1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Mozambique Ministry of Energy Energy Development and Access Project - EDAP Consolidated Procurement Plan for ME, EDM and FUNAE Components I. General 1. Project information: Country: Republic of Mozambique Borrower: Government of Mozambique Project Name: Energy Development and Access Project - EDAP Project ID: P Credit No: MZ Project coordination Unit: Ministry of Energy 2. Bank s approval Date of the procurement Plan: Original: November 4, 2009 Revised: July 02 nd, 3. Date of General Procurement Notice: April 28, Period covered by this procurement plan: 18 Months II. Goods and Works and non-consulting services. 1. Threshold: Procurement Decisions subject to by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method 1. ICB and LIB (Goods and Services other that Consultant Services) 2. NCB (Goods and Services other than Consultant Services) Threshold >500,000 >75,000 and <500,000 The Bank, at its own discretion, may require a sample of contracts to be subject to prior 2. ICB (Works, Supply and Installation) >5,000,000 3 NCB (Works, Supply and Installation) >100,000 and <5,000,000 The Bank, at its own discretion, may require a sample of contracts to

2 4 Direct Contracting (Goods and Services All other that Consultant Services) 5 Direct Contracting (Works) All be subject to prior 2. Prequalification. Bidders for Supply and Installation of plant and equipment contracts shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable 4. Reference to (if any) Project Operational/Procurement Manual: There is no Operational/Procurement Manual for the Project. We refer to the general World Bank procurement guidelines. 5. Any Other Special Procurement Arrangements: Not Applicable 6. Procurement Packages with Methods and Time Schedule 2

3 6.1 Goods Ref. No. Contract (Description) Estimated Cost Procurement Method Prequalification Domestic Preference by Bank ( / Post) Expected Bid- Opening Date Component 1 : EDM 1.1 Vehicles for (4x4 DC and SC) ICB No No Jul-12 Deducted from Sub comp Office Equipment for PIU Shopping No No Post Oct-11 Deducted from Sub comp Component 2: FUNAE 2.1 Vehicles NCB 2.2 Office and field equipment NCB 2.3 Multifunctional Platforms ICB 2.4 Biomass Improved Stoves NCB 2.5 Charcoal Kilns ICB 2.6 Equipment to improve PV systems NCB No No Post Nov 07, 2011 No No Post Feb 07, No No Sep 5, No No Post Sep 5 No No Sep 5 No No Sep Office Equipment (IT, Photocopy Machine, Scanner, Software), for the ME and CNELEC Component 3: Ministry of Energy NCB No No Post Oct 22, The purchasing process will be by lots, accordingly 3

4 3.2 Office equipment (Consumables), for the ME and CNELEC. Shopping No No Post Oct 22, 3.3 Motor Vehicles for ME NCB No No Post July 16, The purchasing process will be by lots, accordingly (Concluded) 6.2 Works Ref. No. Contract (Description) Estimated Cost Procurement Method Prequalification Domestic Preference by Bank ( / Post) Expected Bid- Opening Date Component 1 : EDM 1.1 Maputo Province: NCB No No Post Dec MV Network Transmission Efficiency Improvement Pilot Maputo Manica Province: ICB No No Dec Reh. & Reinf of Primary Network (A1 and A3) SEs Matola & Manica. 1.3 Maputo Province: NCB No No Post Dec Reh. & Reinf of Primary Network (A2) Upgrade Swear Chang. 1.4 Manica Province: NCB No No Post Dec Reh. & Reinf of Primary Network (A4) Upgrade OHL 6.6 to 22kV. 1.5 B - Nampula Province: ICB Yes No Dec Extension of Dist Networks & Customer connections (B1; B2; B3; B4; B5). 1.6 D Tete Province: ICB Yes No Dec D Extension of Dist Networks & Customer connections (D1; D2; D3; D4; D5) Supply, Installation & Training of ICB No No Jul-12 4

5 Integrated Business System (IBMS) Supply, Installation & Training of Integrated Business System (IBMS): AMR systems NCB No No Post Apr - 12 Component 2: FUNAE 2.1 Institutional Solar Systems - Rural Schools NCB No No Nov 21, Institutional Solar Systems - Rural Clinics NCB No No Post Nov 21, Community/Local Operator Solar Systems NCB No No Post Sep 5, 2.4 Support to Private Sector Supply/Delivery No No Post Sep 5, NCB of PV Systems 6.3 Non Consulting Services Ref. No. Contract (Description) Estimated Cost Procurement Method Prequalification Domestic Preference by Bank ( / Post) Expected Bid-Opening Date 1. Rental of Office Space for ME`s EDAP project Staff and Consultants 192, NCB No No Post September 24, 5

6 III. Selection of Consultants 1. Threshold: Selection decisions subject to by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Threshold 1. >200, SSS (Firms) All 4. IC >100,000 5 SSS (Individual) All 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 200,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Not Applicable 6

7 4. Consultancy Assignments with Selection Methods and Time Schedule Ref. No. Estimated Cost Selection Method by Bank ( / Post) Expected Proposals Submission Date Consultancy Services for Environmental Management Plan v) T. Assistance for Design &Supervision of Revenue Protection Project (RPP/AMRs) Technical Assistance and Consultancy Services Component 1 : EDM Feb-12 IC Post Feb-12 Feb-12 Component 2: FUNAE kus$50.00 and kus$ transferred for ref No8 (1.5.3.v ) and for Section IV. Training,respectively 2.1 Technical Assistance & Consultancy Services 2.2 Promotion of Household and SME interfuel substitution 2.3 Environmental Management Plan 2.4 Biomass Energy Technologies Demonstration Pilots 2.5 Procurement Officer IC 2.6 Solar PV Specialist IC Sep 30, Sep 30, Sep 30, Sep 30, June 25, June 25, Activity to be discussed with the Bank, FUNAE and ME Component 3: Ministry of Energy 3.1 ME Assembling of the 200,000 December 2013 ToRs in preparation. The study on incentive on renewable 7

8 existing studies on Rural Electrification and Definition of a new Strategy. 3.2 Transaction Advisor for Large Generation Projects (Phase 1) 3.3 ME- TA on Promotion of New Energy Infrastructure October 2013 September 2013 already concluded and of grid systems tariff model in progress are part of this process The Technical proposals under evaluation and the Ministry is concluding the contract with Mr Lesse M. as single source as agreed with the bank to assist the Ministry in the selection and reporting on the TA selection process. It include a set of activities: ( of Energy strategy) already in progress; (1) Strategy of electricity tariff segmentation; (2) Establishment of Energy Independent Regulator having as one of main duties the monitoring of Performance contract (3) Experience sharing on regulatory and power sector reform benchmark 3.4 ME Elaboration of renewable energy strategies 3.5 ME - Study on SAPP market Context: strategic approach for Mozambican power generation projects 3.6 CNELEC - Consultant on Annual s of EDM Performance under future Performance Contracts 3.7 CNELEC Consultant for establishment of monitoring systems for financial, technical and commercial performance 3.8 CNELEC Satisfaction Index of EDM`s Customers 3.9 CNELEC - Consultant for Cost of service and tariff studies, regulatory accounting system and customer complain system 3.10 Technical assistance for the Renewable Energy Department Post November, 2013 August 2013 December 2013 December 2013 Aug 06, March 2013 July 2013 ToR concluded and attached for your consideration The Procurement process has started and we are waiting approval of the TORs. The first step already done with the study on incentive on renewable energies (already concluded). The Second step is the consultancy service on off-grid systems 8

9 3.11 TA on natural gas October 2013 tariff model. The selection of the consultant already concluded and signing of the contract is in progress (for exercises are individual consultants below threshold) meaning below USD ,00 As the Gas Master plan has been concluded it became clear that downstream side need appropriate institutional and regulatory framework. To this end the Ministry hold three seminars with all stakeholders to discuss the finding of the gas master plan were it was concluded the need for TA on the downstream structuring, definition of regulatory approach for natural gas market development taking in to account the current context. It also includes field studies and experience sharing actions. Status: Draft ToR for TA is already elaborated and consolidation is in process. Proposal for field study on selected countries is already ready including the cost estimation TA on petrol 3.15 Consultant for procurement (junior) 3.16 Monitoring and Evaluation Consultant 3.17 Consultant for Transactional Advisor (Legal Advisor) 3.18 Consultant for Supervision of IT Equipment and Configuration of Network of Environmental and Transmission Line Guidelines and 02 Dissemination seminaries on South and Centre region. IC IC IC IC SSS Post Post Post November 2013 July November August August 2013 August 2013 Proposals of projects for Coal to Liquid (CTL) and Gas to Liquid have been presented to the Ministry. The CTL is in process of its feasibility study after the submission of pre-feasibility study. Given that this is a new technology, the Ministry needs TA to assist on the evaluation of the two options including the potential environmental impacts. ToR is in process of elaboration. Junior Procurment Consultant already contracted in. The contract was renewed The individual Consultant already hired. Since the procurement process for recruitment of the main Transactional Advisor (the firm) is still on going the legal advisor is still supporting the Ministry The selection process already concluded and contract signed. It will be submitted in July ME intends to invite UEM (Universidade Eduardo Mondlane) to assist on of environmental and Transmission line guidelines as part a national strategy coordinated by MICOA Consultant on energy CQS Post September 2013 (1) Study that ToR already submitted 9

10 demand management for efficient use of electricity through Low Cost Electric Bulbs and Water Heat Solar Systems. (2) Preparation of implementation strategy including definition of target consumers (3) Technology dissemination 10