1 Gerald Sullivan The SAP Project More Than a Survival Guide

2 Acknowledgments 15 iwlmm^mjmrnmmmmmmmmmmma 1.1 Why Are SAP Implementations So Difficult? Levels of Preparation Required What this Book Will Do for You Factors Critical to Success How the Book Will Be Organized Modifying Major Business Processes Process Standardization Process Simplification Process Automation Building New Skills in the Project 2.3 Transforming SAP into a Company Team 36 Asset ASAP Components Phase One: Project Preparation Phase Two: Business Blueprint Phase Three: Realization Phase Four: Final Preparation Phase Five: Go-Live and Support Quality Gates Full-Scale Implementation Projects Greenfield Deployment Carveout System Replacement Upgrade Projects Support Pack 73 7

3 4.2.2 Enhancement Pack Version Upgrade Pre-Built Package Projects SAP Business One SAP Business One Starter Package Rapid Deployment Solutions Project Preparation Timeline Project Meeting Schedules Headcount Forecasting and Ramp-Up Planning Initial Planning for Integrator Selection Project Procurement Space Planning for Project Activities Preliminary Project Budgeting Integrator Selection Initial Integrator Identification and Information Gathering Request for Proposal Reviewing RFP Responses First Cut Integrator Presentations Final Selection Integrator Contracting Types of Contracts Contract Structure and Contents Change Control Integrator Onboarding Consultant Resources Custom Development Software Fixes Training Awareness Training Overview Sessions 150 8

4 7.4.3 End-User System Training Change Management Training Technical Services Value Management Defining the Project Schedule Project Complexity Factors Determining Overall Project Complexity Choosing a Deployment Approach Building the Implementation Wave Framework Setting Top-Level Requirements Achieving Cost Savings Documentation Knowledge Management Strategy SAP Solution Manager Collaboration Applications Specialized Document Applications High-Level Project Organization Functionally Organized Project Organizations IT-Led Project Organization Matrix-Led Project Organizations Program Management Functional Workstream Leads Horizontal Workstreams Project Charter Project Description Project Plan Summary Roles and Responsibilities Oversight and Guidance 229 9

5 11.3 Risk Management Team Rewards and Recognition Team Recruitment and Selection Onboarding the Project Team Team Logistics Bringing on the Project Team Delivering Project Results Roll-Off and Reintegration Blueprinting Sessions Kick-Off and Session One Sessions Two and Three Design Documentation Process Definition Documents Change Management Initiation Process Flows and Process Steps Business Controls Identification Managing the Documentation Process Localization Closing the Business Blueprinting Phase Transition to Realization Realization Project Plan Realization Kick-Off Realization Handbook Organizing for Realization Workstream Management Regional and Site Responsibilities Project Management Status Reporting and Performance Metrics Deliverables Tracking and Milestone Recognition Risk Management Resourcing

6 15.1 Configuration and Custom Development Configuration Custom Object Development String Testing Security Design SAP Roles Data Level Security Company Policy Assessment Structure of Systems Testing Systems Testing Processes Test Planning Script Execution Test Metrics Defect Processing Mega-Scenarios Regression Testing Using Testing Systems Systems Test Entrance and Exit Criteria Data Data Types Data Cleansing and Conversion Data Governance Reports Corporate-Level Reports Key Performance Indicators Electronic Data Interchange EDI Structure EDI Project Deliverables Security and Internal Controls Internal Controls Analysis Role Mapping and End-User Training

7 18.1 The SAP Landscape Environment and Client Structure Infrastructure Build and Test Performance and Failover Testing Business Transformation Change Impacts Stakeholder Management Organizational Design Project Communication Course Development Delivery Methods Content Types Course Organization Development Tools Trainer Preparation Training Delivery Logistics Translation of Training Materials Course Scheduling Logistics Tools Post-Go-Live Processes Cutover Processes Business Preparation Data Load and Verification User Training Cutover Communication Go-Live Authorization

8 22.1 Final Go-Live Processes Continuing Cutover Activities Granting System Access Business Ramp-Up Execution Hypercare Hypercare Operations Hypercare Exit The SAP Center of Excellence COE Organization The COE and the Project Staffing Team 535 the COE Sustainment Governance Governance Structure Managing COE Workload Critical Success Factors for Sustainment Governance Continuing Company Projects 546 The Author 549 Index

Procurement Transformation on the Fast Track: Doing More with Less

Procurement Transformation on the Fast Track: Doing More with Less Procurement Transformation on the Fast Track: Doing More with Less February, 2010 ProcureAbility Presenters John Evans President and CEO ProcureAbility jevans@procureability.com 2 AN APPROACH UNHEARD OF

More information

Tax Migration in Indian Localization

Tax Migration in Indian Localization www.kpit.com Tax Migration in Indian Localization TAXINJ -> TAXINN Agenda 1 Customer requirement 2 Scope 3 Out of scope 4 Assumptions 5 Phases of implementation 6 Challenges 7 Delivery model 2 Customer

More information

System Under Development Review of the Departmental Financial Management System Renewal Project

System Under Development Review of the Departmental Financial Management System Renewal Project System Under Development Review of the Departmental Financial Management System Renewal Project Audit and Evaluation Branch In collaboration with Deloitte LLP December 2015 List of Acronyms AAFC ADM AEB

More information

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter 1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business Case Contract Enterprise environmental factors Project charter Expert judgement 26/02/2013 18:22:56 1 2

More information

Program Management Professional (PgMP)

Program Management Professional (PgMP) Program Management Professional (PgMP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published

More information

Ariba Network Integration for SAP Business Suite rapid-deployment solution V Solution Details

Ariba Network Integration for SAP Business Suite rapid-deployment solution V Solution Details Ariba Network Integration for SAP Business Suite rapid-deployment solution V4.731 Solution Details Contents Overview of SAP Rapid Deployment Solutions Overview of the Ariba Network Overview of the Solution

More information

Work Plan and IV&V Methodology

Work Plan and IV&V Methodology Work Plan and IV&V Methodology ISG Public Sector has been helping public sector organizations acquire and implement (from a project oversight and organizational change management perspective) new, enterprise-wide

More information

CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS

CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS Objectives Introduction The objectives are: Describe the purpose of the phase planning activity, preconditions, and deliverables in the implementation methodology.

More information

Copyright 2013 Pearson Education, Inc. Publishing as Prentice Hall 5-1

Copyright 2013 Pearson Education, Inc. Publishing as Prentice Hall 5-1 Copyright 2013 Pearson Education, Inc. Publishing as Prentice Hall -1 Learning objectives Manage the planning process of a project Understand the work breakdown structure of a project Understand different

More information

exact LCMS setup Introduction to the 7 project steps

exact LCMS setup Introduction to the 7 project steps exact LCMS setup Introduction to the 7 project steps Project steps 1. Kick-off Meeting 2. Configuration Workshop 3. Content Workshops 4. End user Training 5. User Acceptance Test 6.Deployment 7. Operation

More information

Azure Infrastructure for SAP

Azure Infrastructure for SAP Azure Infrastructure for SAP Sizing and Assessment Offers 40% - 75% cost operational cost savings (Lower TCO) Fast and inexpensive deployment of SAP landscapes (minutes vs. weeks) Automation provisioning

More information

Oracle Taleo Business Edition Implementation Fixed Scope Offerings

Oracle Taleo Business Edition Implementation Fixed Scope Offerings Oracle Taleo Business Edition Implementation Fixed Scope Offerings Date Email Website : Dec-2015 : info@kovaion.com : www.kovaion.com Kovaion Consulting Kovaion A Snapshot Oracle Alliance Certified Consultants

More information

Initiation Group Process. Planning Group Process

Initiation Group Process. Planning Group Process Initiation Group Process Develop Project Charter Project statement of work Expert judgment Project charter Business case Contract (if third party project) EEF: government/industry standards, organizational

More information

Project Management Session 6.2. Project Initiation Phase Integration Management

Project Management Session 6.2. Project Initiation Phase Integration Management Project Management Session 6.2 Project Initiation Phase Integration Management 1 Project Phases & Knowledge Areas 1. Integration 2. Scope Management 3. Time Management 4. Cost Management 5. Quality Management

More information

Implementing Veeva Align Technical Overview. Ben Lawson Practice Manager Network & Align Services, Europe

Implementing Veeva Align Technical Overview. Ben Lawson Practice Manager Network & Align Services, Europe Implementing Veeva Align Technical Overview Ben Lawson Practice Manager Network & Align Services, Europe 1 How is Veeva Align implemented? 2 How can Veeva Align be deployed? 3 What does a typical project

More information

The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th

The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th www.pmlead.net PMI, PMP, CAPM and PMBOK Guide are trademarks of the Project Management Institute, Inc. PMI has not endorsed and did not

More information

Talent Community of Expertise

Talent Community of Expertise Future-State HR Service Delivery Model Operating Model Design IMPACT CoE HR Leadership Communications Change Management Executive Recruitment Talent Community of Expertise Talent Recruitment Talent Management

More information

WORK PLAN AND IV&V METHODOLOGY Information Technology - Independent Verification and Validation RFP No IVV-B

WORK PLAN AND IV&V METHODOLOGY Information Technology - Independent Verification and Validation RFP No IVV-B 1. Work Plan & IV&V Methodology 1.1 Compass Solutions IV&V Approach The Compass Solutions Independent Verification and Validation approach is based on the Enterprise Performance Life Cycle (EPLC) framework

More information

This resource is associated with the following paper: Assessing the maturity of software testing services using CMMI-SVC: an industrial case study

This resource is associated with the following paper: Assessing the maturity of software testing services using CMMI-SVC: an industrial case study RESOURCE: MATURITY LEVELS OF THE CUSTOMIZED CMMI-SVC FOR TESTING SERVICES AND THEIR PROCESS AREAS This resource is associated with the following paper: Assessing the maturity of software testing services

More information

COURSE LISTING. Courses Listed. with Portfolio & Project Management SAP ERP. 13 March 2018 (10:01 GMT) SAP01 - SAP SAP01E - SAP Overview

COURSE LISTING. Courses Listed. with Portfolio & Project Management SAP ERP. 13 March 2018 (10:01 GMT) SAP01 - SAP SAP01E - SAP Overview with Portfolio & Project Management SAP ERP Courses Listed SAP01 - SAP SAP01E - SAP Overview PL200E - Business Processes in SAP Project System PLM200 - Business Processes in SAP Project Systems PL210E

More information

Understanding Changes to the Certified Internal Auditor Program for 2013

Understanding Changes to the Certified Internal Auditor Program for 2013 Understanding Changes to the Certified Internal Auditor Program for 2013 Certified Internal Auditor (CIA ) 2013 Content Change Overview: This document is provided by IIA Global Headquarters to explain

More information

ACCELERATE YOUR JOURNEY TO BEING DIGITAL

ACCELERATE YOUR JOURNEY TO BEING DIGITAL ACCELERATE YOUR JOURNEY TO BEING DIGITAL GETTING TO THE VALUE OF SIMPLE BEYOND THE TECHNICAL COMPLEXITY. GETTING THERE FASTER. It is with expectations of deep simplification in process and data - that

More information

SAP Solution Manager for SAP Business Suite 7

SAP Solution Manager for SAP Business Suite 7 SAP Solution Manager for SAP Business Suite 7 Solution Management for Application Life-Cycle Management, SAP AG Customer Click here the latest version of this document End-to-end Application Lifecycle

More information

INFOSYS SMART OILFIELD SERVICES SOLUTION FOR SAP ERP

INFOSYS SMART OILFIELD SERVICES SOLUTION FOR SAP ERP INFOSYS SMART OILFIELD SERVICES SOLUTION FOR SAP ERP Transformation Made Easy Growth awaits. But are your systems up to the task? As a growing oilfield services (OFS) company, you are helping shape the

More information

Fixed scope offering. Oracle Fusion Inventory & Cost Management Cloud Service. 22 February 2016 A DIVISION OF DIMENSION DATA

Fixed scope offering. Oracle Fusion Inventory & Cost Management Cloud Service. 22 February 2016 A DIVISION OF DIMENSION DATA Fixed scope offering Oracle Fusion Inventory & Cost Management Cloud Service 22 February 2016 A DIVISION OF DIMENSION DATA 2015 1 Business objectives The solution Scope Methodology Project plan \ time

More information

SAP Value Assurance for SAP S/4HANA DETAILED INFORMATION SAP SE or an SAP affiliate company. All rights reserved.

SAP Value Assurance for SAP S/4HANA DETAILED INFORMATION SAP SE or an SAP affiliate company. All rights reserved. SAP Value Assurance for DETAILED INFORMATION Quick-Start Your Transformation to Contents 4 in Your Digital Core Run Better in the Digital World 8 Your Choice of Entry Points for SAP Value Assurance Service

More information

Representative Projects. ASM Technologies Limited

Representative Projects. ASM Technologies Limited Representative Projects Automotive Major Automotive Major in Thailand Offshore ABAP Factory for a SAP Supply Chain & APO Implementation Client: Japanese Auto Major in Thailand Project: Offshore ABAP Factory

More information

E-PROCUREMENT OPERATIONS

E-PROCUREMENT OPERATIONS E-PROCUREMENT OPERATIONS Post-launch capabilities to ensure your success Introduction: E-procurement operations capabilities that will enable your success Automating the processes your organization uses

More information

Going Global A Blueprint for Rapid Deployments to China and Poland John Gardner and Anthony Wellman

Going Global A Blueprint for Rapid Deployments to China and Poland John Gardner and Anthony Wellman [ Going Global A Blueprint for Rapid Deployments to China and Poland John Gardner and Anthony Wellman [ Agenda Company Overview Our SAP Evolution Governance Model Methodology + Tracking Business Template

More information

Accenture Architecture Services. DevOps: Delivering at the speed of today s business

Accenture Architecture Services. DevOps: Delivering at the speed of today s business Accenture Architecture Services DevOps: Delivering at the speed of today s business What is DevOps? IT delivery supporting the new pace of business Over the last 10 years, the nature of IT delivery has

More information

Building an Enterprise QA Centre of Excellence Best Practices Discussion IBM Corporation

Building an Enterprise QA Centre of Excellence Best Practices Discussion IBM Corporation Building an Enterprise QA Centre of Excellence Best Practices Discussion 2015 IBM Corporation Objectives Pleased to take this opportunity to present the Enterprise QACoE The objectives of the session are

More information

NEW HORIZONS ONLINE LIVE

NEW HORIZONS ONLINE LIVE NEW HORIZONS ONLINE LIVE WELCOME TO Certified Associate of Project Management (CAPM ) Fifth Edition PMBOK Guide - Please configure your audio: Meeting Audio Setup Wizard The Project Life Cycle Overview

More information

Creating an IWMS Implementation Plan

Creating an IWMS Implementation Plan Creating an IWMS Implementation Plan Overview The increased information available through an Integrated Workplace Management System (IWMS) impacts every part of an organization and can dramatically increase

More information

Strategic Scorecard Service Grant

Strategic Scorecard Service Grant Strategic Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Service Grant has been generously supported by Capital One. Outline Strategy Management

More information

Test Management Test Planning - Test Plan is a document that is the point of reference based on which testing is carried out within the QA team.

Test Management Test Planning - Test Plan is a document that is the point of reference based on which testing is carried out within the QA team. Test Management Test Planning - Test Plan is a document that is the point of reference based on which testing is carried out within the QA team. - It is also a document we share with the Business Analysts,

More information

Talent Community of Expertise

Talent Community of Expertise Future-State HR Service Delivery Model Operating Model Design Service CoE HR Leadership Communications Change Management Executive Recruitment Talent Community of Expertise Talent Recruitment Talent Management

More information

Table of Contents. FIT Confidential SAP Architecture Design Session v1.7 Page i

Table of Contents. FIT Confidential SAP Architecture Design Session v1.7 Page i Version 1.7 Table of Contents Executive Summary... 1 Architecture Design Session... 2 Phase 1: Conference Call Preparation... 2 Phase 2: On-Site Meeting... 3 Phase 3: Solution Proposal... 4 Questions?...

More information

Developing a Succession Plan

Developing a Succession Plan Introduction Developing a Succession Plan provided by Rose Miller, SPHR Pinnacle Human Resources, LLC 1 2 3 4 5 6 7 Covered in Part I Succession planning at Agencies can be a high-stakes endeavor. The

More information

Hva er SAP Activate. o Next generation agile methodology that drives customer success

Hva er SAP Activate. o Next generation agile methodology that drives customer success Hva er SAP Activate o Next generation agile methodology that drives customer success Hva er SAP Activate o Ferdig utkast til prosjektplan o 100+ templates til ulike dokumenter o Sterkt knyttet til Best

More information

SAP QM Online Training

SAP QM Online Training WWW.XPLORESAP.COM SAP QM Online Training XPLORESAP 2014 X P L O R E S A P, H Y D E R A B A D, I N D I A SAP QM Training Topics SAP OVERVIEW General discussion about SAP and its importance Organization

More information

IT PROJECT ANALYST/MANAGER

IT PROJECT ANALYST/MANAGER IT PROJECT ANALYST/MANAGER I. DESCRIPTION OF WORK Positions in this banded class are responsible for project management work involving planning and coordination of information technology projects. To ensure

More information

Digital Transformation Blueprint. The Dawn of the Digital Industrial

Digital Transformation Blueprint. The Dawn of the Digital Industrial Digital Transformation Blueprint The Dawn of the Digital Industrial The age of the Industrial Internet of Things is upon us Let GE Digital help get you get started. Build your Digital Transformation Blueprint

More information

SAP s Quality & Testing Platform Complete Solution of Products and Professional Services

SAP s Quality & Testing Platform Complete Solution of Products and Professional Services SAP s Quality & Testing Platform Complete Solution of Products and Professional Services Plan Execute Evaluate Manager Manager Adapter SAP Quality Center by HP SAP Test Acceleration and Optimization SAP

More information

L approccio Accenture alla migrazione SAP S/4HANA. SAP Forum Fieramilanocity 20 ottobre 2016

L approccio Accenture alla migrazione SAP S/4HANA. SAP Forum Fieramilanocity 20 ottobre 2016 L approccio Accenture alla migrazione SAP S/4HANA SAP Forum Fieramilanocity 20 ottobre 2016 Ismaele Bassani Managing Director Accenture Technology SAP Platform Lead Italy, Central Europe & Greece ismaele.bassani@accenture.com

More information

A Guide to the Project Management Body of Knowledge (PMBOK Guide) Sixth Edition Errata 3 rd Printing

A Guide to the Project Management Body of Knowledge (PMBOK Guide) Sixth Edition Errata 3 rd Printing A Guide to the Body of Knowledge (PMBOK Guide) Sixth Edition Errata 3 rd Printing NOTE: The following errata only pertain to the first and second printing of the PMBOK Guide Sixth Edition. In order to

More information

SUSE Unified Delivery Process

SUSE Unified Delivery Process Guide www.suse.com SUSE Unified Delivery Process What Is the SUSE Unified Delivery Process? The SUSE Unified Delivery Process is a solution delivery process based on the IBM* Rational Unified Process*

More information

Project Charter Template

Project Charter Template Templates from Project Charter Template 1. Vision: Concise and compelling idea behind the project 2. Drivers, Constraints, and Floats: What s driving the project, what s constraining the project, and where

More information

Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition

Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Topics for Discussion PMI Foundational Standards Harmonization of PMI s Foundational Standards Top 10 changes

More information

ERP Edge Tech Mahindra Oracle Cloud Transforming your business to capture profit in the Cloud

ERP Edge Tech Mahindra Oracle Cloud Transforming your business to capture profit in the Cloud ERP Edge Tech Mahindra Oracle Cloud Transforming your business to capture profit in the Cloud Copyright 2017 Tech Mahindra. All rights reserved. 1 Table of Contents 1 The Cloud Value Proposition 2 Tech

More information

Course Content - SAP SD Module

Course Content - SAP SD Module Course Content - SAP SD Module Session 1: Introduction 1. Introduction to SAP 2. Landscape of SAP a. Two-System Landscape b. Three-System Landscape 3. Architecture of SAP 4. Introduction to SAP SD a. Sales

More information

Product Documentation SAP Business ByDesign February Business Configuration

Product Documentation SAP Business ByDesign February Business Configuration Product Documentation PUBLIC Business Configuration Table Of Contents 1 Business Configuration.... 4 2 Business Background... 5 2.1 Configuring Your SAP Solution... 5 2.2 Watermark... 7 2.3 Scoping...

More information

Requirements for a Successful Replatform Project

Requirements for a Successful Replatform Project Requirements for a Successful Replatform Project Replatform Preparation A successful Replatform Project begins with assessing and validating the current system, applications, jobs and associated application

More information

Noel McGwynne CONTACT (86)

Noel McGwynne CONTACT (86) My Ethos is that I must Focus on WHAT is needed and WHAT it will achieve not HOW it s done (that s for later). Once you know what you want you can usually find a way to do it! Noel McGwynne NAME Noel McGwynne

More information

Job Titles and Skill Categories

Job Titles and Skill Categories Application Developer Architect Business Analyst CADD/GIS Administrator Data Entry Operator Database Administrator Functional Architect Help Desk Analyst Intern Mobile Specialist Network Engineer Product

More information

Focused Build A Focused Solution for SAP Solution Manager

Focused Build A Focused Solution for SAP Solution Manager Focused Build A Focused Solution for SAP Solution Manager Michael Klöffer, Chief Service Architect, SAP SE Marc Thier, SVP Solution Management, SAP SE Marc O. Schäfer, Director Product Management, SAP

More information

Optimize New Product Development. Presenter s Name Presenter s Title

Optimize New Product Development. Presenter s Name Presenter s Title Optimize New Product Development Presenter s Name Presenter s Title Safe Harbor Statement The following is intended to outline our general product direction. It is intended for information purposes only,

More information

Command and Control Software Development Lessons Learned. Lt Col Michael D. Sarchet Deputy Director, Space Systems Command and Control Division

Command and Control Software Development Lessons Learned. Lt Col Michael D. Sarchet Deputy Director, Space Systems Command and Control Division Command and Control Software Development Lessons Learned Lt Col Michael D. Sarchet Deputy Director, Space Systems Command and Control Division 1 UNCLASSIFIED Agenda Two real world case studies Lessons

More information

Building a Winning Business Case for HCM SaaS

Building a Winning Business Case for HCM SaaS Building a Winning Business Case for HCM SaaS Mark Bray, Principal Consultant ISG WHITE PAPER 2016 Information Services Group, Inc. All Rights Reserved INTRODUCTION The number of enterprises that experience

More information

Onboarding: How to Successfully Move SAP to the Cloud

Onboarding: How to Successfully Move SAP to the Cloud Onboarding: How to Successfully Move SAP to the Cloud Kausik Chaudhuri Director & Practice Lead, Global SAP Onboarding & Migration Services Virtustream onboarding and migration services Onboarding Mission

More information

SAP Enterprise Support Advisory Council Program Overview 2018

SAP Enterprise Support Advisory Council Program Overview 2018 SAP Enterprise Support Advisory Council Program Overview 2018 SAP SE April 2018 Agenda: Introduction to SAP Enterprise Support Advisory Council SAP Enterprise Support Advisory Council Focus Topics 2018

More information

Questions & Answers to RFP for Efficiency & Transformation Review

Questions & Answers to RFP for Efficiency & Transformation Review Questions & Answers to RFP for Efficiency & Transformation Review Questions are listed in the order received. Responses for the Sourcing & Procurement RFP and the Delivery of Services are Combined in this

More information

Project Management Professional (PMP)

Project Management Professional (PMP) Project Management Professional (PMP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute Project Management Professional (PMP) Examination Content Outline June 2015 Published

More information

Expresso Webinar SAP Leonardo Jump-Start Program

Expresso Webinar SAP Leonardo Jump-Start Program Expresso Webinar SAP Leonardo Jump-Start Program March 27th, 2017 Ashutosh Kumar, Chief Business Consultant, Digital Business @ SAP Internal Agenda Overview SAP Leonardo Overview SAP Leonardo Jump-Start

More information

Request for Resume (RFR) MHBE IT IDIQ Master Contract All Master Contract Provisions Apply. Section 1 General Information

Request for Resume (RFR) MHBE IT IDIQ Master Contract All Master Contract Provisions Apply. Section 1 General Information Section 1 General Information RFR Number: (Reference BPO Number) Functional Area (Enter One Only) ADPICS Reference BPO number to be entered upon issuance Functional Area Eight IT Quality Assurance Consulting

More information

ORACLE RESPONSYS PROFESSIONAL SERVICES DESCRIPTIONS

ORACLE RESPONSYS PROFESSIONAL SERVICES DESCRIPTIONS ORACLE RESPONSYS PROFESSIONAL SERVICES DESCRIPTIONS (January 25, 2018) RESPONSYS CONSULTING SERVICES PACKAGES... 3 Responsys Basic SmartStart Implementation Service Remote... 3 Responsys Premium SmartStart

More information

Workday Project Kickoff

Workday Project Kickoff BRANDEIS INBOUND TO WORKDAY Workday Project Kickoff Oct 26, 2017 Agenda 1. Welcome and Opening Remarks 2. Project Benefits and Guiding Principles 3. Collaborative Solutions Overview 4. Project Overview

More information

SAP Industry Accelerators a Deeper look

SAP Industry Accelerators a Deeper look SAP Industry Accelerators a Deeper look Jayne Landry, Global VP Product Management, SAP Leonardo Analytics PUBLIC Agenda What Are SAP Leonardo Industry Accelerators? Solution Portfolio and Road Map Demo:

More information

IPMA-CANADA INTERNATIONAL CERTIFICATION PROGRAM IPMA-CP (IN TRAINING) IPMA-CP IPMA-ACP IPMA-EX IPMA-CE

IPMA-CANADA INTERNATIONAL CERTIFICATION PROGRAM IPMA-CP (IN TRAINING) IPMA-CP IPMA-ACP IPMA-EX IPMA-CE IPMA- Canada INTERNATIONAL PROGRAM IPMA-CP (IN TRAINING) IPMA-CP IPMA-ACP IPMA-EX IPMA-CE INTERNATIONAL PROGRAM is a national human resource management association whose mission is to promote excellence

More information

HCM Project Planning SUN October 1, 2017

HCM Project Planning SUN October 1, 2017 HCM Project Planning SUN 2727 October 1, 2017 Session Objective This session explores how to incorporate key lessons learned from actual implementations of Oracle HCM Cloud into up-front project planning

More information

Integration and Testing

Integration and Testing Integration and Testing 1 Today Software Quality Assurance Integration Test planning Types of testing Test metrics Test tools 2 Deliverables by Phase Possible Deliverables by Phase Concept Document Statement

More information

CHAPTER 1 Introduction

CHAPTER 1 Introduction CHAPTER 1 Introduction The Standard for Program Management provides guidelines for managing programs within an organization. It defines program management and related concepts, describes the program management

More information

PRIMUS TECHSYSTEMS PVT. LTD.

PRIMUS TECHSYSTEMS PVT. LTD. PRIMUS TECHSYSTEMS PVT. LTD. We believe in excelling together OUR PROFILE Primus TechSystems (PRIMUS TECHSYS) provides SAP solutions and services across entire SAP range of technology. The company was

More information

IBM Integrated Product Development (IPD)

IBM Integrated Product Development (IPD) IBM Integrated Product Development (IPD) Project Executive: Bijan Salimi 09/14/11 Agenda What is IPD and its objectives? IPD Teams Hierarchy IPD Phases Teams Roles & Responsibilities Decision Checkpoints

More information

PMI-001 Questions & Answers

PMI-001 Questions & Answers PMI-001 Questions & Answers Number: PMI-001 Passing Score: 700 Time Limit: 137 min File Version: 21.2 http://www.gratisexam.com/ PMI-001 Questions & Answers Exam Name: Project Management Professional v5

More information

EY Core Consulting. Activity 16.1: Reflection activity

EY Core Consulting. Activity 16.1: Reflection activity Block 3 Lesson 16: Project management Activity 16.1: Reflection activity Objective: Discuss and share your thought about your reflection questions and identify important takeaways from the previous day.

More information

Upgrading ATM Software for a Financial Solutions Provider

Upgrading ATM Software for a Financial Solutions Provider Customer Success Stories TEKsystems Global Services Upgrading ATM Software for a Financial Solutions Provider FINANCIAL SERVICES MANAGED SERVICES OFFERING Executive Summary TEKsystems provided a managed

More information

SAP Leonardo Live. North America

SAP Leonardo Live. North America SAP Leonardo Live North America TITLE Cargill: Connecting the Supply Chain with Digital Business Planning Eric Johnson Vice President Operations and Supply Chain www.cargill.com CONFIDENTIAL. This document

More information

EXTERNAL EVALUATION OF THE EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS DRAFT TECHNICAL SPECIFICATIONS

EXTERNAL EVALUATION OF THE EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS DRAFT TECHNICAL SPECIFICATIONS EXTERNAL EVALUATION OF THE EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS DRAFT TECHNICAL SPECIFICATIONS / / / 1) Motivation for this evaluation According to the founding Regulation (168/2007) of the Fundamental

More information

COURSE LISTING. Courses Listed. with SAP ERP. 18 January 2018 (11:06 GMT)

COURSE LISTING. Courses Listed. with SAP ERP. 18 January 2018 (11:06 GMT) with SAP ERP COURSE LISTING Courses Listed SAP01E - SAP Overview SAP01E - SAP Overview SAP01 - SAP Overview SM001E - Introduction to SAP Solution Manager SCM500 - Processes in Procurement SCM510 - Inventory

More information

Audit of Human Resources Planning

Audit of Human Resources Planning Health Canada Santé Canada Final Audit Report Audit of Human Resources Planning March 2012 Table of Contents Executive summary... i 1. Introduction... 1 1.1 Background... 1 1.2 Audit objective... 2 1.3

More information

SAM Server Optimization

SAM Server Optimization SAM SOFTWARE ASSET MANAGEMENT SAM Server Optimization Engagement kit 1 SAM Server Optimization engagement kit Table of Contents How to use this document 3 Introduction 4 Step 1: Planning 7 Step 2: Data

More information

MEDITECH 6.X IMPLEMENTATION 8 PHASES

MEDITECH 6.X IMPLEMENTATION 8 PHASES MEDITECH 6.X IMPLEMENTATION 8 PHASES - A PUBLICATION BY PARALLON TECHNOLOGY SOLUTIONS - TABLE OF CONTENTS Intro 1 2 3 4 5 6 7 8 Phase 1: Planning Phase 2: Process Review Phase 3: Design Phase 4: Build

More information

Scope Management 3/11/2015. Chapter 5 Learning Objectives. Project Scope. 1) Conceptual development. Problem Statements. Statement of Work (SOW)

Scope Management 3/11/2015. Chapter 5 Learning Objectives. Project Scope. 1) Conceptual development. Problem Statements. Statement of Work (SOW) Chapter 5 Learning Objectives Scope Management 05-01 Project Scope 05-02 Conceptual Development The process that addresses project objectives by finding the best ways to meet them. Project scope is everything

More information

EXHIBIT K: PROJECT ASSUMPTIONS GENERAL AND PROJECT ADMINISTRATION ASSUMPTIONS

EXHIBIT K: PROJECT ASSUMPTIONS GENERAL AND PROJECT ADMINISTRATION ASSUMPTIONS EXHIBIT K: PROJECT ASSUMPTIONS CGI has specified general project assumptions as well as assumptions associated with specific tasks, activities, roles and responsibilities. These additional assumptions

More information

RESIDENT SURVEYS UNDERSTANDING RETENTION THROUGH THE CUSTOMER EXPERIENCE. Implementation Process and Guidelines CONTACT US

RESIDENT SURVEYS UNDERSTANDING RETENTION THROUGH THE CUSTOMER EXPERIENCE. Implementation Process and Guidelines CONTACT US RESIDENT SURVEYS UNDERSTANDING RESIDENT RETENTION THROUGH THE CUSTOMER EXPERIENCE Implementation Process and Guidelines CONTACT US 888-988-3767 www.epmsonline.com info@epmsonline.com TABLE of CONTENTS

More information

copyright Value Chain Group all rights reserved

copyright Value Chain Group all rights reserved About the VCG VCG Mission Statement Goal Value Proposition Member View Process Transformation Framework (VRM) Value Reference Model (XRM) X Reference Model (VLM) Value Lifecycle Model (SOA-IM) Service

More information

SAP Solution Manager Authorization Concept Motivation and Support. SAP Active Global Support

SAP Solution Manager Authorization Concept Motivation and Support. SAP Active Global Support SAP Solution Manager Authorization Concept Motivation and Support SAP Active Global Support Agenda Motivation for Authorization Concept Most Customer Pain Points 2011 SAP AG. All rights reserved. 2 Motivation

More information

2017 Oracle EBS Cloud Roadmap

2017 Oracle EBS Cloud Roadmap 2017 Oracle EBS Cloud Roadmap Velocity Technology Solutions This EBS Cloud Roadmap will: Suggest the right time to move EBS to the cloud Walk you through the steps and projected timeline. Provide reasons

More information

AN ISO CERTIFIED COMPANY ISO 9001:2008 IT CONSULTING, OUTSOURCEING & SOLUTIONS MSI Infotech Pvt. Ltd.

AN ISO CERTIFIED COMPANY ISO 9001:2008 IT CONSULTING, OUTSOURCEING & SOLUTIONS MSI Infotech Pvt. Ltd. AN ISO CERTIFIED COMPANY ISO 9001:2008 IT CONSULTING, OUTSOURCEING & SOLUTIONS. About Us It is a pleasure to introduce MSI Infotech Pvt. Ltd. as Consulting, Outsourcing & Solutions provider to IT and Non-IT

More information

Customer Service Call Center Optimization through Mergers & Acquisitions

Customer Service Call Center Optimization through Mergers & Acquisitions Customer Service Call Center Optimization through Mergers & Acquisitions Sandra Haller Lisa Reilly Milind Nazare April 28 th 2016 Introduction and Overview Peoples Natural Gas serves customers in Pennsylvania,

More information

SNP TEST MANAGEMENT. SNP The Transformation Company. SNP Test Pack. Test Manager SNP. Test Pack SNP. Pack SolMan Setup & Review.

SNP TEST MANAGEMENT. SNP The Transformation Company. SNP Test Pack. Test Manager SNP. Test Pack SNP. Pack SolMan Setup & Review. Test Manager L Defect Management Pack SolMan Setup & Review M S TEST MANAGEMENT The Transformation Company TEST PACK S TEST PACK M Introduction to and basics of carrying out module-based testing of migration

More information

Certified Tester. Expert Level. Modules Overview

Certified Tester. Expert Level. Modules Overview Certified Tester Expert Level Modules Overview Version 1.3, 31 st October 2014 Copyright Notice This document may be copied in its entirety, or extracts made, if the source is acknowledged. Version 1.3

More information

Project Stakeholder Management

Project Stakeholder Management Jambo (Swahili) Project Management Process Groups Project 4. Integration Management Initiating Planning Executing 5. Scope Monitoring & Controlling Closing Knowledge Areas 6. Time 7. Cost 8. Quality 9.

More information

Software Testing Life Cycle

Software Testing Life Cycle Software Testing Life Cycle STLC (Software Testing Life Cycle) is an integral component of SDLC (Software Development Life Cycle). Testing has become a distinct phenomenon during and after the development

More information

BEYOND ERP : DELIVERING AMBITIOUS GLOBAL TRANSFORMATION AND GROWTH

BEYOND ERP : DELIVERING AMBITIOUS GLOBAL TRANSFORMATION AND GROWTH BEYOND ERP : DELIVERING AMBITIOUS GLOBAL TRANSFORMATION AND GROWTH MARC BÉCHET VICE PRESIDENT GLOBAL IT ERP KEY TOPICS Unilever background and business transformation journey Driving growth with continuing

More information

PMP Sample Questions Click here for PMP Questions. Question No : 1 Which of the following is an output of Define Scope?

PMP Sample Questions  Click here for PMP Questions. Question No : 1 Which of the following is an output of Define Scope? PMP Sample Questions www.techfaq360.com Click here for 1600+ PMP Questions Question No : 1 Which of the following is an output of Define Scope? A. Accepted deliverables B. Change Requests C. Project document

More information

Project Management Institute (PMI) Practice Standard for Configuration Management

Project Management Institute (PMI) Practice Standard for Configuration Management Project Configuration Management Project Management Institute (PMI) Practice Standard for Configuration Management Project Configuration Management What we will cover: Introduction Relationship with other

More information

3 PART THREE: WORK PLAN AND IV&V METHODOLOGY (SECTION 5.3.3)

3 PART THREE: WORK PLAN AND IV&V METHODOLOGY (SECTION 5.3.3) 3 PART THREE: WORK PLAN AND IV&V METHODOLOGY (SECTION 5.3.3) Emagine IT s approach to Independent Verification and Validation (IV&V) has been shaped over the years by hands-on experience and contributions

More information

WEBINAR: SAP Best Practices for SAP IBP Update

WEBINAR: SAP Best Practices for SAP IBP Update WEBINAR: SAP Best Practices for SAP IBP - 1711 Update Presenter: Christian Seipl, Senior Business Process Consultant, SAP Thomas Fiebig, Product Manager, SAP Overview of new SAP Best Practices content

More information

MBP1123 Project Scope, Time and Cost Management Prepared by Dr Khairul Anuar

MBP1123 Project Scope, Time and Cost Management Prepared by Dr Khairul Anuar MBP1123 Project Scope, Time and Cost Management Prepared by Dr Khairul Anuar L2 Project Scope Management www.notes638.wordpress.com Project Scope Management Scope initiation/planning Scope definition Issue

More information