Interconnection Specialists ensure all projects are treated in accordance with the current applicable tariff provisions

Size: px
Start display at page:

Download "Interconnection Specialists ensure all projects are treated in accordance with the current applicable tariff provisions"

Transcription

1

2

3

4 After the study process, main contact becomes your ISO contract negotiator Reports will be issued using Resource Interconnection Management System database (RIMS). It is imperative that project owners apply for access at the earliest opportunity following submission of an Interconnection Request. Interconnection Specialists ensure all projects are treated in accordance with the current applicable tariff provisions

5 Interconnection Specialists also ensure all projects are treated in accordance with the current applicable tariff provisions

6

7 Examples may include administration, operations, planning, and accounting requirements and the market that are consistent with the ISO tariff.

8 8

9 Cluster is the most common study type; a group of Interconnection Requests studied together to determine system impacts Delineation within the interconnection process due to size

10 See Appendix DD Section 1.3 There is no study or analysis performed as part of the pre-application process. Pre-Application Request Form is similar to a scaled version of an Interconnection Request (IR)

11

12 Estimated schedule. Does not include Generator Interconnection Agreement, construction and New Resource Interconnection (NRI) process (full network model, metering and telemetry, etc.) which is 6/7 months or more. Acronyms BD (Business Day) CD (Calendar Day) FT (Fast Track) GIA (Generator Interconnection Agreement) ISP (Independent Study Process)

13

14

15 15

16 Small project 20 MW or smaller Large project larger than 20 MW

17 17

18 Link to the Generator Interconnection queue at the end of the presentation Includes non-confidential project information (Study Type, size, location POI, COD, current study status, status of the GIA) Tabs for Active projects (project in study process through GIA execution and build out of project, Completed projects (projects that are commercially available), and Withdrawn projects Queue report is posted in Excel and.pdf formats, Excel allows you to slice and dice the data in a manner that is meaningful to you 18

19

20 April 1st-15 th is the only cluster application window each year. (New timeline is pending FERC approval) A Study Group is a group of electrically related projects usually located in a certain geographic area. Two and a third year period includes Scoping Meeting, two study phases, and deliverability allocation 20

21 Estimated schedule. Does not include Generator Interconnection Agreement, construction, and New Resource Interconnection (NRI) process (full network model, metering and telemetry, etc.) which is 203 days or more. Meeting invitees: Interconnection Customer California Independent System Operator Participating Transmission Owner Affected Systems (Tariff Appendix DD 3.7) Queue Management manages overall coordination with Affected Systems. Generator Interconnection and Deliverability Allocation Procedures (GIDAP) Business Practice Manual (BPM) Acronyms BD (Business Day) CD (Calendar Day) COD (Commercial Operation Date) IF (Interconnection Facility) NU (Network Upgrade) POI (Point of Interconnection) 21

22 Cost responsibility (Tariff Appendix DD 7.3, 8.3, 8.4, ) NU posting adjustments Reassessment - new upgrades or change in cost allocation factor (App DD 11.5, Technical bulletin: Generator Interconnection Procedures Reassessment Process, stakeholder process) Appendix B changes (App DD , 6.7.3). After Phase II study and subsequent allocation, IC s allocation decisions may reduce/eliminate some upgrades (App DD 8.9.8). Links to: Technical bulletin: Generator Interconnection Procedures Reassessment Process Appendix B form Deliverability Allocation Customer Options Form provided Option A/B deliverability impacts: Link for Generator Interconnection and Deliverability Allocation Procedures Cluster Process Summary Session 3, Studies, Study Results, and Project Cost Responsibility Acronyms IF (Interconnection Facilities) NU (Network Upgrade) TP (Transmission Planning) 22

23 Tariff Appendix DD ; In-Service Date, Trial Operation commencement date, and Commercial Operation Date may change as supported by the study report and Appendix B allowable changes. Material Modification review through Queue Management possibly required for others BPMs: Generator Interconnection and Deliverability Allocation Procedures 7 Generator Management 3 Acronyms BD (Business Day) GISPA (Generator Interconnection Study Process Agreement) IR (Interconnection Request) 23

24 Separate Postings Due for NU vs. IF Cluster Posting Ranges (see tables in Generator Interconnection and Deliverability Allocation Procedures Cluster Process Summary link provided): Initial Posting Range (Tariff Appendix DD 11.2) o IF - Lesser of actual or Small: Result of formula, $50K min Large: Result of formula, $500K min, $7.5M max o NU (Only Option B projects include ADNUs in formula) - Lesser of actual or Small: Result of formula, $50K min Large: Result of formula, $500K min, $7.5M max Second Posting Range (App DD ) o IF - Lesser of actual or Small: Result of formula, $100K min, $1M max Large: Result of formula, $500K min, $7.5M max o NU (Only Option B projects include ADNUs in formula) - Lesser of actual or Small: Result of formula, $100K min, $1M max Large: Result of formula, $500K min, $15M max Post actual cost amount when less than minimum calculation (App DD ) Acronyms IF (Interconnection Facility) NU (Network Upgrade) PTO (Participating Transmission Owner) 24

25 Posting timing: Tariff Appendix DD , , Substantial error or omission: under/overstatement of IC s NU or IF cost responsibility by more than 5% or $1M, whichever is greater (App DD 6.8.1, 6.8.3) Dispute of study report does not change amount of posting or due date. If approved, any needed adjustments made then. Acronyms CD (Calendar Day) 25

26 Tariff Appendix DD Section 4- Independent Study Process Eligibility: -Must provide demonstration of adequate financing or financial resources -Point of Interconnection must be at 1) existing facility that doesn t require expansion or 2) facility that is in process of being built/expanded that will be in service by the COD. -Needed and identified RNUs must be in service prior to the COD -Also, demonstrate ability to obtain reg. approvals/permits as well as purchase order for gen equipment. System Impact Study and Facilities Study (Section 4.4) includes short circuit analysis, a stability analysis, a power flow analysis, an assessment of the potential magnitude of financial impacts, if any, on Local Furnishing Bonds, and a proposed resolution, and any other studies that are deemed necessary. 26

27 Tariff Appendix DD 4, Estimated schedule. Does not include Generator Interconnection Agreement, construction and New Resource Interconnection (NRI) process (full network model, metering and telemetry, etc.) which is 6/7 months or more. The ISP Deliverability portion is included with the next Cluster process requires almost two and a third years. Determine Eligibility 30 CDs Determine Electrical Independence 30 CDs Scoping Meeting set within 5 BDs of determining electrical independence (target within 30 CDs) System Impact and Facilities Study (SIFS) within 120 CDs of executing a study agreement for the study SIFS Results Meeting (optional) within 20 BDs of receipt of SIFS report. GIA Tendered - within 30 CDs from SIFS results meeting. No deliverability in this GIA. IC Comments to GIA - within 30 CDs. GIA negotiations - <= 120 CDs from SIFS report. If deliverability is requested, that is studied with the next cluster. Acronyms BD (Business Day) CD (Calendar Day) GIA (Generator Interconnection Agreement) IC (Interconnection Customer) ISO (Independent System Operator) ISP (Independent Study Process) NRI (New Resource Interconnection) RNU (Reliability Network Upgrade) SIFS (System Impact and Facilities Study) 27

28 Posting timing: Tariff Appendix DD , , ISP: Optional Deliverability Assessment (App DD 4.6 and 11) (Initial, Second, and Third IFS with Cluster postings) Substantial error or omission: under/overstatement of IC s NU or IF cost responsibility by more than 5% or $1M, whichever is greater (App DD 6.8.1, 6.8.3) Dispute of study report does not change amount of posting or due date. If approved, any needed adjustments made then. Acronyms BD (Business Day) CD (Calendar Day) ISP (Independent Study Process) 28

29 Separate Postings Due for NU vs. IF Acronyms IF (Interconnection Facility) ISP (Independent Study Process) NU (Network Upgrade) PTO (Participating Transmission Owner) 29

30 Tariff Appendix DD Section 5 No larger than 5MW with Energy Only deliverability; however, it can be an expansion to existing project/resource. There is a $500 processing fee. Screens must be met, as detailed in Section Customer Options meetings are needed if they fail screens. Additional Supplemental Review meeting based on the outcomes of the Customer Options Meetings (includes a short study process and additional deposit for estimated costs) 30

31 Tariff Appendix DD 5 Awaiting FERC ruling on requested changes. Estimated schedule. Does not include project construction and ISO s New Resource Interconnection (NRI) process (full network model, metering and telemetry, etc.) which is 6/7 months or more. No Deliverability. Deem IR complete, valid, and ready to study within 10 BDs (depending on IR package completeness and accuracy). Initial Review (screens) within 15 BDs from determining eligibility. Customer Options Meeting within 10 BDs from determination of upgrades or additional studies needed. Supplemental Review within 10 BDs of receipt of study deposit. SGIA (Small Generator Interconnection Agreement) Tendered within 15 BDs: Passing screens and determining no upgrades anticipated Failing screens, no upgrades anticipated, but ok to interconnect Passing screens, reasonable upgrades and after confirmation of IC agreeing to pay for upgrades. No deliverability in GIA. Acronyms BD (Business Day) FT (Fast Track) IR (Interconnection Request) 31

32 Fast Track assumes no upgrades are necessary. However, costs may be identified from the Customer Options or Supplemental Review depending on what modifications are needed. Acronyms IF (Interconnection Facility) NU (Network Upgrade) PTO (Participating Transmission Owner) 32

33

34 Deliverability is the difference between a project that is Energy Only and Full Capacity. Resource Adequacy requirements: the incentive is that the resource can receive NQC payments in addition to what it receives for supplying energy.

35 Deliverability is the difference between a project that is Energy Only and Full Capacity. Resource Adequacy requirements: the incentive is that the resource can receive NQC payments in addition to what it receives for supplying energy.

36 Tariff Appendix DD Section 9.2 Payment of study fee does not guarantee of deliverability Previously studied for EO: Option A not allocated TP Deliverability that converted to EO Option B which chose Partial Capacity deliverability, now wants additional deliverability Both Option A and B must have GIAs in good standing. * Cluster or ISP projects (plus PTO WDAT projects) that didn t originally request FC or PC deliverability on the original IR, or * FT projects that would now like to try and obtain deliverability, or *projects that didn t receive all of the deliverability you wanted or needed through the TPD allocation process (which I will cover in a moment) *For projects that lost deliverability by not maintaining the requirements.

37 Tariff Section This process is not part of GIDAP (Tariff Appendix DD); the process is outlined in California ISO Tariff Section UDC manages the application process and assignment of deliverability subject to the California ISO Tariff. California ISO reviews the applications and validates assignments. Only applies to distribution level projects ONLY. Qualifying Facilities (QF) conversions have grandfathered deliverability. DG must complete New Resource Implementation Checklist to utilize the assigned deliverability

38 Allocation criteria (captured in affidavit) (Tariff Appendix DD 8.9.2): All deliverability projects must meet minimum permitting and financing criteria to be eligible for an allocation of deliverability. Minimum requirement for permitting is IC has applied for the necessary governmental permit or authorization for the construction. Minimum requirement for financing involves balance sheet financing, commitment of project financing for full MW amount, regulator approved PPA meeting specific criteria, or included on an active short list... Only Option A projects may park the first time through. Link to Affidavit for Projects Seeking Deliverability and GIDAP Business Practice Manual provided GIDAP BPM - additional details, including affidavit scoring (GIDAP BPM , part iii and ) Acronyms ISO (Independent System Operator) PTO (Participating Transmission Operator) WDAT (Wholesale Distribution Access Tariff) 38

39 39

40 Tariff Appendix DD Section 8.9 Initial TP Deliverability affidavit, Affidavit Template for Projects Seeking Transmission Plan Deliverability, identifies minimum financing and permitting criteria. Acronyms ISP (Independent Study Process) TP (Transmission Plan) 40

41 Tariff Appendix DD 7.4, 7.5 Notified by market notice. IPE- Any downsized project will have any refund of their IFS based on their pre-downsized amounts. Project has to be in good standing- (a)timely IFS and complied with requirements of the Tariff. (b)the IR is not withdrawn or deemed withdrawn (c)in compliance with the terms of the IA (hasn t received a notice of breach where the project never cured a deficiency) Annual downsizing and reassessment study- This is a reassessment of the Phase I base case prior to the Phase II studies. It takes into the account any impacts that withdrawals, downsized projects, results of TP deliverability from prior Interconnection study cycle. COD Requirements ( ): Has not achieved the last COD in GIA Or Has achieved the last COD in GIA but total MW capacity is lower than what is in GIA. Amount must be greater than the de minimis threshold. Acronyms COD (Commercial Operation Date) GIA (Generator Interconnection Agreement) NU (Network Upgrade) 41

42 42

43

44 Tariff Appendix DD 3.8 Acronyms IC (Interconnection Customer) IR (Interconnection Request) ISO (Independent System Operator) 44

45 Tariff Appendix DD Effect on the study deposit < 30 CDs following Scoping Meeting: 100% of unused portion of study deposit > 30 CDs following the Scoping Meeting but on or before 30 days following the phase I results meeting: Difference between study deposit and greater of: Costs incurred, or One-half the original study deposit up to a maximum of $100,000 ($50,000 for projects 20 MW or less) > 31 days following the phase I results meeting No refund If IC proceeds to sign a GIA any unused portion of the study deposit is refunded IC invoiced for amounts exceeding study deposit Site Exclusivity Deposit refundable at any time Acronyms CD (Calendar Day) 45

46 Tariff Appendix DD

47 Financial Security for Network Upgrades IC must meet the conditions for partial recovery to qualify for partial recovery of financial security. See all six Conditions for Partial Recovery of Interconnection Financial Security- Tariff Appendix DD Most common: Failure to secure a power purchase agreement Failure to secure a necessary permit Documents supporting condition for recovery will be required, if applicable Acronyms ISP (Independent Study Process) 47

48 Withdrawal between the first posting and the deadline for the second posting Lesser of IFS (plus any other provided security plus any separately provided capital): less all costs and expenses incurred or irrevocably committed, OR minus the lesser of 50% of posted value or $10,000/MW Withdrawal between the second posting and the commencement of construction activities Lesser of IFS (plus any other provided security plus any separately provided capital): less all costs and expenses incurred or irrevocably committed OR minus the lesser of 50% of posted value or $20,000/MW Tariff Appendix DD , Acronyms IFS (Interconnection Financial Security) 48

49 Acronyms IC (Interconnection Customer) IFS (Interconnection Financial Security) NU (Network Upgrade) 49

50 Acronyms IC (Interconnection Customer) IFS (Interconnection Financial Security) NU (Network Upgrade) 50

51 Acronyms IC (Interconnection Customer) IFS (Interconnection Financial Security) NU (Network Upgrade) 51

52 Acronyms IC (Interconnection Customer) IFS (Interconnection Financial Security) NU (Network Upgrade) 52

53 RIMS is a secure web-based database application Used to track and manage data from active as well as withdrawn Interconnection Requests in the ISO queue Allows for the accurate tracking of customer submitted data, project tasks and milestones by the ISO and the PTOs Accessed through secure website portals Interconnection Customers and PTOs have viewing access to only their projects Interconnection Customers access their study reports in RIMS

54 - RIMS Home Page defaults to the New Request tab - Information on the right instructs a user on how to view the ISO Generator Interconnection Queue and a link to the application information on CAISO.com.

55 1. Fill in the New Request section to receive a registration code via that will allow you to upload an Interconnection Request and associated documents. This only needs to be done once for each project.

56

57 1. Once a registration code is received, paste it into the Registration Code field and hit Submit. 2. The registration code can be shared at the registrant s discretion, allowing multiple people to upload required information.

58 The box contains an inventory of documents and project types that require them to complete your application The Interconnection Request form found on the Generation Interconnection webpage is the only version that is compatible with the electronic, previous versions are not compatible and will not successfully upload Click on the Upload Project Files

59

60 Notification of successful submission is shown in a yellow banner at the bottom of the page

61 Access established via the ISO s Access Identity Management system Massih Ahmadi from Customer Service will uncover the mysteries of AIM after my presentation.. Study costs and invoices are available to view Documents available to view include: IR documents Reports Meeting minutes Agreements Updated documents and documents due during the study process can be uploaded, such as: Appendix B to the study agreement due after the Phase I study TP Deliverability affidavit

62 62

63 63

64 64

65 65

66 66

67 67

68 68

69 Side note the very first time you try to access a document in RIMS, you will see this screen. DO NOT BE AFRAID! Close the screen and wait ~30 minutes. SharePoint is running a security routine. This only happens one time. After waiting, you will be able to go in and access any of the documents. 69

70 70

71

72 72

73 73

74 74

75

76 76

77 77

78 78

79 79

80 80

81 81

82 82

83 83

84 84

85 85

86 86

87 87

Small Generator Interconnection Procedures (SGIP) Customer Guide

Small Generator Interconnection Procedures (SGIP) Customer Guide Customer Guide SCE&G utilizes a FERC mandated and approved process, known as the Small Generator Interconnection Procedure (SGIP), to evaluate the interconnection of small generators to the SCE&G transmission

More information

Water & Energy Consulting Lon W. House, Ph.D.

Water & Energy Consulting Lon W. House, Ph.D. Water & Energy Consulting Lon W. House, Ph.D. 530.409.9702 (cell) lonwhouse@waterandenergyconsulting.com www.waterandenergyconsulting.com 2795 East Bidwell Street 10645 N. Oracle Rd. Suite 100-176 Suite

More information

Generator Interconnection Driven Network Upgrade Cost Recovery. Draft Final Proposal

Generator Interconnection Driven Network Upgrade Cost Recovery. Draft Final Proposal Generator Interconnection Driven Network Upgrade Cost Recovery Draft Final Proposal February 6, 2017 California ISO Draft Final Proposal Table of Contents 1. Summary... 3 2. Background... 3 3. Stakeholder

More information

Queue Management. A look at queue reform and. Jennifer Heintz and Janet Wheeler June 12, 2012

Queue Management. A look at queue reform and. Jennifer Heintz and Janet Wheeler June 12, 2012 Queue Management A look at queue reform and the queue process Jennifer Heintz and Janet Wheeler June 12, 2012 1a What is a queue? The interconnection queue (queue) refers to the process of getting a new

More information

Business Practice Manual for Reliability Requirements. Version 34

Business Practice Manual for Reliability Requirements. Version 34 Business Practice Manual for Reliability Requirements Version 34 Last Revised: January 1, 2009July 28, 2010 Approval History Approval Date: 3/27/09 Effective Date: 3/31/09 BPM Owner: Chetty Mamandur BPM

More information

Is FERC s Generator Interconnection Policy really conducive to efficient generation development?

Is FERC s Generator Interconnection Policy really conducive to efficient generation development? By Steven S. Garwood PowerGrid Strategies, LLC March 24, 2010 Is FERC s Generator Interconnection Policy really conducive to efficient generation development? Critical environment for efficient generation

More information

Open Access Transmission Tariff ATTACHMENT K

Open Access Transmission Tariff ATTACHMENT K ATTACHMENT K PART I Introduction The Transmission Provider s (herein referred to as Tacoma Power) local transmission planning process will include open planning meetings that Tacoma Power will conduct

More information

Resource Adequacy Deliverability for Distributed Generation DG Deliverability Assessment Results

Resource Adequacy Deliverability for Distributed Generation DG Deliverability Assessment Results Resource Adequacy Deliverability for Distributed Generation 2017-2018 DG Deliverability Assessment Results February 21, 2018 Resource Adequacy Deliverability for Distributed Generation 1 Introduction In

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specification Energy Storage and Distributed Energy Resources Phase -2 Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 18 Disclaimer All information contained in this draft Business Requirements

More information

Business Practice Manual for the Transmission Planning Process

Business Practice Manual for the Transmission Planning Process Business Practice Manual for the Transmission Planning Process Order 890 Compliance Version 76.0 September 15,February 11, 2010 TABLE OF CONTENTS Order 890 Compliance... i 1. Introduction... 6 1.1 Purpose

More information

Procedure: Station Power Portfolio Application

Procedure: Station Power Portfolio Application Overview Introduction FERC has established a policy that allows a single corporate entity that owns one or more Generating Units to self-supply Station Power over a monthly netting period using Energy

More information

Business Practice Manual for Scheduling Coordinator Certification & Termination and Convergence Bidding Entity Registration & Termination.

Business Practice Manual for Scheduling Coordinator Certification & Termination and Convergence Bidding Entity Registration & Termination. Business Practice Manual for Scheduling Coordinator Certification & Termination and Convergence Bidding Entity Registration & Termination Version 45 Last Revised: January February 2413, 20112012 and Convergence

More information

PJM Manual 14A: New Services Request Process Revision: 20 Effective Date: October 1, Prepared by Interconnection Planning Department

PJM Manual 14A: New Services Request Process Revision: 20 Effective Date: October 1, Prepared by Interconnection Planning Department PJM Manual 14A: New Services Request Process Revision: 20 Effective Date: October 1, 2017 Prepared by Interconnection Planning Department PJM 2017 Table of Contents Table of Contents Table of Exhibits...7

More information

TPP-GIP Integration Proposal November 30, 2011

TPP-GIP Integration Proposal November 30, 2011 TPP-GIP Integration Proposal November 30, 2011 Major Elements of Proposal Demand-Based Planning of Network Upgrades in the TPP Synchronize GIP, TPP and the LSE Procurement Processes Allocation of Deliverability

More information

Market Procedure: Network Control Services

Market Procedure: Network Control Services ELECTRICITY INDUSTRY ACT 2004 ELECTRICITY INDUSTRY (WHOLESALE ELECTRICITY MARKET) REGULATIONS 2004 WHOLESALE ELECTRICITY MARKET RULES Market Procedure: Network Control Services Version 2 Commencement:

More information

3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the

3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the FERC ELECTRIC TARIFF First Revised Sheet No. 121 ORIGINAL VOLUME NO. I Replacing Original Sheet No. 121 3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. 3.1 Nature of Relationship. Each Participating

More information

PLATTE RIVER POWER AUTHORITY OPEN ACCESS TRANSMISSION TARIFF. May 1, 2009

PLATTE RIVER POWER AUTHORITY OPEN ACCESS TRANSMISSION TARIFF. May 1, 2009 PLATTE RIVER POWER AUTHORITY OPEN ACCESS TRANSMISSION TARIFF May 1, 2009 Original Sheet No.1 TABLE OF CONTENTS I. COMMON SERVICE PROVISIONS... 8 1 Definitions... 8 1.1 Ancillary Services... 8 1.2 Annual

More information

SCHEDULE 12 Transmission Enhancement Charges. Establishment of Transmission Enhancement Charges.

SCHEDULE 12 Transmission Enhancement Charges. Establishment of Transmission Enhancement Charges. SCHEDULE 12 Transmission Enhancement Charges (a) Establishment of Transmission Enhancement Charges. (i) Establishment of Transmission Enhancement Charges by Transmission Owners and Entities That Will Become

More information

CALL FOR COMBINED HEAT AND POWER (CHP) PROJECTS. Program Guide

CALL FOR COMBINED HEAT AND POWER (CHP) PROJECTS. Program Guide CALL FOR COMBINED HEAT AND POWER (CHP) PROJECTS Program Guide TABLE OF CONTENTS Introduction... 2 Purpose... 2 About CHP... 2 Program Description... 2 Call for CHP Projects... 3 Participant Webinar...

More information

Business Practice Manual for Scheduling Coordinator Certification & Termination and Convergence Bidding Entity Registration & Termination.

Business Practice Manual for Scheduling Coordinator Certification & Termination and Convergence Bidding Entity Registration & Termination. Business Practice Manual for Scheduling Coordinator Certification & Termination Convergence Bidding Entity Registration & Termination Version 89 Revised: January 1, 2015Junely, 2017 Approval History Approval

More information

Southern California Edison Company SOUTHERN CALIFORNIA EDISON COMPANY WHOLESALE DISTRIBUTION ACCESS TARIFF

Southern California Edison Company SOUTHERN CALIFORNIA EDISON COMPANY WHOLESALE DISTRIBUTION ACCESS TARIFF SOUTHERN CALIFORNIA EDISON COMPANY WHOLESALE DISTRIBUTION ACCESS TARIFF Original Sheet No. TABLE OF CONTENTS. Applicability.... Definitions.... Nature of Distribution Service.... Term.... Distribution

More information

Incremental Black Start RFP Response Template & General Information

Incremental Black Start RFP Response Template & General Information Revision 2: 7/28/2015 Incremental Black Start RFP Response Template & General Information Overview This document is divided into three sections: Section 1: An incremental RFP response template Section

More information

1. Is there a preference between MW and MWh? RPS need for San Diego Gas & Electric is based upon a percentage of retail sales, which is in MWh.

1. Is there a preference between MW and MWh? RPS need for San Diego Gas & Electric is based upon a percentage of retail sales, which is in MWh. 1. Is there a preference between MW and MWh? RPS need for San Diego Gas & Electric is based upon a percentage of retail sales, which is in MWh. There is no target for MW of renewable capacity (except in

More information

PJM Queue Process Challenges. Aaron Berner Manager, Interconnection Analysis Planning Committee July 14, 2016

PJM Queue Process Challenges. Aaron Berner Manager, Interconnection Analysis Planning Committee July 14, 2016 PJM Queue Process Challenges Aaron Berner Manager, Interconnection Analysis Planning Committee July 14, 2016 Applications Types of applications: Attachment N new generation and uprates to existing generation

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff. Appendix A. Master Definition Supplement

California Independent System Operator Corporation Fifth Replacement Electronic Tariff. Appendix A. Master Definition Supplement Appendix A Master Definition Supplement - Access Charge A charge paid by all Utility Distribution Companies, Small Utility Distribution Companies, and MSS Operators with Gross Load in a PTO Service Territory,

More information

ONCOR INTERCONNECTION APPLICATION AND PROCESS FOR DISTRIBUTED RESOURCES

ONCOR INTERCONNECTION APPLICATION AND PROCESS FOR DISTRIBUTED RESOURCES ONCOR INTERCONNECTION APPLICATION AND PROCESS FOR DISTRIBUTED RESOURCES 2016 Commercial and Residential Solar Programs Kickoff Meeting November 11-12, 2015 Ken Brunkenhoefer Oncor Asset Planning OVERVIEW

More information

ISO New England - ISO New England Inc. Transmission, Markets and Services Tariff

ISO New England - ISO New England Inc. Transmission, Markets and Services Tariff ATTACHMENT K REGIONAL SYSTEM PLANNING PROCESS TABLE OF CONTENTS 1. Overview 2. Planning Advisory Committee 2.1 Establishment 2.2 Role of Planning Advisory Committee 2.3 Membership 2.4 Procedures (a) Notice

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents California Independent System Operator Corporation 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination Of Ancillary Service Standards...

More information

LOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The

LOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The 1 2 3 4 LOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The Transmission Provider will calculate and post the Planning

More information

Requirements For Generation and Transmission Interconnections

Requirements For Generation and Transmission Interconnections Requirements For Generation and Transmission Interconnections Table of Contents 1.0 INTRODUCTION... 1 2.0 INTERCONNECTION POLICY... 2 3.0 STANDARD INTERCONNECTION PROCESS... 3 3.1 ASSUMPTIONS... 3 3.2

More information

2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Louisiana, LLC

2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Louisiana, LLC 2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Louisiana, LLC Entergy Services, Inc. June 8, 2016 TABLE OF CONTENTS 1. GENERAL INFORMATION... 1 1.1. Introduction...

More information

REQUEST FOR PROPOSALS. RFP Strategic Planning Consultant. ISSUE DATE: July 31, 2015

REQUEST FOR PROPOSALS. RFP Strategic Planning Consultant. ISSUE DATE: July 31, 2015 REQUEST FOR PROPOSALS RFP 2015-16 02 Strategic Planning Consultant ISSUE DATE: July 31, 2015 CLOSING DATE AND TIME: 4:00 PM local time, Wednesday, August 26, 2015 CHILDRENS AID SOCIETY OF THE UNITED COUNTIES

More information

SASKPOWER OPEN ACCESS TRANSMISSION TARIFF

SASKPOWER OPEN ACCESS TRANSMISSION TARIFF Effective September 1, 2011 SASKPOWER OPEN ACCESS TRANSMISSION TARIFF TABLE OF CONTENTS I. COMMON SERVICE PROVISIONS 1 1 Definitions 1 1.1 Ancillary Services: 1 1.2 Annual Transmission Costs: 1 1.3 Application:

More information

Business Practice Manual for Metering. Version 56

Business Practice Manual for Metering. Version 56 Business Practice Manual for Metering Version 56 Last Revised: September 09, 2011 May 7, 2012 Approval History Approval Date: March 13, 2009 Effective Date: March 31, 2009 BPM Owner: Nancy TraweekBenik

More information

LOAD SERVING ENTITIES PJM REGION

LOAD SERVING ENTITIES PJM REGION Intra-PJM Tariffs --> RELIABILITY ASSURANCE AGREEMENT PJM Interconnection, L.L.C. Rate Schedule FERC No. 44 RELIABILITY ASSURANCE AGREEMENT Among LOAD SERVING ENTITIES in the PJM REGION Effective Date:

More information

Vector Pipeline L.P. Original Sheet No. 30 FERC Gas Tariff First Revised Volume No. 1 v0.0.0 RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE

Vector Pipeline L.P. Original Sheet No. 30 FERC Gas Tariff First Revised Volume No. 1 v0.0.0 RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE Vector Pipeline L.P. Original Sheet No. 30 1. AVAILABILITY RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE This FT-1 Rate Schedule is available to any party (hereinafter called "Shipper"), for firm transportation

More information

ELECTRICITY SUPPLIER COORDINATION TARIFF MARYLAND

ELECTRICITY SUPPLIER COORDINATION TARIFF MARYLAND MD Electric Supplier--P.S.C. Md. No. 2 ELECTRICITY SUPPLIER COORDINATION TARIFF IN MARYLAND Date of Issue: April 27, 2015 Date Effective: June 1, 2015 MD Electric Supplier--P.S.C. Md. No. 2 Sixteenth Revised

More information

Introduction to the Demand Response Auction. IESO Training

Introduction to the Demand Response Auction. IESO Training Introduction to the Demand Response Auction IESO Training May 2017 Introduction to the Demand Response Auction AN IESO TRAINING PUBLICATION This guide has been prepared to assist in the IESO training of

More information

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC.

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. Sheet 1 SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. ELECTRICITY SUPPLIER COORDINATION TARIFF Issued: August 1, 2000 Effective: September 20, 2000 ELECTRICITY SUPPLIER COORDINATION TARIFF TABLE OF CONTENTS

More information

Welcome to the SDG&E 2013 Request for Offers of Eligible Renewable Resources Pre-Bid Conference

Welcome to the SDG&E 2013 Request for Offers of Eligible Renewable Resources Pre-Bid Conference Welcome to the SDG&E 2013 Request for Offers of Eligible Renewable Resources Pre-Bid Conference 2013 Request for Offers of Eligible Renewable Resources Pre-Bid Conference January 15, 2014 9:30am-12pm Webinar

More information

Subaward Online Invoice Review and Approval Process

Subaward Online Invoice Review and Approval Process Subaward Online Invoice Review and Approval Process Agenda Need for Improvement Federal Requirements Process Enhancements Invoice Submission Notification and Workflow SIR Invoice Review/Hold Reasons/Resolution

More information

Kinder Morgan Illinois Pipeline LLC Original Sheet No. 15 FERC Gas Tariff First Revised Volume No. 1

Kinder Morgan Illinois Pipeline LLC Original Sheet No. 15 FERC Gas Tariff First Revised Volume No. 1 Kinder Morgan Illinois Pipeline LLC Original Sheet No. 15 RATE SCHEDULE FTS FIRM TRANSPORTATION SERVICE 1. AVAILABILITY This Rate Schedule FTS is available to any entity (hereinafter called Shipper) which:

More information

SCHEDULE SS STANDBY SERVICE

SCHEDULE SS STANDBY SERVICE SCHEDULE SS STANDBY SERVICE SHEET NO. 69 A. APPLICABILITY: Applicable to customers with alternate regular source(s) of energy other than electricity from the Company when such sources are connected to

More information

NBP (ATG) IR 01 March 5, Reference: NBP 18.01

NBP (ATG) IR 01 March 5, Reference: NBP 18.01 NBP (ATG) IR 01 March 5, 2015 Reference: NBP 18.01 a. Who does NB Power intend to have testify with respect to the evidence? b. In preparing the evidence, who has reviewed or prepared portions of the evidence

More information

Southern Company Transmission General Business Practices

Southern Company Transmission General Business Practices Table of Contents General Guidelines and Requirements... 1 Applying for Transmission Service... 2 Firm Point-to-Point Transmission Service... 2 Non-Firm Point-to-Point Transmission Service... 2 Network

More information

INTERCONNECTION PROCEDURES FOR DISTRIBUTED GENERATION

INTERCONNECTION PROCEDURES FOR DISTRIBUTED GENERATION PLATEAU ELECTRIC COOPERATIVE INTERCONNECTION PROCEDURES FOR DISTRIBUTED GENERATION Policy B32 1 P a g e TABLE OF CONTENTS PAGE 1. GENERAL PROCEDURES & STANDARDS 3 1.1 Scope 1.2 Application for Interconnection

More information

Business Practices for. Schedule 21-ES. (Modifications Issued on August 11, 2016)

Business Practices for. Schedule 21-ES. (Modifications Issued on August 11, 2016) (Modifications Issued on August 11, 2016) 1 List of Contents Introduction Purpose of Document Overview of Transmission Services in New England Definitions Applicable Schedules Services Applicable to these

More information

Temporary Shutdown of Resource Operations. Straw Proposal

Temporary Shutdown of Resource Operations. Straw Proposal Temporary Shutdown of Resource Operations June 21, 2017 Market & Infrastructure Policy Table of Contents 1. Executive Summary... 3 2. Plan for Stakeholder Engagement... 4 3. Background... 4 4. Scope of

More information

Distributed Generation. Technical Requirements and Interconnection Agreements

Distributed Generation. Technical Requirements and Interconnection Agreements Distributed Generation Technical Requirements and Interconnection Agreements February 2005 Table of Contents Section 1: Interconnection Process for Distributed Generation Systems (17 pages) Section 2:

More information

Infor Lawson Supply Chain Management Applications, built with Landmark Release Notes

Infor Lawson Supply Chain Management Applications, built with Landmark Release Notes Infor Lawson Supply Chain Management Applications, built with Landmark Release Notes Version: 10.1.0.0 Published: April 2014 Infor Lawson Supply Chain Management Applications, built with Landmark 10.1.0.0

More information

ELECTRICITY SUPPLIER COORDINATION TARIFF IN THE DISTRICT OF COLUMBIA

ELECTRICITY SUPPLIER COORDINATION TARIFF IN THE DISTRICT OF COLUMBIA DC Electric Supplier--P.S.C. of D.C. No. 1 ELECTRICITY SUPPLIER COORDINATION TARIFF IN THE DISTRICT OF COLUMBIA Date of Issue: April 7, 2017 Date Effective: April 7, 2017 DC Electric Supplier--P.S.C. of

More information

PJM ExSchedule User Guide

PJM ExSchedule User Guide PJM ExSchedule User Guide Revision: 07 Effective Date: July 13, 2017 Prepared by Transmission Service Department PJM 2017 i Approval and Revision History PJM User Guide: ExSchedule Table of Contents Table

More information

Entergy New Orleans, Inc Request for Proposals for Long-Term Renewable Generation Resources

Entergy New Orleans, Inc Request for Proposals for Long-Term Renewable Generation Resources Click to edit Master title style Entergy New Orleans, Inc. 2016 Request for Proposals for Long-Term Renewable Generation Resources Bidders Conference 0 June 1, 2016 Click Conference to edit Master Introduction

More information

DAIMLER GROUP NORTH AMERICAN COMPANIES

DAIMLER GROUP NORTH AMERICAN COMPANIES DAIMLER GROUP NORTH AMERICAN COMPANIES General Purchasing Conditions for IT Part G Lease of Standard Software 1 Subject Matter / Scope of Performance 1.1 General The terms and conditions of this Part G

More information

Frontier Telephone Companies TARIFF FCC NO. 14 Original Page 16-1 FACILITIES FOR INTERSTATE ACCESS

Frontier Telephone Companies TARIFF FCC NO. 14 Original Page 16-1 FACILITIES FOR INTERSTATE ACCESS Original Page 16-1 16. ADVANCED COMMUNICATIONS NETWORKS 16.1 (A) General This section contains the rules and regulations pertaining to the provision of TCP/IP Data Aggregation service (Modem-Based Dial

More information

Frontier Telephone Companies TARIFF FCC NO. 13 Original Page 18-1 ACCESS SERVICE

Frontier Telephone Companies TARIFF FCC NO. 13 Original Page 18-1 ACCESS SERVICE Original Page 18-1 18. ADVANCED COMMUNICATIONS NETWORKS 18.1 (A) General This section contains the rules and regulations pertaining to the provision of Modem Based Data Aggregation service (Modem-Based

More information

NU Guidance on ISO-NE Proposed Plan Application (PPA) Process for Generators Connecting to the NU Distribution System

NU Guidance on ISO-NE Proposed Plan Application (PPA) Process for Generators Connecting to the NU Distribution System NU Guidance on ISO-NE Proposed Plan Application (PPA) Process for Generators Connecting to the NU Distribution System Introduction This Proposed Plan Application (PPA) primer will assist Interconnection

More information

X Accept as requested X Change to Existing Practice Accept as modified below Decline

X Accept as requested X Change to Existing Practice Accept as modified below Decline 1. RECOMMENDED ACTION: EFFECT OF EC VOTE TO ACCEPT RECOMMENDED ACTION: X Accept as requested X Change to Existing Practice Accept as modified below Status Quo Decline 2. TYPE OF DEVELOPMENT/MAINTENANCE

More information

Committed Offer: Offer on which a resource was scheduled by the Office of the Interconnection for a particular clock hour for the Operating Day.

Committed Offer: Offer on which a resource was scheduled by the Office of the Interconnection for a particular clock hour for the Operating Day. Proposed Tariff Revisions Attachment K-Appendix and Schedule 1 of the Operating Agreement Generator Offer Flexibility Senior Task Force Revisions Related To Make-Whole and Lost Opportunity Cost Payments

More information

Module E-1 Capacity Tracking Tool

Module E-1 Capacity Tracking Tool Module E-1 Capacity Tracking Tool Page 1 of 82 I. Disclaimer... 4 II. Document Change History... 5 1. INTRODUCTION... 6 1.1. Purpose... 6 1.2. Scope... 7 2. OVERVIEW... 7 3. RELATED DOCUMENTS AND REQUIREMENTS...

More information

AB AMBER GRID RULES FOR ACCESS TO THE NATURAL GAS TRANSMISSION SYSTEM

AB AMBER GRID RULES FOR ACCESS TO THE NATURAL GAS TRANSMISSION SYSTEM TRANSMISSION SYSTEM OPERATOR AB AMBER GRID AB AMBER GRID RULES FOR ACCESS TO THE NATURAL GAS TRANSMISSION SYSTEM Version 3.0 Vilnius, 2015 TABLE OF CONTENTS 1. GENERAL PROVISIONS... 3 2. DEFINITIONS AND

More information

Energy Auction for the CPV Sentinel Generating Facility

Energy Auction for the CPV Sentinel Generating Facility Energy Auction for the CPV Sentinel Generating Facility Energy Auction Instructions and Terms and Conditions of Participation Updated June 11, 2013 A. GENERAL A.1. Company ( SCE ) seeks to sell, by this

More information

PJM Manual 18B: Energy Efficiency Measurement & Verification Revision: 03 Effective Date: November 17, Prepared by PJM Forward Market Operations

PJM Manual 18B: Energy Efficiency Measurement & Verification Revision: 03 Effective Date: November 17, Prepared by PJM Forward Market Operations PJM Manual 18B: Energy Efficiency Measurement & Verification Revision: 03 Effective Date: November 17, 2016 Prepared by PJM Forward Market Operations PJM 2016 Table of Contents Table of Contents Approval...5

More information

ORLANDO UTILITIES COMMISSION Open Access Transmission Tariff Original Sheet 91 SCHEDULE 7 Long-Term Firm and Short-Term Firm Point-To-Point Transmission Service The Transmission Customer shall compensate

More information

Subaward Online Invoice Review and Approval Process Pilot Group. Agenda

Subaward Online Invoice Review and Approval Process Pilot Group. Agenda Subaward Online Invoice Review and Approval Process Pilot Group Agenda Need for Improvement Federal Requirements Process Enhancements Invoice Submission Notification and Workflow SIR Invoice Review/Hold

More information

Green Power Connection. Interconnection Process Updates for Contractors in New Jersey

Green Power Connection. Interconnection Process Updates for Contractors in New Jersey Green Power Connection Interconnection Process Updates for Contractors in New Jersey Presented by: Vicki Luttrell Date: Dec. 12 and Dec. 15, 2016 Welcome Online Application Portal Updates Application Process:

More information

SECTION B ELECTRICITY SUPPLIER COORDINATION TARIFF

SECTION B ELECTRICITY SUPPLIER COORDINATION TARIFF SECTION B ELECTRICITY SUPPLIER COORDINATION TARIFF Baltimore Gas and Electric Company Electric Supplier i TABLE OF CONTENTS 1.0: DEFINITIONS/EXPLANATION OF ABBREVIATIONS... 1 2.0: GENERAL TERMS AND CONDITIONS

More information

Commitment Cost Enhancements Phase 3 Action Plan

Commitment Cost Enhancements Phase 3 Action Plan Commitment Cost Enhancements Phase 3 Action Plan November 10, 2017 Table of Contents 1. Executive Summary... 3 2. Background... 3 3. Stakeholder Engagement... 6 4. Summary of Stakeholder Comments... 6

More information

PJM Manual 10: Pre-Scheduling Operations Revision: 36 Effective Date: December 22, Prepared by Operations Planning Division

PJM Manual 10: Pre-Scheduling Operations Revision: 36 Effective Date: December 22, Prepared by Operations Planning Division PJM Manual 10: Pre-Scheduling Operations Revision: 36 Effective Date: December 22, 2017 Prepared by Operations Planning Division PJM 2017 Table of Contents Table of Contents Table of Exhibits...4 Approval...5

More information

Use-Limit Resource Guide Book Standard Version #8 Effective Date 2/2/2017

Use-Limit Resource Guide Book Standard Version #8 Effective Date 2/2/2017 Use-Limit Resource Guide Book Standard Version #8 Effective Date 2/2/2017 CAISO Public Use-Limit Resource Guide Book Standard REVISION HISTORY VERSION NO. DATE DESCRIPTION 1.0 12-12-2007 Initial Draft

More information

SDG&E 2016 Preferred Resources LCR RFO Bidder s Conference

SDG&E 2016 Preferred Resources LCR RFO Bidder s Conference SDG&E 2016 Preferred Resources LCR RFO Bidder s Conference SDG&E Energy Innovation Center 4760 Clairemont Mesa Blvd San Diego, CA 92117 By Phone: 1 866 814 8399 Pass Code: 1670738 Audience link: https://engage.vevent.com/rt/sempra/index.jsp?seid=132

More information

PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017

PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017 PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017 Prepared by System Planning Department PJM 2017 Table of Contents Table of Contents

More information

ARTICLE 29: GRIEVANCE PROCEDURE

ARTICLE 29: GRIEVANCE PROCEDURE ARTICLE 29: GRIEVANCE PROCEDURE A. General Conditions 1. A grievance is a written complaint by an individual employee, a group of employees, or the Union that the Employer has violated a specific provision

More information

Case/Order Reference(s): Schedule 3 Purchase of Receivables. Tariff pages changed in this update: Cover Page, Page Nos.

Case/Order Reference(s): Schedule 3 Purchase of Receivables. Tariff pages changed in this update: Cover Page, Page Nos. COVER PAGE FOR PEPCO MARYLAND ELECTRICITY SUPPLIER TARIFF CURRENT UPDATE Internet updated on: August 15, 2017 Tariff changes effective: Schedule 3 - POR Total Pages 54 Reason for the Tariff Changes: POR

More information

APPLICATION FOR COMBINED HEAT AND POWER INCENTIVES

APPLICATION FOR COMBINED HEAT AND POWER INCENTIVES APPLICATION FOR COMBINED HEAT AND POWER INCENTIVES PECO is offering cash incentives for qualified Combined Heat and Power (CHP) technology projects 1 to encourage the development of projects that improve

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS UTILITY BILLING SOFTWARE DUE DATE: NO LATER THAN 5:00 PM EASTERN TIME, MARCH 11, 2016 QUESTIONS: JESSICA MARTIN-LANE JESSICA@MARTIN-MCGILL.COM NOTE: THE COUNTY OF HARNETT RESERVES

More information

Jacksonville Aviation Authority (JAA)

Jacksonville Aviation Authority (JAA) Oracle Training isupplier for End Users Jacksonville Aviation Authority (JAA) Page i Table of Contents Introduction... 1 Objectives... 3 Topic 1: isupplier Portal and Home Page Review... 4 Topic 2: isupplier

More information

Project Overview for the Rights Protection Mechanisms Survey Request for Proposal

Project Overview for the Rights Protection Mechanisms Survey Request for Proposal Project Overview for the Rights Protection Mechanisms Survey Request for Proposal Date of issue: 29 January 2018 ICANN Project Overview for the Rights Protection Mechanisms Survey Request for Proposal

More information

ARTICLE 34 GRIEVANCE PROCEDURE

ARTICLE 34 GRIEVANCE PROCEDURE ARTICLE 34 GRIEVANCE PROCEDURE A. General Conditions 1. A grievance is a claim by an individual employee, a group of employees, or the UAPD that the University has violated, misapplied, or misinterpreted

More information

System Impact Study and Facilities Study Process Manual For Cleco Power LLC

System Impact Study and Facilities Study Process Manual For Cleco Power LLC System Impact Study and Facilities Study Process Manual For Cleco Power LLC Version 3 March 2010 System Impact Study and Facilities Study Manual for Cleco Power LLC 1.0 Introduction.3 1.1 Purpose.3 1.2

More information

Residual imbalance energy settlement and ramp rate changes for self-scheduled variable energy resources

Residual imbalance energy settlement and ramp rate changes for self-scheduled variable energy resources Market Issues Bulletin Residual imbalance energy settlement and ramp rate changes for self-scheduled variable energy resources March 10, 2015 www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.4400

More information

Rule 21 Sheet 1 GENERATING FACILITY INTERCONNECTIONS

Rule 21 Sheet 1 GENERATING FACILITY INTERCONNECTIONS Southern California Edison Revised Cal. PUC Sheet No. 31574-E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 30685-E Rule 21 Sheet 1 A. Applicability 1. This Rule describes the Interconnection,

More information

CETRA s Resource Portal Translation. Plunet Business Manager

CETRA s Resource Portal Translation. Plunet Business Manager CETRA s Resource Portal Translation Plunet Business Manager v2 CETRA s Resource Portal Plunet The intention of this guide is to provide general information about CETRA s resource portal (Plunet) as well

More information

Transportation. Tariff. Vector Pipeline Limited Partnership

Transportation. Tariff. Vector Pipeline Limited Partnership Transportation Tariff of Vector Pipeline Limited Partnership (Effective April 1, 2004 Unless Indicated Otherwise) Communications Concerning this Tariff Should be Addressed to: Vector Pipeline Limited 38705

More information

Ingersoll Rand ERS and isupplier FAQ s

Ingersoll Rand ERS and isupplier FAQ s Ingersoll Rand ERS and isupplier FAQ s Consistent with Ingersoll Rand s commitment to continuous improvement, our suppliers are transitioning to isupplier Portal functionality and Evaluated Receipt Settlement

More information

BPM Change Management Meeting

BPM Change Management Meeting BPM Change Management Meeting September 26, 2017 Julia Payton BPM Change Management Process BPM_CM@caiso.com Agenda BPM Change Management Meeting, September 26, 2017 Topic Introduction/meeting overview

More information

Verizon Enterprise Center CALNET 3 Invoices User Guide

Verizon Enterprise Center CALNET 3 Invoices User Guide Version 1.17 Last Updated: March 2017 2017 Verizon. All Rights Reserved. The Verizon name and logo and all other names, logos, and slogans identifying Verizon s products and services are trademarks and

More information

IBM Business Partner Operations Guide for Solution Provider for IBM Software as a Service

IBM Business Partner Operations Guide for Solution Provider for IBM Software as a Service IBM Business Partner Operations Guide for Solution Provider for IBM Software as a Service Europe, Middle East and Africa Version 1.12 This Operations Guide and updated versions will be posted on the IBM

More information

REGISTRATION OF MEDICAL DEVICE. SUBMISSION & APPLICATION By IDAMAZURA IDRIS MEDICAL DEVICE AUTHORITY

REGISTRATION OF MEDICAL DEVICE. SUBMISSION & APPLICATION By IDAMAZURA IDRIS MEDICAL DEVICE AUTHORITY REGISTRATION OF MEDICAL DEVICE SUBMISSION & APPLICATION By IDAMAZURA IDRIS MEDICAL DEVICE AUTHORITY Medical device: regulated item under the Medical Device Act 2012 (Act 737) and its regulation The objective:

More information

Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101

Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101 Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101 Request for Qualifications Construction Manager at Risk (CMAR) INSTRUCTIONS

More information

Wes Yeomans Vice President Operations Management Committee May 31, 2017 COPYRIGHT NYISO ALL RIGHTS RESERVED

Wes Yeomans Vice President Operations Management Committee May 31, 2017 COPYRIGHT NYISO ALL RIGHTS RESERVED Ramapo Phase Angle Regulator Cost Recovery Wes Yeomans Vice President Operations Management Committee May 31, 2017 Agenda Background Benefits of Two Ramapo Phase Angle Regulators Annual Cost Projections

More information

EUROPEAN SPACE AGENCY ESA EXPRESS PROCUREMENT PROCEDURE EXPRO / EXPRO+ TENDERING CONDITIONS ( EXPRO/TC ) NOTE

EUROPEAN SPACE AGENCY ESA EXPRESS PROCUREMENT PROCEDURE EXPRO / EXPRO+ TENDERING CONDITIONS ( EXPRO/TC ) NOTE P a g e 1 EUROPEAN SPACE AGENCY ESA EXPRESS PROCUREMENT PROCEDURE EXPRO / EXPRO+ TENDERING CONDITIONS ( EXPRO/TC ) NOTE For the purposes of EXPRO and EXPRO+ categories of Requests for Proposal (RFP) and

More information

MOD Steady-State and Dynamic System Model Validation

MOD Steady-State and Dynamic System Model Validation MOD-033-1 Steady-State and Dynamic System Model Validation A. Introduction 1. Title: Steady-State and Dynamic System Model Validation 2. Number: MOD-033-1 3. Purpose: To establish consistent validation

More information

CA. CA Unified Infrastructure Management. Program Guide for Developers

CA. CA Unified Infrastructure Management. Program Guide for Developers Marketplace @ CA CA Unified Infrastructure Management Program Guide for Developers 1 Marketplace @ CA CA Unified Infrastructure Management Contents Executive Summary Determining if Marketplace @ CA is

More information

ODP Year 3 Transportation Cost Report Instructions. Prospective Payment System Rating Period: Fiscal Year 2011/2012 (July 1, 2011 June 30, 2012)

ODP Year 3 Transportation Cost Report Instructions. Prospective Payment System Rating Period: Fiscal Year 2011/2012 (July 1, 2011 June 30, 2012) December 10, 2010 ODP Year 3 Transportation Cost Report Instructions Prospective Payment System Rating Period: Fiscal Year 2011/2012 (July 1, 2011 June 30, 2012) Commonwealth of Pennsylvania Office of

More information

Introduction to RRG Drafting Team Proposal

Introduction to RRG Drafting Team Proposal November 17, 2003 Introduction to RRG Drafting Team Proposal SUMMARY This introduction will review the overall task the RRG drafting team took on, set out the overall guiding principles it used, and describe

More information

The following words and terms shall have the following meanings unless the context indicates otherwise:

The following words and terms shall have the following meanings unless the context indicates otherwise: SUBCHAPTER 6. WATER SUPPLY MANAGEMENT ACT RULES 7:19-6.1 Scope and Authority (a) The Statewide Water Supply Master Plan represents the planning mechanism by which the State approaches its water needs.

More information

Subaward Online Invoice Review and Approval Process Pilot Group. Agenda

Subaward Online Invoice Review and Approval Process Pilot Group. Agenda Subaward Online Invoice Review and Approval Process Pilot Group Agenda Need for Improvement Federal Requirements Process Enhancements Invoice Submission Notification and Workflow SIR Invoice Review/Hold

More information

CHOPTANK ELECTRIC COOPERATIVE, INC. P.S.C. Md. No. 3 Fifth Revised Page No. 59 COGENERATION AND SMALL POWER PRODUCTION RATE SCHEDULE X

CHOPTANK ELECTRIC COOPERATIVE, INC. P.S.C. Md. No. 3 Fifth Revised Page No. 59 COGENERATION AND SMALL POWER PRODUCTION RATE SCHEDULE X Fifth Revised Page No. 59 908 COGENERATION AND SMALL POWER PRODUCTION RATE SCHEDULE X A. AVAILABILITY Available to members of the Cooperative for purchases of electricity by the Cooperative from qualified

More information