Presentation for the Local Government Commission and the Community Environmental Council. July 13, 2007
|
|
- Scott Todd
- 6 years ago
- Views:
Transcription
1 Community Choice Aggregation Presentation for the Local Government Commission and the Community Environmental Council July 13,
2 Community Choice Aggregation (CCA) CCA Legislation (AB117) allows cities and counties, and JPAs made up of cities and/or counties, to aggregate customers load for the purpose of procuring electricity (generation) Customers have the right to opt out of the program and continue to be served as a bundled SCE customer, or if currently Direct Access, remain with their ESP After initial opt-out period, CCA customers can return to SCE bundled service by providing 6 months notice SCE continues to provide transmission, distribution, metering, billing and customer-care services 2
3 Community Choice Aggregation CPUC Process The CPUC has established rules, procedures and schedules for CCA interaction with the state s investor owned utilities (IOU). The rules and schedules pertain to CCA program guidelines, service fees, information fees and cost responsibility surcharges (CRS) CCA CRS is a cost-recovery mechanism (exit fees) Ensures that state and SCE procurement costs aren t shifted to non-cca customers SCE s 2007 CCA-CRS (exit fee) approximately 1.5 cents/kwh 3
4 What should be done before Establishing a CCA? Conduct a detailed feasibility study that addresses all issues and costs Includes, but is not be limited to, start-up costs, power procurement, financial and economic impact analysis, clear identification of potential customers, and service and reliability standards Develop a detailed power supply plan that addresses all procurement and service issue requirements Includes, but is not be limited to, short and long-term cost to purchase energy, hedging factors, CAISO service costs, renewable portfolio standards, resource adequacy requirements, and Greenhouse Gas (GHG) emissions standards Know that establishing a CCA in a volatile natural gas market presents considerable risk Will the CCA have access to low-cost power compared to the existing electric service provider s diverse power procurement portfolio? Will the projected revenues cover all the expenses of operating a CCA? 4
5 Natural Gas Spot Price Trend-NYMEX NYMEX Natural Gas Futures 29-Mar-07 3 month strip $ month strip $ month strip $ year strip $ 8.19 May-07 $ 7.73 May-08 $ 7.98 Jun-07 $ 7.87 Jun-08 $ 8.04 Jul-07 $ 8.01 Jul-08 $ 8.12 Aug-07 $ 8.11 Aug-08 $ 8.18 Sep-07 $ 8.16 Sep-08 $ 8.24 Oct-07 $ 8.27 Oct-08 $ 8.34 Nov-07 $ 8.91 Nov-08 $ 8.78 Dec-07 $ 9.56 Dec-08 $ 9.24 Jan-08 $ 9.89 Jan-09 $ 9.50 Feb-08 $ 9.87 Feb-09 $ 9.49 Mar-08 $ 9.64 Mar-09 $ 9.26 Apr-08 $ 8.10 Apr-09 $
6 The CCA Value Equation Are CCA customer costs less than or equal to SCE s customer costs? CCA Customer Costs Energy Procurement Costs < CCA Program costs CRS Non- Gen. SCE Customer Costs CCA Related Costs Cost of Generation Cost of risk mitigation and management Resource Adequacy Renewable Portfolio Standard Cost of CA-ISO ancillary services Insurance and Bonds Customer Protections Potential ESP Costs City administrative costs Consulting costs Cost of transaction services provided to CCA Cost Responsibility Surcharges Transmission Distribution Metering Billing Utility Users Tax Franchise Fees 6
7 CCA and IOU Responsibilities City specific rates Services Provider Responsibilities * Non- Generation Cost Responsibility Surcharge Generation CCA Program Costs** SCE CCA Distribution & Transmission Public Purpose Program Charges Other CPUC related charges Customer services Meter Installation & Reading Billing Communications on behalf of CCA Utility Users Tax Franchise Fees Energy procurement Cost Responsibility Surcharges (CRS) Energy forecasting & planning Renewable Portfolio Standard compliance Resource Adequacy CA-ISO related charges - Ancillary services - Standby & spinning reserve - Scheduling & settlement costs - Line losses & related energy costs Administrative and Program Costs Insurance and bonds * Refer to CPUC s , OIR to implement portions of AB 117 concerning Community Choice Aggregation **See previous slide for breakdown of Aggregator Program Costs 7
8 Requirements for all Load Serving Entities Load Serving Entities (LSEs) includes investor owned utilities (IOUs), energy service providers (ESPs), and community choice aggregators (CCAs). All LSEs have been directed to accelerate Resource Adequacy Requirements (D ) and AB 380 LSEs must maintain and enhance near term electric service reliability by implementing 15-17% planning reserve margin LSEs will also have to satisfy California s Renewable Portfolio Standard (RPS) under SB 1078 and AB % renewables by 2017; possibly accelerated to 2010 Legislation being could increase the amount of renewable generation required and shorten time frames Renewable costs beyond a market price referent are paid for by Public Goods Charge (PGC) funds, if available SCE leads nation in procurement of power from renewable generation sources (16% of portfolio) Greenhouse Gas Emission Standards are now in place through: AB 32 (California Global Warming Solutions Act of 2006) SB 1368 (Greenhouse Gases Emission Performance Standard) Current legislation limits the amount of coal that municipalities can import into CA NOTE: Requirements above will affect the cost of generation for all LSEs. 8
9 Summary Evaluate carefully all proposals for total costs, risks and potential benefits as compared to the generation, administrative, and operational costs for the utility Seek contractual commitments that prevent CCA from having to pay more than utility generation costs Seek third party evaluations of all proposals Contact SCE for evaluation of feasibility studies and proposals, as the utility is prepared and willing to review load profile reports and other program elements to help potential CCA members make informed decisions 9
Community Choice Aggregation In California: An Overview. City of La Mesa City Council Meeting September 27, 2016
Community Choice Aggregation In California: An Overview City of La Mesa City Council Meeting September 27, 2016 About EPIC Research Center University of San Diego Launched in 2005 Mission Conduct Research
More informationThe CCA Handbook. A Guide to Conducting Business with Southern California Edison under Community Choice Aggregation. Version 3.
The CCA Handbook A Guide to Conducting Business with Southern California Edison under Community Choice Aggregation Version 3.0 February 1, 2017 Welcome Preface Chapter 1: Chapter 2: Chapter 3: Chapter
More informationCCA Terms Glossary. Valley Clean Energy Alliance. i CCA Terms Glossary
CCA Terms Glossary Valley Clean Energy Alliance i CCA Terms Glossary Table of Contents Energy Basics... 1 Wholesale Energy Services... 1 Finance... 2 Rate Setting... 3 Call Center and Data Management...
More informationPG&E s General Comments on Demand Response Vision Update. January 11, 2008
PG&E s General Comments on Demand Response Vision Update January 11, 2008 This document provides PG&E s comments on the draft California Demand Response: A Vision of the Future. The comments are divided
More informationBusiness Practice Manual for The Transmission Planning Process
Business Practice Manual for The Transmission Planning Process Posted: June 2, 2015 Intentionally left blank TABLE OF CONTENTS 1. Introduction... 9 1.1. Purpose of California ISO Business Practice Manuals...
More information2018 Draft Policy Initiatives Roadmap. Market and Infrastructure Policy December 7, 2017
2018 Draft Policy Initiatives Roadmap Market and Infrastructure Policy December 7, 2017 Primary drivers of proposed three-year roadmap Recent grid operations challenges pointing to need for day-ahead market
More informationAdministration Division Public Works Department Anchorage: Performance. Value. Results.
Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,
More informationElectric Forward Market Report
Mar-01 Mar-02 Jun-02 Sep-02 Dec-02 Mar-03 Jun-03 Sep-03 Dec-03 Mar-04 Jun-04 Sep-04 Dec-04 Mar-05 May-05 Aug-05 Nov-05 Feb-06 Jun-06 Sep-06 Dec-06 Mar-07 Jun-07 Sep-07 Dec-07 Apr-08 Jun-08 Sep-08 Dec-08
More informationANNUAL REPORT ON MARKET ISSUES & PERFORMANCE
ANNUAL REPORT ON MARKET ISSUES & PERFORMANCE Department of Market Monitoring ACKNOWLEDGEMENT The following members of the Department of Market Monitoring contributed to this report Eric Hildebrandt Keith
More information2017 Energy Preview. What to expect in Gene Beck, CEM, CLP Executive Director
2017 Energy Preview What to expect in 2017 Gene Beck, CEM, CLP Executive Director Impact of The Election House Before House After [PERCENTA GE] [PERCENTA GE] Dems Reps [PERCENTA GE] [PERCENTA GE] Dems
More informationThe ESP Handbook. Chapter 9 Billing under CCA. Version 2.0 May 1, 2015
The ESP Handbook Chapter 9 Billing under CCA Version 2.0 May 1, 2015 9.1 Introduction This chapter provides an overview of billing policies and procedures under Community Choice Aggregation (CCA). The
More informationFinal 2014 Flexible Capacity Needs Assessment
Final 2014 Flexible Capacity Needs Assessment May 1, 2014 Table of Contents 1. Introduction... 2 2. Summary... 2 3. Defining the ISO System-Wide Flexible Capacity Need... 3 4. Forecasting Minute-by-Minute
More informationCommunity Choice Aggregation (CCA) Reference Guide
Community Choice Aggregation (CCA) Reference Guide Community Choice Aggregation (CCA) programs are governmental entities formed by cities and counties to serve the energy requirements of their local residents
More informationLoad Shift Working Group. https://gridworks.org/initiatives/load-shift-working-group/
Load Shift Working Group APRIL 18 10AM 2PM PST CPUC GOLDEN GATE ROOM https://gridworks.org/initiatives/load-shift-working-group/ Agenda 10:00 10:20am: Intro and Purpose (Gridworks) 10:20 12:00pm: Grid
More informationRenewables Portfolio Standard (RPS) Sara Kamins April 2, 2008
Renewables Portfolio Standard (RPS) Sara Kamins April 2, 2008 RPS Presentation RPS Policy RPS Procurement Process RPS Compliance Rules Progress Towards Goals Project Development Hurdles Future of RPS 2
More informationTime-Varying Value of Energy Efficiency
Time-Varying Value of Energy Efficiency ACEEE Energy Efficiency as a Resource David Nemtzow (DOE/BTO) Natalie Mims (LBNL) November 1, 2017 This work was supported by the DOE Office of Energy Efficiency
More informationFinal Flexible Capacity Needs Assessment for 2018
Final Flexible Capacity Needs Assessment for 2018 April 28, 2017 1 Table of Contents 1. Introduction... 3 2. Summary... 3 3. Defining the ISO System-Wide Flexible Capacity Need... 5 4. Forecasting Minute-by-Minute
More informationCCA for Monterey Bay?
CCA for Monterey Bay? Powering our own future through Community Choice Aggregation July 27, 2011 Santa Cruz County Commission on the Environment What is CCA? Enabled by California legislation (AB 117)
More informationLoad Serving Entity Definition Refinement Draft Final Proposal
Updated: September 21, 2016 Table of Contents 1. Executive Summary... 4 2. Scope of Initiative... 6 3. Changes to this proposal... 6 4. Stakeholder Engagement... 7 5. Background... 8 Allocation of Congestion
More informationBriefing on 2018 Policy Initiatives Roadmap and Annual Plan
Briefing on 2018 Policy Initiatives Roadmap and Annual Plan Greg Cook Director, Market and Infrastructure Policy EIM Governing Body Meeting General Session January 23, 2018 The ISO previously committed
More informationCALSEIA 2017 Legislative Session Wrap-Up October 16, 2017
CALSEIA 2017 Legislative Session Wrap-Up October 16, 2017 Bill Outcome CALSEIA Position AB 271 Oppose (Caballero) on Senate Floor/ Deal on AB 1284 (Dababneh) AB 378 (C.Garcia, Holden, and E. Garcia) AB
More informationOhio. Market Guide. AEP Columbus Southern Power AEP Ohio Power Dayton Power & Light. Residential Customers:
Market Guide Ohio ELECTRIC Duke Energy Ohio Cleveland Electric Illuminating Toledo Edison Ohio Power Dayton Power & Light Ohio Edison Columbus Southern Power NATURAL GAS Duke Energy Ohio UTILITIES SERVED
More informationRecommendations Regarding the RFP for a Technical Feasibility Study for East Bay Community Energy
Recommendations Regarding the RFP for a Technical Feasibility Study for East Bay Community Energy This memo from the East Bay Clean Power Alliance* is to provide feedback on the Draft RFP prepared by Alameda
More informationDay Ahead Market Enhancements: Issue Paper/Straw Proposal
Day Ahead Market Enhancements: Issue Paper/Straw Proposal Don Tretheway Senior Advisor, Market Design Policy Megan Poage Senior Market Design & Regulatory Policy Developer March 7, 2018 Agenda Time Topic
More informationTraffic Division Public Works Department Anchorage: Performance. Value. Results.
Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements. Direct Services Design, operate and maintain the
More informationRATES P-1 Service P-2A Service Customer Charge, per month... $ $65.00
SOUTHEN CAIFONIA GAS COMPANY evised CA. P.U.C. SHEET NO. 54875-G OS ANGEES, CAIFONIA CANCEING evised CA. P.U.C. SHEET NO. 54808-G Schedule No. G-NGV Sheet 1 NATUA GAS SEVICE FO MOTO VEHICES APPICABIITY
More informationVirtual Bidding and Scheduling Requirements in MRTU
Virtual Bidding and Scheduling Requirements in MRTU Gary A. Stern, Ph.D. Director of Market Southern California Edison Virtual Bidding SCE s Position Virtual bidding (VB) should not be implemented in California
More informationEnergy Market Outlook
Kyle Cooper, (713) 248-3009, Kyle.Cooper@iafadvisors.com Week Ending November 17, 2017 Please contact me to review a joint RBN Energy daily publication detailing natural gas fundamentals. Price Action:
More informationTransmission Planning at the Midwest ISO. Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008
Transmission Planning at the Midwest ISO Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008 Midwest ISO: What We Do Monitor flow of power over the high voltage
More informationCHP Economic Factors: Electric and Natural Gas Market Trends PREPARED BY: PREPARED FOR: DATE:
CHP Economic Factors: Electric and Natural Gas Market Trends PREPARED BY: PREPARED FOR: DATE: Daniel Peaco, Principal Consultant Efficiency Maine Combined Heat & Power Conference SEPTEMBER 29, 2016 Discussion
More informationSouthern California Edison Approach to Renewable Integration June 7, 2011
Southern California Edison Approach to Renewable Integration June 7, 2011 Page: 0 SCE s 2010 Resource Mix Natural Gas All Resources 100% = 75 billion kwh/yr Renewable Resources 100% = 14.5 billion kwh/yr
More informationCCA FEASIBILITY STUDY FOR ALAMEDA COUNTY
CCA FEASIBILITY STUDY FOR ALAMEDA COUNTY JANUARY 6, 2016 Mark Fulmer MRW & Associates Oakland, California mef@mr wassoc.com 510.834-1999 THE MRW TEAM MRW & Associates Experts in California wholesale power
More informationProcurement Under GHG Regulation
Procurement Under GHG Regulation Pedro J. Pizarro Senior Vice President, Power Procurement Southern California Edison IEP Annual Meeting September 25, 2007 Existing GHG-Related Procurement Rules Loading
More informationElectricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)
For the first quarter of 2015, Ontario experienced overall demand that was typical for the province in winter, and strong generator output. Demand for Ontario electricity increased as a result of cold
More informationCalifornia ISO. Q Report on Market Issues and Performance. July 10, Prepared by: Department of Market Monitoring
California Independent System Operator Corporation California ISO Q1 2017 Report on Market Issues and Performance July 10, 2017 Prepared by: Department of Market Monitoring TABLE OF CONTENTS Executive
More informationPORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS
PORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS Edwin Castro CNEE Guatemala Viena, september 2009 What is the reason to develop this model? In our own electricity market
More informationEnergy Market Outlook
Kyle Cooper, (713) 248-3009, Kyle.Cooper@iafadvisors.com Week Ending January 5, 2018 Please contact me to review a joint RBN Energy daily publication detailing natural gas fundamentals. Price Action: The
More informationPJM EIS Generation Attribute Tracking System (GATS)
PJM EIS Generation Attribute Tracking System (GATS) Presented to NASEO 2015 Mid-Atlantic Regional Meeting June 22, 2015 Who is PJM EIS? PJM Environmental Information Services, Inc. Formed in February 2005
More informationFor Bandon Utilities Commission
For Bandon Utilities Commission July 12, 2017 Profile BPA, a component of the U.S. Department of Energy, is a non-profit and self-funded power marketing administration in the Pacific Northwest. Congress
More informationCalifornia s Renewable Portfolio Standard
California s Renewable Portfolio Standard Northwest Power and Conservation Council California Power Markets Symposium September 5, 2013 William A. Monsen MRW & Associates, LLC Oakland, California wam@mrwassoc.comcom
More informationThird Generation California Electricity Market Design
Third Generation California Electricity Market Design Dr. Chris Mensah-Bonsu Senior Market Design Engineer California ISO San Francisco Chapter Meeting IEEE Power Engineering Society San Francisco, California,
More informationFurther Analyses of the Exercise and Cost Impacts of Market Power In California s Wholesale Energy Market
Further Analyses of the Exercise and Cost Impacts of Market Power In California s Wholesale Energy Market March 2001 Prepared by Eric Hildebrandt, Ph.D. Department of Market Analysis California Independent
More informationEnergy Market Outlook
Kyle Cooper, (713) 248-3009, Kyle.Cooper@iafadvisors.com Week Ending November 24, 2017 Please contact me to review a joint RBN Energy daily publication detailing natural gas fundamentals. Price Action:
More informationEnergy Storage and Distributed Energy Resources Phase 3
Energy Storage and Distributed Energy Resources Phase 3 Straw Proposal February 15, 2018 Market & Infrastructure Policy Table of Contents 1 Introduction... 3 2 Stakeholder Process... 4 3 Energy Imbalance
More informationEnergy Imbalance Market Overview
Energy Imbalance Market Overview Presentation to: Portland General Electric EIM OATT Stakeholder Meeting David Timson Account Manager CAISO Strategic Alliances October 14, 2016 Topics for Discussion ISO
More informationElectrification and its Implications for the California Electricity System
Electrification and its Implications for the California Electricity System Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy EPRI-IEA Workshop: Challenges in Electricity Decarbonization
More informationPumped hydro Storage Plants
Pumped hydro Storage Plants Olivier Teller, Product Director PSP 15 Nov 2012 PSP >130 GW (99% world electricity storage) Market: 6 GW/year Europe: ~1.5GW/year 100 years / illimited cycle numbers ~1000
More informationIAF Advisors Energy Market Outlook Kyle Cooper, (713) , October 31, 2014
IAF Advisors Energy Market Outlook Kyle Cooper, (713) 722 7171, Kyle.Cooper@IAFAdvisors.com October 31, 2014 Price Action: The December contract rose 17.5 cents (4.7%) to $3.873 on a 33.3 cent range. Price
More informationRaynet Software Lifecycle
Raynet Software End of End of RMSi 10.6 2016-Dec 2018-Dec* 2020-Dec* RMSi 10.5 2016-Jan 2018-Jan 2020-Jan RMSi 10.4 2014-May 2016-May 2018-May RMS/RMSi 10.3 2014-Feb 2016-Feb 2018-Feb RMS/RMSi 10.2 2013-Nov
More informationRegional Expansion SB 350 Implementation Timeline Special Study Portfolios
Comments of TransWest Express LLC on Topics Discussed during the CPUC and ISO June 20, 2016 Telephone Call to discuss the California ISO 2016-2017 Transmission Planning Process, 50% RPS Special Study Introduction
More informationSEPA Direct Debits indicator evolution (Spanish basic indicator vs Euro area)
Payment Systems Department Settlement Systems Analysis Division STATISTICS SEPA INDICATORS 100,00% 90,00% 80,00% 70,00% 60,00% 50,00% 40,00% 30,00% 20,00% 10,00% 0,00% SEPA Direct Debits indicator evolution
More informationComments of Northern California Power Agency CAISO Load Granularity Refinements Issue Paper. September 20, 2010
651 Commerce Drive Roseville, CA 95678 phone (916) 781-3636 fax (916) 783-7693 web www.ncpa.com Comments of Northern California Power Agency CAISO Load Granularity Refinements Issue Paper September 20,
More informationThe CCA Handbook. Chapter 3 Establishing Community Choice Aggregation Service An Overview. Version 3.0 February 1, 2017
The CCA Handbook Chapter 3 Establishing Community Choice Aggregation Service An Overview Version 3.0 February 1, 2017. Overview of Establishing CCA Service in the SCE Territory Southern California Edison
More informationStorage as a Transmission Asset:
Storage as a Transmission Asset: Enabling transmission-connected storage assets providing regulated cost-of-service-based transmission service to also access other market revenue streams Issue Paper Karl
More informationElectric Price Outlook April 13, 2017
Electric Price Outlook April 13, 2017 Scott Drzycimski, Director Customer, Community and Economic Development Jason Nielsen, Manager Regulatory Affairs Keeping you informed Ongoing pricing outlook webinars
More informationHedging Coal Price Risk in a Deregulated Power Market
Hedging Coal Price Risk in a Deregulated Power Market Ginny Farrow Manager Rail Car Fleet NCCI Spring Conference Greensboro, NC April 12, 2007 Safe Harbor Statement This Presentation contains forward-looking
More informationCalifornia s Energy Storage Mandate
State-Federal RPS Collaborative and ESTAP Webinar California s Energy Storage Mandate Hosted by Warren Leon, Executive Director, CESA November 19, 2013 Housekeeping All participants will be in listen-only
More informationSCE and PRIME JOINT RATE COMPARISONS
and JOINT RATE COMPARISONS As part of our mutual commitment to better serve customers, Southern California Edison () and Pico Rivera Innovative Municipal Energy () have jointly created a comparison of
More informationEuropean Freight Forwarding Index
European Freight Forwarding Index 1 February 1 Sentiment is improving in the freight market Johannes Møller joml@danskebank.dk +45 45 12 36 Main conclusion from survey Our proprietary European Freight
More informationRENEWABLE ENERGY INTEGRATION IN TAMILNADU
RENEWABLE ENERGY INTEGRATION IN TAMILNADU Generator Installed Capacity in MW CGS Nuclear 6% PURCHASE (LTOA, MTOA) 18% TN Hydro 2308 TN Thermal 4320 TN Gas 516 TN IPP 746 CGS Thermal 15% CPP 3% TN IPP 3%
More information2016 Fall Reliability Conference MRO
2016 Fall Reliability Conference MRO CAISO s Coordination, Tracking, and Monitoring Distributed Energy Resources Amber Motley; Manager, Short Term Forecasting November 2 nd, 2016 California ISO Overview
More information5 Star London Hotels - Example Report
5 Star London Hotels - Example Report January 2018 CONTENTS Your Benchmark Report Website Traffic Conversion Rates Ecommerce Performance AdWords Spend Your Traffic Index Your Conversion Rate Index Your
More informationPI as a Utility- Scale PV Monitoring Platform
PI as a Utility- Scale PV Monitoring Platform Presented by Steve Hanawalt, President Outline State of the Market Issues and Challenges Potential Solutions Benefits Summary and Q&A 2 Outline State of the
More informationEast Bay Community Choice Aggregation Preliminary Analysis
East Bay Community Choice Aggregation Preliminary Analysis December 6, 2012 East Bay Municipal Utility District Oakland, California TABLE OF CONTENTS GLOSSARY OF TERMS... i EXECUTIVE SUMMARY... ES - 1
More informationOkaloosa RESTORE Advisory Committee (ORAC) January 8, :30 PM 4:30 PM Emerald Coast Convention Center
Okaloosa RESTORE Advisory Committee (ORAC) January 8, 2014 2:30 PM 4:30 PM Emerald Coast Convention Center Agenda Minutes Approval Consultant s Administrative Report Scheduled Presentations - None Regional
More informationSCE Background PG&E LADWP SDG&E
SCE Background PG&E LADWP SDG&E One of the nation s largest electric utilities Nearly 14 million residents in service territory Approximately 5 million customer accounts 50,000 square-mile service area
More information1. Is there a preference between MW and MWh? RPS need for San Diego Gas & Electric is based upon a percentage of retail sales, which is in MWh.
1. Is there a preference between MW and MWh? RPS need for San Diego Gas & Electric is based upon a percentage of retail sales, which is in MWh. There is no target for MW of renewable capacity (except in
More informationIssue Paper. Direct Participation of Demand Response Resources in CAISO Electricity Markets. December 22, CAISO JEP / BDC/ JDG 12/22/08, page 1
Issue Paper Direct Participation of Demand Response Resources in CAISO Electricity Markets December 22, 2008 CAISO JEP / BDC/ JDG 12/22/08, page 1 Direct Participation of DR Resources Table of Contents
More informationCOURSE LISTING. Courses Listed. 4 February 2018 (12:50 GMT) SAPSCM - SAP SCM. SCM200 - Business Processes in Planning (SCM)
with, SAP SCM Courses Listed SAPSCM - SAP SCM SCM200 - Business Processes in Planning (SCM) SCM210 - SCM Core Interface APO SCM220 - Demand Planning (APO DP) SCM212 - Core Interface and Supply Chain Integration
More informationOhio s History of Regulation. Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia
Ohio s History of Regulation Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia Historical Perspective: Why Regulation? Electricity has historically been considered a natural
More informationCOURSE LISTING. Courses Listed. with Customer Relationship Management (CRM) SAP CRM. 15 December 2017 (12:23 GMT)
with Customer Relationship Management (CRM) SAP CRM Courses Listed SAPCRM - Overview of the SAP CRM Solution CR100 - CRM Customizing Fundamentals CR500 - CRM Middleware CR580 - SAP CRM User Interface TCRM10
More informationSouthern California Edison
Southern An Edison International An Edison Company International Serving Company Customers Serving for over Customers 125 Years for over 125 Years Serves a population Serves a population of more of than
More informationReport to the Finance Committee Comprehensive Annual Financial Report. Prepared by the Office of Finance April 2016
Report to the Finance Committee 2015 Comprehensive Annual Financial Report Prepared by the Office of Finance April 2016 Audit Opinion date April 11, 2016 Unmodified or clean audit opinion on financial
More informationCongestion and Marginal Losses
Section 10 Congestion and Marginal Losses Congestion and Marginal Losses The Locational Marginal Price (LMP) is the incremental price of energy at a bus. The LMP at any bus is made up of three components:
More informationReview TAC Structure Revised Straw Proposal Stakeholder Meeting
Review TAC Structure Revised Straw Proposal Stakeholder Meeting April 11, 2018 Chris Devon, Market and Infrastructure Policy Agenda Time (PDT) Topic Presenter 10:00 10:10 am Welcome and introduction James
More informationRevised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E
Revised Cal. P.U.C. Sheet No. 40911-E Cancelling Revised Cal. P.U.C. Sheet No. 40581-E ELECTRC SCHEDULE TBCC Sheet 1 TRANSTONAL BUNDLED COMMODTY COST APPLCABLTY: TERRTORY: RATES: This schedule applies
More informationLoad Impact Evaluation of California s Statewide Base Interruptible Program
Load Impact Evaluation of California s Statewide Base Interruptible Program Final Report May 1, 2009 Freeman, Sullivan & Co. 101 Montgomery St., 15th Floor San Francisco, CA 94104 Prepared for: Pacific
More information2011 Update Of the San Francisco Electricity Resource Plan (2002 ERP)
Review Draft 01/28/2011 2011 Update Of the San Francisco Electricity Resource Plan (2002 ERP) Prepared by the San Francisco Public Utilities Commission JANUARY 2011 1 Review Draft 01/28/2011 This update
More informationDemand Response. Overview. Recommendations
Section 6 Demand Response Demand Response Markets require both a supply side and a demand side to function effectively. The demand side of wholesale electricity markets is underdeveloped. Wholesale power
More informationERCOT ISO: Current Market and Trends in Future Market Design
ERCOT ISO: Current Market and Trends in Future Market Design Reza Alaghehband, P.E. Control Engineering, Austin Energy, Austin, TX EMS Users Group Meeting September 12-13, 2005 Providence, RI Outline:
More informationProcurement Summary Company Y.
Procurement Summary Company Y. Date: 1 st April 2014 - Draft SmartPower was asked by Company Y to assist the facilities team in procuring energy for the upcoming year. This report summarises the offers
More informationWater-Energy-Carbon Nexus and Your Membrane Plant
Advanced Membrane Technologies Stanford University, May 07, 2008 Water-Energy-Carbon Nexus and Your Membrane Plant Alan Zelenka Energy Services Leader Kennedy/Jenks Consultants The Water-Energy-Carbon
More informationBusiness Practice Manual for Reliability Requirements. Version 34
Business Practice Manual for Reliability Requirements Version 34 Last Revised: January 1, 2009July 28, 2010 Approval History Approval Date: 3/27/09 Effective Date: 3/31/09 BPM Owner: Chetty Mamandur BPM
More informationBEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking Regarding Policies and Protocols for Demand Response, Load Impact Estimates, Cost-Effectiveness Methodologies,
More informationData Viewer, Member Voting, Account Manager, DR Hub, Power Meter, and Data Miner Roadmaps
Data Viewer, Member Voting, Account Manager, DR Hub, Power Meter, and Data Miner Roadmaps As of March 20, 2018 www.pjm.com 2018 Roadmap Data Viewer, Voting, Account Manager, DR Hub and Power Meter, Data
More informationIMPACT OF CLIMATE CHANGE ON WATER AVAILABILITY AND EXTREME FLOWS IN ADDIS ABABA
IMPACT OF CLIMATE CHANGE ON WATER AVAILABILITY AND EXTREME FLOWS IN ADDIS ABABA Contents Background of climate change Climate Change Studies in and Around Addis Ababa Impact of climate change on Water
More informationVictorian AMI Program Stephen Thomson, AMI Program Director Principal Consultant Marchment Hill Consulting
Victorian AMI Program Stephen Thomson, AMI Program Director Principal Consultant Marchment Hill Consulting 21 January 2009 Victorian AMI Program Phases 2006 Jul 2007 May 2010 2013 Establishment Phase Involved
More informationSAN FRANCISCO LOCAL AGENCY FORMATION COMMISSION ENERGY SERVICES STUDY
SAN FRANCISCO LOCAL AGENCY FORMATION COMMISSION ENERGY SERVICES STUDY Table of Contents Letter of Transmittal Table Contents List of Tables List of Figures INTRODUCTION: REPORT PURPOSE AND ROLE OF SF LAFCo
More information3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the
FERC ELECTRIC TARIFF First Revised Sheet No. 121 ORIGINAL VOLUME NO. I Replacing Original Sheet No. 121 3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. 3.1 Nature of Relationship. Each Participating
More informationPacific Coast Oil Trust FEDERAL INCOME TAX INFORMATION
Pacific Coast Oil Trust 2013 FEDERAL INCOME TAX INFORMATION -1- (Pacific Coast Oil Trust) 2013 FEDERAL INCOME TAX INFORMATION This booklet provides 2013 tax information which will allow Certificate Holders
More informationPACIFIC GAS AND ELECTRIC COMPANY 2017 GENERAL RATE CASE PHASE II PREPARED TESTIMONY EXHIBIT (PG&E-1) VOLUME 1 REVENUE ALLOCATION AND RATE DESIGN
Application: 1-0- (U M) Exhibit No.: Date: June 0, 01 Witness(es): Various PACIFIC GAS AND ELECTRIC COMPANY 01 GENERAL RATE CASE PHASE II PREPARED TESTIMONY EXHIBIT VOLUME 1 REVENUE ALLOCATION AND RATE
More informationOutlook for Natural Gas Demand for Winter
Outlook for Natural Gas Demand for 2010-2011 Winter Energy Ventures Analysis, Inc. (EVA) Overview Natural gas demand this winter is projected to be about 295 BCF, or 2.5 percent, above demand levels recorded
More informationAEE New England New England Energy Update 1/6/2016. Tim Bigler Senior Market Strategist
AEE New England New England Energy Update 1/6/2016 Tim Bigler Senior Market Strategist Agenda NYMEX NG/Oil Prices New England NG/Electric Prices Future Gas Produc:on Influences New England NG Pipeline
More informationMiFID II Extraterritorial Impacts. Product Manufacturing and Distribution
MiFID II Extraterritorial Impacts Product Manufacturing and Distribution Speakers Marie Gervacio, Executive Director, EY Advisory Services Limited Marie has over 17 years of advisory and assurance experience
More informationREPORT TO: PREPARED BY:
REPORT TO: THE CONGRESSIONAL TASK FORCE ON ECONOMIC GROWTH IN PUERTO RICO PREPARED BY: SEAONE CARIBBEAN, LLC AUGUST 9, 2016 Jan-19 Aug-19 Mar-20 Oct-20 May-21 Dec-21 Jul-22 Feb-23 Sep-23 Apr-24 Nov-24
More informationEnergy Resource Recovery Account (ERRA) 2017 Forecast of Operations
Application No.: A.1-0-001 Exhibit No.: SCE-1 Witnesses: S. DiBernardo S. Liu E. Martinez T. Cameron E. Lavik R. Thomas M. Palmstrom T. Frontino S. Lelewer K. Seeto R. Hite M. Sheriff D. Hopper D. Wong
More informationIntegrating Energy Efficiency and Demand Response
Integrating Energy Efficiency and Demand Response Energy Efficiency and Active Demand Management Colleen M. Snee, Director - Integrated Demand Resources Johnson Controls, Inc. ACEEE Energy Efficiency as
More informationThe Digital Economy and the state of play in national accounting
The Digital Economy and the state of play in national accounting www.statcan.gc.ca Telling Canada s story in numbers James Tebrake Statistics Canada November 2017 Outline The state of play in National
More informationPolicy Direction for Alberta s Capacity Market Framework
Policy Direction for Alberta s Capacity Market Framework August 15, 2017 Alberta Department of Energy Table of Contents Executive Summary... 1 1 Introduction... 2 2 Policy Direction for Alberta s Capacity
More information