of Life Extension

122 Norwegian Oil and Gas Recommended Guidelines for the Management of Life Extension 122 Norwegian Oil and Gas Recommended Guidelines for the Management of Life Extension Original version No: 122 Established: 2008.06.06 Revision no: 2 Date revised: 2017.08.11 Page: 2 PREFACE These guidelines

More information

QHSE program.

QHSE program. 2016 QHSE program www.odfjelldrilling.com 3 Preface 4 policy 4 HSE policy 4 Environmental principles 5 Security Policy 6 Corporate 7 Mobile Offshore Drilling Units 8 Odfjell Well Services 9 Platform Drilling

More information

Storage Tank Explosion Frequencies on FPSOs

Storage Tank Explosion Frequencies on FPSOs Storage Tank Explosion Frequencies on FPSOs John Spouge, Principal Consultant, DNV GL, Vivo Building, 30 Stamford Street, London SE1 9LQ Introduction This paper presents a new estimate of the frequency

More information

Service Catalogue. Environmental Services provided by Environmental Solutions

Service Catalogue. Environmental Services provided by Environmental Solutions Service Catalogue Environmental Services provided by Environmental Solutions Content 1 Introduction... 1 2 Software Subscriptions... 1 3 Chemical Management... 2 4 Environmental Accounting and Reporting...

More information

Offshore Health and Safety The Practical and Legal Issues

Offshore Health and Safety The Practical and Legal Issues Offshore Health and Safety The Practical and Legal Issues 24 October 2013 25/10/2013 1 Our programme 17.00 17.15 Welcome and introduction Martin Peter Næsby, Oil Gas Denmark, and Bo Sandroos, Sandroos

More information

Company Profile. Atlas Offshore Co. No.8, Negar Ave. Vali e Asr St., Tehran, Iran

Company Profile. Atlas Offshore Co. No.8, Negar Ave. Vali e Asr St., Tehran, Iran Company Profile Atlas Offshore Co. No.8, Negar Ave. Vali e Asr St., Tehran, Iran +98 21 88774544 +98 21 88790572 Table of Contents About US........ 2 Our Capabilities.. 3 Work shop / Storage... 4 EPC Services

More information

Technical solutions for energy recovery

Technical solutions for energy recovery Technical solutions for energy recovery We are Uniper We are a leading international energy company with operations in more than 40 countries and around 13,000 employees. We combine a balanced portfolio

More information

QUALITY ASSURANCE / QUALITY CONTROL POLICY

QUALITY ASSURANCE / QUALITY CONTROL POLICY QUALITY ASSURANCE / QUALITY CONTROL POLICY TABLE OF CONTENTS SI. NO. DETAILS 1. Introduction 2. Quality Policy and Objectives 3. Organization 4. Contract Review 5. Document and Data Control 6. Purchasing

More information

HOW TO CONSTRUCT ASME BOILER BY THAI ASSOCIATION OF BOILOER AND PRESSURE VESSEL

HOW TO CONSTRUCT ASME BOILER BY THAI ASSOCIATION OF BOILOER AND PRESSURE VESSEL HOW TO CONSTRUCT ASME BOILER BY THAI ASSOCIATION OF BOILOER AND PRESSURE VESSEL WHAT IS ASME The American Society of Mechanical Engineers set up a committee in 1911 for the purpose of formulating standard

More information

Oil & Gas Processing and Midstream Services

Oil & Gas Processing and Midstream Services Oil & Gas Processing and Midstream Services Site Preparation Heavy Equipment Services Process/Pipe-rack Modules Pressure Vessels API Storage Tanks Instrument & Electrical Piping/Steel Fabrication Gas/Crude

More information

NQA-1 Graded Approach, 55-Gallon Drum Summary

NQA-1 Graded Approach, 55-Gallon Drum Summary 1, Organization 2, Quality Assurance program 3, Design 4, Procurement Document 5, Instructions, procedures, and Drawings 100 Basic 200 Structure and Responsibility 201 General 202 Delegation of Work 300

More information

Value Engineering Applications in Service Contracts

Value Engineering Applications in Service Contracts Value Engineering Applications in Service Contracts 12th Annual NDIA Systems Engineering Conference October 28, 2009 Dr. Jay Mandelbaum Institute for Defense Analyses 4850 Mark Center Drive Alexandria,

More information

COMPLY MANTAIN EXCEED

COMPLY MANTAIN EXCEED 1.0 EXECUTIVE SUMMARY Global Engineering & Construction Pty Ltd is a leading provider of integrated design, management and construction solutions to clients across the Oil & Gas industry sector. We are

More information

Schedule D3. Data Item Descriptions. Quality Assurance

Schedule D3. Data Item Descriptions. Quality Assurance DID, Front Cover QA Document Identifier Number: [* insert VSY Document #] Rev: 1 Title: DID Front Cover Quality Assurance Ship applicability: All Document Owner: [* insert name] Document Approver: [* insert

More information

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) The LNG Terminal

More information

Going the extra mile in Safety and Environmental Performance. Presented by : Capt. D. Kastanias,, Senior HHSQE & Training Officer

Going the extra mile in Safety and Environmental Performance. Presented by : Capt. D. Kastanias,, Senior HHSQE & Training Officer Going the extra mile in Safety and Environmental Performance Presented by : Capt. D. Kastanias,, Senior HHSQE & Training Officer Company s s Profile KYLA is a dynamic d Ship Management Company established

More information

Corporate Procurement. Sustainable Timber Procurement Policy

Corporate Procurement. Sustainable Timber Procurement Policy Corporate Procurement Sustainable Timber Procurement Policy Release: Final Draft 1 Document Control Date Version Description Author Position 12.12.08 0.01 First Draft Peter Faill (PAF) Head of Strategic

More information

SOLUTIONS.

SOLUTIONS. DELIVERING ROBUST SOLUTIONS www.ace-winches.co.uk www.ace-winches.no ACE Manufacturing ACE MANUFACTURING is a turnkey solution provider covering the design, manufacture, testing and installation of high

More information

OSIsoft PI System: A Vessel for Change in Synergy

OSIsoft PI System: A Vessel for Change in Synergy OSIsoft PI System: A Vessel for Change in Synergy Presented by Francois Mevis, Synergy OSIsoft PI System A Vessel for Change in Synergy Thursday, 18 September 2014 Contents Context Company Plant Operational

More information

Extending Turbine Lift Statutory Inspection Intervals

Extending Turbine Lift Statutory Inspection Intervals Extending Turbine Lift Statutory Inspection Intervals Siemens Gamesa and the Written Scheme of Examination Sally Shenton and Conaill Soraghan January 2018 CS-0018 Summary Using a written scheme of examination

More information

Long-Term Nucle ar O p erations

Long-Term Nucle ar O p erations Long-Term Nucle ar O p erations E x e c u t i v e S u m m a r y Long-Term Nuclear Operations What is a feasible life span for a nuclear plant? I would say 80 years, without question. And I think if we

More information

Assessing Capacity and Progress Towards Timber Legality Assurance: A Tool to Support Country-to- Country Learning

Assessing Capacity and Progress Towards Timber Legality Assurance: A Tool to Support Country-to- Country Learning /SOM/EGILAT/9 Agenda: II B Assessing Capacity and Progress Towards Timber Legality Assurance: A Tool to Support Country-to- Country Learning Purpose: Information Submitted by: The Nature Conservancy th

More information

Wind Energy. Strategies - Main Topics - Current Activities. https://www.vgb.org/en/_wind/

Wind Energy. Strategies - Main Topics - Current Activities. https://www.vgb.org/en/_wind/ Wind Energy Strategies - Main Topics - Current Activities https://www.vgb.org/en/_wind/ VGB PowerTech Wind Reduction of installation and operational costs and increase of operational safety of wind power

More information

NG BAILEY CREATING EXCEPTIONAL ENVIRONMENTS FACILITIES SERVICES

NG BAILEY CREATING EXCEPTIONAL ENVIRONMENTS FACILITIES SERVICES NG BAILEY CREATING EXCEPTIONAL ENVIRONMENTS 02 03 CONTENTS CREATING EXCEPTIONAL ENVIRONMENTS - INTRODUCTION 03 CREATING EXCEPTIONAL ENVIRONMENTS - INTRODUCTION 04 BESPOKE SERVICES TAILORED TO YOU 06 WORKING

More information

COMPANY CIVIL CONSTRUCTION PROFILE

COMPANY CIVIL CONSTRUCTION PROFILE MQS LTD COMPANY CIVIL CONSTRUCTION PROFILE 76, Babek Avenue Baku AZ 00 30, Phone: (+ 99412) 570 14 04, 570 06 96, 570 09 07, 570 07 37 www.mqs.az Page 1 of 23 Contents 1 Contact Details 2 About the Company

More information

Integrity Management Software Solution Managing your daily activities.

Integrity Management Software Solution Managing your daily activities. Integrity Management Software Solution Managing your daily activities. S. Ruik Beyhaut Product Management ROSEN Integrity Solutions GmbH Lingen, Germany Contents Why does the industry need Asset Integrity

More information

ABB LIMITED. Events programme 2019 Training courses, conferences, webinars, forums and workshops

ABB LIMITED. Events programme 2019 Training courses, conferences, webinars, forums and workshops ABB LIMITED Events programme 2019 Training courses, conferences, webinars, forums and workshops Events programme 2019 January 9 th SafetyInsight - minimising the cost impact of maintaining safe operations

More information

Share Fair 4 th November Graham Clarke and Allan Baird

Share Fair 4 th November Graham Clarke and Allan Baird Share Fair 4 th November 2015 Graham Clarke and Allan Baird Safety Floor Plan WE ARE HERE 2 Agenda Amec Foster Wheeler at a Glance Value and Vision How to do Business with us A Changing Market The Supply

More information

Asset Integrity Management a risk based approach Turning Policy into operational practice

Asset Integrity Management a risk based approach Turning Policy into operational practice Asset Integrity Management a risk based approach Turning Policy into operational practice 5 th February 2014 Pipeline Integrity Management Forum 2014 Roy van Elteren Head of Section Gas Infrastructure

More information

Deep Panuke. 01U 02 May 2013 Issued for Use John Nowlan Hugh Farrell R. MacQueen

Deep Panuke. 01U 02 May 2013 Issued for Use John Nowlan Hugh Farrell R. MacQueen 01U 02 May 2013 Issued for Use John Nowlan Hugh Farrell R. MacQueen Rev Date Reason for Issue Prepared Checked Approved Title OP16 Prequalification Questionnaire DM EN PQ OP 0003 01U Project Originator

More information

Report of the Board for 2005

Report of the Board for 2005 Report of the Board for 2005 Financial results For the fisheries and aquaculture trades, 2005 was a good year with profitability in most sectors. Trade political difficulties in existing markets have been

More information

Design Management Plan

Design Management Plan Lessons learned from one of New Zealand s most challenging civil engineering projects: rebuilding the earthquake damaged pipes, roads, bridges and retaining walls in the city of Christchurch 2011-2016.

More information

Conformity Assessment. Section III Nuclear Requirements Buenos Aires, Argentina May 2017

Conformity Assessment. Section III Nuclear Requirements Buenos Aires, Argentina May 2017 Conformity Assessment Section III Nuclear Requirements Buenos Aires, Argentina May 2017 ASME Section III Requirements Workshop Scope ASME Certificates of Authorization Quality Assurance Requirements Discussion

More information

POSITION DESCRIPTION. Maintenance Planning Officer Unloading. Docs# Maintenance Planning Officer (Unloading)

POSITION DESCRIPTION. Maintenance Planning Officer Unloading. Docs# Maintenance Planning Officer (Unloading) POSITION DESCRIPTION Planning Officer Docs#1312730 Planning Officer () Page 1 of 5 POSITION DESCRIPTION Planning Officer - Position Number 1087 Position Status Permanent Position Supervisor Superintendent

More information

Health and Safety Management Standards

Health and Safety Management Standards Management Standards Curtin University Sept 2011 PAGE LEFT INTENTIONALLY BLANK Management Standards Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Documents... 4 2. Management System Model...

More information