1 SPATIALinfoat NBN Co Physical Resource Management Tony Cotter Managing Director SPATIALinfo Pty Ltd

2 What is NBN? NBN - a Gov t funded infrastructure project Funding requirement is $A 41 billion, IRR = 7% Implementation vehicle is NBN Co, regulated as wholesale only, uniform wholesale pricing independent of location NBN Co is building Layers 1 and 2 only Physical Network (GPON, distribution, backhaul & transit) Logical Network (Ethernet Virtual Circuits) NBN Co will only provide Layer 2 (no Layer 1 unbundling) Layer 3 retail services provided by 3rd Parties through 120 Points of Interconnection (PoI)

3 Who is SPATIALinfo? SPATIALinfo an Australian software company In the spatial business since 1981 (formerly ARC Systems) Software product exporter since 1994 Focused entirely on the global Communications market Cable operators (MSOs) in North America Telcos everywhere Solutions delivery via partners Systems Integrators, e.g. Accenture Data specialists, e.g. Apex Covantage Resellers, e.g. TeleOSS

4 Who uses spatialsuite? Historically Telstra (CPR, based on our previous generation CAD based technology) Currently 40+ customers in North America Largest = Comcast (51 million homes passed) Others incl Rogers, Shaw, Charter, Mediacom Design & Construction contractors to the above Locally Singtel Optus NBN Co

5 NBN the acronym N = National, ubiquitous to 100% of premises 93% via FTTP 4% via Wireless (100<towns<1,000 pop) 3% via Satellite (localities<100 pop) B = Broadband FTTP GPON services up to 1 Gb/s Wireless and Satellite at 12 Mb/s N = open access wholesale Network 181,000 km GPON cable 57,000 km fiber backhaul

6 NBN Broadband Footprint

7 Broadband Demand

8 Usage Projections

9 GPON Roadmap

10 NBN FTTP Architecture

11 NBN Product Overview

12 TM Forum SID v9

13 TMF SID Resource Domain

14 Generic Network Architecture

15 NBN OSS/BSS Architecture

16 PCNI Domain Inventory & Work Order Management ERP Work Order Management Orchestration Layer Logical Network Inventory Physical Network Inventory spatialsuite Telco Service providers require: A highly integrated end to end work flow process A single integrated view of network inventory A single consistent asset based view of existing resources and work in progress

17 Layer 3 & above Layer 2 Layer 1 LNI/PNI Data Ownership Discoverable Channels Routers, servers, switches, fiber nodes, bridges, links VPNs, VoIP VLANS, LSPs Equipment Non discoverable Channels Bearers, distribution frames, splices, amplifiers, taps LNI Joint PNI Layer 0 Infrastructure Racks, ducts, cables, trenches, poles, pedestals, manholes, handholes Land base & Address Streets, cadaster, property boundaries, easements, addresses

18 spatialsuite Architecture Enterprise Deployment Contract Drafting Outsourced Design VPN/Firewall/Cloud Network Design Engineering Asset Management High performance 2-tier engineering client Field Operations Construction Installation Automatic sync of network data to disconnected field devices Data Sync Redline markup of field jobs with seamless database update Customer Service Service Qualification Address Verification Network Operations Outage Analysis Long Range Planning Plant Mapping 3-tier applications services platform Web Server spatialserver Data model, data access, job management, security, licensing Data Access Tracing JMS Enterprise Integration (EBS, SOA) Logical Inventory Provisioning NMS - Billing CRM Import and manage CAD Drawings Import and Validate Customer Addresses

19 NBN OSS/BSS Implementation IBM is prime integrator plus domain integrator for Billing and Assurance Alcatel is fulfillment domain integrator using Comptel products Alcatel/Comptel will implement LNI SPATIALinfo is product vendor for PNI PNI scope includes planning, design & construction Accenture is domain integrator for the spatialsuite

20 NBN Rollout

21 NBN Construction 12 million premises to be passed in 10 years Equates to 5,000 premises per day 30,000 personnel required for construction All construction performed by contractors All operational field work by contractors

22 NBN Status First release sites are operational Construction is now under way Fujitsu/ServiceStreamconstructing greenfields(new estates) Silcar/Thiess won first brownfields (over-build) contract SpatialNET deployed for R0 planning, design & asbuilt Design contractors will be accessing spatialnetand NBN Co PNI database via Citrix

23 Take Aways Importance of PNI in GPON Highly passive network (no active equipment between FAN site and ONT at service address) Desire to fully automate service activation process via B2B Creates much greater reliance on high quality network data and applications Shift from CAD to spatialnet Design contractors preferring to use spatialnetrather than CAD tools and ETL NBN Co highly supportive as this methodology enforces fiber engineering rules at data creation & edit time

24 THANK YOU QUESTIONS OR COMMENTS? Acknowledgement: Diagrams are sourced from the NBN Corporate Plan Dec 2010, in which much more detailed information is publicly available. The document can be downloaded from the Publications Archive for 2010 at