1 Public Contracts Regulations 2015 A Constructionline guide

2 Introduction The construction industry has a high risk and complicated procurement process. This has been recognised in a Cabinet Office guidance document for PCR 2015, which has given the industry specific criteria, including: A range of procurement thresholds, which require different processes and methodologies The use of a PQQ within certain thresholds (PAS91:2013 has been recommended for this purpose). The use of a PQQ has also been disallowed for some thresholds. What are the Public Contracts Regulations 2015? In February 2015 the Public Contracts Regulations 2015 were introduced. The new regulations follow on from the EU Directive 2014/24/EU and are now part of UK law. They apply to all public sector contracts. The purpose of PCR 2015 is to streamline, accelerate and simplify the public sector procurement process above and below certain thresholds, whilst making it easier for SMEs to compete for contracts on a level playing field. It also ensures that public sector organisations use transparent processes to select suppliers. The simplest way to ensure that you comply with this guidance is to adopt PAS 91:2013 and advertise your contracts as required. THE PURPOSE OF THIS BROCHURE Constructionline has prepared this brochure to help you understand how the Public Contracts Regulations 2015 have impacted your stage one supplier assessment processes and how your membership with Constructionline can assist you at every step of the way. What is PAS 91:2013? PAS 91:2013 is a standardised pre-qualification questionnaire, which has been developed to reduce the need for suppliers to complete a variety of different pre-qualification questionnaires for different, and in some cases the same, clients. Developed by the British Standards Institute (BSI), the question set has been commissioned by Government. It s not enough to adopt the spirit of PAS 91! In order to align to PAS 91:2013, a company must make sure that their pre-qualification questions follow the exact wording, ordering and numbering conventions laid out in the PAS 91:2013 questionnaire. If their stage one supplier assessment deviates from the structure and layout of PAS 91:2013 in any way, the company cannot say that they are aligned to PAS 91:2013, adopting the spirit of PAS 91 by using some of the ordering or numbering conventions is not enough. The uptake of PAS 91:2013 has been limited, the construction industry would save millions, rising to billions of pounds a year through efficiency savings if PAS 91:2013 were used more widely, as more and more companies would align to and recognise a standardised question set for pre-qualification. 1 2

3 How Constructionline helps in the procurement and advertising process PCR 2015 REQUIREMENT PCR 2015 states that when you advertise your contract to an open market, the opportunity must be published on Contracts Finder, in addition to other portals: Advertise your contracts valued above the threshold for works nationally on TED (Tenders Electronic Daily). Advertise your contracts valued above the threshold for goods and services on regional portals such as London Tenders, Sell2Wales, and NEPO. Under PCR 2015, the use of the pre-qualification stage has been limited, depending on the value of the contract. The requirements are as follows: Contracts valued between the threshold for good & services and the threshold for works, and above: The pre-qualification stage still applies. Use of PAS 91:2013 is advised. Contracts valued between the standing order limit and the threshold for goods & services: Use of the pre-qualification stage is prohibited. Instead, suitability assessment questions, drawn from a PQQ, can be asked at the ITT stage. As a buyer you are required to assess each responding supplier s commercial, technical and financial competencies, to determine whether they meet the minimum criteria of the contract. The PCR 2015 requirements aim to ensure a simpler and more consistent approach to supplier assessment through recommended use of PAS 91:2013 where the pre-qualification stage applies. For contracts valued between the standing order limit and the threshold for goods & services, where the pre-qualification stage is not permitted, contracting authorities can ask suitability assessment questions at the Invitation to Tender stage, provided that they are relevant to the subject matter of the contract. PUBLISH OPPORTUNITY TO MARKET ISSUE PQQ SUPPLIER ASSESSMENT SHORTLIST SUPPLIERS (ITT) AWARD CONTRACT SUPPLIER MANAGEMENT Reference Constructionline as an exemption within your portal advertisements to make considerable efficiency savings in prequalification. Responding Constructionline suppliers will have already been verified to Stage One of the pre-qualification process. Typically, over 90% of responses are from Constructionline registered suppliers. Constructionline remains a useful tool at Stage One of the pre-qualification process: Where pre-qualification applies, Constructionline can be used as an exemption with a supplier assessment that aligns to PAS 91:2013. Where pre-qualification is prohibited, Constructionline can be used as an exemption to suitability assessment questions. We verify suppliers information to Stage One of the assessment process for you, using our PAS 91:2013 aligned question set. Registered Constructionline members will have undergone the PAS 91:2013 aligned assessment process to achieve membership. What s more, for a small fee we ll assess non-registered suppliers to Stage One for you. Learn more about our One-Off Assessment Service, See page... By undertaking the supplier assessment process on your behalf, Constructionline can save you roughly 300 per supplier. We provide suitability assessment questions via our PAS 91:2013 aligned question set, helping you to determine a supplier s suitability at the Invitation to Tender stage. Therefore, Constructionline can be used as an exemption at this stage. We provide you with the necessary information held on each verified supplier at Stage One of the assessment process to help you make an informed decision on which supplier to award the contract to. After you ve awarded the contract, Constructionline can help with the ongoing monitoring of your suppliers information, including their health and safety data, insurances, financial details and environmental policy. We ll alert you of any concerns to help you reduce risk. You ll retain control of your suppliers. Constructionline allows you to add/remove suppliers on your lists with complete autonomy. HOW CONSTRUCTIONLINE HELPS PCR 2015 contract value thresholds EU threshold for works EU threshold for goods & services Standing order limit 4.01 million 164,176 (public sector) 106,047 (central government) 25,000 (public sector) 10,000 (central government) 3 4

4 Supplier Assessment The contract value thresholds As a set of requirements for the procurement process of public sector authorities, PCR 2015 applies where works, services or supply contracts exceed certain value thresholds. How Constructionline can help you, whatever the size of your project Constructionline remains a very useful tool for public sector buyers, both above and below the EU threshold for works ( 4,104,394 million). It can be used within the procurement process at the 3 levels covered below EU threshold. The 2015 provisions introduced the rules that must be followed in the PQQ process when a contract is valued above those thresholds. Our schematic below provides helpful guidance on how PCR s contract value thresholds impact the pre-qualification stage and how Constructionline can help to simplify the process. PUBLIC SECTOR 4,104, m OJEU threshold for works CONTRACT VALUE PUBLIC CONTRACT REGULATIONS 2015: IMPACT ON THE PQQ STAGE Between 164,176 and 4,104,394 CHANGES TO PCR REGULATIONS Above the OJEU threshold for works ( 4.104,394) No change - use of PAS 91 advised. Above 164,176 New level introduced in PCR 2015 Section 4. Can still use the pre-qualification stage (PAS 91). HOW CONSTRUCTIONLINE HELPS Continue to use Constructionline as an exemption to reduce work by 95%, and ensure compliance to PAS 91. Continue to use Constructionline and be PAS 91 compliant. Between 4,104,394 and 164,176 A pre-qualification stage can be still used within the procurement process. Constructionline can be used as an exemption question at stage one of the pre-qualification process, meaning they don t need to provide information at stage one of the pre-qualification process. For values above 4,104,394 million (the OJEU threshold for works) Between 164,176 and 25,000 A pre-qualification stage is prohibited. However, Constructionline can be used to provide suitability assessment questions presented in the form of pre-qualification questions. These can be used as a part of a single stage tender process to help assess the appropriateness of a bidding supplier. Below 25,000 The Constructionline system can be used as a source of verified suppliers for approved lists. With over 34,000 registered contrators, consultants and material suppliers on our system, you can run an intelligent search to find suppliers that meet your project criteria. The use of PAS 91:2013 is advised by the Cabinet Office, as such, Constructionline can be used as an exemption question. We offer a dynamic purchasing System (DPS) product to assist you in the management of your suppliers for projects above OJEU level. 164,176 25,000 0 Between 25,000 and 164,176 Below the 25,000 standing order limit Below 164,176 Use of the pre-qualification stage prohibited. Suitability Assessment questions can be included in the ITT/Tender stage as long as they are relevant and proportionate. Below 25,000 There is no change - this is traditionally where Approved Lists and Quick Quotes are used. Continue to use Constructionline as an exemption within the suitability assessment questions, both helping suppliers and saving time in the tender assessments. This will also mean the suitability assessment questions are aligned to PAS 91. Continue to use Constructionline to manage Approved Lists and sourcing Quick Quotes. It s important to note that although PCR 2015 has removed the use of a pre-qualification stage at certain values, it has not removed the use of pre-qualification across the board. Instead, for contracts valued below between 164,176 and 25,000, suitability assessment questions presented in the form of pre-qualification questions can be used. The pre-qualification stage and therefore the use of PAS 91:2013, which Constructonline aligns to, is recommended for many contract value thresholds in the Cabinet Office guidance document for PCR

5 Advertising In order to comply with PCR 2015, public sector organisations must also ensure that new opportunities, above thresholds, are published on Contracts Finder (in addition to, or instead of any other portal or publications route they may currently use). The threshold for publishing is 10,000 contract value for Central Government and 25,000 contract value for non Central Government contracting authorities, including NHS Trusts. However, authorities are only required to advertise an opportunity on Contracts Finder if its value is above the value stipulated in the organisation s existing standing order. Advertising with Constructionline As a buying organisation, you are required to advertise your contract opportunities openly to suppliers in the industry. We assist you in advertising your contracts with complete transparency and in line with all current legislation, whilst saving time and cost in the process for you organisation. Place an advert in regional and/or national portals By referencing Constructionline as an exemption for suppliers at Stage One of the assessment process in your advert, you ll save a large amount of time and money when assessing responses from our members. Regional advertising portals are used for project works that are within a particular location/region - valued above are the threshold for goods and services. National portals hold advertisements for large national projects - valued above the threshold for works. Other Constructionline services: One off assessments For any responses you receive for your advertised work opportunities from suppliers that aren t Constructionline registered, our team of assessors will handle the hard work for you Financial assessment of non-registered suppliers - We ll assess the suppliers financial information to ensure that their accounts are up-to-date and represent the business ability to undertake your works. Option 1 - All information must be collated by the buyer and provided in Excel format to the Constructionline assessors for processing. Option 2 - Buyer to send full audited accounts and references to Constructionline assessors, who will then extract the relevant information and undertake the assessment process. Full assessment of non-registered suppliers - We ll assess a suppliers entire stage one pre-qualification information on your behalf, to ensure they have met all the necessary requirements to work with you. Check that registered suppliers meet your requirements/project criteria - We ll run a report on the registered suppliers within our system, to find the assessed suppliers who meet your project requirements. THE OPPORTUNITIES NOTICE BOARD The Opportunities Notice Board (ONB) is our free tool, where you can advertise your work opportunities exclusively to Constructionline suppliers. You can set specific supplier criteria which companies need to meet before they can express their interest, including: area of operation, work category, notation value and health and safety status THE INFORMATION WE PROVIDE YOU Once we ve completed the assessment, our team will provide you with a report indicating whether each supplier has passed or failed the assessment process. At your request, we ll also provide you with more details regarding reasons why a supplier may have failed the assessment. As all expressions of interest will be made from registered Constructionline suppliers, you can rest assured that each supplier has met the required standards to work with you. Please note: We won t award the contract to a supplier for you; it ll still be up to you to choose who you want to work with. To help you generate expressions of interest, our marketing team will send out an communication on your behalf to our supplier members that fit the criteria you have specified. 7 8

6 Other Constructionline services: Dynamic Purchasing System (DPS) What is a Dynamic Purchasing System? A Dynamic Purchasing System (DPS) is similar to an electronic framework agreement, with two exceptions, new suppliers can join at any time and it is to be run as a completely electronic process. The rules relating to the usage and creation of a DPS come from PCR However, in brief: A DPS can be set up by contracting authorities, including central purchasing bodies. A DPS should be set up for identified types of requirement, which may be divided into categories of products, works or services. Suppliers must be able to apply to join a DPS for free. There are 2 stages to a DPS process How does a DPS benefit you? A DPS can streamline procurement for both suppliers and authorities; suppliers don t have to demonstrate suitability and capability every time they wish to compete for a public sector contract, and the award of individual tenders can be quicker than under some other procedures. A DPS is more flexible in some respects than frameworks, particularly as suppliers may join it at any time during its period of validity, meaning that suppliers are not locked out for the duration as they are with traditional frameworks. CASE STUDY: THE NHS LONDON PROCUREMENT PARTNERSHIP 1 2 The initial setup stage All suppliers who meet the selection criteria and are not excluded must be admitted to a DPS. Contracting authorities must not impose any limit on the number of suppliers that may join a DPS. The supplier must be assessed by the contracting authority within 10 working days of their application. Constructionline can be used to select the suppliers, through our database of over 34,000 PAS 91:2013 aligned registered members or our one off assessment service. The second stage Individual contracts are awarded during the second stage. In this stage, the authority invites all suppliers on a DPS (or the relevant category within a DPS) to bid for the specific contract. In January 2016, NHS London Procurement Partnership (LPP) partnered with Constructionline to launch the first Dynamic Purchasing System (DPS) for the construction industry. To simplify the process for suppliers, LPP accepts Constructionline membership in lieu of its full pre-qualification questionnaire. And, for all suppliers joining a DPS who aren t Constructionline registered, Constructionline assess them on behalf of LPP as a part of our One-Off Assessment Service. Edward James, Workstream Lead at LPP explains, Our Partnership exists to support the needs of our members and other public sector bodies on the procurement of any goods or services and enable an NHS trust or other public sector organisation to purchase goods, works or services through an open market of potential suppliers. 9 10

7 FAQ 1 What is Constructionline s position or view regarding your relevance now PCR 2015 is in place? 4 Due to the regulation changes, are there implications on the pre-qualification process and services like Constructionline? Constructionline remains a very useful tool for public sector buyers. Firstly, it can be used to run Approved Lists and as a source of audited suppliers for Quick Quote procurement processes. Secondly, for OJEU adverts, it can be used as an exemption question to save suppliers from having to provide information for an advert that they have already supplied to, and have verified by, Constructionline. This use as an exemption question is equally applicable for sub-ojeu contracts and, where the new threshold applies, it can be used to make the provision of suitability assessment data easier for both the supplier and the public sector buyer. 2 The new EU regulations state no pre-qualification stage can be used below EU threshold. How does Constructionline fit in seeing as it has a long standing history as a pre-qualification database? There are 3 different areas covered by below EU threshold : 1) Between 4,104,394 and 164,176 a pre-qualification stage can still be used within the procurement process. 2) Between 164,176 and 25,000 a pre-qualification stage is prohibited, however suitability assessment questions may need to be used and Constructionline can help the supplier and buyer with the provision of verified data. 3) Below 25,000 Constructionline can help administrate Approved Lists and be a source for Quick Quotes. 3 What actions can Local Authorities take to mitigate the effects of the new EU regulations? In many ways there is little change. A public sector buyer needs to run open and transparent processes to select suppliers. For contracts between 25,000 and 164,176 the use of a pre-qualification stage is prohibited, however it is likely that similar data will need to be collected and assessed. The difference is that this is now done in a single tender stage through the use of suitability assessment questions. These may be the same as pre-qualification questions (provided the questions are relevant and proportionate to the contract opportunity) and as such Constructionline can provide the necessary verified answers. With regard to the pre-qualification process - see answer 2 above. Constructionline can be used in a variety of ways - see answer 1 above. 5 Please can you clarify the role of Contracts Finder with regard to the requirement for Local Authorities to publish any contract opportunities above 25,000? Furthermore, does this prevent our continued use of Request for Quotes among pre-selected and/or prequalified suppliers? The new Public Contract Regulations offer a degree of flexibility for the public sector buyer. Higher thresholds for advertising can be stipulated in their standing orders which were in place before the regulations came in, as such, the higher value applies rather than 25,000. Therefore, Authorities would only be required to advertise an opportunity on Contracts Finder if its value is above the value stipulated in the standing order. 6 Is the assessment process used by Constructionline to sign up suppliers classified as a pre-qualification questionnaire, and therefore not allowed under the new Public Contract Regulations? See answer 1 above. It is important to note that the new regulations are removing the use of a pre-qualification stage for certain thresholds of procurement activities, not removing the use of pre-qualification across the board. Instead, for those below EU threshold, suitability assessment questions presented in the form of pre-qualification questions can be used as part of a single-stage tender process to help assess the appropriateness of a bidding supplier. Constructionline therefore has multiple uses, including being a source of answers for public sector buyers and suppliers for suitability assessment questions

8 PO Box 6441, Basingstoke, Hampshire, RG21 7FN T: E: Calls will cost 7p per minute plus your phone company s access charge.

HOW TO DO BUSINESS WITH BANGOR UNIVERSITY A GUIDE FOR SUPPLIERS

HOW TO DO BUSINESS WITH BANGOR UNIVERSITY A GUIDE FOR SUPPLIERS HOW TO DO BUSINESS WITH BANGOR UNIVERSITY A GUIDE FOR SUPPLIERS Produced by Bangor University s Corporate Procurement Team July 2016 Version 1.0 CONTENT About this Guide.. 3 Background.. 4 The Procurement

More information

E 4 ISSUE/REVISION LAST MODIFIED 26 November 2012 DATE PRINTED

E 4 ISSUE/REVISION LAST MODIFIED 26 November 2012 DATE PRINTED THE UNIVERSITY of EDINBURGH Estates & Buildings ESTATE DEVELOPMENT E 4 ISSUE/REVISION LAST MODIFIED 26 November 2012 DATE PRINTED RIBA stage E E4 PREPARE PQQ FOR CONTRACT WORKS (OJEU & NON OJEU) 1. DEFINITION

More information

Getting Started Introduction to Membership Levels Information Required to Complete and Submit Your Questionnaire 02 Getting Started - June v1

Getting Started Introduction to Membership Levels Information Required to Complete and Submit Your Questionnaire 02 Getting Started - June v1 Getting Started Introduction to Membership s Information Required to Complete and Submit Your Questionnaire 02 Getting Started - June 2018 - v1 About Constructionline Thank you for choosing to join Constructionline.

More information

An Introduction to Milton Keynes Council Procurement

An Introduction to Milton Keynes Council Procurement An Introduction to Milton Keynes Council Procurement An Introduction to Milton Keynes Council Procurement v1 October 2014 1 Milton Keynes Council Procurement Introduction Milton Keynes Council (the Council)

More information

Procurement Process: General Requirements

Procurement Process: General Requirements Procurement Process: General Requirements The University has a legal requirement to comply with EU Procurement Directives, which govern the way in which public sector procurement is conducted for contracts

More information

Due to the nature of this post you will be required to undertake an Enhanced Disclosure Check.

Due to the nature of this post you will be required to undertake an Enhanced Disclosure Check. Procurement Manager External Vacancy Post Ref: 6043 Full Time, 37 hours per week. Permanent. 35,817 per annum. Attractive benefits for this post include 35 days annual leave per year plus bank holidays

More information

Getting Started. Introduction to Membership Levels. Information Required to Complete and Submit Your Questionnaire

Getting Started. Introduction to Membership Levels. Information Required to Complete and Submit Your Questionnaire Getting Started Introduction to Membership Levels Information Required to Complete and Submit Your Questionnaire 02 Getting Started - December 2018 - v1 About Constructionline Thank you for choosing to

More information

Understanding Your Profile Status

Understanding Your Profile Status Understanding Your Profile Status How to View your Profile Status Status Indicators and Their Meaning 03 Understanding your profile status - June 2018 - v1 About Constructionline Thank you for choosing

More information

Legal Topic Note PROCUREMENT LTN 87. January Introduction

Legal Topic Note PROCUREMENT LTN 87. January Introduction Legal Topic Note LTN 87 January 2016 PROCUREMENT Introduction 1. This LTN applies to local councils in England and Wales except for paragraphs 10 to 15 below which apply only to local councils in England.

More information

- Details of the item to be procured and whether it is for works, services or goods;

- Details of the item to be procured and whether it is for works, services or goods; Procurement Policy 1. INTRODUCTION The policy is designed to ensure we comply with the relevant legislation, regulations and guidance which regulate our procurement activities. We will ensure our procurement

More information

Commissioning and Procurement Toolkit

Commissioning and Procurement Toolkit Commissioning and Procurement Toolkit A Resource for the Voluntary and Community Sector and Social Enterprises January 2016 Commissioning and Procurement Toolkit With government increasingly funding the

More information

Estates, Facilities & Professional Services. Transactional Finance, Accountancy & Transactional Procurement Services Framework User Guide

Estates, Facilities & Professional Services. Transactional Finance, Accountancy & Transactional Procurement Services Framework User Guide . Estates, Facilities & Professional Services Transactional Finance, Accountancy & Transactional Procurement Services Framework Framework Reference Number: LPP/2013/00002 April 2015 2 Version Control Contributor(s)

More information

Procurement Policy & Procedures

Procurement Policy & Procedures Procurement Policy & Procedures 1 Introduction 2 Objectives 3 Organisation 4 Authority 5 Procurement Procedures 6 EU Procurement Regulations 7 General Principles of Procurement 8 Reporting & Information

More information

supplier qualification system guide Milton Keynes - Oakgrove

supplier qualification system guide Milton Keynes - Oakgrove supplier qualification system guide Milton Keynes - Oakgrove responsible business practices Metro Bank is committed to introducing responsible business practices that make it easier for our suppliers to

More information

A quick guide to. school food procurement

A quick guide to. school food procurement A quick guide to school food procurement Contents Page Why is good procurement important? 3 Good procurement in practice 4 Procurement decision tree 5 What are my options? 8 Pros and cons 9 How do I decide?

More information

What the new EU Public Procurement Directive means for SMEs: A DCO Overview

What the new EU Public Procurement Directive means for SMEs: A DCO Overview What the new EU Public Procurement Directive means for SMEs: A DCO Overview What the new EU Procurement Directive means for SMEs: A DCO Overview By Michael Crosby Communications Officer Connect on LinkedIn

More information

Market Engagement/Soft Market Event

Market Engagement/Soft Market Event Market Engagement/Soft Market Event Lifestyle Services Procurement September 28 th 2016 Public Health Procurement Leads Steve Curtis, Senior Procurement Officer Jayne Smith, Procurement Officer Aims Robust

More information

Supplier qualification system guide

Supplier qualification system guide Supplier qualification system guide Transforming the way we work together aldermore.co.uk Responsible business practices Aldermore is committed to introducing responsible business practices that make it

More information

FRAMEWORK OVERVIEW. The framework will enable trusts to procure cabinet locking devices either by direct award or through mini competition.

FRAMEWORK OVERVIEW. The framework will enable trusts to procure cabinet locking devices either by direct award or through mini competition. FRAMEWORK OVERVIEW HealthTrust Europe (HTE) s Cabinet Locking Devices framework provides high security access and key management solutions for medicine cabinets and restricted access areas. The framework

More information

Role of contracts & procurement

Role of contracts & procurement Role of contracts & procurement Many bring sites and/or containers are provided and serviced without any formal arrangement between the different parties (i.e. the local authority and the service provider)

More information

Increase credibility Demonstrate capability to meet the industry requirements through the recognised industry pre-qualification scheme

Increase credibility Demonstrate capability to meet the industry requirements through the recognised industry pre-qualification scheme UVDB Achilles UVDB FAQ s What is the Achilles UVDB Supplier Information Management Service? Achilles UVDB is the community for the UK utilities industry. It enables the utilities sector to use Achilles

More information

ISLE OF MAN GOVERNMENT PROCUREMENT POLICY GD 2017/0026

ISLE OF MAN GOVERNMENT PROCUREMENT POLICY GD 2017/0026 ISLE OF MAN GOVERNMENT PROCUREMENT POLICY GD 2017/0026 INCLUSIVE TOLERANT SUSTAINABLE INTRODUCTION This Document sets out the Council of Ministers Procurement Policy for Government Ministerial Forward

More information

Procurement Policy. Prepared By. Nick Ronan, Development Director. Date of Last Review November Date of Current Review March 2016

Procurement Policy. Prepared By. Nick Ronan, Development Director. Date of Last Review November Date of Current Review March 2016 Procurement Policy Prepared By Nick Ronan, Development Director Date of Last Review November 2012 Date of Current Review March 2016 Date of Next Review March 2019 Reviewed By Board 1. INTRODUCTION 1.1

More information

Date 24/01/12. Date 24/01/12. Date 24/01/12. Date. Date. Date 30 January Date 24/01/12. Date 24/01/12. Kate Kennally. Date 6/02/12.

Date 24/01/12. Date 24/01/12. Date 24/01/12. Date. Date. Date 30 January Date 24/01/12. Date 24/01/12. Kate Kennally. Date 6/02/12. DELEGATED POWERS REPORT NO. SUBJECT: Care Pathway Modelling and Invest to Save Intervention Design across Health and Social Care Services Dementia Care and Stroke Discharge Control sheet All reports 1.

More information

DOING BUSINESS WITH THE TRUST TENDERING FOR TRUST CONTRACTS

DOING BUSINESS WITH THE TRUST TENDERING FOR TRUST CONTRACTS DOING BUSINESS WITH THE TRUST TENDERING FOR TRUST CONTRACTS CONTENTS Page NHS Procurement... 3 Introduction... 4 Legislation and Codes of Practice... 5-6 Information Required by the Trust... 7 Tendering

More information

Competitive Tendering Policy. Pate s Grammar School

Competitive Tendering Policy. Pate s Grammar School Competitive Tendering Policy Pate s Grammar School Approved by: Finance & Facilities Committee Date: May 2018 Last reviewed: May 2018 Next review due by: May 2020 Contents 1. Aims... 1 2. Legislation and

More information

A framework guide for Off-Site Construction of New Homes (NH1)

A framework guide for Off-Site Construction of New Homes (NH1) A framework guide for Off-Site Construction of New Homes (NH1) Better buying for homes and local communities WWW.SCOTTISHPROCUREMENT.SCOT Introducing the SPA What makes the SPA different? The Scottish

More information

PLEASE ASK A MEMBER OF STAFF IF YOU WOULD LIKE A VERSION IN A DIFFERENT FORMAT

PLEASE ASK A MEMBER OF STAFF IF YOU WOULD LIKE A VERSION IN A DIFFERENT FORMAT Procurement Policy AS WITH ALL OF THE ASSOCIATION S POLICIES & PROCEDURES, THIS DOCUMENT, IN FULL AND IN PART, IS AVAILABLE IN SUMMARY, ON TAPE, IN BRAILLE, AND IN TRANSLATION INTO MOST OTHER LANGUAGES.

More information

PLEASURES AND PI OF PROCUREMENT

PLEASURES AND PI OF PROCUREMENT Brick Workshop 28 29/06/2017 Brymbo Ironworks PLEASURES AND PI OF PROCUREMENT PROCUREMENT The purchase of work, services, goods and assets PROCUREMENT PROCESS The actions taken in purchasing work, services,

More information

The impact and progress achieved against each of the principles of the 2015 WPPS is summarised below:

The impact and progress achieved against each of the principles of the 2015 WPPS is summarised below: Y Pwyllgor Cyfrifon Cyhoeddus / Public Accounts Committee PAC(5)-07-18 P2 National Assembly for Wales Public Accounts Committee: Public Procurement Evidence from Welsh Government Welsh Government Leadership

More information

Contract Management arrangements - Procurement Policy update

Contract Management arrangements - Procurement Policy update Agenda item: 13 Report title: Report by: Action: Contract Management arrangements - Procurement Policy update Gordon Duffus, Head of Procurement, Resources and Quality Assurance, gordon.duffus@gmc-uk.org,

More information

A quick guide to equality and procurement for housing

A quick guide to equality and procurement for housing A quick guide to equality and procurement for housing A quick guide to equality and procurement What s in this guide? This guide is intended to provide important information about key legal requirements

More information

Government Procurement: challenges and need for new approach Sheffield Hallam FM Conference

Government Procurement: challenges and need for new approach Sheffield Hallam FM Conference Government Procurement: challenges and need for new approach Sheffield Hallam FM Conference Deborah Rowland, Government Property Unit Paddy Howlin, Government Procurement Service 12 th September 2012 UNCLASSIFIED

More information

Audit services outline procurement strategy

Audit services outline procurement strategy Audit services outline procurement strategy November 2016 High quality independent audit is one of the cornerstones of public accountability. It gives assurance that taxpayers money has been well managed

More information

DE1 Pre-qualification Questionnaires

DE1 Pre-qualification Questionnaires Digital Engineering Series DE1 Pre-qualification Questionnaires Pre-qualification questionnaires CIBSE DE1: 2016 The Chartered Institution of Building Services Engineers 222 Balham High Road, London, SW12

More information

PROCUREMENT A SUMMARY GUIDE OF KEY POINTS

PROCUREMENT A SUMMARY GUIDE OF KEY POINTS PROCUREMENT A SUMMARY GUIDE OF KEY POINTS In Relation To Procurement Principles and Legislation INDEX NATIONAL LEGISLATION, POLICY AND GUIDANCE... 3 CCG PROCUREMENT THRESHOLDS... 3 EU THRESHOLDS... 3 EU

More information

Ensuring full compliance with policy & practice by staff and suppliers. Equality Analysis Report Template (2014)

Ensuring full compliance with policy & practice by staff and suppliers. Equality Analysis Report Template (2014) Equality Analysis Procurement Ensuring full compliance with policy & practice by staff and suppliers 1 Title of policy Procurement Policy Equality Analysis Report Template (2014) 2 Who does the policy,

More information

Request authorisation from your Gestamp contact to access the Gestamp Supplier Portal. View and participate in all upcoming opportunities with Gestamp

Request authorisation from your Gestamp contact to access the Gestamp Supplier Portal. View and participate in all upcoming opportunities with Gestamp Gestamp Supplier Risk (SRM) System Overview The Supplier Risk (SRM) provides the Gestamp group with a streamlined, standardised, and above-all sustainable supplier pre-qualification system. This will serve

More information

Reliable supply chain

Reliable supply chain Reliable supply chain Services for professional procurement. Be better informed, make better decisions. Achilles Supply-Line - The cost effective supplier management solution for buyers in Ireland www.achilles.com

More information

Procurement Policy. Policy Valid From 2 February Last Review date

Procurement Policy. Policy Valid From 2 February Last Review date Procurement Policy Policy Valid From 2 February 2016 Last Review date Next Review Date 2 February 2019 Contents Policy Statement Definition Commitment Appendix 1 Procurement Thresholds & Timescales 1 Policy

More information

Collaborate To Compete Developing consortia to deliver contracts

Collaborate To Compete Developing consortia to deliver contracts Collaborate To Compete Developing consortia to deliver contracts Introduction In the current economic and policy climate, many civil society organisations that have previously accessed funding from government

More information

A framework guide for Off-Site Construction of New Homes (NH1)

A framework guide for Off-Site Construction of New Homes (NH1) A framework guide for Off-Site Construction of New Homes (NH1) The new shape of procurement in Wales WWW.WELSHPROCUREMENT.CYMRU Introducing the WPA What makes the WPA different? The Welsh Procurement Alliance

More information

Aligning equality and procurement goals

Aligning equality and procurement goals Aligning equality and procurement goals Guide for the learning and skills sector Equality and diversity Aligning equality and procurement goals Contents Who this Guide is for 3 Overview 3 Equality legislation

More information

GLASGOW WEST HOUSING ASSOCIATION PROCUREMENT STRATEGY

GLASGOW WEST HOUSING ASSOCIATION PROCUREMENT STRATEGY GLASGOW WEST HOUSING ASSOCIATION PROCUREMENT STRATEGY 2016-2020 Glasgow West Housing Association Limited Registered with The Scottish Housing Regulator HEP126 Registered under the Co-operative and Community

More information

Procurement Strategy period September 2012 September 2014

Procurement Strategy period September 2012 September 2014 National Library of Scotland Procurement Strategy period September 2012 September 2014 Aims This document aims to identify NLS strategy for the development and continued improvement of procurement systems,

More information

Medical Category Tower Providers Contract Awards. Questions and Answers

Medical Category Tower Providers Contract Awards. Questions and Answers Medical Category Tower Providers Contract Awards Questions and Answers 1. What is the Future Operating Model (FOM)? The National Health Service (NHS) has the potential, through greater collaboration, to

More information

European Maritime and Fisheries Fund Competitive Tendering and Public Procurement. Technical Guidance Notes

European Maritime and Fisheries Fund Competitive Tendering and Public Procurement. Technical Guidance Notes Welsh Government Rural Communities Rural Development Programme 2014-2020 European Maritime and Fisheries Fund 2014-2020 Competitive Tendering and Public Procurement Technical Guidance Notes Crown Copyright

More information

Glasgow Life Procurement Annual Report

Glasgow Life Procurement Annual Report 1 Glasgow Life Procurement Annual Report 2016-2017 1. Introduction This Annual Report provides an account of Glasgow Life s procurement activity for 2016/17. 2. Background and key statistics The Scottish

More information

Brief Guide to Public Sector EU Procurement Legislation. Services for professional procurement. Be better informed, make better decisions.

Brief Guide to Public Sector EU Procurement Legislation. Services for professional procurement. Be better informed, make better decisions. Services for professional procurement. Be better informed, make better decisions. Brief Guide to Public Sector EU Procurement Legislation www.achilles.com Public procurement in the European Union (EU)

More information

What Constructionline offers you

What Constructionline offers you Constructionline exists to simplify the supplier assessment service and ensure that both suppliers and buyers gain the most from a PAS91 aligned pre-qualification process. This document has been put together

More information

Project: Replacement provision for the Highway Term Service Contract (HTSC)

Project: Replacement provision for the Highway Term Service Contract (HTSC) BUSINESS JUSTIFICATION CASE (BJC) Project: Replacement provision for the Highway Term Service Contract (HTSC) Purpose: To support the Councils Highways Service in the management of highways infrastructure,

More information

A framework guide for Modular Buildings (MB1)

A framework guide for Modular Buildings (MB1) A framework guide for Modular Buildings (MB1) Better buying for homes and local communities Introducing the SPA What makes the SPA different? The Scottish Procurement Alliance (SPA) is a new approach for

More information

provide the key responsibilities of UK SBS in delivering quality and effective Strategic Procurement services to the Client

provide the key responsibilities of UK SBS in delivering quality and effective Strategic Procurement services to the Client The purpose of this Procurement Service Schedule is to: provide detail on the current scope of UK SBS Strategic Procurement services to BIS show service areas that have been determined as in scope for

More information

Apex Housing Association Appointment of consultants procedure

Apex Housing Association Appointment of consultants procedure 1.0 OBJECTIVE 2.0 SCOPE 1.1 To establish, implement, and maintain a procedure to define the requirements for the appointment of consultants. 2.1 This procedure applies to the processes relating to the

More information

Parliamentary Procurement Rules

Parliamentary Procurement Rules Parliamentary Procurement Rules Document Revision History and Key Facts Version Issue date Policy owner Date of next review Comments/ brief description of main changes in this revision 001 01/01/15 PPCS

More information

MG ALBA PROCUREMENT POLICY AND SCHEME OF TENDERING

MG ALBA PROCUREMENT POLICY AND SCHEME OF TENDERING MG ALBA PROCUREMENT POLICY AND SCHEME OF TENDERING 1 PROCUREMENT POLICY 1 Purpose and Compliance 1.1 The purpose of this Procurement Policy and Scheme of Tendering is to set clear rules for the procurement

More information

In total, nine bidders submitted a PQQ response and five were successfully taken forward to the Invitation to Tender stage.

In total, nine bidders submitted a PQQ response and five were successfully taken forward to the Invitation to Tender stage. Report to Cabinet 12 th January 2017 By the Cabinet Member for Leisure and Culture & By the Cabinet Member for Finance and Assets DECISION REQUIRED Main report not exempt Appendix 1 Exempt under Paragraph

More information

Corporate Strategy for Commissioning and Procurement

Corporate Strategy for Commissioning and Procurement Corporate Strategy for Commissioning and Procurement 2012-2015 Page 1 of 19 C ontents 1 I n t r o d u c t i o n... 3 Introduction to Durham County Council... 3 Introduction to the Corporate Strategy for

More information

GLOSSARY C O N T E N T S PAGE. Group Procurement Strategy

GLOSSARY C O N T E N T S PAGE. Group Procurement Strategy C O N T E N T S PAGE 1 Executive Summary 3 2 Scope of this Strategy 3 3 Procurement Principles 4 4 Route To Market 6 5 Procurement Governance 8 6 Procurement Plan 2018/19 8 GLOSSARY EU European Union ICT

More information

Audit services procurement strategy

Audit services procurement strategy Audit services procurement strategy December 2016 High quality independent audit is one of the cornerstones of public accountability. It gives assurance that taxpayers money has been well managed and properly

More information

Electricity for Education User Guide. Low costs Budget certainty Dedicated point of contact at YPO and npower

Electricity for Education User Guide. Low costs Budget certainty Dedicated point of contact at YPO and npower Electricity for Education User Guide Low costs Budget certainty Dedicated point of contact at YPO and npower ypo.co.uk/energyforschools schoolsenergy@ypo.co.uk Key Contract Facts Fully OJEU compliant contract

More information

Tendering and Procurement

Tendering and Procurement The Handy Guide to Tendering and Procurement Updated March 2012 Project Development & Support Ltd The Handy Guide to Tendering and Procurement Updated March 2012 Contents Guidance on the principles which

More information

DOING BUSINESS WITH THE TRUST TENDERING FOR TRUST CONTRACTS

DOING BUSINESS WITH THE TRUST TENDERING FOR TRUST CONTRACTS DOING BUSINESS WITH THE TRUST TENDERING FOR TRUST CONTRACTS CONTENTS Page NHS Procurement... 3 Introduction... 4 Legislation and Codes of Practice... 5-6 Information Required by the Trust... 7 Tendering

More information

2. What is the aim, objective or purpose of the policy, procedure, service or function?

2. What is the aim, objective or purpose of the policy, procedure, service or function? Equalities Impact Assessment (EIA) Purchasing Services Purchasing Processes A.Policy/practice details 1. Title of Policy/Practice University of Bath Purchasing Processes 2. What is the aim, objective or

More information

Oman LNG L.L.C. Pre-Qualification of Tenderers NGH : PROVISION OF MANPOWER RECRUITMENT SERVICES

Oman LNG L.L.C. Pre-Qualification of Tenderers NGH : PROVISION OF MANPOWER RECRUITMENT SERVICES Oman LNG L.L.C. Pre-Qualification of Tenderers NGH-16-843 : PROVISION OF MANPOWER RECRUITMENT SERVICES Provision of Manpower Recruitment Services Page 1 of 7 06/09/16 GUIDELINES Response to this questionnaire

More information

London Borough of Newham E-Auction Case Study

London Borough of Newham E-Auction Case Study London Borough of Newham E-Auction Case Study Target Audience Local Authorities Title: Identification: Version: Collaborative E-Auction Case Study Draft Date of Issue: July 2005 Current Status: Prepared

More information

Annual Procurement Report 2017/18. Prepared by: Gillian Berry, Senior Accountant Contact:

Annual Procurement Report 2017/18. Prepared by: Gillian Berry, Senior Accountant Contact: Annual Procurement Report 2017/18 Prepared by: Gillian Berry, Senior Accountant Contact: 01382 207140 Approved by: Board: 18 December 2018 1 Contents 1.0 Introduction 1.1 About the Care Inspectorate 2.0

More information

Procurement Policy. Education is for improving lives and for leaving your community and world better than you found it.

Procurement Policy. Education is for improving lives and for leaving your community and world better than you found it. Procurement Policy Education is for improving lives and for leaving your community and world better than you found it. Review date: April 2020 Page 1 of 13 Contents 1. Introduction... 3 2. Principles...

More information

FRAMEWORK BRIEF. Information Communication Technology (ICT) Solutions

FRAMEWORK BRIEF. Information Communication Technology (ICT) Solutions FRAMEWORK BRIEF Information Communication Technology (ICT) Solutions FRAMEWORK OVERVIEW The HealthTrust Europe (HTE) Information Communication Technology (ICT) Solutions framework for the provision of

More information

ECMWF Copernicus procurement process

ECMWF Copernicus procurement process ECMWF Copernicus procurement process Sylvia Baylis ECMWF Head of Procurement Funded by the European Union Implemented by ECMWF s procurement process Procurements for CAMS and C3S Copernicus services will

More information

RE-PROCUREMENT OF THE COLLABORATIVE SOUTH EAST WALES HIGHWAYS AND CIVILS CONSTRUCTION FRAMEWORK (SEWHIGHWAYS2)

RE-PROCUREMENT OF THE COLLABORATIVE SOUTH EAST WALES HIGHWAYS AND CIVILS CONSTRUCTION FRAMEWORK (SEWHIGHWAYS2) CARDIFF COUNCIL CYNGOR CAERDYDD CABINET MEETING: 27 JULY 2017 RE-PROCUREMENT OF THE COLLABORATIVE SOUTH EAST WALES HIGHWAYS AND CIVILS CONSTRUCTION FRAMEWORK (SEWHIGHWAYS2) REPORT OF CORPORATE DIRECTOR

More information

FRAMEWORK BRIEF. Information Communication Technology (ICT) Solutions

FRAMEWORK BRIEF. Information Communication Technology (ICT) Solutions FRAMEWORK BRIEF Information Communication Technology (ICT) Solutions FRAMEWORK OVERVIEW The HealthTrust Europe (HTE) Information Communication Technology (ICT) Solutions framework for the provision of

More information

FRAMEWORK BRIEF. X-Ray Contrast Media & Associated Products

FRAMEWORK BRIEF. X-Ray Contrast Media & Associated Products FRAMEWORK BRIEF X-Ray Contrast Media & Associated Products FRAMEWORK OVERVIEW The HealthTrust Europe (HTE) framework agreement for X-Ray Contrast Media and Associated Products includes all types of contrast

More information

Brief Guide to Public Sector EU Procurement Legislation. Despatch PIN not a call for competition (optional) allowing shortened timescale

Brief Guide to Public Sector EU Procurement Legislation. Despatch PIN not a call for competition (optional) allowing shortened timescale A summary of the Open Procedure: Brief Guide to Public Sector EU Procurement Legislation Despatch PIN not a call for competition (optional) allowing shortened timescale before the contract notice was dispatched,

More information

A framework guide for Modular Buildings (MB1)

A framework guide for Modular Buildings (MB1) A framework guide for Modular Buildings (MB1) The new shape of procurement in Wales WWW.WELSHPROCUREMENT.CYMRU Introducing the WPA What makes the WPA different? The Welsh Procurement Alliance (WPA) is

More information

Simplifying Supplier Selection. Sue Hurrell, Value Wales

Simplifying Supplier Selection. Sue Hurrell, Value Wales Simplifying Supplier Selection Sue Hurrell, Value Wales What am I covering? Background Supplier Selection what we set out to achieve SQuID what is it? The risk-based approach Summary of content The project

More information

Edinburgh Region Procurement Team (ERPT) Procurement Strategy: January 2017 July 2018

Edinburgh Region Procurement Team (ERPT) Procurement Strategy: January 2017 July 2018 Edinburgh Region Procurement Team (ERPT) Procurement Strategy: January 2017 July 2018 Institutional Membership Status Version 1.0 Owner Andrew Foulner, CPO, ERPT Source location Procurement website Publication

More information

PROCUREMENT POLICY. Director of Finance Head of Financial Services. The Intranet version of this document is the only version that is maintained.

PROCUREMENT POLICY. Director of Finance Head of Financial Services. The Intranet version of this document is the only version that is maintained. PROCUREMENT POLICY Document Summary To ensure the Trust s approach to Purchasing, Supply and Distribution provides the maximum benefit in both cost and service to the Trust. DOCUMENT NUMBER POL/002/043

More information

CAN DO the. toolkit 2. RESOURCE 1: Can Do Toolkit 2. Funded by. MerthyrValleys. Quality Living Striving for Excellence Working Together

CAN DO the. toolkit 2. RESOURCE 1: Can Do Toolkit 2. Funded by. MerthyrValleys. Quality Living Striving for Excellence Working Together SMEfriendly procurement CAN DO the toolkit 2 Funded by MerthyrValleys H O M E S Quality Living Striving for Excellence Working Together RESOURCE 1: Can Do Toolkit 2 IMPORTANT: All three resources that

More information

DOING BUSINESS WITH NHS EDUCATION FOR SCOTLAND

DOING BUSINESS WITH NHS EDUCATION FOR SCOTLAND DOING BUSINESS WITH NHS EDUCATION FOR SCOTLAND A SUPPLIER S GUIDE Quality Education for a Healthier Scotland V3 Produced by: The NES Procurement Team commissioning@nes.scot.nhs.uk April 2010 INDEX 1. Introduction

More information

Welcome. STAKEHOLDER ENGAGEMENT WORKSHOP. New Thinking New Beginning

Welcome. STAKEHOLDER ENGAGEMENT WORKSHOP. New Thinking New Beginning Welcome. STAKEHOLDER ENGAGEMENT WORKSHOP New Thinking New Beginning SPPRA CIRCULARS SPPRA Circular No.1 of 2015 :CONTROL OF PRICES PAID BY PROCURING ENTITIES TO PREVENT AWARDING OF CONTRACTS TO TENDERERS

More information

FRAMEWORK AGREEMENT GUIDE

FRAMEWORK AGREEMENT GUIDE FRAMEWORK AGREEMENT GUIDE For timber window and door products Trusted procurement for better buildings and homes 03 WHY WORK WITH LHC? About this framework agreement These are the key reasons to work with

More information

Contents Contact details

Contents Contact details Procurement Strategy - Period December 2016 December 2018 Contents 1.0 Introduction / Executive Summary... 2 2.0 Procurement Vision and Mission Statement... 2 3.0 Strategic rationale / context... 2 3.1

More information

Pre-qualification Reform Project. Briefing Document Common Assessment Standard

Pre-qualification Reform Project. Briefing Document Common Assessment Standard Pre-qualification Reform Project Briefing Document Build UK believe that a key enabler of pre-qualification reform is the creation of a for the industry, providing a common benchmark for auditing pre-qualification

More information

BIS Research & Evaluation Framework. Guide for Buyers

BIS Research & Evaluation Framework. Guide for Buyers BIS Research & Evaluation Framework Guide for Buyers Framework reference: CR150025BIS BIS Research & Evaluation Framework: Guide for Buyers Update 22 June 2016 1 P age Research & Evaluation Framework Contract

More information

Prequalification Questionnaire. for. Property Related Professional Services. PROC/2013/80/CT/Professional Services EU RESTRICTED PROCEDURE

Prequalification Questionnaire. for. Property Related Professional Services. PROC/2013/80/CT/Professional Services EU RESTRICTED PROCEDURE Section A Prequalification Questionnaire for Property Related Professional Services PROC/2013/80/CT/Professional Services EU RESTRICTED PROCEDURE CONTENTS Section A Section B Section C Appendix 1 Appendix

More information

DOING BUSINESS WITH THE TRUST TENDERING FOR TRUST CONTRACTS

DOING BUSINESS WITH THE TRUST TENDERING FOR TRUST CONTRACTS DOING BUSINESS WITH THE TRUST TENDERING FOR TRUST CONTRACTS CONTENTS Page NHS Procurement... 3 Introduction... 4 Legislation and Codes of Practice... 5-6 Information Required by the Trust... 7 Tendering

More information

Implementation of the EU Procurement Directives and Wider Commercial Reform. Ed Green Deputy Director, EU and Domestic Procurement Policy

Implementation of the EU Procurement Directives and Wider Commercial Reform. Ed Green Deputy Director, EU and Domestic Procurement Policy Implementation of the EU Procurement Directives and Wider Commercial Reform Ed Green Deputy Director, EU and Domestic Procurement Policy Agenda Crown Commercial Service Policy Priorities European Policy

More information

Sanctuary Group: Sanctuary Group is a trading name of Sanctuary Housing Association, an exempt charity, and all of its subsidiaries.

Sanctuary Group: Sanctuary Group is a trading name of Sanctuary Housing Association, an exempt charity, and all of its subsidiaries. Title: Procurement Strategy Business Function: All Functions across Author(s): Group Procurement Other Contributors: Legal Services Authorised by: Sanctuary Scotland Board Chief Financial Officer : is

More information

Parliamentary Procurement Rules

Parliamentary Procurement Rules Parliamentary Procurement Rules Document Revision History and Key Facts Version Issue date Policy owner Date of next review Comments/ brief description of main changes in this revision 001 01/01/15 PPCS

More information

POLICY DOCUMENT. For use by all member schools. Procurement, Tendering and Sponsorship

POLICY DOCUMENT. For use by all member schools. Procurement, Tendering and Sponsorship POLICY DOCUMENT For use by all member schools Procurement, Tendering and Sponsorship Name Date Written By C Sheehan CFO Nov 2017 Approved by Committee v1.0 Rob Taylor, Chair of FARCO Feb 2018 Review Version

More information

Public Procurement Guidelines for LEADER Funding Applicants

Public Procurement Guidelines for LEADER Funding Applicants Public Procurement Guidelines for LEADER Funding Applicants Disclaimer: This Guidance Note is issued without liability and is for general information purposes only. County Wicklow Partnership accept no

More information

Questions and answers

Questions and answers The Engagement Gateway Pre qualification questionnaire Questions and answers Q1. At launch events, there were a specific number of participants mentioned at the three levels. Have these numbers changed?

More information

NHS GREENWICH Clinical Commissioning Group. Procurement Framework Document. Version 1.4

NHS GREENWICH Clinical Commissioning Group. Procurement Framework Document. Version 1.4 NHS GREENWICH Clinical Commissioning Group Procurement Framework Document Version 1.4 Date Version Status Comments 28/03/2013 1.3 Draft Draft submitted to Governing Body on 3/04/13 and Market Management

More information

Responding to the Public Services (Social Value) Act 2012

Responding to the Public Services (Social Value) Act 2012 Number: 95 Responding to the Public Services (Social Value) Act 2012 Authors: Matthew Jackson, Head of Research, CLES, 0161 236 7036, matthewjackson@cles.org.uk and Louis Harrison, CLES intern Introduction

More information

FRAMEWORK BRIEF. Pathology Referral Testing and Reporting Services

FRAMEWORK BRIEF. Pathology Referral Testing and Reporting Services FRAMEWORK BRIEF Pathology Referral Testing and Reporting Services FRAMEWORK OVERVIEW HealthTrust Europe (HTE) has put in place a framework agreement for Pathology Referral Testing and Reporting Services.

More information

Procurement. Equalities in Procurement Policy. Policy Review Period/Expiry. November 2014

Procurement. Equalities in Procurement Policy. Policy Review Period/Expiry. November 2014 Procurement Equalities in Procurement Policy Policy Manager Andy Hay Policy Group Procurement Policy Established November 2013 Policy Review Period/Expiry November 2014 Last Updated November 2013 Aims

More information

Procurement Strategy and Action Plan. Financial Year

Procurement Strategy and Action Plan. Financial Year Procurement Strategy and Action Plan Financial Year 2018-2019 Status Final Owner Procurement Source location Procurement website Consultation APUC Endorsed Audit Committee 11 June 2018 Publication 1 August

More information

Electricity Procurement

Electricity Procurement Electricity Procurement Energy Managers Guide to Electricity Procurement Produced by the Energy Manager s Association Introduction Summary This guide offers an overview of the energy procurement process

More information

A simple Procurement Process Flow diagram is shown in Appendix 1 and should be considered when carrying out spend.

A simple Procurement Process Flow diagram is shown in Appendix 1 and should be considered when carrying out spend. Scottish Canals Procurement Policy Introduction The Scottish Canals Procurement Policy supports the Scottish Canals Procurement Strategy and sets out the method of delivery of the day-to-day procurement