Gold Standard Verification Report

Size: px
Start display at page:

Download "Gold Standard Verification Report"

Transcription

1 Gold Standard Verification Gold Standard Verification Report GS Verification of the Registered CDM Project Electricity Generation from Mustard Crop Residues: Tonk, India UNFCCC CDMP GS Project # 441 Monitoring period 02: to Report No February 2013 TÜV SÜD South Asia Pvt. Ltd. Environmental Technology Carbon Management Service Solitaire, I.T.I. Road, Aundh Pune INDIA

2 Gold Standard Verification Report No. Date of first issue Version No: Date of this revision Subject: GS Verification Accredited TÜV SÜD Unit: TÜV SÜD South Asia Pvt. Ltd. Environmental Technology, Carbon Management Service, Solitaire, I.T.I. Road, Aundh Pune , INDIA Project Participants: Kalpataru Power Transmission Limited, 101, Sun Tower, SB 158-A, Gandhi Nagar Mod, Bapu Nagar, Jaipur , State- Rajasthan, INDIA (Client) Atmosfair ggmbh, Zossener Straße 55-58, Berlin, Germany Registration number / Project Title CDM Project 1774: Electricity Generation from Mustard Crop Residues: Tonk, India GS Project 441: Monitoring period: to First Monitoring Report (version/date) Version 1 / Final Monitoring Report (version/date) Version 2.1 / Summary: TÜV SÜD has performed the GS verification of the registered CDM project: 1774: Electricity generation from mustard crop residues: Tonk, India and GS Project 441: Tonk Biomass Project, India. The project involves implementation of a biomass based power plant by Kalpataru Power Transmission Limited (KPTL) with direct combustion boiler at the plant in Uniara, Tonk district of Rajasthan, India. The plant utilizes mustard crop residues, a renewable biomass that is abundantly available in the region. The electricity generated is primarily supplied to the Rajasthan state electricity grid. A document review, followed by a site visit was conducted to verify the information submitted by the project participant regarding the present verification period. Based on the assessment carried out, the verifier confirms: The project has been implemented and operated in accordance with the description given in the UNFCCC registered PDD (version 05, ). The project is completely implemented as described in registered PDD. The issuance has been done for the CDM part of the periodic verification of project: 1774: Electricity generation from mustard crop residues: Tonk, India. The revised monitoring plan complies with the applied methodology (AMS I.D version 11- Grid connected renewable electricity generation) and the monitoring has been carried out as exactly following the Monitoring Plan. Installed equipments essential for generating emission reductions run reliably and the meters are calibrated appropriately. The project is generating emission reductions as a CDM project. The project is generating emission reductions as a GS-CDM project. The verifier can confirm that the GHG emission reductions are calculated without material misstatements. Our opinion refers to the project s GHG emissions and resulting GHG emission reductions reported, both determined due to the valid and registered project s baseline, its monitoring plan and associated documents. Based on the information we have seen and evaluated we confirm that the implementation of the project resulted in 71,125 t CO 2 e of emission reductions during the verification period to

3 Gold Standard Verification Assessment Team Leader: Nikunj Agarwal Technical Reviewer: Thomas Kleiser Verification Team members: Eswar Murty

4 Gold Standard Verification Abbreviations CAR Corrective Action Request CDM Clean Development Mechanism CDM-EB CDM Executive Board CER Certified Emission Reduction CO 2 e Carbon dioxide equivalent CR / CL Clarification Request DOE Designated Operational Entity EF Emission Factor ER Emission Reduction FAR Forward Action Request GHG Greenhouse Gas(es) GWP Global Warming Potential KP Kyoto Protocol KPTL Kalpataru Power transmission Limited MP Monitoring Plan MR Monitoring Report NABL National Accreditation Board for Laboratories PDD Project Design Document PP Project Participant PLF Plant Load Factor RVPNL Rajasthan Vidyut Prasaran Nigam Ltd TÜV SÜD TÜV SÜD South Asia Pvt Ltd UNFCCC United Nations Framework Convention on Climate Change VVM Validation and Verification Manual GS Gold Standard

5 Gold Standard Verification Main Documents (referred to in this report) Methodology (name / version) AMS I.D, Version 11 (as per registered PDD) Scope 1 Technical Area 1.1 Registered PDD: Registered on Revised Monitoring Plan: (UNFCCC Approved: 24 Jan 2012) TÜV SÜD verification report for second Report No dated Monitoring period Version Date Published GS Monitoring Report Final GS Monitoring Report Project documentation link (UNFCCC): SUED /view Table of Contents Page 1 Introduction Objective Scope GHG Project Description Methodology Verification Process Verification Team Review of Documents On-site Assessment and follow-up Interviews Quality of Evidence to Determine Emission Reductions Resolution of Clarification and Corrective and Forward Action Requests Internal Quality Control Verification Results FARs from Validation / Previous Verification Project Implementation in accordance with the registered Project Design Document Compliance of the Monitoring Plan with the Monitoring Methodology Compliance of the Monitoring with the Monitoring Plan Assessment of Data and Calculation of Greenhouse Gas Emission Reductions Summary of Findings Verification Statement Annex 1: Verification Protocol Annex 2: Information Reference List Annex 3: Appointment Certificates

6 1 INTRODUCTION 1.1 Objective Kalpataru Power Transmission Limited has commissioned an independent GS verification by TÜV SÜD South Asia Pvt Ltd,GS project 441: The objective of the verification work is to comply with the requirements of paragraph 62 of the CDM Modalities and Procedures. According to this assessment TÜV SÜD shall: ensure that the project activity has been implemented and operated as per the registered PDD Electricity Generation from Mustard Crop Residues: Tonk, India registered on , and that all physical features (technology, project equipment, monitoring and metering equipment) of the project are in place, ensure that the MR and other supporting documents provided are complete and verifiable and in accordance with applicable CDM requirements, ensure that actual monitoring systems and procedures comply with the monitoring systems and procedures described in the revised monitoring plan and the approved methodology, evaluate the data recorded and stored as per the methodology Renewable electricity generation for a grid, AMS I.D. Version Scope The verification scope is defined as an independent and objective review and ex-post determination of the monitored reductions in GHG emissions by the Designated Operational Entity. The verification is based on the submitted monitoring report, the validated project design documents and validation report, first verification report, the applied monitoring methodology, revised monitoring plan, relevant decisions, clarifications and guidance from the CMP and the EB and any other information and references relevant to the project activity s resulting emission reductions. These documents are reviewed against the requirements of the Kyoto Protocol, the CDM Modalities and Procedures and related rules and guidance and the GS Requirements v1. TÜV SÜD has, based on the requirements in the VVM applied a rule-based approach. The principles of accuracy and completeness, relevance, reliability and credibility were combined with a conservative approach to establish a traceable and transparent verification opinion. The verification considers both quantitative and qualitative information on emission reductions. The verification is not meant to provide any consultancy towards the client. However, stated requests for clarifications, corrective and/or forward actions may provide input for improvement of the monitoring activities. 1.3 GHG Project Description Project activity: UNFCCC registration number: 1774 GS Project number 441 Project Participants: 1. Kalpataru Power Transmission Limited (Client) 2. Atmosfair ggmbh Location of the project: Khatoli village, Uniara Town, Tonk District, Rajasthan (Latitude : and Longitude : ) Date of registration:

7 GS Verification Starting date of the crediting period Crediting period: to (Renewable) Technical description of the project The project activity is grid connected biomass-based power generation plant which utilizes biomass as fuel. Power plant has designed to operate with multiple agricultural biomass residues. The fuel used is mustard crop residue. No fossil fuels have been used in this monitoring period. The electricity generated by project activity is sold to the state electricity grid. The project involves the implementation of mustard crop residue based power generation plant with an installed capacity of 8 MW using direct combustion boiler technology. The project is a case of utilizing an existing technology of combusting biomass fuels in a medium-pressure steam boiler (modified Rankine cycle with regenerative feed water heating and water-cooled condensation). The 8 MW turbine was supplied by Hangzhou Steam Turbine, China. The main aim of the project activity is to utilize the available biomass in the region effectively for generation of clean electricity.

8 GS Verification 2 METHODOLOGY 2.1 Verification Process The verification process is based on the approach depicted in the Validation and Verification Manual and GS requirements v1. Standard auditing techniques have been adopted. The verification team performs first a desk review, followed by an on-site visit which results in a protocol including all the findings. The next step is to close out the findings through direct communication with the PPs and finally prepare the verification report. This verification report and other supporting documents then undergo an internal quality control by the CB Environment and Energy before submission to the Gold Standard. The Verification of the CDM part has been described in the TÜV SÜD Report No dated 25 July Subsequently the issuance has been done by CDM EB on 25 October This report forms the basis for reference to the CDM part. 2.2 Verification Team The appointment of the verification team takes into account the technical area(s), sectoral scope(s) and relevant host country experience required amongst team members for verifying the ER achieved by the project activity in the relevant monitoring period for this verification. The CB TÜV SÜD operates the following qualification levels for team members that are assigned by formal appointment rules: Assessment Team Leader (ATL); Verifier (V); Verifier Trainee (T); Technical Experts (TE). The verification team was consisting of the following members: Coverage of Qualificat Coverage Name technical ion of scope area On-Site Host country experience Nikunj Agarwal ATL (1.1) No Eswar Murty V (1.1) Yes Technical Reviewer: Thomas Kleiser 2.3 Review of Documents The GS Monitoring Report version 1, dated was submitted by the PP before the verification activities started. The MR was assessed based on all the relevant documents as listed earlier. The aim of the assessment in the desk review was to verify the completeness of the data and the information presented in the MR. The compliance check of the MR with respect to the revised monitoring plan of the registered PDD and the applied methodology was carried out. Particular attention to the frequency of measurements, the quality of the metering equipment including calibration requirements, and the quality assurance and quality control procedures was paid. The evaluation of data management and the quality assurance and

9 GS Verification quality control system in the context of their influence on the generation and reporting of emission reductions was also carried out. A complete list of all documents reviewed is available in Annex 1 of this report. 2.4 On-site Assessment and follow-up Interviews On 18 th and 19 th May 2011, TÜV SÜD performed a physical site inspection and on-site interviews with project stakeholders to: confirm the implementation and operation of the project, review the data flow for generating, aggregating and reporting the monitoring parameters, confirm the correct implementation of procedures for operations and data collection, cross-check the information provided in the MR documentation with other sources (raw data), check the monitoring equipments against the requirements of the PDD and the approved methodology, including calibrations, maintenance, etc., review the calculations and assumptions used to obtain the GHG data and ER, identify if the quality control and quality assurance procedures are in place to prevent or correct errors or omissions in the reported parameters. A list of the persons interviewed during this verification activity is included in Annex Quality of Evidence to Determine Emission Reductions Among many others the following relevant and reliable evidences have been used by the audit team during the verification process: Joint meter recording sheets and Invoices raised for net electricity export for each month [14] Biomass consumption and procurement records for each month [20] Daily, weekly and monthly gross energy generation and auxiliary consumption measured at plant and recorded in log sheets [19] Plant outages records [29] Calibration certificates from state electricity board agency for main and backup meter & Weighbridge used in the project activity [15, 16, 17] Power Purchase Agreement [8] There is sufficient evidence covering the full verification period in the required frequency is available to validate the figures stated in the final MR. The source of the evidences will be discussed in chapter 3 of this report. Specific cross-checks have been done in cases that further sources were available. All figures in the monitoring report were cross-checked by the audit team against the raw data. The data collection system meets the requirements of the monitoring plan.

10 GS Verification 2.6 Resolution of Clarification and Corrective and Forward Action Requests The objective of this phase of the verification process was to resolve any outstanding issues which needed to be clarified for TÜV SÜD s positive conclusion on the GHG emission reduction calculation. To guarantee the transparency of the verification process, the concerns raised, based on the desk review and subsequent on-site audit assessment and follow up interviews, together with the responses given are documented in Annex 1 (List of Findings). A Corrective Action Request is raised where TÜV SÜD identifies: non-conformities in monitoring and/or reporting with the monitoring plan and/or methodology; that the evidence provided is not sufficient to prove conformity; mistakes in assumptions, data or calculations that impair the ER; FARs stated during validation or previous verification that are not solved until the on-site visit. A Clarification Request is raised where TÜV SÜD does not have enough information or the information is not clear in order to confirm a statement or data. A Forward Action Request is raised where TÜV SÜD identifies that monitoring and/or reporting required special attention or adjustments for the next verification period. Information or clarifications provided as response to a CAR, CL or FAR could also lead to a new CAR. 2.7 Internal Quality Control As a final step of verification, the final documentation including the final verification report, certification report and all necessary documents have to undergo an internal quality control by the Certification Body (CB) Environment and Energy, i.e. each report has to be finally approved by the CB Committee. In projects where one of the CB Committee members is part of the assessment team, the approval is given by the rest of the committee. If the documents have been satisfactorily approved, the Request for Issuance is submitted to the CDM-EB along with the relevant documents.

11 GS Verification 3 VERIFICATION RESULTS In the following sections the results of the verification are stated. The verification results relate to the project performance as documented and described in the final GS Monitoring Report ( , version 2.1 The Verification of the CDM part has been described in the TÜV SÜD Report No dated 25 July Subsequently the issuance has been done by CDM EB on 25 October This report forms the basis for reference to the CDM part. The verification findings for the GS are presented below: 3.1 FARs from Previous Verification 1. Forward Action Request # 1: For the next monitoring period where period is less than a year and not a full biomass procurement period is covered, the DOE shall confirm that biomass used in the boiler is appropriately determined based on biomass as determined via belt weigher. The DOE has cross checked biomass procurement data against month wise consumption data. The DOE confirms that biomass used in the boiler, which is sourced from the storage area is fed into the boiler via the belt conveyer and thereby weighed at the belt weigh and that therefore the biomass used is appropriately determined via belt weigh. Hence, FAR is closed. 2. Forward Action Request # 2: The DOE shall confirm during next periodic verification that the direct biomass input to boiler represents an accurate picture of biomass consumption by project activity. The DOE confirms that the direct biomass input to boiler represents an accurate picture of biomass consumption by the project activity. Hence, FAR is closed. 3.2 Project Implementation in accordance with the registered Project Design Document The project is fully implemented according to the description presented in the PDD. The verifier confirms, through the visual inspection that all physical features of the proposed CDM project activity including data collecting systems and storage have been implemented in accordance with the registered PDD. The project activity is completely operational and the same has been confirmed during the CDM verification site visit. With reference to Annex 66 & Annex 67 of EB48, TÜV SÜD is of the opinion that there is no "permanent changes" observed, in line with the guidance. 3.3 Compliance of the Monitoring Plan with the Monitoring Methodology The monitoring plan is in accordance with the approved methodology, AMS I D, Version 11, applied by the proposed CDM project activity. Based on the FAR raised in the First CDM Verification Report (TÜV SÜD Report No ) to revise the monitoring plan in order to improve the clarity and completeness of information to clearly indicate the monitoring parameters (electricity

12 GS Verification generation and electricity for internal consumption of the power plant),a request for revision of the monitoring plan was submitted by PP to EB. The CDM-EB has approved the revision in the monitoring plan on 24 th January 2012 [4]. Subsequently the issuance has been done by CDM EB on 25 October There has not been a notification of change or request for approval of changes during the current monitoring period. 3.4 Compliance of the Monitoring with the Monitoring Plan The monitoring for GS parameters has been carried out in accordance with the GS PDD annex and the GS Monitoring report. All parameters were monitored and determined as per the monitoring plan which has been mentioned in details below The verification of the parameters required by the monitoring plan is provided as follows: Data / Parameter: Water Quality/ ID GS1 Data unit: mg/l Description: Water quality of the plant Source of data used: Means of verification/comments: Cross-check Rajasthan State Pollution Control Board Consent to operate under the Water Act - consent letter given by Rajasthan State Pollution Control Board valid for the period from 01/08/2010 to 31/07/2013. Payment made towards the water cess Data / Parameter: Air Quality/ ID GS2 Data unit: g/m 3 Description: Air quality of the plant Source of data used: Rajasthan State Pollution Control Board & Indian Ambient Air quality standards Means of Consent to operate under the Air Act - consent letter given by verification/comments: Rajasthan State Pollution Control Board valid for the period from 01/08/2010 to 31/07/2013. Cross-check Technical specifications and operation of the electrostatic precipitator (ESP) Data / Parameter: Livelihood of the poor Data unit: - Description: Number of farmers benefitted by the sale of biomass residues Source of data used: Biomass purchase data Means of verification/comments: Based on the data for purchase of mustard crop residues from farmers at KPTL plant.. Cross-check Certificate from the chartered accountant firm indicating the goods received note (GRN) and the samples of sales receipts (GRN- Goods Receipt Notes) issued by KPTL. Data / Parameter: Employment numbers Data unit: - Description: Number of people employed in the plant as a result of project activity Source of data used: Employment records of KPTL plant Means of Based on the number of personnel employed verification/comments:

13 GS Verification Cross-check Salary details of staff of the plant Data / Parameter: Technological self reliance Data unit: - Description: Number of engineers trained to operate and implement the technology Source of data used: Plant data Means of Based on the training records of KPTL staff verification/comments: Cross-check Based on the employee records of KPTL. Data / Parameter: Resource Competetion Data unit: - Description: Quantity of biomass residue type n used for heat generation as a result of the project activity during the year y and for which leakage can not be ruled out Source of data used: Published literature, official reports, surveys Means of The latest data of agricultural department ( ) for biomass verification/comments: availability in the region. The survey report dated 2008 is not used to demonstrate surplus of biomass directly but to demonstrate the demand for Mustard Crop residues by Brick Kilns. The data collected from the District Agriculture Department show that for the period the project is only purchasing 21% of the mustard crop available. No other project has been registered under 50 Km radius as it is the policy of Government of Rajasthan to avoid the competition of raw material. The letter from the Nodal Agency has been checked to confirm the same [34]. There are few brick kilns using mustard crop residue and the consumption per annum is approximately MT only [25]. The biomass assessment for each monitoring period need not be done as it has been done at the beginning of the crediting period. This has also been clarified in the revised Monitoring plan, footnote 2. Moreover, during the first periodic verification, there was detailed assessment of the MCR use in the 50 km radius. Cross-check The survey from 2008 is used to exemplary show that Brick Kilns only use a minor share of the remaining mustard crop. As the brick kiln survey report mentions, the only competing users are the brick kilns but their consumption is little so that there is a surplus in the region is 69%. The survey done for the Brick Kilns is not repeated every year but it is reasonable to assume that the consumption is not changing from one year to the other. It should also be noted that parts of the biomass burned in 2009 has been purchased in 2008 already. The calibration of all metering equipments is done regularly and the relevant calibration documents were viewed by the audit team during the on-site visit. These calibration certificates confirm the calibration status listed in the Monitoring Report for all meters. No further calibration activities are required for this GS-CDM activity. No deviations exceeding the required frequency or the stated limits were found. Hence raw data of all measured parameter are reliable and serve as the basis for the reported emission reductions.

14 GS Verification 3.5 Assessment of Data and Calculation of Greenhouse Gas Emission Reductions The Emission Reduction Calculations are laid down in the Monitoring Report. As the approach to calculate the baseline emissions is based on the applied methodology AMS I.D. Version 11, net amount of electricity produced solely by biomass and exported to the grid multiplied with the exante defined emission factor for the respective grid. Such an approach is deemed to be acceptable. The reported data has been cross checked against other sources as explained in section 3.4. The verifier confirms that the methods and formulae used to obtain the baseline emissions are appropriate. The same have been done in accordance with the methods and formulae described in the registered monitoring plan and applicable methodology.the verifier confirms that the default value (from PDD) for grid emission factor has been correctly applied. The verifier also confirms that the emission factor (793.2 tco 2 /GWh) which has been calculated ex-ante in the registered PDD has been used correctly in the monitoring report and also the calculation of this factor was as per the requirement of AMS I D, version 11. Further, in the present monitoring period ( to ), the real, monitored emission reductions are about 27.16% higher than the ones estimated in the PDD. That is because the electricity generated depends upon the plant load factor of the power plant. The power plant reached a PLF of 70.68% during the Monitoring Period (86.97% in the period 1st March 2009 to February 28, 2010, 54.39% in the period 1st March 2010 to February 28, 2011).The plant load factor during present monitoring period was found % as compared to estimated 65% during normal years and 50% during drought years, on gross generation in the registered PDD. Since emission reduction depends on total electricity generation and export to grid multiplying with emission factor defined in the monitoring plan of the registered PDD therefore emission reduction amount for this monitoring period is higher. The low PLF considered at the time of registration was due to fire accidents, drought and anticipated performance uncertainties during implementation. However post registration, the plant operation has improved and due to extensive maintenance, fuel handling system, stock keeping and data control procedures, the PLF of the plant has increases subsequently. These maintenance efforts, data recording procedures and stock keeping have been verified by the DOE during the verification audit. Further, DOE has checked that the project additionality has been based on Barrier analysis and not on financial analysis. Hence it is clear that the increase in PLF does not have any impact on project additionality [ 19, 31].

15 GS Verification 4 SUMMARY OF FINDINGS The verifier can confirm that the MR and related documents are complete and verifiable in accordance with the CDM requirements. All the findings raised by the verification team, the responses by the PPs and the conclusion from the team are presented in Annex 1, the means of verification and resulting changes in the MR or related documents are stated as follows: CR 1: The data pertaining to that of the Consent to operate under Air and Water Act. The Consent only indicates the standards to be complied, where as actual data is not present. Please submit the analysis reports of air quality & water quality parameters as mentioned in the consent. CR 1, means of verification The analysis reports for water and air samples have been submitted. The data is in line with the permissible limits as per Pollution control Board. CR 1, changes in the MR or related documents The MR has been updated to include the data as per the reports.

16 GS Verification 5 VERIFICATION STATEMENT TÜV SÜD has performed the GS verification of the project:. The verification is based on the currently valid documentation of the UN Framework Convention on Climate Change (UNFCCC) and the GS requirements v1. The management of Kalpataru Power Transmission Limited is responsible for the preparation of the GHG emissions data and the reported GHG emission reductions on the basis set out within the projects monitoring plan and the applied methodology AMS I. D, Version 11. The verifier can confirm that: the development and maintenance of records and reporting procedures are in accordance with the GS monitoring plan; the project is operated as planned and described in the validated and registered project design document (registration date ); the installed equipment being essential for generating emission reduction runs reliably and is calibrated appropriately; the monitoring system is in place and generates GHG emission reductions data; the GHG emission reductions are calculated without material misstatements; the monitoring plan in GS Monitoring Report (version.2.1 dated: ) is as per the monitoring plan of the applied methodology; the revised monitoring plan of registered PDD is as per the applied methodology. Our opinion refers to the project s GHG emissions and resulting GHG emission reductions reported both determined due to the valid and registered project s baseline, its monitoring plan and its associated documents. Based on the information we have seen and evaluated, we confirm the following statement: Reporting period: From to Verified emissions in the above reporting period: Baseline emissions: t CO 2 e Project emissions: 0 t CO 2 e Leakage emission: 0 t CO 2 e Emission reductions: t CO 2 e Pune, Certification Body Environment and Energy TUV SUD South Asia

17 GS Verification Annex 1: List of Findings

18 List of Findings - Compilation and Resolutions Project Title: Tonk Biomass Project India Page 1 of 2 Definitions contained in the Glossary of CDM terms and applied in the Standard Shall / Should / May Credible Reliable CAR CL FAR In addition to the definitions contained in the Glossary of CDM terms, the following terms apply in the VVS (VVS/10): Shall is used to indicate requirements to be followed; Should is used to indicate that among several possibilities, one course of action is recommended as particularly suitable; May is used to indicate what is permitted. Information is credible if it is authentic and is able to inspire belief or trust, and the willingness of persons to accept the quality of evidence. (VVS/17) Information is reliable if the quality of evidence is accurate and credible and able to yield the same results on a repeated basis. (VVS/17) The DOE shall raise a CAR if one of the following situations occur: (VVS/220) (a) Non-compliance with the monitoring plan or methodology are found in monitoring and reporting and has not been sufficiently documented by the project participants, or if the evidence provided to prove conformity is insufficient; (b) Modifications to the implementation, operation and monitoring of the registered project activity has not been sufficiently documented by the project participants; (c) Mistakes have been made in applying assumptions, data or calculations of emission reductions that will impact the quantity of emission reductions; (d) Issues identified in a FAR during validation to be verified during verification or previous verification(s) have not been resolved by the project participants. The DOE shall raise a CL if information is insufficient or not clear enough to determine whether the applicable CDM requirements have been met. (VVS/221) The DOE shall raise a FAR during verification for actions if the monitoring and reporting require attention and/or adjustment for the next verification period. (VVS/223) Compilation and Resolutions of CARs, CRs and FARs Clarification Requests by the assessment team Comments and Results Conclusion and IRL Issue Data to cross check the standard Requirement Gold Standard sustainability monitoring Clarification Request Clarification Request No. 1 The data pertaining to that of the Consent to operate under Air and Water Act. The Consent only indicates the standards to be complied, where as actual data is not present. PP shall submit the analysis reports of air quality & water quality parameters as mentioned in the consent. Response The air and water sample analysis reports have been provided to the DOE. Finding Closed IRL 36, 37 IS-CMS-CB-POG-02-08_List of Findings_v03

19 List of Findings - Compilation and Resolutions Project Title: Tonk Biomass Project India Page 2 of 2 Clarification Requests by the assessment team Assessment Means of verification Adjustment on project design OR Changes in the monitoring report or supporting annexes The analysis reports for water and air samples have been submitted. The data is in line with the permissible limits as per Pollution control Board. NA Forward Action Requests by the assessment team Issue Requirement Forward Action Request Comments and Results Forward Action Request No. 1 Finding Closed IRL xx Response Means of verification Any resulting changes in the monitoring report or supporting annexes IS-CMS-CB-POG-02-08_List of Findings_v03

20 GS Verification Annex 2: Information Reference List

21 GS Verification: Information Reference List Page 1 of 4 Ref. No. Author/Editor/ Issuer Title/Type of Document. Publication place On-site interviews and inspections of the project site were conducted on by the auditing team of TÜV SÜD. Issuance and/or submission date Additional Information Mr. Eswar Murty TÜV SUD South Asia TÜV SÜD The persons interviewed during site audit are Mr. Anand Chopra KPTL Mr. Hitesh Goyal KPTL Mr. SK Basu KPTL Mr. Paras Jain KPTL Mr. Florian Zerzawy Atmosfair ggmbh Mr. Joerg Ruediger Atmosfair ggmbh May UNFCCC TUV SUD Verification Report No of the First Verification for Electricity generation from mustard crop residues: Tonk, India, Reference no. 29/07/2010 UNFCCC CDMP 2. UNFCCC AMS-I.D Renewable electricity generation for a grid, version KPTL GS Monitoring Report, version 1 21/04/ KPTL Revised Monitoring Plan approved by UNFCCC GPJZ/Revised%20Monitoring%20Plan.pdf?t=QVJ8bTE0ZmRmfDCOu9WaH nrrngxncpq5b5gv 22/12/ KPTL Final GS Monitoring Report, version /01/ Sitson India Pvt Ltd Technical Specifications for 38 TPH Boiler Hangzhou Steam Turbine Company Technical Specifications for 8 MW Turbine RVPNL & KPTL Power Purchase Agreement between KPTL and RVPN TÜV SÜD SOUTH ASIA PVT LTD

22 GS Verification: Information Reference List Page 2 of 4 Ref. No. 9. Author/Editor/ Issuer Rajasthan State Pollution Control Board Title/Type of Document. Publication place Consent to operate under Air Act 1981 valid till Consent to operate under section 25/26 of the Water Act which covers the monitoring period. Issuance and/or submission date 28/01/ HSTC Letter from HTC to KPTL regarding overloading of 8 MW turbine 02/11/ HSTC Technical specifications indicating 10% overloading of 8 MW turbine Rajasthan Power Discoms Avant Garde KPTL RVPN Letter from Chief Engineer, Rajasthan Power Discoms regarding Power allocation to Rajasthan grids, Letter from Boiler manufacturer to KPTL regarding non suitability of boiler to fire fossil fuels, Joint meter readings and Invoices raised to Jodhpur Vidyut Vitran Nigam Limited, Ajmer Vidyut Vitran Nigam Limited and Jaipur Vidyut Vitran Nigam Limited Calibration certificate of the Main Meter (Serial no:tnb00978 & Backup Meter (Serial no: /11/ /09/2009 March1, 2009 to February 28, /02/2011, 16/09/ /02/2010, 25/09/ /03/ Calibration certificate of Weighbridge 11/11/2010, 13/11/2009, 30/03/ Calibration certificate of Belt weigher 30/03/2009, 22/02/ KPTL 19. KPTL 20. KPTL Sample copy of generator meter reading and plant log book logbook which contains the data of gross generation, auxiliary consumption and fuel consumption Daily Generation data spreadsheet Biomass procurement and consumption data for the period March1, 2009 to February 28, 2011 March1, 2009 to February 28, 2011 March1, 2009 to February 28, KPTL Fuel Stock statement March1, 2009 to February Additional Information TÜV SÜD SOUTH ASIA PVT LTD

23 GS Verification: Information Reference List Page 3 of 4 Ref. No. Author/Editor/ Issuer 22. KPTL Title/Type of Document. Publication place Excel Spreadsheet for Emission reduction calculations Issuance and/or submission date 28, 2011 March1, 2009 to February 28, KPTL Biomass assessment report from Kalpataru Power Transmission Limited Dep. Of Agriculture Biomass data from the Department of Agriculture Nature club of Rajasthan 26. KPTL Survey Report on the use of Mustard crop residues by Brick Kilns Sample of Biomass receipt and payment voucher of fuels March1, 2009 to February 28, KPTL Procedure for Data monitoring and Operation system KPTL Organization chart, Kalpataru Power Transmission Limited KPTL Shutdown details report for the period March1, 2009 to February 28, KPTL Plant Performance Report indicating PLF and generation KPTL List of Training record during the monitoring period March1, 2009 to February 28, Google earth screen shot for plant coordinates of Tonk RERC 34. Energy Department, Government of Rajasthan Notification regarding metering standards 29/05/2007 Policy for promoting power generation through non conventional energy sources 13/11/ KPTL Logsheet data for 8 MW turbine 36. KPTL & Pollution Final report of Analysis of Air and water samples Nov 2010 Additional Information TÜV SÜD SOUTH ASIA PVT LTD

24 GS Verification: Information Reference List Page 4 of 4 Ref. No. 37. Author/Editor/ Issuance and/or Title/Type of Document. Publication place Issuer submission date Control Board Jan 2011 KPTL & Pollution Control Board Final report- Analysis of water 38. KPTL Data of surplus biomass in the region 39. TUV SUD Verification Report No July Additional Information TÜV SÜD SOUTH ASIA PVT LTD

25 GS Verification Annex 3: Appointment Certificates

26

27

28