Validation Report. Validation of the Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil. Report No , Revision 01 B.

Size: px
Start display at page:

Download "Validation Report. Validation of the Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil. Report No , Revision 01 B."

Transcription

1 Validation Report USNA ALTO ALEGRE S/A - AÇÚCAR E ÁLCOOL Validation of the Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Report No , Revision 01 B 2005, December 22 TÜV ndustrie Service GmbH TÜV SÜD Group Carbon Management Service Westendstr Munich - GERMANY

2 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 1 of 23 Report No. Date of first issue Revision No. Date of this revision Certificate No th November B 22 nd December Subject: Executing Operational Unit: Client: Contract approved by: Report Title: Number of pages Validation of a CDM Project TÜV ndustrie Service GmbH TÜV SÜD Group Carbon Management Service Westendstr Munich Federal Republic of Germany Usina Alto Alegre S/A Açúcar e Álcool Av. Cel. José Soares Marcondes, 3537 Presidente Prudente São Paulo Brazil Werner Betzenbichler Validation of the Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil 23 (excluding annexes and front page) Summary: The Certification Body Climate and Energy has been ordered by Usina Alto Alegre S/A (São Paulo) to perform a validation of the above mentioned project. Using a risk based approach the validation of this project has been performed by document reviews and on-site inspection, audits at the locations of the project and interviews at the offices of the project developer and the project owner. n summary, it is TÜV SÜD s opinion that the Alto Alegre Bagasse Cogeneration Project (AABCP), as described in the revised project design document of November 2005, meets all relevant UNFCCC requirements for the CDM, set by the Kyoto Protocol, the Marrakech Accords and relevant guidance by the CDM Executive Board and that the project furthermore meets all relevant host country criteria and correctly applies the baseline and monitoring methodology AM0015 Hence TÜV SÜD will recommend the AABCP for registration as CDM project activity by the CDM Executive Board. Prior to the submission of this validation report to the CDM Executive Board, TÜV SÜD will have to receive the written approval of the DNA of involved parties, including confirmation by the DNA of Brazil that the project assists in achieving sustainable development. Additionally the assessment team reviewed the estimation of the projected emission reductions. We can confirm that the indicated amount of emission reductions of tonnes CO 2e over a crediting period of seven years, resulting in a calculated annual average of tonnes CO 2e, represent a reasonable estimation using the assumptions given by the project documents. Work carried out by: Thomas Kleiser (Project manager, GHG lead auditor) Michael Rumberg (GHG lead auditor) Wilson Tomao (ghg auditor, local expert) Javier Castro (technical expert, GHG trainee) nternal Quality Control by: Werner Betzenbichler

3 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 2 of 23 Abbreviations AE CAR CDM CER CR DOE EA / EA ER GHG KP MP PDD TÜV SÜD UNFCCC VVM Applicant Operational Entity Corrective Action Request Clean Development Mechanism Certified Emission Reduction Clarification Request Designated Operational Entity Environmental mpact Assessment / Environmental Assessment Emission reduction Greenhouse gas(es) Kyoto Protocol Monitoring Plan Project Design Document TÜV ndustrie Service GmbH TÜV SÜD Group United Nations Framework Convention on Climate Change Validation and Verification Manual

4 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 3 of 23 Table of Contents Page 1 NTRODUCTON Objective Scope GHG Project Description 7 2 METHODOLOGY Review of Documents Follow-up nterviews Resolution of Clarification and Corrective Action Requests 11 3 VALDATON FNDNGS Project Design Discussion Findings usion Baseline and Additionality Discussion Findings usion Monitoring Plan Discussion Findings usion Calculation of GHG Emissions Discussion Findings usion Environmental mpacts Discussion Findings usion Comments by Local Stakeholders Discussion Findings usion 21 4 COMMENTS BY PARTES, STAKEHOLDERS AND NGOS FNAL VALDATON OPNON...23 Annex 1: Validation Checklist Annex 2: nformation Reference List

5 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 4 of 23 1 NTRODUCTON 1.1 Objective Usina Alto Alegre S/A Açúcar e Álcool has commissioned TÜV ndustrie Service GmbH TÜV SÜD Group (TÜV SÜD) to validate the Alto Alegre Bagasse Cogeneration Project (AABCP). The validation serves as design verification and is a requirement of all CDM projects. The purpose of a validation is to have an independent third party assess the project design. n particular, the project's baseline, the monitoring plan (MP), and the project s compliance with relevant UNFCCC and host country criteria are validated in order to confirm that the project design as documented is sound and reasonable and meets the stated requirements and identified criteria. Validation is a requirement for all CDM projects and is seen as necessary to provide assurance to stakeholders of the quality of the project and its intended generation of certified emission reductions (CERs). UNFCCC criteria refer to the Kyoto Protocol criteria and the CDM rules and modalities as agreed in the Bonn Agreement and the Marrakech Accords. 1.2 Scope The validation scope is defined as an independent and objective review of the project design document, the project s baseline study and monitoring plan and other relevant documents. The information in these documents is reviewed against Kyoto Protocol requirements, UNFCCC rules and associated interpretations. TÜV SÜD has, based on the recommendations in the Validation and Verification Manual employed a risk-based approach in the validation, focusing on the identification of significant risks for project implementation and the generation of CERs. The validation is not meant to provide any consulting towards the client. However, stated requests for clarifications and/or corrective actions may provide input for improvement of the project design. The audit team has been provided with a draft PDD in August Based on this documentation a document review and a fact finding mission in form of an on site audit has taken place. The PDD submitted in August 2005 was made public in the global stakeholder process. Afterwards the client decided to revise the PDD according to the CAR and CRs indicated in the audit process. The final revision, dated November 10 th, 2005 serves as basis of the final assessment presented by this report. Studying the existing documentation belonging to this project, it was obvious that the competence and capability of the validation team has to cover at least the following aspects: Knowledge of Kyoto Protocol and the Marrakech Accords Environmental and Social mpact Assessment Skills in environmental auditing (SO 14000, EMAS) Quality assurance Technical aspects of cogeneration and the use of biomass Monitoring concepts

6 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 5 of 23 Political, economical and technical random conditions in host country According to these requirements TÜV SÜD has composed a project team in accordance with the appointment rules of the TÜV certification body climate and energy : The validation team was consisting of the following two experts: Thomas Kleiser Michael Rumberg Wilson Tomao Javier Castro (Project manager, GHG lead auditor) (GHG lead auditor) (ghg auditor, local expert) (technical expert, GHG trainee) Thomas Kleiser is a lead auditor for CDM and J projects at TÜV ndustrie Service GmbH TÜV SÜD Group. n his position he is responsible for the implementation of verification and certifications processes for GHG mitigation projects. He has received extensive training in the CDM and J validation processes and participated already in more than 20 CDM and J project assessments. Michael Rumberg is head of the division CDM/J at TÜV ndustrie Service GmbH TÜV SÜD Group. n his position he is responsible for the implementation of validation, verification and certifications processes for greenhouse gas mitigation projects in the context of the Kyoto Protocol. Before entering this company he worked as an expert for renewable energy, forestry, environmental issues, climate change and sustainability within the environmental branch of an insurance company. His competences are covering risk assessments, quality and environmental auditing (EMS auditor), baseline setting, monitoring and verification due to the requirements of the Kyoto Protocol. Mr. Wilson Tomao is lead auditor and former manager of TÜV Bayern Brazil. He is familiar with local laws and regulations and the assessment of technical installations. He assisted Mr. Betzenbichler during the on-site inspections and by evaluating documents submitting in Portuguese language. Meanwhile he can refer to the participation in the validation process of more than 15 CDM-projects in Brazil. Javier Castro is an energy expert for CDM and J projects at TÜV ndustrie Service GmbH TÜV SÜD Group. He has an academic background in chemical engineering and energy systems. n his position he participates as an expert in energy related projects during the validation, verification and certifications processes for GHG mitigation projects. He has received extensive training in the CDM and J validation processes. The audit team covers the above mentioned requirements as follows: Knowledge of Kyoto Protocol and the Marrakech Accords (Rumberg/Kleiser) Environmental and Social mpact Assessment (All) Skills in environmental auditing (All) Quality assurance (All) Technical aspects (All)

7 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 6 of 23 Monitoring concepts (Rumber/Kleiser) Political, economical and technical random conditions in host country (Tomao) n order to have an internal quality control of the project, a team of the following persons has been composed by the certification body climate and energy : Werner Betzenbichler Head of the Certification Body Climate and Energy

8 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 7 of GHG Project Description This project activity consists of increasing the efficiency in the bagasse (a renewable fuel source, residue from sugarcane processing) cogeneration facility at Usina Alto Alegre S/A Açúcar e Álcool (Alto Alegre), a Brazilian sugar mill. With the implementation of this project, the mill is able to sell electricity to the national grid, avoiding the dispatch of same amount of energy produced by fossil-fuelled thermal plants to that grid. By that, the initiative avoids CO 2 emissions, also contributing to the regional and national sustainable development. By investing to increase steam in efficiency in the sugar and alcohol production and increase in the efficiency of burning the bagasse (more efficient boilers), Alto Alegre generates surplus steam and uses it exclusively for electricity production (through turbo-generators). Using steam-rankine cycle as the basic technology of its cogeneration system, for achieving an increasing amount of surplus electricity to be generated, Alto Alegre began its efforts in two phases, which are: Phase 1 (2004): The expansion plan started with the operation of a new 20 MW backpressure turbo-generator and one 65 bar boiler. Hence, the total installed capacity of the mill got nearly 25.2 MW (20 MW active turbo-generators, one 4.0 MW and one 1.2 MW turbo-generators and one 23 bar boiler were put in stand by). Phase 2 (2007): Alto Alegre has plans to proceed with the expansion of its cogeneration facilities in 2007, installing another 12 MW backpressure turbo-generator and one 63 bar boiler (another 21 bar boiler was put in stand by). With that, Alto Alegre will have nearly 15 MW to exploit for commercialisation (the capacity available for internal consumption is predicted to be 10 MW). This means increasing renewable energy share in the Brazilian matrix. Project participants are: Usina Alto Alegre S/A Açúcar e Álcool, a Brazilian private company Econergy Brasil Ltda., a Brazilian private company 2 METHODOLOGY The project assessment aims at being a risk based approach and is based on the methodology developed in the Validation and Verification Manual (for further information see an initiative of all Applicant Entities, which aims to harmonize the approach and quality of all such assessments. n order to ensure transparency, a validation protocol was customised for the project, according to the Validation and Verification Manual. The protocol shows, in a transparent manner, criteria (requirements), means of verification and the results from validating the identified criteria. The validation protocol serves the following purposes: t organises, details and clarifies the requirements a CDM project is expected to meet; t ensures a transparent validation process where the validator will document how a particular requirement has been validated and the result of the validation.

9 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 8 of 23 The validation protocol consists of three tables. The different columns in these tables are described in Figure 1. The completed validation protocol is enclosed in Annex 1 to this report.

10 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 9 of 23 The validation protocol consists of three tables. The different columns in these tables are described in Figure 1. The completed validation protocol is enclosed in Annex 1 to this report. Requirement Reference usion Cross reference The requirements the project must meet. Gives reference to the legislation or agreement where the requirement is found. This is either acceptable based on evidence provided (OK), or a Corrective Action Request (CAR) of risk or non-compliance with stated requirements. The corrective action requests are numbered and presented to the client in the Validation report. Used to refer to the relevant checklist questions in Table 2 to show how the specific requirement is validated. This is to ensure a transparent Validation process. Validation Protocol Table 2: Requirement checklist Checklist Question Reference Means of verification (MoV) The various requirements in Table 1 are linked to checklist questions the project should meet. The checklist is organised in seven different sections. Each section is then further subdivided. The lowest level constitutes a checklist question. Gives reference to documents where the answer to the checklist question or item is found. Explains how conformance with the checklist question is investigated. Examples of means of verification are document review (DR) or interview (). N/A means not applicable. Comment Draft and/or Final usion The section is used to elaborate and discuss the checklist question and/or the conformance to the question. t is further used to explain the conclusions reached. This is either acceptable based on evidence provided (OK), or a Corrective Action Request (CAR) due to noncompliance with the checklist question (See below). Clarification is used when the validation team has identified a need for further clarification. Validation Protocol Table 3: Resolution of Corrective Action and Clarification Requests Draft report clarifications and corrective action requests Ref. to checklist question in table 2 Summary of project owner response Validation conclusion f the conclusions from the draft Validation are either a Corrective Action Request or a Clarification Request, these should be listed in this section. Reference to the checklist question number in Table 2 where the Corrective Action Request or Clarification Request is explained. The responses given by the Client or other project participants during the communications with the validation team should be summarised in this section. This section should summarise the validation team s responses and final conclusions. The conclusions should also be included in Table 2, under Final usion. Figure 1 Validation Protocol Tables

11 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 10 of Review of Documents The project design document submitted by the client and additional background documents related to the project design and baseline were reviewed. A complete list of all documents reviewed is attached as annex 2 to this report. 2.2 Follow-up nterviews On October 13 th, 2005 TÜV SÜD performed interviews with project stakeholders to confirm selected information and to resolve issues identified in the document review. Representatives of: Usina Alto Alegre S/A, Brazil Econergy Brasi Ltda. Sao Paulo, State of Sao Paulo, Brazil have been interviewed. The main topics of the interviews are summarised in Table 1. Table 1 nterview topics nterviewed organisation nterview topics Usina Alto Alegre S/A Project design Technical equipment Sustainable development issues Additionality Crediting period Monitoring plan Management system Environmental impacts Stakeholder process Approval by the host country Econergy Brasil Ltda. Project design Technical equipment Sustainable development issues Baseline determination Additionality Crediting period Monitoring plan Environmental impacts Stakeholder process

12 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 11 of Resolution of Clarification and Corrective Action Requests The objective of this phase of the validation was to resolve the requests for corrective actions and clarification and any other outstanding issues which needed to be clarified for TÜV SÜD`s positive conclusion on the project design. The Corrective Action Requests and Clarification Requests raised by TÜV SÜD were resolved during communications between the Client and TÜV SÜD. To guarantee the transparency of the validation process, the concerns raised and responses that will be given are summarised in chapter 3 below and documented in more detail in the validation protocol in Annex 1.

13 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 12 of 23 3 VALDATON FNDNGS n the following sections the findings of the validation are stated. The validation findings for each validation subject are presented as follows: 1) The findings from the desk review of the project design documents and the findings from interviews during the follow up visit are summarised. A more detailed record of these findings can be found in the Validation Protocol in Annex 1. 2) Where TÜV SÜD had identified issues that needed clarification or that represented a risk to the fulfilment of the project objectives, a Clarification or Corrective Action Request, respectively, have been issued. The Clarification and Corrective Action Requests are stated, where applicable, in the following sections and are further documented in the Validation Protocol in Annex 1. The validation of the project resulted in 4 Corrective Action Requests and 17 Clarification Requests. 3) Where Clarification or Corrective Action Requests have been issued, the exchanges between the Client and TÜV SÜD to resolve these Clarification or Corrective Action Requests is summarised. 4) The draft final conclusions for validation subject are presented. The validation findings relate to the project design as documented and described in the final project design documentation. 3.1 Project Design Discussion As mentioned above the purpose of the project is to avoid CO2 emissions from fossil power plants by increasing the efficiency of the existing renewable energy generation. The surplus of electricity being generated by an installed CHP plant is fed into the grid. The whole energy generation is based on renewable biomass, here bagasse from the sugar cane process. Hence, the project contributes to the sustainable development in Brazil, reducing GHG emissions, substituting electricity generated by grid plants through electricity generated from biomass (renewable energy). The design engineering does reflect current good practices. The design has been professionally developed. Subsequently the project got approval by the relevant authorities. The project itself does apply state of the art equipment. Regarding the employed technology, there is no requirement to change the existing technology as a result of running out of life-time of the existing technical equipment. There are no significant indications that the technology used to implement the project could be substituted during the envisaged operational lifetime of the project activity (25 years) and in particular in the first crediting period. The first crediting period starts 04/05/2004, the length of the first crediting period is seven years with the intention for renewal. Nevertheless the starting date as well as the operational lifetime are clearly defined and also handled in a reasonable manner, but have to be ensured more detailed by additional justification. Furthermore the experience of the company with cogeneration already in the past has to be demonstrated. The positive environmental effects of the project, the social benefits and the

14 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 13 of 23 contribution to sustainable development in Brazil have to be illustrated more detailed. Furthermore the project boundaries have to be explained / viewed more clearly. The project is in line with relevant legislation of the Brazil. According to the publicly available document renewable energy projects belong to the favoured options under the CDM. Hence, the project can currently be seen as being in line with the host country specific requirements for CDM. The funding for the project does not lead to a diversion of official development assistance as according to the information obtained by the audit team ODA does not contribute to the financing of the project. Moreover its is assured that as the start of the crediting period is before the registration of the project that the project activities starting date falls in the period between 1 January 2000 and the registration of the first clean development mechanism project. The start of project activities has been before the registration date of the first clean development mechanism project. The project hasn t received a written Letter of Approval (LoA) currently. One of the requirements to receive such a LoA by the Brazilian DNA is a positive validation opinion in the final validation report. The signed written Letter of Approval has to be submitted to the validator before starting the registration process for this project at the UNFCCC-EB Findings Outstanding issue: The project has not obtained a Letter of Approval/ Letter of Authorization from the nvestor Contry and Brazilian government so far. No documentation has been submitted to the validation team. The issuance of these documents will also demonstrate whether the project is in line with sustainable development policies of the host country. Response: The Letter of Approval (LoA) can be issued by the Brazilian DNA only after the presentation of the validation report issued by the DOE (TÜV SÜD). Clarification Request No. 1: A drawing illustrating the project boundaries should be submitted to the validator. Response: The drawing illustrating the project boundaries has been sent to the validator by at November 11 th, Clarification Request No. 2: More detailed information concerning the dates of initial operation of the new equipment (for both phases) and the current status of the old equipment (use as stand-by equipment or demolished) should be added to the PDD and integrated (status demolished or stand-by) in table 1). Also project-specific information concerning the old equipment, its status and age/life-time should be added.

15 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 14 of 23 Response: The requested information was submitted to the validator. For further information see Annex 1 of this validation report (validation Protocol). Clarification Request No. 5: t should be explained whether Alto Alegre sugar mill already used cogeneration for its own needs without governmental incentives before starting the project. Response: The use of electricity generated by cogeneration facility for internal consumption of the own mill is a business-as-usual practice. Thus Alto Alegre already used cogeneration for his own needs before starting the process. Corrective Action Request No. 3: t has to be demonstrated clearly, re-traceably, transparently and secured in written form that the sugar mill owner has been informed about the Kyoto mechanisms and about the possible revenues from selling CERs of a CDM-project before he started the project and that he first after this information decided to go for the project taking into account the financial possibilities of CDM (see step 0 and common requirements for the qualification of a project as CDM-project as formulated in the Kyoto protocol and specified in the Marrakech Accords). Response: The requested information was submitted to the validator. For further information see Annex 1 (validation protocol). Clarification Request No. 6: The decision to choose May 4 th, 2004 as starting date for the project activity should be explained (how is this date justified). Furthermore the estimation of a lifetime of 25 years for the equipment used in this project should be supported by a plausible argumentation or written documents. s there a guarantee by the supplier of the new equipment or are there experiences from comparable projects? Response: The requested information was submitted to the validator. For further information see Annex 1. Clarification Request No. 10: The positive effects of the project have to be demonstrated and elaborated a little bit more detailed in the PDD. New job opportunities as result of the implementation of the project have to be quantified. Response: All the environmental and social benefits of the project are demonstrated in section A.2 of the PDD.

16 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 15 of 23 n addition, 15 direct and 45 indirect job opportunities were created for implementation and operation of Alto Alegre s cogeneration system usion The corrective action and clarification requests have been resolved. Prior to the submission of this validation report to the CDM Executive Board, TÜV SÜD will have to receive the written approval of the DNA of involved parties, including confirmation by the DNA of Brazil that the project assists in achieving sustainable development. 3.2 Baseline and Additionality Discussion By dispatching renewable electricity to a grid, electricity that would otherwise be produced using fossil fuel is displaced. This electricity displacement will occur in the system s margin, i.e. this CDM project will displace electricity that is produced by marginal sources - fossil fueled thermal plants -, which have higher electricity dispatching costs and are solicited only over the hours that base load sources (low-cost or must-run sources) cannot supply the grid. According to the applied and approved methodology AM0015 the project activity follows the steps provided by the methodology taking into account the (b) Simple Adjusted OM calculation for the STEP 1, since there would be no available data for applying to the preferred option (c) Dispatch Data Analysis OM. For STEP 2, the option 1 was chosen. The physical boundary is the Brazilian grid south-southeast-midwest, controlled by ONS. Using the tool for the demonstration and assessment of additionality, issued by UNFCCC October 22 nd, 2004, it can be confirmed that the project is additional. The economic unattractiveness of enhancing the already existing cogeneration process is indicating the additionality of this project, because the improved operation of the energy processes is not considered as necessary for the operation of Alto Alegre. This should be elaborated more detailed. The project baseline is clearly, retractably and plausibly displayed in the project BLS. Possible project alternatives are discussed. The discussion of leakage effects has to be elaborated more argumentative Findings Corrective Action Request No. 4: The financial and technical advantages and the feasibility of following the path business-asusual have to be elaborated more detailed. n detail: - the financial framework of the project has to be demonstrated via financial figures such as RR, payback period etc.. t should be made clear that continuing business-as-usual would have been the more attractive solution. f available the main content of the investment analysis for this project should be included in the PDD.

17 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 16 of 23 f possible, a feasibility study should be added to the PDD, furthermore it should be demonstrated that the end of the lifetime. Response: Requested information was submitted to the validator. For further information see Annex 1. Clarification Request No. 8: t has been demonstrated in a plausible manner (argumentation) that leakage emissions are not expected to occur. Response: The emission due to leakage happens when there s a decrease on bagasse sold from one year to another. However, this project activity did not sell bagasse prior to its implementation usion The corrective action and clarification requests have been fully resolved and the project does hence comply with the requirements. 3.3 Monitoring Plan Discussion The monitoring plan is appropriate, traceable and transparent. The generated electricity that is fed into the grid in order to estimate emissions within the project boundary can be measured simply and with an appropriate accuracy. According to the interview with ONS needed data for calculating the combined margin will be made available to the project developer. As the project is already in operation it can be confirmed that monthly and annual reporting of the collected data at the several monitoring points is working, the responsibilities for registration, monitoring, measurement and reporting are established. The already existing monitoring system has to be demonstrated and explained more clearly in the PDD and attached documentation. Furthermore the existing QMS has to be described Uncertainty and possibility of monitoring errors are addressed and discussed plausible in the project documents Findings Clarification Request No. 7: Monitoring procedures with responsibilities, work instructions and information concerning dealing with emergency cases etc. have to be elaborated and examples for work instructions have to be submitted to the validator. As the project is already running since 2004 an example for the annual CDM-specific reporting in this project has to be submitted to the Response: Request information was submitted to the validator. For further information see Annex 1.

18 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 17 of 23 Clarification Request No. 11: The quality management system (QMS) currently implemented in the sugar mill is not described clearly enough in the PDD. Additional information has to be submitted to the validator. Response: The requested information was submitted to the validator. For further information see Annex 1. Clarification Request No. 12: The issue procedures and responsibilities for maintenance of monitoring equipment and installations should be addressed and elaborated more detailed. Response: The requested information was submitted to the validator. For further information see Annex usion The clarification requests have been fully resolved and the project does hence comply with the requirements. 3.4 Calculation of GHG Emissions Discussion The calculation follows the approach of the approved methodology AM0015, using the simple adjusted operational margin in order to calculate the combined margin as a fifty-fifty mix of operational and build margin. The amount of prospective generated electricity is multiplied with this combined margin in order to calculate the emission reduction in the grid. But more current data have to be used for the calculations. Furthermore there are some open issues concerning the calculation of emission reductions especially in the second phase of the project. The calculations have to be worked out and explained more clearly. The data sources are reliable and the approach of calculating the operational and the build margin is traceable and correct against the background of available data and chosen project boundary Findings Corrective Action Request No. 1: More actual data should be used. The operating and built margin are calculated on basis of data from the years As there are already data available for the year 2004 the data (lambda, operating and built margin) used in the PDD have to be updated.

19 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 18 of 23 Response: The PDD was updated with new data from as required. All linked information was also modified. Corrective Action Request No. 2a: The planned sale of electricity maybe there is a contact with the responsible local/regional grid operator for the years (2011) should be stated in the PDD to have a source for the calculations in chapter A and in table E.6.). Furthermore the monthly amount of electricity sold to the grid from starting the project (May 2004) until September or October 2005 has to be submitted to the validator. Without these background data for the calculations it cannot be confirmed that the calculations are conservative. Furthermore the data given in table E.6 would be much more transparent if, in separate figures, the baseline emissions (and assumptions for calculating these baseline emissions), the project emissions ( 0 ) and the emission reductions would be specified. Nowhere in the PDD a list with the baseline emissions (and the basis for the calculations (supplied electricity to the grid on monthly basis) of baseline emissions in the years ) is existing. Thus it is impossible to confirm that the calculations are conservative. All these background information has to be added to the PDD. Response: Request information was submitted to the validator. For further information see Annex 1. Corrective Action Request No. 2b: The data on page 8 and 26 for example the emission reductions in the year 2009 ( and ) are not identical? What is the reason for this? As long as no further data are available (operating hours, efficiency factor, planned amount of electricity to sell to the grid on monthly basis etc.) are available we cannot confirm the correctness of calculations! Response: The emissions reductions data was updated. The electricity produced in the period is an estimative, elaborated by the cogeneration department of the mill, admitting that bagasse is produced and burned during the sugarcane harvest season (about 7 months in a year) and that Electricity Sold = Total nstalled Capacity Stand-by Equipments nternal Consumption. A new table with additional information was added on Annex 3, as required (Figure 6). Clarification Request No. 3: t has to be checked whether the crediting period (first 7 years) is really envisaged to be closed at the end of 2010 (see chapter A.4.4.1, there seems to be a mistake) or whether the finish date should not be May 3 rd, 2011, which would be possible (and correct). Response: An additional note was inserted below the Tables of PDD s sections A and E.6.

20 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 19 of 23 Clarification Request No. 4: The actual data until 2004, which are already available, have to be used to determine lambda and the operating / built margin. Response: The PDD was updated with new data from as required. All linked information was also modified. Clarification Request No. 9: According to the 20th EB meeting, the board decided that emission factors have to be adjusted ex-post each year. That is not demonstrated clearly and considered in the Monitoring Plan and tables in chapter D of the PDD. This has to be adjusted. Response: The PDD will be updated with a more recent data for EF calculation, considering the period between 2002 and 2004, and all linked information also. Clarification Request No. 13: Brief information concerning uncertainties should be added to the PDD. Response: The meters have an accuracy higher than 99,8% and are calibrated every two years according to the Brazilian electric sector Norm: EC 60687(06/1992) - classe 0, usion The corrective action and clarification requests have been fully resolved and the project does hence comply with the requirements.

21 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 20 of Environmental mpacts Discussion An Environmental mpact Assessment (EA) has to be submitted to the responsible national authorities. The environmental impacts have been analyzed by the State Secretary of Environment (Secretaria de Estado do Meio Ambiente) through CETESB (Companhia de Tecnologia de Saneamento Ambiental) state of São Paulo environmental agency. The assessment demonstrated the compliance of the project with all referred environmental legislation in Brazil. The relevant background documentation has to be submitted to the validator Findings Clarification Request No. 14: Date (period) for the environmental impact assessment (carried out by CETESB) and a short summary have to be included in the PDD. A copy of the existing CETESB report has to be submitted to the validator. Response: Regarding the cogeneration system expansion of Alto Alegre, the mill has received their Operation License, issued by CETESB on June 25 th, Alto Alegre is in compliance with all the requests regarding its licensing procedures and this information is already inserted into the section F.1 of the PDD usion The clarification request has been fully resolved and the project does hence comply with the requirements.

22 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 21 of Comments by Local Stakeholders Discussion A local stakeholder process was performed in order to inform about project activity. According to the requirements of the Brazilian DNA the stakeholders were invited to comment the project. The invitation procedure has to be elaborated more detailed Findings Clarification Request No. 15: More detailed information concerning the invitation letter for the local Stakeholder Process has to be added to the PDD. Response: This information is already available in the section G.1 of the PDD. The procedures were adopted as suggested and required by the Brazilian DNA. Clarification Request No. 16: t has to be explained why in this case no information via the mass media newspaper was sent out. Response: The procedures were adopted as suggested and required by the Brazilian DNA. Clarification Request No.17: The information that an official Local Stakeholder Process normally is not required for such projects (according to the information during the on-site audit) has to be explained. Response: The procedures were adopted as suggested and required by the Brazilian DNA usion The clarification requests have been fully resolved and the project does hence comply with the requirements.

23 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 22 of 23 4 COMMENTS BY PARTES, STAKEHOLDERS AND NGOS TÜV SÜD published the project documents on UNFCCC website and on its own website ( D=286&mode=1). The PDD was open for commenting from August 12 th, 2005 to September 10 th, No comments have been received.

24 VALDATON OF THE CDM PROJECT Alto Alegre Bagasse Cogeneration Project (AABCP), Brazil Page 23 of 23 5 FNAL VALDATON OPNON The Certification Body Climate and Energy has been ordered by Usina Alto Alegre S/A - Açúcar e Álcool to perform a validation of the above mentioned project. The validation was performed on the basis of UNFCCC criteria and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting. UNFCCC criteria refer to Article 12 of the Kyoto Protocol, the CDM modalities and procedures and subsequent decisions by the CDM Executive Board. n summary, it is TÜV SÜD s opinion that the Alto Alegre Bagasse Cogeneration Project (AABCP), as described in the revised project design document of November 2005, meets all relevant UNFCCC requirements for the CDM, set by the Kyoto Protocol, the Marrakech Accords and relevant guidance by the CDM Executive Board and that the project furthermore meets all relevant host country criteria and correctly applies the baseline and monitoring methodology AM0015 Hence, TÜV SÜD will recommend the AABCP for registration as CDM project activity by the CDM Executive Board. Prior to the submission of this validation report to the CDM Executive Board, TÜV SÜD will have to receive the written approval of the DNA of involved parties, including confirmation by the DNA of Brazil that the project assists in achieving sustainable development. By displacing fossil fuel-based electricity in principal with electricity generated from a renewable source, the project results in reductions of CO 2 emissions that are real, measurable and give long-term benefits to the mitigation of climate change. An analysis of the investment and technological barriers demonstrates that the proposed project activity is not a likely baseline scenario. Emission reductions attributable to the project are hence additional to any that would occur in the absence of the project activity. Given that the project is implemented as designed, the project is likely to achieve the estimated amount of emission reductions. Additionally the assessment team reviewed the estimation of the projected emission reductions. We can confirm that the indicated amount of emission reductions of tonnes CO 2e over a crediting period of seven years, resulting in a calculated annual average of tonnes CO 2e, represent a reasonable estimation using the assumptions given by the project documents. The validation is based on the information made available to us and the engagement conditions detailed in this report. The validation has been performed using a risk based approach as described above. The only purpose of this report is its use during the registration process as part of the CDM project cycle. Hence, TÜV SÜD can not be held liable by any party for decisions made or not made based on the validation opinion, which will go beyond that purpose. Munich, Munich, Werner Betzenbichler Head certification body climate and energy Thomas Kleiser Lead Auditor

25 Annex 1 Final Validation Protocol

26 Table 1 Mandatory Requirements for Clean Development Mechanism (CDM) Project Activities REQUREMENT REFERENCE CONCLUSON Cross Reference / Comment 1. The project shall assist Parties included in Annex in achieving compliance with part of their emission reduction commitment under Art. 3 Kyoto Protocol Art.12.2 Table, Section A.3 2. The project shall assist non-annex Parties in achieving sustainable development and shall have obtained confirmation by the host country thereof Kyoto Protocol Art. 12.2, Marrakesh Accords, CDM Modalities 40a Outstanding issue t is demonstrated clearly in the PDD that the realisation of the project will assist Brazil in sustainable development. But the final confirmation concerning the contribution of the project to the sustainable development in the host country (Brazil) can be issued not before submitting this report to the Brazilian DNA. The confirmation will be included in the written letter of approval for this project (see also mandatory requirement No. 4 of this validation protocol below). The written Letter of Approval (LoA) issued by the host country has to be presented before starting the registration process of this page A-1 CDM Validation Protocol Usina Alto Alegre - Report No version 01 B

27 REQUREMENT REFERENCE CONCLUSON Cross Reference / Comment project at the UNFCCC Executive Board (EB). 3. The project shall assist non-annex Parties in contributing to the ultimate objective of the UNFCCC 4. The project shall have the written approval of voluntary participation from the designated national authorities of each party involved Kyoto Protocol Art Kyoto Protocol Art. 12.5a, Marrakesh Accords, CDM Modalities 40a Section A.4.4 Outstanding issue A final written approval is not yet available, but Brazilian Government has indicated to accept Bagasse cogeneration projects to be eligible under CDM. One of the requirements that the Brazilian Government (Brazilian DNA) will issue such a written Letter of approval is a positive validation opinion in the final validation report. The written Letter of Approval (LoA) issued by the host country has to be presented before starting the registration process of this project at the UNFCCC Executive Board (EB). CDM Validation Protocol Usina Alto Alegre - Report No version 01 B page A-2

28 REQUREMENT REFERENCE CONCLUSON Cross Reference / Comment 5. The emission reductions shall be real, measurable and give long-term benefits related to the mitigation of climate change Kyoto Protocol Art. 12.5b Table, Section A Reduction in GHG emissions shall be additional to any that would occur in absence of the project activity, i.e. a CDM project activity is additional if anthropogenic emissions of greenhouse gases by sources are reduced below those that would have occurred in the absence of the registered CDM project activity Kyoto Protocol Art. 12.5c, Marrakesh Accords, CDM Modalities 43 Table, Section A Potential public funding for the project from Parties in Annex shall not be a diversion of official development assistance Marrakech Accords According to the information obtained by the audit team ODA does not contribute to the financing of the project. 8. Parties participating in the CDM shall designate a national authority for the CDM Marrakech Accords, CDM Modalities 29 Brazil as Host Country has a designated national authority (DNA) for the CDM in place. The address is: Comissão nterministerial de Mudança Global do Clima Esplanada dos Ministérios, Bloco E - 2 andar - sala , Brasilia DF Brazil page A-3 CDM Validation Protocol Usina Alto Alegre - Report No version 01 B

29 REQUREMENT REFERENCE CONCLUSON Cross Reference / Comment 9. The host country shall be a Party to the Kyoto Protocol Marrakech Accords, CDM Modalities Comments by local stakeholders shall be invited, a summary of these provided and how due account was taken of any comments received 11. Documentation on the analysis of the environmental impacts of the project activity, including transboundary impacts, shall be submitted, and, if those impacts are considered significant by the project participants or the Host Party, an environmental impact assessment in accordance with procedures as required by the Host Party shall be carried out. 12. Baseline and monitoring methodology shall be previously approved by the CDM Methodology Panel 13. Provisions for monitoring, verification and reporting shall be in accordance with the modalities described in the Marrakech Accords and relevant decisions of the COP/MOP Marrakech Accords, CDM Modalities 37b Marrakech Accords, CDM Modalities 37c Marrakech Accords, CDM Modalities 37e Marrakech Accords, CDM Modalities 37f Responsible person: Mr. Jose Domingos Gonzalez Miguez ( miguez@mct.gov.br ) Phone: (55-61) Fax: (55-61) Brazil has ratified the Kyoto Protocol on August 23, Section G Section F.2 Section B.1 and D.1 Section D.2 CDM Validation Protocol Usina Alto Alegre - Report No version 01 B page A-4

30 REQUREMENT REFERENCE CONCLUSON Cross Reference / Comment 14. Parties, stakeholders and UNFCCC accredited NGOs shall have been invited to comment on the validation requirements for minimum 30 days, and the project design document and comments have been made publicly available 15. A baseline shall be established on a project-specific basis, in a transparent manner and taking into account relevant national and/or sectoral policies and circumstances 16. The baseline methodology shall exclude to earn CERs for decreases in activity levels outside the project activity or due to force majeure 17. The project design document shall be in conformance with the UNFCCC CDM-PDD format Marrakech Accords, CDM Modalities, 40 Marrakech Accords, CDM Modalities, 45c,d Marrakech Accords, CDM Modalities, 47 Marrakech Accords, CDM Modalities, Appendix B, EB Decisions A global public stakeholder process on the UNFCCC website started on August 12th, 2005 for 30 days (Link: weiser/guide2.aspx?d=1173&eb ene1_d=26&ebene2_d=286&m ode=1). No comments on this project have been received. Section B.4 and B.5 Section B.4 and B.5 The PDD is in conformance with the CDM Project Design Document (version 02) which is in effect as of July 1, CDM Validation Protocol Usina Alto Alegre - Report No version 01 B page A-5

Validation Report. Validation of the Southeast Caeté Mills Bagasse Cogeneration Project (SECMBCP), Brazil. Report No , Revision 01 B

Validation Report. Validation of the Southeast Caeté Mills Bagasse Cogeneration Project (SECMBCP), Brazil. Report No , Revision 01 B Validation Report USNA CAETÉ S.A. Validation of the Southeast Caeté Mills Bagasse Cogeneration Project (SECMBCP), Brazil Report No. 704245, Revision 01 B 2005, December 22 TÜV ndustrie Service GmbH TÜV

More information

Validation Report. Kalpataru Energy Venture Pvt. Ltd. Validation of the Biomass Power Project at Kalpataru Energy Venture Private Limited

Validation Report. Kalpataru Energy Venture Pvt. Ltd. Validation of the Biomass Power Project at Kalpataru Energy Venture Private Limited Validation Report Kalpataru Energy Venture Pvt. Ltd. Validation of the Biomass Power Project at Kalpataru Energy Venture Private Limited Report No. 806970, Revision 01 2006, April 12 TÜV ndustrie Service

More information

Validation Report. Equipav S. A. Açúcar e Álcool. Validation of the Equipav Bagasse Cogeneration Project (EBCP) 23/12/2005

Validation Report. Equipav S. A. Açúcar e Álcool. Validation of the Equipav Bagasse Cogeneration Project (EBCP) 23/12/2005 Validation Report Equipav S. A. Açúcar e Álcool Validation of the Equipav Bagasse Cogeneration Project (EBCP) REPORT NO. 219107, REV. 02B 23/12/2005 TÜV ndustrie Service GmbH TÜV SÜD Group Carbon Management

More information

Validation Report. Usina Nova América S/A. Validation of the. Nova América Bagasse Cogeneration Project (NABCP) 2005, December 13

Validation Report. Usina Nova América S/A. Validation of the. Nova América Bagasse Cogeneration Project (NABCP) 2005, December 13 Validation Report Usina Nova América S/A Validation of the Nova América Bagasse Cogeneration Project (NABCP) REPORT NO. 209131 REV. 2 B 2005, December 13 TÜV ndustrie Service GmbH TÜV SÜD Group Carbon

More information

Validation Report. Matrix Power Pvt. Ltd. (MPPL)

Validation Report. Matrix Power Pvt. Ltd. (MPPL) Validation Report Matrix Power Pvt. Ltd. (MPPL) Validation of the 4.5 MW Biomass (Agricultural Residues) Based Power Generation Unit of M/s Matrix Power Pvt. Ltd. (MPPL) project Report No. 6589 Revision

More information

Validation Report. Beijing Guotou Energy Conservation Company. Validation of The 30 MW Tuoli Wind Farm Project in Urumqi, Xinjiang of China

Validation Report. Beijing Guotou Energy Conservation Company. Validation of The 30 MW Tuoli Wind Farm Project in Urumqi, Xinjiang of China Validation Report Beijing Guotou Energy Conservation Company Validation of The 30 MW Tuoli Wind Farm Project in Urumqi, Xinjiang of China Report No. 712740 rev. 1 17 July 2006 TÜV SÜD ndustrie Service

More information

Validation Report. Monte Rosa S.A. Validation of the Monta Rosa Bagasse Cogeneration Project. Report No , Revision 0 20/12/2005

Validation Report. Monte Rosa S.A. Validation of the Monta Rosa Bagasse Cogeneration Project. Report No , Revision 0 20/12/2005 Validation Report Monte Rosa S.A. Validation of the Monta Rosa Bagasse Cogeneration Project Report No. 691171, Revision 0 20/12/2005 TÜV ndustrie Service GmbH TÜV SÜD Group Carbon Management Service Westendstr.

More information

Validation Report. Bioenergia Cogeradora S.A. Validation of the Project Bioenergia Cogeradora. Report No , Revision 0 b.

Validation Report. Bioenergia Cogeradora S.A. Validation of the Project Bioenergia Cogeradora. Report No , Revision 0 b. Validation Report Bioenergia Cogeradora S.A Validation of the Project Bioenergia Cogeradora Report No. 609937, Revision 0 b 2005, December 22 TÜV ndustrie Service GmbH TÜV SÜD Group Carbon Management Service

More information

Validation Report. Triveni Engineering and Industries Ltd. Validation of the Bagasse based Co-generation Power Project at Khatauli, India

Validation Report. Triveni Engineering and Industries Ltd. Validation of the Bagasse based Co-generation Power Project at Khatauli, India Validation Report Triveni Engineering and ndustries Ltd. Validation of the Bagasse based Co-generation Power Project at Khatauli, ndia Report No. 877510, Revision 01 2006, December 21 TÜV SÜD ndustrie

More information

Validation Report. Report No , Revision , March 16

Validation Report. Report No , Revision , March 16 Validation Report AGCERT NTERNATONAL LMTED, RELAND VALDATON OF THE AWMS GHG MTGATON PROJECT BR05-B-03, BRAZL Report No. 645204, Revision 01 2006, March 16 TÜV ndustrie Service GmbH TÜV SÜD Group Carbon

More information

Validation Report. BK Energia Itacoatiara Ltda. Validation of the BK Energia Itacoatiara Project, Brazil. Report No , September 8

Validation Report. BK Energia Itacoatiara Ltda. Validation of the BK Energia Itacoatiara Project, Brazil. Report No , September 8 Validation Report BK Energia Itacoatiara Ltda. Validation of the BK Energia Itacoatiara Project, Brazil Report No. 629709 2005, September 8 TÜV Industrie Service GmbH TÜV SÜD Group Carbon Management Service

More information

Determination Report

Determination Report Determination Report Determination of the Kimle Wind Turbine Park HUNGARY Report No. 536103-K 2004-12-17 TÜV ndustrie Service GmbH TÜV SÜD Group Carbon Management Service Westendstr. 199-80686 Munich -

More information

Validation Report. PT. Multimas Nabati Asahan (MNA) Validation of the Small Scale CDM Project: MNA Biomass 9,7 MWe Condensing Steam Turbine

Validation Report. PT. Multimas Nabati Asahan (MNA) Validation of the Small Scale CDM Project: MNA Biomass 9,7 MWe Condensing Steam Turbine Validation Report PT. Multimas Nabati Asahan (MNA) Validation of the Small Scale CDM Project: MNA Biomass 9,7 MWe Condensing Steam Turbine Report No. 680129, Revision 02 2006, April 26 TÜV ndustrie Service

More information

Determination Report

Determination Report Determination Report Determination of the Pilot programmatic Joint Implementation project in North Rhine- Westphalia (JIM.NRW) JI Program of Activities in Germany (Track 1) Report No. 987901 2007-11-14

More information

Final Determination Report

Final Determination Report Final Determination Report Determination of the Onega Town Coal-to-Waste Wood Energy Switch, NW- J project in Report No. 796 441, Rev. 03 TÜV SÜD ndustrie Service GmbH, Carbon Management Service Westendstr.

More information

Gold Standard Validation Report

Gold Standard Validation Report Gold Standard Validation Report CARBON ASSET MANAGEMENT SWEDEN AB Gold Standard Validation of the Ningxia Yinyi 49.50 MW Wind-farm Project, China Report No. 1053561 04 April 2008 TÜV SÜD Industrie Service

More information

Validation Report. Abonos Colombianos SA.

Validation Report. Abonos Colombianos SA. Validation Report Abonos Colombianos SA. VALIDATION OF THE CDM-PROJECT: PROJECT FOR THE CATALYTIC REDUCTION OF N 2 O EMISSIONS WITH A SECONDARY CATALYST INSIDE THE AMMONIA OXIDATION REACTORS OF THE NAN1

More information

Determination Report

Determination Report Determination Report Determination of the Sopronkövesd Wind Farm HUNGARY Report No. 677087, Rev. 01 2005-08-18 TÜV ndustrie Service GmbH TÜV SÜD Group Carbon Management Service Westendstr. 199-80686 Munich

More information

Validation Report. Biogas de Juarez S.A de C.V. Ciudad Juarez Landfill Gas to Energy Project. 2007, August 20

Validation Report. Biogas de Juarez S.A de C.V. Ciudad Juarez Landfill Gas to Energy Project. 2007, August 20 Validation Report Biogas de Juarez S.A de C.V Ciudad Juarez Landfill Gas to Energy Project. REPORT NO. 978560 2007, August 20 TÜV SÜD Industrie Service GmbH Carbon Management Service Westendstr. 199-80686

More information

How to Select a DOE and preparation for validation and verification Presentation Report

How to Select a DOE and preparation for validation and verification Presentation Report How to Select a DOE and preparation for validation and verification Presentation Report Introduction to DOE s The two key functions of DOEs are: Validation: assessing whether a project proposal meets the

More information

Validation Report. Report No , Revision April 2007

Validation Report. Report No , Revision April 2007 Validation Report BIRLA PLUS CEMENT Validation of the Optimum utilisation of clinker for Pozzolana Portland Cement (PPC) production at Birla Plus Cement in Bathinda, Punjab, India project Report No. 869837,

More information

Registration - Information and reporting checklist (Version 2.0) The main changes between version 1.0 and version 2.0 are the following:

Registration - Information and reporting checklist (Version 2.0) The main changes between version 1.0 and version 2.0 are the following: Registration - Information and reporting checklist (Version 2.0) Version 1.0 of the information and reporting checklist was published in June 2010. The enclosed version 2.0 of this checklist represents

More information

Determination Report

Determination Report Determination Report Determination of Bayerngas Ökobonusprogramm Gewerbe- und Industriekunden JI Program of Activities in Germany (Track 1) Report No. 1101506 2008-07-22 TÜV SÜD Industrie Service GmbH,

More information

VALIDATION REPORT. Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO REVISION NO.

VALIDATION REPORT. Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO REVISION NO. Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO. 2007-1142 REVISION NO. 02 Date of first issue: Project No.: 2007-07-09 44410005-08 Approved by: Organisational

More information

Gold Standard Validation Report

Gold Standard Validation Report Gold Standard Validation Report Thai Biogas Energy Company Ltd. (TBEC) GOLD STANDARD VALIDATION OF THE CDM PROJECT: TBEC THA CHANG BIOGAS PROJECT REPORT NO. 1237633-GS 459 21 January 2011 TÜV SÜD Industrie

More information

Annex 1 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01.2) CONTENTS ABBREVIATIONS... 3 I. INTRODUCTION...

Annex 1 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01.2) CONTENTS ABBREVIATIONS... 3 I. INTRODUCTION... Page 1 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL (Version 01.2) CONTENTS Paragraphs Page ABBREVIATIONS... 3 I. INTRODUCTION... 1 5 4 A. Updates to the Manual... 6 4 II. TERMS FOR VALIDATING

More information

Determination Report

Determination Report Determination Report Determination of the Benaiciai Wind Power Project, Lithuania, Report No. 907778 Revision 2 2008, May 5 TÜV SÜD Industrie Service GmbH, Carbon Management Service Westendstr. 199-80686

More information

Validation Report. Gansu Jieyuan Wind Power Co., Ltd. 2008, August 12

Validation Report. Gansu Jieyuan Wind Power Co., Ltd. 2008, August 12 Validation Report Gansu Jieyuan Wind Power Co., Ltd VALIDATION OF THE CDM-PROJECT: GANSU YUMEN SANSHILIJINGZI WIND POWER PROJECT REPORT NO. 1159769 2008, August 12 TÜV SÜD Industrie Service GmbH Carbon

More information

Annex 3 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01) CONTENTS I. INTRODUCTION

Annex 3 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01) CONTENTS I. INTRODUCTION page 1 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL (Version 01) CONTENTS Paragraphs Page ABBREVIATIONS... 4 I. INTRODUCTION... 1 5 5 A. Updates to the Manual... 6 4 II. TERMS FOR VALIDATING

More information

CDM AND VER VALIDATION PROTOCOL

CDM AND VER VALIDATION PROTOCOL APPENDIX A CDM AND VER VALIDATION PROTOCOL SAYALAR 30.4 MW WIND FARM PROJECT TURKEY FINAL REPORT NO. 2007-44003 REVISION NO. 01 Table 1 Mandatory Requirements for High Standard Voluntary Emission Reduction

More information

VALIDATION REPORT HUANENG NEW ENERGY INDUSTRIAL CO. LTD. VALIDATION OF GUANGDONG NAN AO MW WIND FARM PROJECT

VALIDATION REPORT HUANENG NEW ENERGY INDUSTRIAL CO. LTD. VALIDATION OF GUANGDONG NAN AO MW WIND FARM PROJECT TÜV ndustrie Service GmbH TÜV Rheinland Group VALDATON REPORT HUANENG NEW ENERGY NDUSTRAL CO. LTD. VALDATON OF GUANGDONG NAN AO 45.05 MW WND FARM PROJECT REPORT NO. 01 997 9105031898 REVSON NO. 03 CDM

More information

Validation Report. Datang Zhangzhou Wind Power Co., Ltd. VALIDATION OF THE CDM-PROJECT: Fujian Zhangpu Liuao 45MW Wind Power Project.

Validation Report. Datang Zhangzhou Wind Power Co., Ltd. VALIDATION OF THE CDM-PROJECT: Fujian Zhangpu Liuao 45MW Wind Power Project. Validation Report Datang Zhangzhou Wind Power Co., Ltd VALIDATION OF THE CDM-PROJECT: Fujian Zhangpu Liuao 45MW Wind Power Project REPORT NO. 948571 2007, August 30 TÜV SÜD Industrie Service GmbH Carbon

More information

VALIDATION REPORT SAIHANBA EAST MW WINDFARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

VALIDATION REPORT SAIHANBA EAST MW WINDFARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT SAIHANBA EAST 45.05 MW WINDFARM PROJECT IN CHINA REPORT NO. 2006-1309 REVISION NO. 01 DET NORSKE VERITAS DET NORSKE VERITAS VALIDATION REPORT Date of first issue: Project No.: 2006-05-26

More information

Risk Based Verification Cambodia cook stove project

Risk Based Verification Cambodia cook stove project Risk Based Verification Cambodia cook stove project Chee.Keong.Lai@dnv.com www.dnv.com/certification/climatechange Contents 1. Introduction of Det Norske Veritas AS 2. Risk Based Validation/Verification

More information

Determination Report

Determination Report Determination Report LANXESS Deutschland GmbH DETERMINATION OF Redundant thermal decomposition of residual nitrous oxide (N2O) from the LANXESS adipic acid production in Krefeld-Uerdingen JI-Track 1 project

More information

VER + Verification Report

VER + Verification Report VER + Verification Report Enecore Carbon Initial Verification and Verification of the First Monitoring Period of the Beijing No.3 Thermal Power Plant Gas-Steam Combined Cycle Project Using Natural Gas

More information

Criteria Catalogue: VER+

Criteria Catalogue: VER+ Criteria Catalogue: VER+ Prepared / changed: IS-CMS-MUC approved: IS-CMS-MUC page 1 of 10 CONTENTS Acronyms...3 Definitions...3 A. CRITERIA CATALOGUE... 4 1. Eligibility Criteria...4 2. Additionality...4

More information

Bagasse-based cogeneration project in Brazil. Summary

Bagasse-based cogeneration project in Brazil. Summary Bagasse-based cogeneration project in Brazil Summary March, 2005/04/19 Association of International Research Initiatives for Environmental Studies Mitsubishi Research Institute Inc. 1. Background 1.1

More information

VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN

VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN Rio Taquesi Hydroelectric Power Project UNFCCC Ref. No. 1031 SGS Climate Change Programme SGS United Kingdom Ltd SGS House 217-221 London Road

More information

Validation Report. Xinjiang Tianfu Thermoelectric Co., Ltd

Validation Report. Xinjiang Tianfu Thermoelectric Co., Ltd Validation Report Xinjiang Tianfu Thermoelectric Co., Ltd VALIDATION OF THE CDM-PROJECT: Manasi River Stage I Hydropower Project of Hongshanzui Hydropower Plant, Xinjiang Tianfu Thermoelectric REPORT NO.

More information

(CDM Registration Reference Number 0187)

(CDM Registration Reference Number 0187) JALLES MACHADO S.A VERIFICATION OF THE JALLES MACHADO BAGASSE COGENERATION PROJECT (JMBCP) (CDM Registration Reference Number 0187) REPORT NO. BRAZIL-VER/0033/2008 REVISION NO. 01 BUREAU VERITAS CERTIFICATION

More information

Carbon Resource Management Ltd. IN CHINA. 2008, October May 0624

Carbon Resource Management Ltd. IN CHINA. 2008, October May 0624 Validation Report Carbon Resource Management Ltd. VALIDATION OF THE CDM-PROJECT: ZHEJIANG CIXI WIND FARM PROJECT IN CHINA REPORT NO. 1055098 2008, October May 0624 TÜV SÜD Industrie Service GmbH Carbon

More information

Validation of CDM Projects Real life examples of what a DOE looks for

Validation of CDM Projects Real life examples of what a DOE looks for Validation of CDM Projects Real life examples of what a DOE looks for Jonathan Avis, CDM Business Manager ERM Certification and Verification Services 2nd Floor, Exchequer Court 33 St Mary Axe London EC3A

More information

Validation Report VALIDATION OF THE CDM-PROJECT: SHABA 30MW HYDRO POWER PROJECT IN GUIZ- HOU PROVINCE CHINA REPORT NO

Validation Report VALIDATION OF THE CDM-PROJECT: SHABA 30MW HYDRO POWER PROJECT IN GUIZ- HOU PROVINCE CHINA REPORT NO Validation Report 1000842 VALIDATION OF THE CDM-PROJECT: SHABA 30MW HYDRO POWER PROJECT IN GUIZ- HOU PROVINCE CHINA REPORT NO. 1000842 2008, April 21 TÜV SÜD Industrie Service GmbH Carbon Management Service

More information

Validation Report. The World Bank WEST GUANGXI. Report No March 2010

Validation Report. The World Bank WEST GUANGXI. Report No March 2010 Validation Report The World Bank VALIDATION OF THE CDM-PROJECT: REFORESTATION ON DEGRADED LANDS IN NORTH- WEST GUANGXI Report No. 845821 17 March 2010 TÜV SÜD Industrie Service GmbH Carbon Management Service

More information

VERIFICATION REPORT VEJO GUSIS,UAB

VERIFICATION REPORT VEJO GUSIS,UAB VEJO GUSIS,UAB VERIFICATION OF THE LIEPYNES WIND POWER PARK JOINT IMPLEMENTATION PROJECT MONITORING PERIOD: 1 JANUARY 2012 TO 31 OCTOBER 2012 REPORT NO. LITHUANIA-VER/0075/2012 REVISION NO. 01 BUREAU VERITAS

More information

VALIDATION REPORT BHL PALIA KALAN PROJECT IN INDIA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

VALIDATION REPORT BHL PALIA KALAN PROJECT IN INDIA REPORT NO REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT IN INDIA REPORT NO. 2006-9136-2 REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT Date of first issue: Project No.: 2006-11-29 2006-9136-2 Approved by: Organisational unit: Einar Telnes

More information

PROGRAMME OF ACTIVITIES (POA) REQUEST FOR REGISTRATION - INFORMATION AND REPORTING CHECK CHECKLIST

PROGRAMME OF ACTIVITIES (POA) REQUEST FOR REGISTRATION - INFORMATION AND REPORTING CHECK CHECKLIST PROGRAMME OF ACTIVITIES (POA) REQUEST FOR REGISTRATION - INFORMATION AND REPORTING CHECK CHECKLIST PCP : Clean development mechanism project cycle procedure (version 02.0), EB 66, annex 64, 2 March 2012.

More information

VALIDATION REPORT. Jaroensompong Corporation Rachathewa Landfill Gas to Energy Project in Thailand REPORT NO REVISION NO.

VALIDATION REPORT. Jaroensompong Corporation Rachathewa Landfill Gas to Energy Project in Thailand REPORT NO REVISION NO. VALDATON REPORT Jaroensompong Corporation Rachathewa Landfill Gas to Energy Project in Thailand REPORT NO. 2007-1017 REVSON NO. 02 VALDATON REPORT Date of first issue: Project No.: 2007-02-20 28924579

More information

VALIDATION REPORT. Offis Textile Ltd. Fuel Switch Project in Israel REPORT NO REVISION NO. 02

VALIDATION REPORT. Offis Textile Ltd. Fuel Switch Project in Israel REPORT NO REVISION NO. 02 VALIDATION REPORT Offis Textile Ltd. Fuel Switch Project in Israel REPORT NO. 2008-9027 REVISION NO. 02 VALIDATION REPORT Date of first issue: Project No.: 2008-01-17 66010392 Approved by: Organisational

More information

VALIDATION REPORT DHAMPUR SUGAR MILLS LTD VALIDATION OF THE REPORT NO. INDIA-VAL/0072/2007 REVISION NO. 03 BUREAU VERITAS CERTIFICATION

VALIDATION REPORT DHAMPUR SUGAR MILLS LTD VALIDATION OF THE REPORT NO. INDIA-VAL/0072/2007 REVISION NO. 03 BUREAU VERITAS CERTIFICATION DHAMPUR SUGAR MILLS LTD VALIDATION OF THE THE DSM-DHAMPUR BAGASSE COGENERATION PROJECT REPORT NO. INDIA-VAL/0072/2007 REVISION NO. 03 BUREAU VERITAS CERTIFICATION Report Template Revision 3, 28/03/2007

More information

VALIDATION REPORT NINGXIA TIANJING MW WIND-FARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

VALIDATION REPORT NINGXIA TIANJING MW WIND-FARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT NINGXIA TIANJING 50.25 MW WIND-FARM PROJECT IN CHINA REPORT NO. 2006-1769 REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT Date of first issue: Project No.: 2006-10-23 45010012-9

More information

Gangwon Wind Park Project

Gangwon Wind Park Project Report No. TA201-200501, Revision 03 Final Validation Report Gangwon Wind Park Project December 9, 2005 KOREA ENERGY MANAGEMENT CORPORATION Contents 1. Summary of the Project Activity 2 2. Principles 3

More information

VERIFICATION REPORT RENERGA,UAB

VERIFICATION REPORT RENERGA,UAB RENERGA,UAB VERIFICATION OF THE BENAICIAI WIND POWER PROJECT MONITORING PERIOD: 01 JANUARY 2012 TO 31 OCTOBER 2012 REPORT NO. LITHUANIA-VER/0071/2012 REVISION NO. 01 Report Template Revision 4, 13/07/2011

More information

REPORT OF THE SEVENTH MEETING OF THE EXECUTIVE BOARD Annex 5

REPORT OF THE SEVENTH MEETING OF THE EXECUTIVE BOARD Annex 5 - 1 - Annex 5 Appendix A 1 to the simplified modalities and procedures for small-scale CDM project activities CLEAN DEVELOPMENT MECHANISM SIMPLIFIED PROJECT DESIGN DOCUMENT FOR SMALL SCALE PROJECT ACTIVITIES

More information

VALIDATION REPORT LIAONING KANGPING 24.65MW WIND FARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

VALIDATION REPORT LIAONING KANGPING 24.65MW WIND FARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS VALDATON REPORT LAONNG KANGPNG 24.65MW WND FARM PROJECT N CHNA REPORT NO. 2006-1174 REVSON NO. 01 DET NORSKE VERTAS VALDATON REPORT Date of first issue: Project No.: 2006-04-23 63602108 Approved by: Organisational

More information

VALIDATION REPORT ENERGY EFFICIENCY PROJECT IN THE RAMLA CEMENT PLANT IN ISRAEL THROUGH INSTALMENT OF NEW GRINDING TECHNOLOGY

VALIDATION REPORT ENERGY EFFICIENCY PROJECT IN THE RAMLA CEMENT PLANT IN ISRAEL THROUGH INSTALMENT OF NEW GRINDING TECHNOLOGY VALIDATION REPORT ENERGY EFFICIENCY PROJECT IN THE RAMLA CEMENT PLANT IN ISRAEL THROUGH INSTALMENT OF NEW GRINDING TECHNOLOGY REPORT NO. 2006-0712 REVISION NO. 02 DET NORSKE VERITAS VALIDATION REPORT Date

More information

Verification Report. Lovochemie a.s. Second Periodic Verification. of the agreed JI project. Nitrous Oxide Emission Reductions at Lovochemie - CZ

Verification Report. Lovochemie a.s. Second Periodic Verification. of the agreed JI project. Nitrous Oxide Emission Reductions at Lovochemie - CZ Verification Report Lovochemie a.s. Second Periodic Verification of the agreed JI project Nitrous Oxide Emission Reductions at Lovochemie - CZ Report No.: 1125273 March 14, 2008 TÜV SÜD Industrie Service

More information

VALIDATION REPORT RIALMA COMPANHIA ENERGÉTICA S/A. SANTA EDWIGES II SMALL HYDRO POWER PLANT SMALL SCALE CDM PROJECT

VALIDATION REPORT RIALMA COMPANHIA ENERGÉTICA S/A. SANTA EDWIGES II SMALL HYDRO POWER PLANT SMALL SCALE CDM PROJECT RIALMA COMPANHIA ENERGÉTICA S/A. SANTA EDWIGES II SMALL HYDRO POWER PLANT SMALL SCALE CDM PROJECT REPORT NO. BVQI/BRA/2006-002 REVISION NO., 06 BUREAU VERITAS QUALITY INTERNATIONAL Date of first issue:

More information

Verification Report. Quimobásicos HFC Recovery and Decomposition. Periodic Verification # 9 of the registered CDM project. No.

Verification Report. Quimobásicos HFC Recovery and Decomposition. Periodic Verification # 9 of the registered CDM project. No. Verification Report Quimobásicos HFC Recovery and Decomposition Project Periodic Verification # 9 of the registered CDM project No. 0151 Report No. 1175058 June 24, 2008 TÜV SÜD Industrie Service GmbH

More information

VALIDATION REPORT RENEWAL OF CREDITING PERIOD

VALIDATION REPORT RENEWAL OF CREDITING PERIOD VALIDATION REPORT RENEWAL OF CREDITING PERIOD Kanfeng 15MW Hydropower Station Project, Min County, Dingxi City Prefecture, Gansu province, China REPORT NO. CDM-0111-RCP1 No distribution without permission

More information

JI DETERMINATION REPORT

JI DETERMINATION REPORT JI DETERMINATION REPORT JSC ZAPORIZHSTAL RECONSTRUCTION OF THE OXYGEN COMPRESSOR PLANT AT THE JSC ZAPORIZHSTAL, UKRAINE. Report No.: 8000361502 08/193 TÜV NORD CERT GmbH JI/CDM Certification Program Langemarckstrasse

More information

VALIDATION REPORT DAEGU & SINANJEUNGDO PV (PHOTOVOLTAIC) POWER PLANT PROJECT REPORT NO KOREAN FOUNDATION FOR QUALITY REVISION NO. 04.

VALIDATION REPORT DAEGU & SINANJEUNGDO PV (PHOTOVOLTAIC) POWER PLANT PROJECT REPORT NO KOREAN FOUNDATION FOR QUALITY REVISION NO. 04. VALIDATION REPORT DAEGU & SINANJEUNGDO PV (PHOTOVOLTAIC) POWER PLANT PROJECT REPORT NO. 2007-04 REVISION NO. 04. KOREAN FOUNDATION FOR QUALITY Report No : 2007-04, rev. 04 VALIDATION REPORT Date of first

More information

Decision 3/CMP.1 Modalities and procedures for a clean development mechanism as defined in Article 12 of the Kyoto Protocol

Decision 3/CMP.1 Modalities and procedures for a clean development mechanism as defined in Article 12 of the Kyoto Protocol Page 6 Decision 3/CMP.1 Modalities and procedures for a clean development mechanism as defined in Article 12 of the Kyoto Protocol The Conference of the Parties serving as the meeting of the Parties to

More information

CDM What and How? /

CDM What and How? / CDM What and How? Chee.Keong.Lai@dnv.com / SEA.Climate.Change@dnv.com http://www.dnv.com/services/certification/climate_change/ Contents 1. Introduction of Det Norske Veritas AS 2. What is CDM? 3. DNV

More information

VERIFICATION AND CERTIFICATION REPORT

VERIFICATION AND CERTIFICATION REPORT VERIFICATION AND CERTIFICATION REPORT Datang Zhangzhou Wind Power Co., Ltd Fujian Zhangpu Liuao 45MW Wind Power Project SGS Climate Change Programme SGS United Kingdom Ltd SGS House 217-221 London Road

More information

VALIDATION REPORT AÇOS VILLARES NATURAL GAS FUEL SWITCH PROJECT IN BRAZIL REPORT NO REVISION NO. 0 DET NORSKE VERITAS

VALIDATION REPORT AÇOS VILLARES NATURAL GAS FUEL SWITCH PROJECT IN BRAZIL REPORT NO REVISION NO. 0 DET NORSKE VERITAS VALIDATION REPORT AÇOS VILLARES NATURAL GAS FUEL SWITCH PROJECT IN BRAZIL REPORT NO. 2005-1171 REVISION NO. 0 DET NORSKE VERITAS VALIDATION REPORT Date of first issue: Project No.: 2005-09-20 28624550

More information

REFERENCE NUMBER: 2008/024/CDM/01 REPORT NUMBER: 03

REFERENCE NUMBER: 2008/024/CDM/01 REPORT NUMBER: 03 HIDROABANICO S.A. PERIODIC VERIFICATION OF THE PROJECT ACTIVITY ABANICO HYDROELECTRIC PROJECT REFERENCE NUMBER: 2008/024/CDM/01 REPORT NUMBER: 03 Verification Type First periodic verification immediately

More information

Validation Report. Korea South-East Power Co. (KOSEP) small scale hydroelectric power plants project MAR 5, Korea CDM Certification Office

Validation Report. Korea South-East Power Co. (KOSEP) small scale hydroelectric power plants project MAR 5, Korea CDM Certification Office Report No. AT201-200602, Revision 04 Validation Report Korea South-East Power Co. (KOSEP) small scale hydroelectric power plants project MAR 5, 2007 Korea CDM Certification Office KOREA ENERGY MANAGEMENT

More information

Experiences with the first approved projects from a DOE perspective

Experiences with the first approved projects from a DOE perspective TÜV SÜD Carbon Management Service Experiences with the first approved projects from a DOE perspective Presentation overview 1. Activities of TÜV SÜD Group in CDM 2. The T CDM Project Cycle Beijing October

More information

Determination Report

Determination Report Determination Report Brestiom Plc., Sofia DETERMINATION OF JI TRACK 1 BULGARIAN SMALL HYDRO POWER PLANT PORTFOLIO Report No. 1001714 4 June 2010 TÜV SÜD Industrie Service GmbH Carbon Management Service

More information

GUIDELINES FOR COMPLETING THE FORM FOR SUBMISSION OF BUNDLED SMALL-SCALE CDM PROJECT ACTIVITIES (F-CDM-SSC-BUNDLE) (Version 01) CONTENTS

GUIDELINES FOR COMPLETING THE FORM FOR SUBMISSION OF BUNDLED SMALL-SCALE CDM PROJECT ACTIVITIES (F-CDM-SSC-BUNDLE) (Version 01) CONTENTS GUIDELINES FOR COMPLETING THE FORM FOR SUBMISSION OF BUNDLED SMALL-SCALE CDM PROJECT ACTIVITIES (F-CDM-SSC-BUNDLE) (Version 01) CONTENTS I. Information note on bundling of Small-Scale project activities

More information

Bulgarian JI Guidelines. 2006, September

Bulgarian JI Guidelines. 2006, September Bulgarian JI Guidelines 2006, September Table of Contents BULGARIAN JI GUIDELINES... 1 1. International Requirements... 1 2. JI Process in Bulgaria... 3 3. Participants... 4 Step 6: Request for Letter

More information

A rating of Designated Operational Entities (DOEs) Accredited under the Clean Development Mechanism (CDM)

A rating of Designated Operational Entities (DOEs) Accredited under the Clean Development Mechanism (CDM) A rating of Designated Operational Entities (DOEs) Accredited under the Clean Development Mechanism (CDM) Scope, methodology and results Report for WWF Berlin, 27 May 2009 Lambert Schneider Lennart Mohr

More information

AMAYO PHASE II WIND POWER PROJECT

AMAYO PHASE II WIND POWER PROJECT AMAYO PHASE II WIND POWER PROJECT Report No: 8000402033-11/558 Date: 2012-03-21 TÜV NORD CERT GmbH JI/CDM Certification Program Langemarckstraße, 20 45141 Essen, Germany Phone: +49-201-825-3335 Fax: +49-201-825-3290

More information

The Clean Development Mechanism (CDM)

The Clean Development Mechanism (CDM) Jan. 28, 2005 The Clean Development Mechanism (CDM) Converting emission reductions to Certified Emission Reductions (CERs) under the rules governing the Kyoto Protocol Presentation s Outline Jan. 28, 2005

More information

Clean Development Mechanism

Clean Development Mechanism Clean Development Mechanism Srikanth Subbarao Regional CDM Expert for the Pacific Islands (Consultant) Technical Support Facility (TSF) /Carbon Market Initiative Energy, Transport and Water Division Why

More information

Verification Report. Anemon Wind Farm

Verification Report. Anemon Wind Farm Verification Report Anemon Wind Farm Initial and First Periodic Verification of the Gold Standard VER project Anemon Intepe 30.4 MW Wind Farm Project in Turkey Report No. 1 129 574, rev. 1 May 28, 2008

More information

Tips on PDD Preparation

Tips on PDD Preparation Tips on PDD Preparation What is PDD for? The PDD (Project Design Document) was developed by the CDM Executive Board in conformity with the relevant modalities and procedures for the Project Design Document

More information

Capacity Building Workshop on Development of CDM Activities and NAMA for Public And Private Sector In Zimbabwe

Capacity Building Workshop on Development of CDM Activities and NAMA for Public And Private Sector In Zimbabwe CDM Project Cycle Capacity Building Workshop on Development of CDM Activities and NAMA for Public And Private Sector In Zimbabwe Nyanga, Zimbabwe 24 25 August 2016 UNFCCC Secretariat UNFCCC RCC UNFCCC

More information

VALIDATION REPORT 7.5 MW GRID-CONNECTED BIOMASS POWER PROJECT, BY RAVI KIRAN POWER PROJECTS PRIVATE LIMITED IN INDIA

VALIDATION REPORT 7.5 MW GRID-CONNECTED BIOMASS POWER PROJECT, BY RAVI KIRAN POWER PROJECTS PRIVATE LIMITED IN INDIA VALIDATION REPORT 7.5 MW GRID-CONNECTED BIOMASS POWER PROJECT, BY RAVI KIRAN POWER PROJECTS PRIVATE LIMITED IN INDIA REPORT NO. 2006-9131 REVISION NO. 02 DET NORSKE VERITAS VALIDATION REPORT Date of first

More information

Concepts of Clean Development Mechanism. Confederation of Indian Industry

Concepts of Clean Development Mechanism. Confederation of Indian Industry Concepts of Clean Development Mechanism Kyoto Protocol UNFCCC & Kyoto Protocol Kyoto Treaty was drawn up in Kyoto, Japan, on 11 th December, 1997 to implement United Nations Framework Convention for Climate

More information

Carbon of 7. IS-CMS-MUC/Mu Javier Castro. Telefax:

Carbon of 7. IS-CMS-MUC/Mu Javier Castro. Telefax: TÜV SÜD Industrie Service GmbH 80684 Munich Germany CDM Executive Board DAP-PL-2885.99 DAP-IS-2886..00 DAP-PL-3089.00 DAP-PL-27222 DAP-IS-3516..01 DPT-ZE-3510.02 ZLS-ZE-219/99 ZLS-ZE-246/99 Your reference/letter

More information

VERIFICATION/CERTIFICATION REPORT PERIODIC VERIFICATION OF THE TROJES HYDROELECTRIC PROJECT IN MEXICO

VERIFICATION/CERTIFICATION REPORT PERIODIC VERIFICATION OF THE TROJES HYDROELECTRIC PROJECT IN MEXICO VERIFICATION/CERTIFICATION REPORT PERIODIC VERIFICATION OF THE TROJES HYDROELECTRIC PROJECT IN MEXICO (Registration Ref No. 0649) Monitoring period: 01 April 2003-30 November 2006. REPORT NO. 2006-2174

More information

European Investment Bank (EIB) Guidelines for the Climate Change Technical Assistance Facility (CCTAF) Operations

European Investment Bank (EIB) Guidelines for the Climate Change Technical Assistance Facility (CCTAF) Operations European Investment Bank (EIB) Guidelines for the Climate Change Technical Assistance Facility (CCTAF) Operations March 2006 CONTENTS CONTENTS...2 INTRODUCTION...3 1 BACKGROUND...4 1.1 The concept of CDM

More information

VERIFICATION REPORT YUNNAN MANGLI HYDROPOWER PROJECT

VERIFICATION REPORT YUNNAN MANGLI HYDROPOWER PROJECT VERIFICATION REPORT YUNNAN MANGLI HYDROPOWER PROJECT Document Prepared By: Bureau Veritas Certification Holding SAS Report No.BVC/China-VR/7066/2012 Project Title Version Report ID Yunnan Mangli Hydropower

More information

Validation and Verification DOE s Perspective

Validation and Verification DOE s Perspective Validation and Verification DOE s Perspective Presented by: Asim Kumar JANA TÜV Rheinland (India) Pvt Ltd Presented at ADB Headquarters, Manila, Philippines 08 September 2010 1 Contents Validation and

More information

Approved consolidated baseline and monitoring methodology ACM0013

Approved consolidated baseline and monitoring methodology ACM0013 Approved consolidated baseline and monitoring methodology ACM0013 Consolidated baseline and monitoring methodology for new grid connected fossil fuel fired power plants using a less GHG intensive technology

More information

GUIDELINES FOR COMPLETING CDM-SSC-PDD, F-CDM-SSC-Subm, F-CDM-BUNDLE

GUIDELINES FOR COMPLETING CDM-SSC-PDD, F-CDM-SSC-Subm, F-CDM-BUNDLE CDM Executive Board Version 2, page 1 GUIDELINES FOR COMPLETING THE SIMPLIFIED PROJECT DESIGN DOCUMENT (CDM-SSC-PDD), THE FORM FOR SUBMISSIONS ON METHODOLOGIES FOR SMALL-SCALE CDM PROJECT ACTIVITIES (F-CDM-SSC-Subm)

More information

VALIDATION REPORT. The Republic of Turkey

VALIDATION REPORT. The Republic of Turkey VALIDATION REPORT for the GS-VER Project Activity Kocaeli Landfill Gas to Electricity Project in The Republic of Turkey Report No. 21218553 Version No. 01, 10/10/2012 I. Project description: Project title:

More information

VCS METHODOLOGY ELEMENT ASSESSMENT REPORT

VCS METHODOLOGY ELEMENT ASSESSMENT REPORT VCS METHODOLOGY ELEMENT ASSESSMENT REPORT Infra-red Automatic Refrigerant Leak Detection Efficiency Project REPORT NO. 2009-9189 REVISION NO. 02 Date of first issue: Project No.: 14 August 2009 99800011

More information

DETERMINATION REPORT UAB NAUJOJI ENERGIJA

DETERMINATION REPORT UAB NAUJOJI ENERGIJA UAB NAUJOJI ENERGIJA DETERMINATION OF THE CIUTELIAI WIND POWER JOINT IMPLEMENTATION PROJECT REPORT NO. LITHUANIA-DET/0056/2012 REVISION NO. 02 Report Template Revision 7, 29/10/2010 Date of first issue:

More information

VALIDATION REPORT THE GODAVARI SUGAR MILLS LIMITED

VALIDATION REPORT THE GODAVARI SUGAR MILLS LIMITED THE GODAVARI SUGAR MILLS LIMITED VALIDATION OF THE 24 MW BAGASSE BASED CO- GENERATION POWER PROJECT REPORT NO. BVQI/INDIA/8.49 REVISION NO. 01 BUREAU VERITAS QUALITY INTERNATIONAL Date of first issue:

More information

VALIDATION REPORT FRAY BENTOS BIOMASS POWER GENERATION PROJECT (FBBP PROJECT) IN URUGUAY REPORT NO REVISION NO. 01 DET NORSKE VERITAS

VALIDATION REPORT FRAY BENTOS BIOMASS POWER GENERATION PROJECT (FBBP PROJECT) IN URUGUAY REPORT NO REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT FRAY BENTOS BIOMASS POWER GENERATION PROJECT (FBBP PROJECT) IN URUGUAY REPORT NO. 2006-1878 REVISION NO. 01 DET NORSKE VERITAS VALIDATION REPORT Date of first issue: Project No.: 2007-04-18

More information

VERIFICATION REPORT PA KHOANG HYDROPOWER PROJECT REPORT NO. GHGCC(E) REVISION NO. 03 GHG CERTIFICATION OFFICE

VERIFICATION REPORT PA KHOANG HYDROPOWER PROJECT REPORT NO. GHGCC(E) REVISION NO. 03 GHG CERTIFICATION OFFICE VERIFICATION REPORT PA KHOANG HYDROPOWER PROJECT REPORT NO. GHGCC(E)12-004 REVISION NO. 03 GHG CERTIFICATION OFFICE KOREA ENERGY MANAGEMENT CORPORATION Date of first issue: Project No.: 19/06/2012 GHGCC(E)12-004

More information

We think the word Professional scepticism needs to be defined in detail to avoid individual interpretation leading to confusion.

We think the word Professional scepticism needs to be defined in detail to avoid individual interpretation leading to confusion. The CDM Executive Board (EB) has call for public comment on the draft of the Validation and Verification Manual (VVM). This document represents the main views of the CantorCO2e with regards to the current

More information

Biogas Plant Pálhalma. Monitoring Plan DRAFT. June 2004

Biogas Plant Pálhalma. Monitoring Plan DRAFT. June 2004 Biogas Plant Pálhalma Monitoring Plan DRAFT June 2004 Table of contents 1 INTRODUCTION 6 1.1 PURPOSE OF THE MONITORING PLAN 6 1.2 USE OF THE MONITORING PLAN 6 2 ANNUAL REPORTING AND RESPONSIBILITIES 6

More information

Validation Report 9 July 2009

Validation Report 9 July 2009 Validation Report GLOBAL WOODS AG VALIDATION OF THE CCBS-PROJECT: KIKONDA FOREST RESERVE REPORT NO. 1196712-CCBA 9 July 2009 TÜV SÜD Industrie Service GmbH Carbon Management Service Westendstr. 199-80686

More information

ANI OJSC. Validation of the Jradzor Small Hydroelectric CDM project. May 2008 This report contains 37 pages. 1May08.doc

ANI OJSC. Validation of the Jradzor Small Hydroelectric CDM project. May 2008 This report contains 37 pages. 1May08.doc ABCD ANI OJSC Validation of the Jradzor Small Hydroelectric CDM project This report contains 37 pages project 1May08.doc 2008 KPMG Sustainability B.V., a Dutch limited liability company and a member firm

More information

Performance assessment report validation (Version 01.1)

Performance assessment report validation (Version 01.1) Performance assessment report validation (Version 01.1) SECTION 1: GENERAL INFORMATION Entity name: UNFCCC entity ref.no.: Site Visit made by the CDM-AT: Address of the site(s) visited: Scope(s) of accreditation

More information