Explain in writing if the address of the building is different than the address on this form:

Size: px
Start display at page:

Download "Explain in writing if the address of the building is different than the address on this form:"

Transcription

1 ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO SCHOOL DIST Chicago, IL, 6649 DATE LAST THREE YEAR REINSPECTION WAS COMPLETED 3/12/213 If the address on this form is different than the address of the building, submit a written explanation. SECTION II (Please type or print) PLEASE COMPLETE THE FOLING FOR YOUR THREE YEAR REINSPECTION: DATE REINSPECTION COMPLETED: 3/4/216 ENROLLMENT IDPH INSPECTOR LICENSE NUMBER: IDPH LICENSED INSPECTOR NAME (Please Print): Robert DeBord IDPH MP LICENSE NUMBER: IDPH LICENSED MANAGEMENT PLANNER NAME (Please Print): Daniel Juneau DESIGNATED PERSON (Please Print): Robert Christlieb PHONE: 628 (773) /4/216 Signature of Designated Person Date SECTION III PLEASE COMPLETE THE FOLING INFORMATION FOR ANY CHANGES WITHIN THE SCHOOL DISTRICT. School building has been sold. Date of Sale: School has been closed. Date closed: School building has been demolished. School building is asbestos free since last reinspection: Please explain in writing why the school building is now asbestos free and include the supporting documentation. If a new school building has been added to the district, submit either and exclusionary statement or a management plan and inspection report. Include the complete name, address and city of school building. Explain in writing if the address of the building is different than the address on this form: IL Revised 1.3

2 THREE YEAR REINSPECTION CHICAGO SCHOOL DIST 299 Chicago, IL, 6649 Unit: Building ID: IDPH ID Number: REPORT DATE: Friday, March 4, 216 Prepared for: 125 S. Clark Street Chicago, IL 663 Prepared by: 6 West Van Buren St., Ste 5 Phone (312) Fax (312) DO NOT REMOVE FROM SCHOOL REQUIRED BY FEDERAL LAW

3 March 4, 216 Mr. R. Kent Cook Asbestos Program Illinois Department of Public Health 525 West Jefferson Street Springfield, Illinois Re: Three-Year Reinspections Dear Mr. Cook:, Managing Environmental Consultant (MEC), conducted the ThreeYear Reinspections and performed management plan updates for the (CPS) facilities in Region 3,4,5 Elementary Schools. Please update your records with the following information. School District: 299 Unit: School: Region: 5 IDPH ID: Building ID: Address: Chicago, IL, 6649 Building Contact: Black, Tyrone Contact Phone: Current Building Owners: Review 6/14/216 Inspector: Robert DeBord Management Planner: Daniel Juneau Inspector IDPH License: Management Planner IDPH License: If you have any questions or comments, please contact us at (312) Sincerely, Daniel Juneau

4 Environmental tification to Occupants To: Faculty, Staff and Parents From: March 4, 216 RE:, Unit Chicago, IL, 6649 Dear Faculty, Staff and Parents, This letter is to notify you that the 216 asbestos three year re-inspection has been completed at, following the Federal Asbestos Hazard Emergency Response Act (AHERA), 4 CFR Part 763, Subpart E and is available for your review at the main office of the school. Although asbestos-containing materials have been identified at, there is no reason to believe that any threat to the health of students or staff exists at this time. CPS will continue to carefully monitor the condition of asbestos-containing materials and if conditions warrant, all appropriate steps will be taken to maintain the health and safety of all building occupants. If you have any questions regarding this matter or require additional information, please feel free to contact Robert Christlieb, the designated Local Education Authority's Designated Person at (773)

5 Table of Contents I. School and Inspection Information II. Executive Summary III. Methodology IV. Abatement History V. Reassessments and Recommendations VI. Conclusions Table I: Inspector's Reinspection Findings Table II: Management Planner's Review APPENDICES: Appendix A: Assessment Sheets, Drawings and Photos Appendix B: Inspector and Management Planner Licenses Appendix C: Laboratory Accreditations Appendix D: Laboratory Results Appendix E: Chain of Custody Forms

6 SCHOOL AND INSPECTION INFORMATION 1. School Information School: Address: IDPH ID: Contact: Black, Tyrone Unit: Chicago, IL, 6649 Building ID: Phone: Description of Facility Original Construction: 1937 Total Square Footage: Current Occupancy: Additional Construction: of Floors: 3 Phone: (773) Managing Environmental Consultant MEC: Contact: Dan Juneau Address 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector Inspector Name: Robert DeBord Signature: 3/4/216 Inspector IDPH license # ,1978,1927 LEA Designated Person Contact: Robert Christlieb Address: 125 South Clark Street, 17th Floor Chicago, IL Region: 5 Management Planner Management Planner Name: Daniel Juneau Management Planner IDPH license # Review 6/14/ LEA Designated Person's Acknowledgement Signature: 6/14/216 The reinspection report and recommendations have been received by me and appropriate action will be taken by the School District. Signature: 3/4/216 Name: Robert Christlieb Unit : Building:

7 II. EXECUTIVE SUMMARY was retained by the (CPS) to perform a three-year asbestos reinspection of the. This inspection was conducted in accordance with the United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) part (b), and the ongoing Operations and Maintenance Program (O&M) originally designed in the School's Asbestos Management Plan. The purpose of this three-year reinspection is to record any condition changes in the asbestos-containing building material (ACBM) in the school since the previous three-year reinspection and the six-month periodic surveillance, to identify, assess, and include any Homogeneous Areas (HA) not identified in the Management Plan, and to recommend an appropriate response action to manage asbestos. The inspector conducted a three-year reinspection of this facility under Illinois Department of Public Health (IDPH) school reinspection requirements and AHERA, sections and The main building and each addition to the main building, if constructed at different dates, were inspected separately. Laboratory accreditations are included in Appendix C, laboratory results are included in Appendix D, and chain of custody forms are included in Appendix E. te: During previous inspections, some of the HA(s) were identified together as 9" x 9" floor tile (FT), mastics assoc. with 9" x 9" FT, 12" x 12" FT, mastics assoc. with 12" x 12" FT, pipe insulation, etc. Some of these HA(s) have been re-identified by areas that are uniform in color, texture, construction date, application date, and general appearance. The inspector has determined the following: A. The following HAs have changed assessment categories for Building : Unit: 4 Hard Coat Plaster 5 Rough Coat Plaster 6 Troweled on Plaster 7 2'x4' Lay In Ceiling Tile 19 2" x 2" Light Tan Ceramic Tile 11 Grout Associated w/ 2" x 2" Light Tan Ceramic Tile " x 12" Beige w/ Dark Spots Floor Tile 112 Mastic Associated w/ 12" x 12" Beige w/ Dark Spots Floor Tile 12 Hard Coat Plaster Building:

8 Unit: 13 Hard Coat Plaster 14 Hard Coat Plaster 3 12" x 12" Light Beige Floor Tile 94 Accoustical Plaster A Vibration Duct Sleeves D Fittings on Aircell Insulation F Joint Insulation On Cardboard Insulated Piping G Mag-Block Pipe Insulation H Pipe Fitting Insulation on Mag Block Insulated Piping K Fiberglass Tank Insulation Q Pipe Fitting Insulation on Aircell Insulated Piping R Pipe Joint Insulation On Aircell Insulated Piping S Paper wrap insulation U Boiler Gaskets V Pipe Fitting Insulation Piping on Fiberglass Insulated X Pipe Fitting Insulation Piping on Fiberglass Insulated Building:

9 B. The following new homogenous areas have been identified for Building : Unit: 19 2" x 2" Light Tan Ceramic Tile 11 Grout Associated w/ 2" x 2" Light Tan Ceramic Tile " x 12" Beige w/ Dark Spots Floor Tile 112 Mastic Associated w/ 12" x 12" Beige w/ Dark Spots Floor Tile Building:

10 C. This reinspection covered only physically accessible and visible areas and materials that were identified in the LEA's management plan. The following materials were concealed and/or contained in areas that were inaccessible for sampling and have been classified as : Unit: 9"x9" Tan Floor Tile Hard Coat Plaster Rough Coat Plaster Troweled on Plaster 2'x4' Lay In Ceiling Tile Green Linoleum Fiberglass Lay In Ceiling Panels Fire Proof Curtains Green terrazzo 12x12 Green w/white Floor Tile 12x12 Green w/white Floor Tile Mastic 12x12 Brown w/white Floor Tile 12x12 Brown w/white Floor Tile Mastic 2" x 2" Light Tan Ceramic Tile Fire Door Grout Associated w/ 2" x 2" Light Tan Ceramic Tile 12" x 12" Beige w/ Dark Spots Floor Tile Mastic Associated w/ 12" x 12" Beige w/ Dark Spots Floor Tile Hard Coat Plaster Hard Coat Plaster Hard Coat Plaster Hard Coat Plaster Baseboard Baseboad mastic Incinerator insulation Fire- Brick mortar 9 "x 9" Green Floor Tile 9 x 9 Green floor tile Mastic 12" x12" Orange Floor Tile 12" x12" Orange Floor Tile Mastic 12" x 12" Light Beige Floor Tile 12" x 12" Light Beige Floor Tile Mastic Linoleum Linoleum Mastic Gold Carpet Mastic - t Observed Green Carpet Mastic - t Observed Red Carpet Mastic Transite Panel Vibration Damper Drywall Drywall Compound Building:

11 A A B I K Mod-5 Mod-6 Mod-7 N Unit: Drywall Drywall Compound 9" x 9" Dark Brown Floor Tile - Removed 9 "x 9" Black Floor Tile - Replaced 9 "x 9" Gray Floor Tile 9" x 9" Dark Brown Floor Tile 9" x 9" Black Floor Tile 12" x 12" Beige Floor Tile 12" x 12" Brown Floor Tile 12" x 12" Light Brown Floor Tile 12" x 12" Light Brown Floor Tile Mastic 12" x 12" Light Tan Floor Tile 12" x 12" Light Tan Floor Tile Mastic 12 "x 12" Beige Floor Tile 12 "x 12" Light Brown Floor Tile 12 "x 12" Light Brown Floor Tile Mastic 12 "x 12" Brown Floor Tile 12 "x 12" Brown Floor Tile Mastic 12" x12" Orange Floor Tile Green Carpet Adhesive 12" x12" Orange Floor Tile Mastic 12" x12" Brown Floor Tile White w/brown Streaks Floor Tile 12"x12" Dark Brown w/light Brown Streaks Floor Tile 12"x12" Dark Brown w/light Brown Streaks Floor Tile Mastic 12"x12" Brown w/black & White Streaks Floor Tile 12"x12" Brown w/black & White Streaks Floor Tile Mastic Chalkboards Chalkboard Adhesive Mastic Beneath Wood Flooring Terrazzo Accoustical Plaster Grey & Black Terrazzo Blue Carpet Adhesive 12X12 White w/grey & Brown Floor Tile 12X12 White w/grey & Brown Floor Tile Mastic Tan terrazzo Vibration Duct Sleeves Vibration Dampers Fiberglass Duct Covers Fiberglass Tank Insulation Baseboard (Building Demolished) Baseboard mastic (Building Demolished) Drywall (Building Demolished) Fiberglass Duct Building:

12 U Boiler Gaskets The following areas were deemed to be inaccessible: A P R S 12x12 Brown w/white Floor Tile Mastic Fire Door Grout Associated w/ 2" x 2" Light Tan Ceramic Tile Mastic Associated w/ 12" x 12" Beige w/ Dark Spots Floor Tile Incinerator insulation 9x9 Beige and 9x9 Dark Brown floor tile mastic 12" x 12" Beige Floor Tile Mastic 9" x 9" Gray Floor Tile Mastic 9" x 9" Gray Floor Tile Mastic 9 "x 9" Dark Brown Floor Tile Mastic 12"x12" Beige Floor Tile Mastic 12" x 12" Brown Floor Tile Mastic 12" x 12" Light Brown Floor Tile Mastic 12" x 12" Light Tan Floor Tile Mastic 12" x 12" Beige Floor Tile Mastic 12 "x 12" Light Brown Floor Tile Mastic 12 "x 12" Brown Floor Tile Mastic 12" x12" Orange Floor Tile Mastic 12"x12" Dark Brown w/light Brown Streaks Floor Tile Mastic 12"x12" Brown w/black & White Streaks Floor Tile Mastic Chalkboard Adhesive Mastic Beneath Wood Flooring 12X12 White w/grey & Brown Floor Tile Mastic Aircell Pipe Insulation Pipe Joint Insulation On Aircell Insulated Piping Paper wrap insulation Materials were also listed as "assumed" if they were in good condition and sampling was not conducted to avoid damage. This reinspection was conducted by Robert DeBord, IDPH License #. The Management Plan was updated by Daniel Juneau, IDPH License # Inspector and Management Planner Licenses are included in Appendix B. Unit: Building:

13 III. METHODOLOGY Tasks performed on-site included the following: IV. 1. Review current management plan, identify HA(s) and extract appropriate information. 2. Examine and verify abatement records. 3. Touch and visually and physically reinspect and reassess the condition of all friable known or assumed ACBM. 4. Touch and visually and physically reinspect all non-friable known or assumed ACBM to determine whether these materials have become friable since the last inspection or periodic surveillance. 5. Identify any condition changes that may affect Hazard Ranking of known ACBM or ACBM, as well as any HA(s) that have become friable since the last reinspection. 6. Collect bulk samples from each newly discovered friable HA or previously assumed and submit for laboratory analysis. 7. Tabulate reinspection findings and submit for management planner review and recommendations with appropriate response actions based on the AHERA Damage Category of the ACBM. 8. Submit reinspection findings and management planner recommendations to the LEA within thirty (3) days for inclusion into the management plan. ABATEMENT HISTORY The information collected from the existing management plan and inspection report(s) and from interviews with the school official revealed that the following asbestos abatement was conducted at the school since the previous Three year Reinspection. Abatement Dates: V. REASSESSMENTS AND RECOMMENDATIONS The reassessments and recommendations are summarized in Tables I and II on the following pages. Detailed Hazard Assessment Sheets and Drawings and Photos (if applicable) are included in Appendix A. VI. CONCLUSIONS The Building Three-Year reinspection has been completed and response actions have been recommended for both friable and non-friable materials. A timely execution of the response actions recommended will enable the LEA and the Designated Person(s) to effectively manage the existing ACBM. This three-year reinspection report should be inspected in the current Management plan at the CPS Central Office, and one (1) copy should be kept at the school for use when planning any renovation and/or demolition activities in areas where ACBM has been identified. Also, periodic surveillance documentation and any summary reports from any response actions that are executed at the school should be used to update the Management Plan. Unit: Building:

14 Table I Inspector's Reinspection Findings

15 School Unit Building ID Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 1 9"x9" Tan Floor Tile 2 12" x 12" Light Beige Floor Tile 3 Burlap Wall Covering (Abated) 4 Hard Coat Plaster 5 Material Quantity 2,4 Material Units Material Location Asbestos Type Material Category Friable Damage Type Basement Storage Room (Old Lunchroom) 1926 Bldg Room 3 Classrooms: 117, 118, 119, 12, 218, 38, 39 Throughout 1926 Faciolity ASSUMED N NONE CHR ABATED ASSUMED SURFACE Y Damage Quantity Damage Units Damage Category Change in Assessment Category ACBM with the potential for damage NONE Yes Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the 34, Rough Coat Plaster 1, Auditorium ASSUMED SURFACE Y NONE Yes 6 Troweled on Plaster 2,34 Mechanical Rooms ASSUMED SURFACE Y NONE Yes 7 2'x4' Lay In Ceiling Tile 2,34 Food Service and Gym ASSUMED Y NONE Yes 8 Green Linoleum 3,6 Gym and Storage ASSUMED N NONE 9 Fiberglass Lay In Ceiling Panels 3,6 N NONE Fire Proof Curtains 1, Gym and Office Washroom Auditorium ASSUMED 1 ASSUMED N NONE 1 Green terrazzo 2 N NONE ABATED ABATED 13 12X12 Brown w/black Floor Tile 12x12 Brown w/black Floor Tile Mastic (Abated) 12x12 Green w/white Floor Tile 1st Floor elevator Lobby Room 26 Room 26 ASSUMED ASSUMED N NONE 14 12x12 Green w/white Floor Tile Mastic 4 ASSUMED N NONE 15 ABATED Room 39 ABATED 17 12x12 Lt Grey w/dk Grey & White Floor Tile 12x12 Lt Grey w/dk Grey & White Floor Tile Mastic 12x12 Brown w/white Floor Tile 2nd & 3rd Floor Elevator Lobby 2nd & 3rd Floor Elevator Lobby Room 39 2, ASSUMED N NONE 18 12x12 Brown w/white Floor Tile Mastic 2, ASSUMED N NONE 19 2" x 2" Light Tan Ceramic Tile 9 Rooms 117, 119, 219 Rooms 117, 119, 219 Room 112 ASSUMED N NONE Yes 16 Damage Reason Disturbance Potential

16 School Unit Building ID Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 11 Fire Door 11 Grout Associated w/ 2" x 2" Light Tan Ceramic Tile Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units Change in Assessment Category ASSUMED N NONE ACBM with the potential for damage ASSUMED N NONE Yes ACBM with the potential for damage ASSUMED N NONE Yes ASSUMED N NONE Yes ASSUMED SURFACE Y NONE Yes ACBM with the potential for damage ACBM with the potential for damage Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM ACBM with the potential for damage Any remaining friable ACBM or friable suspect ACBM ACBM with the potential for damage ACBM with the potential for damage " x 12" Beige w/ Dark Spots Floor Tile 17 Mastic Associated w/ 12" x 12" Beige w/ Dark Spots Floor Tile Hard Coat Plaster ,1 Kindergarten Restroom 1978 Bldg, 2nd Floor Mechanical Room, Stairway and 3rd floor Room 112 Kindergarten Restroom Room 319 Coat Room Room 319 Coat Room 1894 Building 13 Hard Coat Plaster 36, 1926 Building ASSUMED SURFACE Y NONE Yes 14 Hard Coat Plaster 7, Building ASSUMED SURFACE Y NONE Yes Hard Coat Plaster Baseboard ASSUMED ASSUMED SURFACE 17 Baseboad mastic ASSUMED 18 Incinerator insulation 1, Building 1978 Bldg, Gym, Student Dining, Faculty Dining, Store Room 1978 Bldg, Gym, Student Dining, Faculty Dining, Store Room Boiler room ASSUMED N NONE 19 Fire- Brick mortar 2 Boiler room ASSUMED TSI Y NONE 2 9 "x 9" Green Floor Tile 9 x 9 Green floor tile Mastic 9x9 Beige and 9x9 Dark Brown floor tile ASSUMED CHR N NONE 23 9x9 Beige and 9x9 Dark Brown floor tile mastic 9" x 9" Dark Brown Ffloor Tile - t 1894 Bldg, Room 218, Corridor 1894 Bldg, corridor 1926 Bldg, Room 14, Bldg, Room 14, , Bldg 1st Floor ASSUMED CHR N NONE CHR 24 1,15 1,15 Damage Category Damage Reason Disturbance Potential potential for damage

17 School Unit Building ID Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 25 Observed 9 x 9 Dr Brown floor tile REMOVED 26 12" x 12" Beige Floor Tile " x 12" Beige Floor Tile Mastic " x12" Orange Floor Tile 29 12" x12" Orange Floor Tile Mastic " x 12" Light Beige Floor Tile " x 12" Light Beige Floor Tile Mastic " x 12" Off White Floor Tile 6, " x 12" Off White Floor Tile Mastic 6,2 34 Linoleum 35 Linoleum Mastic 37 9" x 9" Tan Floor Tile Mastic (Abated) (Building Demolished) 38 12" x 12" Light Beige Floor Tile Mastic 39 Gold Carpet Mastic - t Observed 4 Green Carpet Mastic - t Observed Red Carpet Mastic Transite Panel 43 Vibration Damper 44 Drywall Material Quantity Material Units Material Location 4 3 Corridor 1936 Bldg, 2nd Floor corridor 1894 Bldg, Room Bldg, Room Bldg, Room Bldg, Room Bldg, 2nd Floor Corridor 1936 Bldg, 2nd Floor Corridor 1978 Bldg, 1st Floor Student Dining, Lobby, Office, Store Room, and Faculty Dining 1978 Bldg, 1st Floor Student Dining, Lobby, Office, Store Room, and Faculty Dining Kindergarten Washroom Kindergarten Washroom Basement Storage Room (Old Luchroom) 1926 Bldg, Room Bldg, Rooms Bldg, 1st Floor Conference Room Room 16 Office 1926 Bldg 3rd Floor Corridor Mechanical Room Bldg, Locker Asbestos Type Material Category Friable Damage Type ABATED CHR N NONE CHR N ASSUMED ASSUMED ASSUMED ASSUMED Damage Quantity Damage Units Change in Assessment Category Damage Category Damage Reason Disturbance Potential NONE ACBM with the potential for damage ACBM with the potential for damage N NONE NONE Yes N NONE CHR N NONE ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage N CHR N NONE ACBM with the potential for damage ASSUMED ASSUMED ABATED CHR ASSUMED ASSUMED ASSUMED ASSUMED N NONE ASSUMED N NONE ASSUMED N NONE ACBM with the potential for damage ACBM with the potential for damage ACBM with the

18 School Unit Building ID Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 45 Drywall Compound 46 Material Quantity Material Units Material Location 3 Drywall 2,68 47 Drywall Compound 1, " x 9" Dark Brown Floor Tile - Removed 49 9" x 9" Dark Brown Floor Tile Mastic Replaced 5 9 "x 9" Black Floor Tile - Replaced 51 9 x 9 Black floor tile mastic - Replaced 52 9 "x 9" Gray Floor Tile " x 9" Gray Floor Tile Mastic 32 Room and Store Room 1894 Bldg, Locker Room and Store Room 1978 Bldg 1st Floor Men's and Women's Toilets, Store Room, 2nd Floor Mechanical Room 1978 Bldg 1st Floor Men's and Women's Toilets, Store Room, 2nd Floor Mechanical Room 1894 Bldg, 1st, 2nd & 3rd Floor Corridors 1894 Bldg, 1st, 2nd, and 3rd Floor Corridors 1894 Bldg, 1st and 2nd Floor Corridors 1894 Bldg, 1st, 2nd and 3rd Fl corridor 1926 Bldg, Counselor Office 1926 Bldg, Rm " x 9" Gray Floor Tile " x 9" Gray Floor Tile Mastic "x12" Off-White Floor Tile (Abated) 57 12"x12" Off-White Floor Tile Mastic 58 9" x 9" Dark Brown Floor Tile 5, "x 9" Dark Brown Floor Tile Mastic 5,67 6 9" x 9" Black Floor Tile Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units Change in Assessment Category Damage Category Damage Reason Disturbance Potential ASSUMED N NONE ACBM with the potential for damage ASSUMED N NONE ACBM with the potential for damage ASSUMED N NONE ACBM with the potential for damage ASSUMED CHR ASSUMED ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage potential for damage ABATED ASSUMED N NONE CHR N NONE 1926 Bldg, Rm 17 CHR N NONE 1926 Bldg, Rm 17 CHR N NONE 1926 Bldg, Asst Principal's Office 1926 Bldg, Asst Principal's Office 1926 Bldg, Room 14, 11, and Bldg,: Classroom14, 11, 28 and 2nd & 3rd Floor Corridors 1926 Bldg, 2nd, 3rd ABATED CHR ASSUMED N NONE CHR N NONE ASSUMED

19 School Unit Building ID Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 61 9 "x 9" Black Floor Tile 62 9" x 9" Black Floor Tile 63 9" x 9" Black Floor Tile Mastic 64 12" x 12" Beige Floor Tile 3, "x12" Beige Floor Tile Mastic 3, " x 12" Brown Floor Tile 3, " x 12" Brown Floor Tile Mastic 3, " x 12" Light Brown Floor Tile 1, " x 12" Light Brown Floor Tile Mastic 1, " x 12" Medium Brown Floor Tile (Abated) 12" x 12" Medium Brown Floor Tile Mastic (Abated) 12" x 12" Light Tan Floor Tile " x 12" Light Tan Floor Tile Mastic "x 12" Beige Floor Tile 3, " x 12" Beige Floor Tile Mastic 7, "x 12" Light Brown Floor Tile "x 12" Light Brown Floor Tile Mastic "x 12" Brown Floor Tile Material Quantity Material Units Material Location Floor Corridors 1926 Bldg, 2nd & 3rd Floor Corridors 1936 Bldg, 2nd Floor Corridor 1936 Bldg, 2nd Floor Corridor 1926 Bldg, Rooms 25, 31, 39, Bldg, Classrooms 25, 31, 39, Bldg., 1st Floor Corridor and Library (Under Green. Carpet) Library (under green carpet) 1926 Bldg, Kindergarden 1926 Bldg, Kindergarden 1926 Bldg, Room Bldg, Room Bldg, Principal's Office,Store Room, Secretary's Office 1926 Bldg, Principal's Office,Store Room, Secretary's Office 1936 Bldg, Rooms11, 112, 113, 114, Bldg, Rooms 11, 113, Bldg, 3rd Floor Corridor 1936 Bldg, 3rd Floor Corridor 1936 Bldg, 1st Floor Asbestos Type Material Category Friable Damage Type CHR CHR CHR ASSUMED N NONE CHR N ASSUMED CHR Damage Quantity Damage Units Change in Assessment Category Damage Category Damage Reason Disturbance Potential NONE ACBM with the potential for damage ACBM with the potential for damage N NONE ACBM with the potential for damage N NONE ASSUMED N NONE ASSUMED N NONE ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ABATED ABATED ASSUMED N NONE ACBM with the potential for damage ASSUMED N NONE ACBM with the potential for damage ASSUMED N NONE ACBM with the potential for damage CHR N NONE N NONE ASSUMED N NONE ASSUMED N NONE ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the ASSUMED

20 School Unit Building ID Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description "x 12" Brown Floor Tile Mastic 82 Material Quantity Material Units Friable Damage Type Damage Quantity Damage Units Change in Assessment Category Damage Category ASSUMED N NONE Disturbance Potential ASSUMED N NONE ASSUMED ASSUMED N NONE ACBM with the potential for damage ASSUMED ASSUMED ASSUMED N NONE ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage Any remaining friable ACBM or friable suspect ACBM ACBM with the potential for damage 176 Engineer's Office ASSUMED N NONE 99 ASSUMED N NONE 99 Engineer's Washroom Engineer's Washroom Throughout Classrooms Throughout Classrooms Stage ASSUMED N NONE ASSUMED ASSUMED N NONE ASSUMED N NONE Entrances and Corridors Auditorium ASSUMED N NONE ASSUMED SURFACE Y NONE Yes Hallway (Trim) & Stairwells Room 16 1st & 2nd Floor Halls, Café, 3rd Floor Hall, Lower Level Hall 1st & 2nd Floor Halls, Café, 3rd Floor Hall, Lower level Hall ASSUMED N NONE ASSUMED ASSUMED N NONE ACBM with the potential for damage ASSUMED N NONE ACBM with the potential for damage 4, Green Carpet Adhesive 12" x12" Orange Floor Tile Mastic 4, " x12" Brown Floor Tile 86 White w/brown Streaks Floor Tile "x12" Dark Brown w/light Brown Streaks Floor Tile 12"x12" Dark Brown w/light Brown Streaks Floor Tile Mastic 12"x12" Brown w/black & White Streaks Floor Tile 12"x12" Brown w/black & White Streaks Floor Tile Mastic Chalkboards 91A Chalkboard Adhesive 92 Mastic Beneath Wood Flooring , 64 Terrazzo 1,5 Accoustical Plaster 3, Grey & Black Terrazzo 1, Blue Carpet Adhesive 12X12 White w/grey & Brown Floor Tile 25, 98 12X12 White w/grey & Brown Floor Tile Mastic 25, potential for damage ACBM with the potential for damage ACBM with the potential for damage Damage Reason 12" x12" Orange Floor Tile 9 Material Category Asbestos Type Corridor 1936 Bldg 1st Floor Corridor 1894 building; 1st, 2nd, & 3rd Floor Corridors Library 1894 building; 1st, 2nd, & 3rd Floor Corridors 1936 bldg - 1st Floor Corridor 1926 bldg - 3rd Floor Corridor Engineer's Office Material Location

21 School Unit Building ID Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 99 Tan terrazzo A Vibration Duct Sleeves B Vibration Dampers C Aircell Pipe Insulation D Fittings on Aircell Insulation E Cardboard Pipe Insulation F Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units 4 ASSUMED N NONE 2 1st Floor Elevator Lobby Mechanical Areas Change in Assessment Category Damage Category ASSUMED TSI Y NONE Yes 3 ASSUMED N NONE 11 LF CHR TSI Y LOC 5 1 LF CHR TSI Y NONE Yes 325 LF 1978 Mechanical Room 1894 Bldg, Locker Room, Store room, Lunch room, 1st, 2nd Floor Corridor 1894 Bldg, Locker room, store room, Lunch room, 1st, 2nd Floor Corridor 1894 Basement, Pipe Chase and Tunnel CHR TSI Y DIST 2 Joint Insulation On Cardboard Insulated Piping 3 LF CHR TSI Y NONE Yes G Mag-Block Pipe Insulation 4 LF CHR TSI Y NONE Yes H Pipe Fitting Insulation on Mag Block Insulated Piping 4 LF CHR TSI Y NONE Yes Any remaining friable ACBM or friable suspect ACBM I Fiberglass Duct Covers 1, 1984 Basement, Tunnel and Pipe Chases 1894 Bldg, Lunch room, Store Room, Locker Room, and Engineers Room 1894 Bldg, Lunch Room, Store Room, Locker Room, and Engine Room Boiler Room ASSUMED TSI Y NONE J Fiberglass Duct Insulation 1, Mechanical Room CRO TSI Y NONE K Fiberglass Tank Insulation 2,4 Boiler Room ASSUMED TSI Y NONE Yes Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM L Tank Insulation ABATED TSI Vibration Duct Sleeves Bldg, Boiler Room Mechanical Rooms ABATED M CRO N NONE ACBM with the potential for damage MOD-2 Wall Panels Throughout Modular ABATED ACBM with the potential for damage Any remaining friable ACBM or friable suspect ACBM ACBM with the potential for damage Damaged or significantly damaged friable thermal system insulating ACBM Any remaining friable ACBM or friable suspect ACBM Damaged or significantly damaged friable thermal system insulating ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Damage Reason Disturbance Potential 3 MODERATE 3 MODERATE

22 School Unit Building ID Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description Mod-1 9"x9" Tan Floor Tile Mastic (Abated)(Building Demolished) 12" x 12" Brown Floor Tile (Abated)(Building Demolished) 12" x 12" Brown Floor Tile Mastic (Abated)(Building Demolished) Orange Carpet Mastic (Abated)(Building Demolished) Mod-1 Mod-11 Mod-12 Material Quantity Material Units Mod-5 Mod-6 Baseboard mastic (Building Demolished) Mod-7 Drywall (Building Demolished) Mod-8 N 12" x 12" Beige Floor Tile (Abated) (Building Demolished) 12" x 12" Beige Floor Tile Mastic (Building demolished) Pipe Fitting Insulation on Fiberglass Insulated Piping (Abated) Fiberglass Duct 2 LF O Aircell Pipe Insulation 42 LF P Aircell Pipe Insulation 15 LF Q Pipe Fitting Insulation on Aircell Insulated Piping 75 LF Mod-4 Mod-9 Mod-B Asbestos Type Material Category ABATED ABATED Thoughout Corridor ABATED Office, Teachers Lounge, Principal's Office, Store Room Throughout Classrooms Gym and Store Room Gym, Mechanial Equipment Room, Store Room Gym, Mechanial Equipment Room, Store Room Throughout Building Throughout Corridor ABATED ABATED ABATED ASSUMED ASSUMED ASSUMED ABATED thoughout Corridor ABATED Boy's and Girls Toilets Above Lunchroom ABATED TSI ASSUMED TSI Y NONE 1926 Bldg, Assistant Priincipal's Office, 1st Floor Corridor, Room 2, Boiler Room, Pump Room, Store Room, and Unexcavated Area 1936 Bldg, Crawlspace CHR TSI Y NONE CHR TSI Y NONE 1926 Bldg, Assistant Priincipal's Office, CHR TSI Y DIST 1 Yes Building Gym and Store Room Thoughout Corridor Blue Carpet Mastic (Abated) (Building Demolished) 9"x9" Tan Floor Tile (Abated)(Building Demolished) Baseboard (Building Demolished) Mod-13 Material Location Friable Damage Type Damage Quantity Damage Units Change in Assessment Category Damage Category Damage Reason Disturbance Potential Moderate ne Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Damaged or significantly damaged 3

23 School Unit Building ID Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description R Pipe Joint Insulation On Aircell Insulated Piping S Paper wrap insulation T Pipe Fitting Insulation on Paper Wrap Insulated Piping ABATED Boiler Gaskets U V Pipe Fitting Insulation on Fiberglass Insulated Piping W Fittings on Fiberglass abated X Pipe Fitting Insulation on Fiberglass Insulated Piping Material Quantity Material Units 15 LF 1 LF 3 LF 8 LF 2 LF Material Location 1st Floor Corridor, Room 2, Boiler Room, Pump Room, Store Room, and Unexcavated Area 1936 Bldg, Crawlspace Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units Change in Assessment Category Damage Category Damage Reason Disturbance Potential friable thermal system insulating ACBM CHR TSI Y NONE Yes 1926 Bldg, Crawlspace CHR TSI Y NONE Yes 1926 Bldg, Crawlspase 1926 Bldg, Boiler Room ABATED TSI ASSUMED TSI Y NONE Yes 1894 Bldg, Locker Room, Store Room, Lunch Room 1926 Bldg, Basement Unexcavated area 1936 Bldg, Crawlspase CHR TSI Y NONE Yes ABATED TSI CHR TSI Y NONE Yes Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM

24 School Unit Building ID Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report Reinspection Date 3/4/216 Inspector Name Inspector's Comments Robert DeBord 5/15/216 Inspector's IDPH License Number / Expiration Date HA Number: Inspector Comments: t observed 216

25 School Unit Building ID Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: Inspector Comments: t observed 216 t observed 216 t observed 216 t observed 216 t observed 216 t observed 216 t observed 216 t observed 216 t observed 216 t observed 216 t observed 216 t observed 216 t observed 216

26 School Unit Building ID Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: Inspector Comments: t observed 216 t observed 216 t observed 216 t observed 216 t observed 216 t observed 216 t observed 216 t observed 216

27 School Unit Building ID Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: A A Inspector Comments: t observed 216 t observed 216 t observed 216 t observed 216 t observed 216

28 School Unit Building ID Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: B C D E F G H I J K L M MOD-2 Mod-1 Mod-1 Mod-11 Mod-12 Mod-13 Mod-4 Mod-5 Mod-6 Mod-7 Mod-8 Mod-9 Mod-B N O P Q Inspector Comments:

29 School Unit Building ID Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: R S T U V W X Inspector Comments:

30 Table II Management Planner's Review

31 School Address Unit Building ID Chicago, IL, 6649 Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response 1 9"x9" Tan Floor Tile 2,4 6 ACBM with the potential for damage " x 12" Light Beige Floor Tile Burlap Wall Covering (Abated) Chrysotile Abated 4 Hard Coat Plaster 34, Basement Storage Room (Old Lunchroom) 1926 Bldg Room 3 Classrooms: 117, 118, 119, 12, 218, 38, 39 Throughout 1926 Faciolity SURFACE Yes 5 Rough Coat Plaster 1, Auditorium SURFACE Yes 6 Troweled on Plaster 2,34 Mechanical Rooms SURFACE Yes 7 2'x4' Lay In Ceiling Tile 2,34 Food Service and Gym Yes Green Linoleum Fiberglass Lay In Ceiling Panels Fire Proof Curtains Green terrazzo 12X12 Brown w/black Floor Tile 12x12 Brown w/black Floor Tile Mastic (Abated) 12x12 Green w/white Floor Tile 12x12 Green w/white Floor Tile Mastic 12x12 Lt Grey w/dk Grey & White Floor Tile 12x12 Lt Grey w/dk Grey & White Floor Tile Mastic 12x12 Brown w/white Floor Tile 12x12 Brown w/white Floor Tile Mastic 2" x 2" Light Tan Ceramic Tile Fire Door 3,6 3,6 1, 2 6 ACBM with the potential for damage 6 ACBM with the potential for damage 2, 2, 9 6 Abated Abated Abated Abated ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 12 Grout Associated w/ 2" x 2" Light Tan Ceramic Tile 12" x 12" Beige w/ Dark Spots Floor Tile Mastic Associated w/ 12" x 12" Beige w/ Dark Spots Floor Tile Hard Coat Plaster Gym and Storage Gym and Office Washroom Auditorium 1st Floor elevator Lobby Room 26 Room 26 2nd & 3rd Floor Elevator Lobby 2nd & 3rd Floor Elevator Lobby Room 39 Room 39 Rooms 117, 119, 219 Rooms 117, 119, 219 Room 112 Kindergarten Restroom 1978 Bldg, 2nd Floor Mechanical Room, Stairway and 3rd floor Room 112 Kindergarten Restroom Room 319 Coat Room Room 319 Coat Room 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 12, Building SURFACE Yes 13 Hard Coat Plaster 36, 1926 Building SURFACE Yes 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable

32 School Address Unit Building ID Chicago, IL, 6649 Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units 14 Hard Coat Plaster 7, Building SURFACE Yes Hard Coat Plaster Baseboard SURFACE 17 Baseboad mastic Incinerator insulation Fire- Brick mortar 1978 Building 1978 Bldg, Gym, Student Dining, Faculty Dining, Store Room 1978 Bldg, Gym, Student Dining, Faculty Dining, Store Room Boiler room Boiler room TSI Yes 6 ACBM with the potential for damage 7 Any remaining friable ACBM or friable suspect ACBM "x 9" Green Floor Tile 9 x 9 Green floor tile Mastic 9x9 Beige and 9x9 Dark Brown floor tile 9x9 Beige and 9x9 Dark Brown floor tile mastic 9" x 9" Dark Brown Ffloor Tile - t Observed 9 x 9 Dr Brown floor tile REMOVED 12" x 12" Beige Floor Tile 12" x 12" Beige Floor Tile Mastic 12" x12" Orange Floor Tile 12" x12" Orange Floor Tile Mastic 12" x 12" Light Beige Floor Tile 12" x 12" Light Beige Floor Tile Mastic 12" x 12" Off White Floor Tile Chrysotile Chrysotile Chrysotile Abated Chrysotile Chrysotile Chrysotile 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 33 12" x 12" Off White Floor Tile Mastic Chrysotile 6 ACBM with the potential for damage Linoleum Linoleum Mastic 9" x 9" Tan Floor Tile Mastic (Abated) (Building Demolished) 12" x 12" Light Beige Floor Tile Mastic Gold Carpet Mastic - t Observed 1894 Bldg, Room 218, Corridor 1894 Bldg, corridor 1926 Bldg, Room 14, Bldg, Room 14, , Bldg 1st Floor Corridor 1936 Bldg, 2nd Floor corridor 1894 Bldg, Room Bldg, Room Bldg, Room Bldg, Room Bldg, 2nd Floor Corridor 1936 Bldg, 2nd Floor Corridor 1978 Bldg, 1st Floor Student Dining, Lobby, Office, Store Room, and Faculty Dining 1978 Bldg, 1st Floor Student Dining, Lobby, Office, Store Room, and Faculty Dining Kindergarten Washroom Kindergarten Washroom Basement Storage Room (Old Luchroom) 1926 Bldg, Room Bldg, Rooms 111 Abated Chrysotile ,95 2 1,15 1, ,2 6,2 Damage Category Response suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM

33 School Address Unit Building ID Chicago, IL, 6649 Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Green Carpet Mastic - t Observed Red Carpet Mastic Transite Panel Vibration Damper Drywall Drywall Compound 3 46 Drywall 2,68 47 Drywall Compound 1, " x 9" Dark Brown Floor Tile - Removed 49 9" x 9" Dark Brown Floor Tile Mastic - Replaced "x 9" Black Floor Tile - Replaced 9 x 9 Black floor tile mastic - Replaced 9 "x 9" Gray Floor Tile 9" x 9" Gray Floor Tile Mastic 9" x 9" Gray Floor Tile 9" x 9" Gray Floor Tile Mastic 12"x12" Off-White Floor Tile (Abated) 12"x12" Off-White Floor Tile Mastic 9" x 9" Dark Brown Floor Tile 9 "x 9" Dark Brown Floor Tile Mastic " x 9" Black Floor Tile 9 "x 9" Black Floor Tile 9" x 9" Black Floor Tile 9" x 9" Black Floor Tile Mastic 12" x 12" Beige Floor Tile ,76 5,67 3,2 Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response 1926 Bldg, 1st Floor Conference Room Room 16 Office 1926 Bldg 3rd Floor Corridor Mechanical Room 1894 Bldg, Locker Room and Store Room 1894 Bldg, Locker Room and Store Room 1978 Bldg 1st Floor Men's and Women's Toilets, Store Room, 2nd Floor Mechanical Room 1978 Bldg 1st Floor Men's and Women's Toilets, Store Room, 2nd Floor Mechanical Room 1894 Bldg, 1st, 2nd & 3rd Floor Corridors 1894 Bldg, 1st, 2nd, and 3rd Floor Corridors 1894 Bldg, 1st and 2nd Floor Corridors 1894 Bldg, 1st, 2nd and 3rd Fl corridor 1926 Bldg, Counselor Office 1926 Bldg, Rm Bldg, Rm Bldg, Rm Bldg, Asst Principal's Office 1926 Bldg, Asst Principal's Office 1926 Bldg, Room 14, 11, and Bldg,: Classroom14, 11, 28 and 2nd & 3rd Floor Corridors 1926 Bldg, 2nd, 3rd Floor Corridors 1926 Bldg, 2nd & 3rd Floor Corridors 1936 Bldg, 2nd Floor Corridor 1936 Bldg, 2nd Floor Corridor 1926 Bldg, Rooms 25, 31, 39, 35 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage Chrysotile Abated Chrysotile Chrysotile Chrysotile Abated Chrysotile Chrysotile 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage Chrysotile Chrysotile Chrysotile 6 ACBM with the potential for damage

34 School Address Unit Building ID Chicago, IL, 6649 Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response 65 12"x12" Beige Floor Tile Mastic 3,2 Chrysotile 6 ACBM with the potential for damage 66 12" x 12" Brown Floor Tile 3,92 6 ACBM with the potential for damage " x 12" Brown Floor Tile Mastic 12" x 12" Light Brown Floor Tile 12" x 12" Light Brown Floor Tile Mastic 12" x 12" Medium Brown Floor Tile (Abated) 12" x 12" Medium Brown Floor Tile Mastic (Abated) 12" x 12" Light Tan Floor Tile 3,92 1,54 1,54 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 68 Chrysotile Abated Abated 6 ACBM with the potential for damage 73 12" x 12" Light Tan Floor Tile Mastic 68 6 ACBM with the potential for damage "x 12" Beige Floor Tile 3,9 6 ACBM with the potential for damage " x 12" Beige Floor Tile Mastic 12 "x 12" Light Brown Floor Tile 12 "x 12" Light Brown Floor Tile Mastic 12 "x 12" Brown Floor Tile 12 "x 12" Brown Floor Tile Mastic 12" x12" Orange Floor Tile 7, ,1 Chrysotile 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage Green Carpet Adhesive 12" x12" Orange Floor Tile Mastic 4,1 6 ACBM with the potential for damage " x12" Brown Floor Tile White w/brown Streaks Floor Tile 12"x12" Dark Brown w/light Brown Streaks Floor Tile 12"x12" Dark Brown w/light Brown Streaks Floor Tile Mastic 12"x12" Brown w/black & White Streaks Floor Tile 12"x12" Brown w/black & White Streaks Floor Tile Mastic Chalkboards 6 ACBM with the potential for damage Bldg, Classrooms 25, 31, 39, Bldg., 1st Floor Corridor and Library (Under Green. Carpet) Library (under green carpet) 1926 Bldg, Kindergarden 1926 Bldg, Kindergarden 1926 Bldg, Room Bldg, Room Bldg, Principal's Office,Store Room, Secretary's Office 1926 Bldg, Principal's Office,Store Room, Secretary's Office 1936 Bldg, Rooms11, 112, 113, 114, Bldg, Rooms 11, 113, Bldg, 3rd Floor Corridor 1936 Bldg, 3rd Floor Corridor 1936 Bldg, 1st Floor Corridor 1936 Bldg 1st Floor Corridor 1894 building; 1st, 2nd, & 3rd Floor Corridors Library 1894 building; 1st, 2nd, & 3rd Floor Corridors 1936 bldg - 1st Floor Corridor 1926 bldg - 3rd Floor Corridor Engineer's Office 176 Engineer's Office 6 ACBM with the potential for damage Engineer's Washroom Engineer's Washroom 6 ACBM with the potential for damage 6 ACBM with the potential for damage Throughout Classrooms

35 School Address Unit Building ID Chicago, IL, 6649 Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response 91A Chalkboard Adhesive Mastic Beneath Wood Flooring Terrazzo Accoustical Plaster 2, 64 1,5 3, Throughout Classrooms Stage Entrances and Corridors Auditorium SURFACE Yes Grey & Black Terrazzo Blue Carpet Adhesive 12X12 White w/grey & Brown Floor Tile 1, 25, 6 ACBM with the potential for damage 98 12X12 White w/grey & Brown Floor Tile Mastic 25, 6 ACBM with the potential for damage 99 A Tan terrazzo Vibration Duct Sleeves 4 2 Hallway (Trim) & Stairwells Room 16 1st & 2nd Floor Halls, Café, 3rd Floor Hall, Lower Level Hall 1st & 2nd Floor Halls, Café, 3rd Floor Hall, Lower level Hall 1st Floor Elevator Lobby Mechanical Areas 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 7 Any remaining friable ACBM or friable suspect ACBM 6 ACBM with the potential for damage TSI Yes B C Vibration Dampers Aircell Pipe Insulation 3 11 LF Chrysotile TSI Yes 5 LF D Fittings on Aircell Insulation 1 LF Chrysotile TSI Yes LF E Cardboard Pipe Insulation 325 LF Chrysotile TSI Yes 2 LF F Joint Insulation On Cardboard Insulated Piping 3 LF Chrysotile TSI Yes LF G Mag-Block Pipe Insulation 4 LF Chrysotile TSI Yes LF H 4 LF Chrysotile TSI Yes LF I Pipe Fitting Insulation on Mag Block Insulated Piping Fiberglass Duct Covers 1, 1978 Mechanical Room 1894 Bldg, Locker Room, Store room, Lunch room, 1st, 2nd Floor Corridor 1894 Bldg, Locker room, store room, Lunch room, 1st, 2nd Floor Corridor 1894 Basement, Pipe Chase and Tunnel 1984 Basement, Tunnel and Pipe Chases 1894 Bldg, Lunch room, Store Room, Locker Room, and Engineers Room 1894 Bldg, Lunch Room, Store Room, Locker Room, and Engine Room Boiler Room TSI Yes J Fiberglass Duct Insulation 1, Mechanical Room Crocidolite TSI Yes K Fiberglass Tank Insulation 2,4 Boiler Room TSI Yes 6 ACBM with the potential for damage 7 Any remaining friable ACBM or friable suspect ACBM 6 ACBM with the potential for damage 1 Damaged or significantly damaged friable thermal system insulating ACBM 7 Any remaining friable ACBM or friable suspect ACBM 1 Damaged or significantly damaged friable thermal system insulating ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM L M MOD-2 Tank Insulation ABATED Vibration Duct Sleeves Wall Panels Bldg, Boiler Room Mechanical Rooms Throughout Modular Building Abated Crocidolite Abated TSI 6 ACBM with the potential for damage Remove Repair

36 School Address Unit Building ID Chicago, IL, 6649 Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Location Asbestos Type Material Category Mod-1 Mod-5 9"x9" Tan Floor Tile Mastic (Abated)(Building Demolished) 12" x 12" Brown Floor Tile (Abated)(Building Demolished) 12" x 12" Brown Floor Tile Mastic (Abated)(Building Demolished) Orange Carpet Mastic (Abated)(Building Demolished) Blue Carpet Mastic (Abated) (Building Demolished) 9"x9" Tan Floor Tile (Abated)(Building Demolished) Baseboard (Building Demolished) Gym and Store Room Abated Thoughout Corridor Abated Thoughout Corridor Abated Office, Teachers Lounge, Principal's Office, Store Room Throughout Classrooms Gym and Store Room Abated Abated Abated Gym, Mechanial Equipment Room, Store Room Gym, Mechanial Equipment Room, Store Room Throughout Building Throughout Corridor Mod-6 Baseboard mastic (Building Demolished) Mod-7 Mod-8 N Drywall (Building Demolished) 12" x 12" Beige Floor Tile (Abated) (Building Demolished) 12" x 12" Beige Floor Tile Mastic (Building demolished) Pipe Fitting Insulation on Fiberglass Insulated Piping (Abated) Fiberglass Duct Abated thoughout Corridor Abated Boy's and Girls Toilets Abated TSI 2 LF Above Lunchroom O Aircell Pipe Insulation 42 LF Aircell Pipe Insulation 15 LF 1926 Bldg, Assistant Priincipal's Office, 1st Floor Corridor, Room 2, Boiler Room, Pump Room, Store Room, and Unexcavated Area 1936 Bldg, Crawlspace P Q Pipe Fitting Insulation on Aircell Insulated Piping 75 LF R Pipe Joint Insulation On Aircell Insulated Piping 15 LF 1926 Bldg, Assistant Priincipal's Office, 1st Floor Corridor, Room 2, Boiler Room, Pump Room, Store Room, and Unexcavated Area 1936 Bldg, Crawlspace Mod-1 Mod-11 Mod-12 Mod-13 Mod-4 Mod-9 Mod-B Material Quantity Material Units Friable Damage Quantity Damage Units Damage Category Response TSI Yes LF Chrysotile TSI Yes LF 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM Chrysotile TSI Yes LF Chrysotile TSI Yes 1 LF 7 Any remaining friable ACBM or friable suspect ACBM 1 Damaged or significantly damaged friable thermal system insulating ACBM Chrysotile TSI Yes LF 7 Any remaining friable ACBM or friable suspect ACBM Remove

37 School Address Unit Building ID Chicago, IL, 6649 Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response S Paper wrap insulation 1 LF 1926 Bldg, Crawlspace Chrysotile TSI Yes LF 7 Any remaining friable ACBM or friable suspect ACBM T Pipe Fitting Insulation on Paper Wrap Insulated Piping ABATED Boiler Gaskets 1926 Bldg, Crawlspase Abated TSI 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM U V W X 3 LF 1926 Bldg, Boiler Room TSI Yes LF Pipe Fitting Insulation on Fiberglass Insulated Piping Fittings on Fiberglass abated 8 LF Chrysotile TSI Yes LF Abated TSI Pipe Fitting Insulation on Fiberglass Insulated Piping Bldg, Locker Room, Store Room, Lunch Room 1926 Bldg, Basement Unexcavated area 1936 Bldg, Crawlspase Chrysotile TSI Yes LF LF

38 School Address Unit Building ID Chicago, IL, 6649 Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report 6/14/216 Review Date Manager Planner Name Daniel Juneau /15/216 Manager IDPH License /Expiration HA Number Management Comments If identified, implement O&M

39 School Address Unit Building ID Chicago, IL, 6649 Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number Management Comments If identified, implement O&M If identified, implement O&M If identified, implement O&M If identified, implement O&M If identified, implement O&M If identified, implement O&M If identified, implement O&M If identified, implement O&M If identified, implement O&M If identified, implement O&M If identified, implement O&M

40 School Address Unit Building ID Chicago, IL, 6649 Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number Management Comments If identified, implement O&M If identified, implement O&M If identified, implement O&M If identified, implement O&M If identified, implement O&M If identified, implement O&M If identified, implement O&M If identified, implement O&M If identified, implement O&M If identified, implement O&M

41 School Address Unit Building ID Chicago, IL, 6649 Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number A Management Comments If identified, implement O&M If identified, implement O&M If identified, implement O&M If identified, implement O&M

42 School Address Unit Building ID Chicago, IL, 6649 Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number A B C D E F G H I J K L M MOD-2 Mod-1 Mod-1 Mod-11 Mod-12 Mod-13 Mod-4 Mod-5 Mod-6 Management Comments If identified, implement O&M Repair or Remove as applicable. Continue O&M

43 School Address Unit Building ID Chicago, IL, 6649 Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number Management Comments Mod-7 Mod-8 Mod-9 Mod-B N O P Q R S T U V W X Repair or Remove as applicable. Continue O&M

44 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 1 9"x9" Tan Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Basement Storage Room (Old Lunchroom) 24 COMMENTS: Inspector's Signature: 3/4/216

45 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ "x9" Tan Floor Tile Basement Storage Room (Old Lunchroom) 24 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

46 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 2 12" x 12" Light Beige Floor Tile HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg Room 3 COMMENTS: t observed 216 Inspector's Signature: 3/4/216

47 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Light Beige Floor Tile 1926 Bldg Room 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

48 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 3 Burlap Wall Covering (Abated) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Classrooms: 117, 118, 119, 12, 218, 38, 39 COMMENTS: Inspector's Signature: 3/4/216

49 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 3 Burlap Wall Covering (Abated) Classrooms: 117, 118, 119, 12, 218, 38, 39 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

50 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 4 Hard Coat Plaster HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout 1926 Faciolity 34 COMMENTS: Inspector's Signature: 3/4/216

51 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 4 Hard Coat Plaster Throughout 1926 Faciolity 34 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

52 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 5 Rough Coat Plaster HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Auditorium 1 COMMENTS: Inspector's Signature: 3/4/216

53 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 5 Rough Coat Plaster Auditorium 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

54 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 6 Troweled on Plaster HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Mechanical Rooms COMMENTS: Inspector's Signature: 3/4/216

55 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 6 Troweled on Plaster Mechanical Rooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

56 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 7 2'x4' Lay In Ceiling Tile HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Food Service and Gym COMMENTS: Inspector's Signature: 3/4/216

57 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ 'x4' Lay In Ceiling Tile Food Service and Gym In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

58 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 8 Green Linoleum HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Gym and Storage 36 COMMENTS: Inspector's Signature: 3/4/216

59 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 8 Green Linoleum Gym and Storage 36 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

60 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 9 Fiberglass Lay In Ceiling Panels HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Gym and Office Washroom 36 COMMENTS: Inspector's Signature: 3/4/216

61 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 9 Fiberglass Lay In Ceiling Panels Gym and Office Washroom 36 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

62 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 1 Fire Proof Curtains HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Auditorium 1 COMMENTS: Inspector's Signature: 3/4/216

63 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 1 Fire Proof Curtains Auditorium 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

64 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 1 Green terrazzo HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st Floor elevator Lobby 2 COMMENTS: Inspector's Signature: 3/4/216

65 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 1 Green terrazzo 1st Floor elevator Lobby 2 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

66 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 11 12X12 Brown w/black Floor Tile HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 26 COMMENTS: Inspector's Signature: 3/4/216

67 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ X12 Brown w/black Floor Tile Room 26 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

68 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 12 12x12 Brown w/black Floor Tile Mastic (Abated) HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 26 COMMENTS: Inspector's Signature: 3/4/216

69 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ x12 Brown w/black Floor Tile Mastic (Abated) Room 26 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

70 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 13 12x12 Green w/white Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 2nd & 3rd Floor Elevator Lobby 4 COMMENTS: Inspector's Signature: 3/4/216

71 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ x12 Green w/white Floor Tile 2nd & 3rd Floor Elevator Lobby 4 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

72 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 14 12x12 Green w/white Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 2nd & 3rd Floor Elevator Lobby 4 COMMENTS: Inspector's Signature: 3/4/216

73 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ x12 Green w/white Floor Tile Mastic 2nd & 3rd Floor Elevator Lobby 4 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

74 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 15 12x12 Lt Grey w/dk Grey & White Floor Tile HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 39 COMMENTS: Inspector's Signature: 3/4/216

75 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ x12 Lt Grey w/dk Grey & White Floor Tile Room 39 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

76 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 16 12x12 Lt Grey w/dk Grey & White Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 39 COMMENTS: Inspector's Signature: 3/4/216

77 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ x12 Lt Grey w/dk Grey & White Floor Tile Mastic Room 39 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

78 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 17 12x12 Brown w/white Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 117, 119, COMMENTS: Inspector's Signature: 3/4/216

79 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ x12 Brown w/white Floor Tile Rooms 117, 119, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

80 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 18 12x12 Brown w/white Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 117, 119, COMMENTS: Inspector's Signature: 3/4/216

81 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ x12 Brown w/white Floor Tile Mastic Rooms 117, 119, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

82 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 11 Fire Door HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1978 Bldg, 2nd Floor Mechanical Room, Stairway and 3rd floor 6 COMMENTS: Inspector's Signature: 3/4/216

83 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Fire Door 1978 Bldg, 2nd Floor Mechanical Room, Stairway and 3rd floor 6 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

84 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 12 Hard Coat Plaster HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: 1894 Building 121 COMMENTS: Inspector's Signature: 3/4/216

85 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Hard Coat Plaster 1894 Building 121 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

86 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 13 Hard Coat Plaster HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Building 36 COMMENTS: Inspector's Signature: 3/4/216

87 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Hard Coat Plaster 1926 Building 36 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

88 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 14 Hard Coat Plaster HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: 1936 Building 72 COMMENTS: Inspector's Signature: 3/4/216

89 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Hard Coat Plaster 1936 Building 72 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

90 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 15 Hard Coat Plaster HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1978 Building COMMENTS: t observed 216 Inspector's Signature: 3/4/216

91 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Hard Coat Plaster 1978 Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

92 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 16 Baseboard HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1978 Bldg, Gym, Student Dining, Faculty Dining, Store Room COMMENTS: t observed 216 Inspector's Signature: 3/4/216

93 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Baseboard 1978 Bldg, Gym, Student Dining, Faculty Dining, Store Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

94 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 17 Baseboad mastic HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1978 Bldg, Gym, Student Dining, Faculty Dining, Store Room COMMENTS: t observed 216 Inspector's Signature: 3/4/216

95 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Baseboad mastic 1978 Bldg, Gym, Student Dining, Faculty Dining, Store Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

96 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 18 Incinerator insulation HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler room 195 COMMENTS: Inspector's Signature: 3/4/216

97 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Incinerator insulation Boiler room 195 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

98 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 19 Fire- Brick mortar HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler room 2 COMMENTS: Inspector's Signature: 3/4/216

99 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Fire- Brick mortar Boiler room 2 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

100 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 2 9 "x 9" Green Floor Tile HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1894 Bldg, Room 218, Corridor COMMENTS: t observed 216 Inspector's Signature: 3/4/216

101 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ "x 9" Green Floor Tile 1894 Bldg, Room 218, Corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

102 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 21 9 x 9 Green floor tile Mastic HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1894 Bldg, corridor COMMENTS: t observed 216 Inspector's Signature: 3/4/216

103 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ x 9 Green floor tile Mastic 1894 Bldg, corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

104 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 22 9x9 Beige and 9x9 Dark Brown floor tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Room 14, COMMENTS: Inspector's Signature: 3/4/216

105 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ x9 Beige and 9x9 Dark Brown floor tile 1926 Bldg, Room 14, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

106 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 23 9x9 Beige and 9x9 Dark Brown floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Room 14, COMMENTS: Inspector's Signature: 3/4/216

107 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ x9 Beige and 9x9 Dark Brown floor tile mastic 1926 Bldg, Room 14, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

108 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 24 9" x 9" Dark Brown Ffloor Tile - t Observed HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1936, Bldg 1st Floor Corridor COMMENTS: t observed 216 Inspector's Signature: 3/4/216

109 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 9" Dark Brown Ffloor Tile - t Observed 1936, Bldg 1st Floor Corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

110 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 25 9 x 9 Dr Brown floor tile REMOVED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1936 Bldg, 2nd Floor corridor COMMENTS: Inspector's Signature: 3/4/216

111 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ x 9 Dr Brown floor tile REMOVED 1936 Bldg, 2nd Floor corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

112 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 26 12" x 12" Beige Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1894 Bldg, Room COMMENTS: Inspector's Signature: 3/4/216

113 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Beige Floor Tile 1894 Bldg, Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

114 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 27 12" x 12" Beige Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1894 Bldg, Room COMMENTS: Inspector's Signature: 3/4/216

115 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Beige Floor Tile Mastic 1894 Bldg, Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

116 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 28 12" x12" Orange Floor Tile HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Room 26 COMMENTS: t observed 216 Inspector's Signature: 3/4/216

117 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x12" Orange Floor Tile 1926 Bldg, Room 26 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

118 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 29 12" x12" Orange Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Room COMMENTS: Inspector's Signature: 3/4/216

119 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x12" Orange Floor Tile Mastic 1926 Bldg, Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

120 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 3 12" x 12" Light Beige Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1936 Bldg, 2nd Floor Corridor 92 COMMENTS: Inspector's Signature: 3/4/216

121 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Light Beige Floor Tile 1936 Bldg, 2nd Floor Corridor 92 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

122 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 31 12" x 12" Light Beige Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1936 Bldg, 2nd Floor Corridor 92 COMMENTS: Inspector's Signature: 3/4/216

123 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Light Beige Floor Tile Mastic 1936 Bldg, 2nd Floor Corridor 92 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

124 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 32 12" x 12" Off White Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1978 Bldg, 1st Floor Student Dining, Lobby, Office, Store Room, and Faculty Dining 62 COMMENTS: Inspector's Signature: 3/4/216

125 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Off White Floor Tile 1978 Bldg, 1st Floor Student Dining, Lobby, Office, Store Room, and Faculty Dining 62 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

126 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 33 12" x 12" Off White Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1978 Bldg, 1st Floor Student Dining, Lobby, Office, Store Room, and Faculty Dining 62 COMMENTS: Inspector's Signature: 3/4/216

127 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Off White Floor Tile Mastic 1978 Bldg, 1st Floor Student Dining, Lobby, Office, Store Room, and Faculty Dining 62 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

128 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 34 Linoleum HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Kindergarten Washroom COMMENTS: t observed 216 Inspector's Signature: 3/4/216

129 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Linoleum Kindergarten Washroom In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

130 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 35 Linoleum Mastic HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Kindergarten Washroom COMMENTS: t observed 216 Inspector's Signature: 3/4/216

131 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Linoleum Mastic Kindergarten Washroom In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

132 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 37 9" x 9" Tan Floor Tile Mastic (Abated) (Building Demolished) HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Basement Storage Room (Old Luchroom) COMMENTS: Inspector's Signature: 3/4/216

133 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 9" Tan Floor Tile Mastic (Abated) (Building Demolished) Basement Storage Room (Old Luchroom) In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

134 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 38 12" x 12" Light Beige Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Room 3 COMMENTS: t observed 216 Inspector's Signature: 3/4/216

135 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Light Beige Floor Tile Mastic 1926 Bldg, Room 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

136 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 39 Gold Carpet Mastic - t Observed HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1984 Bldg, Rooms 111 COMMENTS: t observed 216 Inspector's Signature: 3/4/216

137 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Gold Carpet Mastic - t Observed 1984 Bldg, Rooms 111 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

138 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 4 Green Carpet Mastic - t Observed HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, 1st Floor Conference Room COMMENTS: t observed 216 Inspector's Signature: 3/4/216

139 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 4 Green Carpet Mastic - t Observed 1926 Bldg, 1st Floor Conference Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

140 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 41 Red Carpet Mastic HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 16 Office COMMENTS: t observed 216 Inspector's Signature: 3/4/216

141 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Red Carpet Mastic Room 16 Office In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

142 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 42 Transite Panel HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg 3rd Floor Corridor 4 COMMENTS: Inspector's Signature: 3/4/216

143 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Transite Panel 1926 Bldg 3rd Floor Corridor 4 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

144 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 43 Vibration Damper HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Mechanical Room 3 COMMENTS: Inspector's Signature: 3/4/216

145 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Vibration Damper Mechanical Room 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

146 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 44 Drywall HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1894 Bldg, Locker Room and Store Room 63 COMMENTS: Inspector's Signature: 3/4/216

147 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Drywall 1894 Bldg, Locker Room and Store Room 63 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

148 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 45 Drywall Compound HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1894 Bldg, Locker Room and Store Room 3 COMMENTS: Inspector's Signature: 3/4/216

149 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Drywall Compound 1894 Bldg, Locker Room and Store Room 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

150 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 46 Drywall HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1978 Bldg 1st Floor Men's and Women's Toilets, Store Room, 2nd Floor Mechanical Room 268 COMMENTS: Inspector's Signature: 3/4/216

151 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Drywall 1978 Bldg 1st Floor Men's and Women's Toilets, Store Room, 2nd Floor Mechanical Room 268 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

152 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 47 Drywall Compound HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1978 Bldg 1st Floor Men's and Women's Toilets, Store Room, 2nd Floor Mechanical Room 134 COMMENTS: Inspector's Signature: 3/4/216

153 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Drywall Compound 1978 Bldg 1st Floor Men's and Women's Toilets, Store Room, 2nd Floor Mechanical Room 134 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

154 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 48 9" x 9" Dark Brown Floor Tile - Removed HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1894 Bldg, 1st, 2nd & 3rd Floor Corridors COMMENTS: t observed 216 Inspector's Signature: 3/4/216

155 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 9" Dark Brown Floor Tile - Removed 1894 Bldg, 1st, 2nd & 3rd Floor Corridors In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

156 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 49 9" x 9" Dark Brown Floor Tile Mastic - Replaced HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1894 Bldg, 1st, 2nd, and 3rd Floor Corridors COMMENTS: t observed 216 Inspector's Signature: 3/4/216

157 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 9" Dark Brown Floor Tile Mastic - Replaced 1894 Bldg, 1st, 2nd, and 3rd Floor Corridors In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

158 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 5 9 "x 9" Black Floor Tile - Replaced HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1894 Bldg, 1st and 2nd Floor Corridors COMMENTS: t observed 216 Inspector's Signature: 3/4/216

159 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ "x 9" Black Floor Tile - Replaced 1894 Bldg, 1st and 2nd Floor Corridors In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

160 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 51 9 x 9 Black floor tile mastic - Replaced HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1894 Bldg, 1st, 2nd and 3rd Fl corridor COMMENTS: Inspector's Signature: 3/4/216

161 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ x 9 Black floor tile mastic - Replaced 1894 Bldg, 1st, 2nd and 3rd Fl corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

162 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 52 9 "x 9" Gray Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Counselor Office 32 COMMENTS: Inspector's Signature: 3/4/216

163 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ "x 9" Gray Floor Tile 1926 Bldg, Counselor Office 32 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

164 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 53 9" x 9" Gray Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Rm COMMENTS: Inspector's Signature: 3/4/216

165 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 9" Gray Floor Tile Mastic 1926 Bldg, Rm In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

166 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 54 9" x 9" Gray Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Rm COMMENTS: Inspector's Signature: 3/4/216

167 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 9" Gray Floor Tile 1926 Bldg, Rm In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

168 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 55 9" x 9" Gray Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Rm COMMENTS: Inspector's Signature: 3/4/216

169 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 9" Gray Floor Tile Mastic 1926 Bldg, Rm In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

170 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 56 12"x12" Off-White Floor Tile (Abated) HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Asst Principal's Office COMMENTS: Inspector's Signature: 3/4/216

171 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ "x12" Off-White Floor Tile (Abated) 1926 Bldg, Asst Principal's Office In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

172 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 57 12"x12" Off-White Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Asst Principal's Office COMMENTS: t observed 216 Inspector's Signature: 3/4/216

173 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ "x12" Off-White Floor Tile Mastic 1926 Bldg, Asst Principal's Office In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

174 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 58 9" x 9" Dark Brown Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Room 14, 11, and COMMENTS: Inspector's Signature: 3/4/216

175 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 9" Dark Brown Floor Tile 1926 Bldg, Room 14, 11, and In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

176 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 59 9 "x 9" Dark Brown Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg,: Classroom14, 11, 28 and 2nd & 3rd Floor Corridors 567 COMMENTS: Inspector's Signature: 3/4/216

177 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ "x 9" Dark Brown Floor Tile Mastic 1926 Bldg,: Classroom14, 11, 28 and 2nd & 3rd Floor Corridors 567 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

178 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 6 9" x 9" Black Floor Tile HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, 2nd, 3rd Floor Corridors COMMENTS: t observed 216 Inspector's Signature: 3/4/216

179 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 9" Black Floor Tile 1926 Bldg, 2nd, 3rd Floor Corridors In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

180 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 61 9 "x 9" Black Floor Tile HISTORICAL AHERA DAMAGE CATEGORY ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, 2nd & 3rd Floor Corridors COMMENTS: t observed 216 Inspector's Signature: 3/4/216

181 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ "x 9" Black Floor Tile 1926 Bldg, 2nd & 3rd Floor Corridors In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

182 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 62 9" x 9" Black Floor Tile HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1936 Bldg, 2nd Floor Corridor COMMENTS: t observed 216 Inspector's Signature: 3/4/216

183 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 9" Black Floor Tile 1936 Bldg, 2nd Floor Corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

184 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 63 9" x 9" Black Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1936 Bldg, 2nd Floor Corridor COMMENTS: t observed 216 Inspector's Signature: 3/4/216

185 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 9" Black Floor Tile Mastic 1936 Bldg, 2nd Floor Corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

186 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 64 12" x 12" Beige Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Rooms 25, 31, 39, COMMENTS: Inspector's Signature: 3/4/216

187 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Beige Floor Tile 1926 Bldg, Rooms 25, 31, 39, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

188 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 65 12"x12" Beige Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Classrooms 25, 31, 39, COMMENTS: Inspector's Signature: 3/4/216

189 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ "x12" Beige Floor Tile Mastic 1926 Bldg, Classrooms 25, 31, 39, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

190 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 66 12" x 12" Brown Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg., 1st Floor Corridor and Library (Under Green. Carpet) 392 COMMENTS: Inspector's Signature: 3/4/216

191 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Brown Floor Tile 1926 Bldg., 1st Floor Corridor and Library (Under Green. Carpet) 392 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

192 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 67 12" x 12" Brown Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Library (under green carpet) 392 COMMENTS: Inspector's Signature: 3/4/216

193 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Brown Floor Tile Mastic Library (under green carpet) 392 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

194 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 68 12" x 12" Light Brown Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Kindergarden 154 COMMENTS: Inspector's Signature: 3/4/216

195 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Light Brown Floor Tile 1926 Bldg, Kindergarden 154 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

196 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 69 12" x 12" Light Brown Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Kindergarden 154 COMMENTS: Inspector's Signature: 3/4/216

197 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Light Brown Floor Tile Mastic 1926 Bldg, Kindergarden 154 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

198 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 7 12" x 12" Medium Brown Floor Tile (Abated) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Room 15 COMMENTS: Inspector's Signature: 3/4/216

199 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Medium Brown Floor Tile (Abated) 1926 Bldg, Room 15 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

200 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 71 12" x 12" Medium Brown Floor Tile Mastic (Abated) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Room 15 COMMENTS: Inspector's Signature: 3/4/216

201 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Medium Brown Floor Tile Mastic (Abated) 1926 Bldg, Room 15 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

202 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 72 12" x 12" Light Tan Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Principal's Office,Store Room, Secretary's Office 68 COMMENTS: Inspector's Signature: 3/4/216

203 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Light Tan Floor Tile 1926 Bldg, Principal's Office,Store Room, Secretary's Office 68 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

204 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 73 12" x 12" Light Tan Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Principal's Office,Store Room, Secretary's Office 68 COMMENTS: Inspector's Signature: 3/4/216

205 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Light Tan Floor Tile Mastic 1926 Bldg, Principal's Office,Store Room, Secretary's Office 68 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

206 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION "x 12" Beige Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1936 Bldg, Rooms11, 112, 113, 114, COMMENTS: Inspector's Signature: 3/4/216

207 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ "x 12" Beige Floor Tile 1936 Bldg, Rooms11, 112, 113, 114, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

208 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 77 12" x 12" Beige Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1936 Bldg, Rooms 11, 113, COMMENTS: Inspector's Signature: 3/4/216

209 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Beige Floor Tile Mastic 1936 Bldg, Rooms 11, 113, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

210 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION "x 12" Light Brown Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1936 Bldg, 3rd Floor Corridor 94 COMMENTS: Inspector's Signature: 3/4/216

211 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ "x 12" Light Brown Floor Tile 1936 Bldg, 3rd Floor Corridor 94 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

212 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION "x 12" Light Brown Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1936 Bldg, 3rd Floor Corridor 94 COMMENTS: Inspector's Signature: 3/4/216

213 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ "x 12" Light Brown Floor Tile Mastic 1936 Bldg, 3rd Floor Corridor 94 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

214 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 8 12 "x 12" Brown Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1936 Bldg, 1st Floor Corridor 94 COMMENTS: Inspector's Signature: 3/4/216

215 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ "x 12" Brown Floor Tile 1936 Bldg, 1st Floor Corridor 94 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

216 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION "x 12" Brown Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1936 Bldg 1st Floor Corridor 94 COMMENTS: Inspector's Signature: 3/4/216

217 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ "x 12" Brown Floor Tile Mastic 1936 Bldg 1st Floor Corridor 94 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

218 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 82 12" x12" Orange Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1894 building; 1st, 2nd, & 3rd Floor Corridors 41 COMMENTS: Inspector's Signature: 3/4/216

219 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x12" Orange Floor Tile 1894 building; 1st, 2nd, & 3rd Floor Corridors 41 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

220 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 83 Green Carpet Adhesive HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Library COMMENTS: t observed 216 Inspector's Signature: 3/4/216

221 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Green Carpet Adhesive Library In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

222 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 84 12" x12" Orange Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1894 building; 1st, 2nd, & 3rd Floor Corridors 41 COMMENTS: Inspector's Signature: 3/4/216

223 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x12" Orange Floor Tile Mastic 1894 building; 1st, 2nd, & 3rd Floor Corridors 41 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

224 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 85 12" x12" Brown Floor Tile HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1936 bldg - 1st Floor Corridor COMMENTS: t observed 216 Inspector's Signature: 3/4/216

225 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x12" Brown Floor Tile 1936 bldg - 1st Floor Corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

226 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 86 White w/brown Streaks Floor Tile HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 bldg - 3rd Floor Corridor COMMENTS: t observed 216 Inspector's Signature: 3/4/216

227 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ White w/brown Streaks Floor Tile 1926 bldg - 3rd Floor Corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

228 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 87 12"x12" Dark Brown w/light Brown Streaks Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Engineer's Office 176 COMMENTS: Inspector's Signature: 3/4/216

229 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ "x12" Dark Brown w/light Brown Streaks Floor Tile Engineer's Office 176 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

230 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 88 12"x12" Dark Brown w/light Brown Streaks Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Engineer's Office 176 COMMENTS: Inspector's Signature: 3/4/216

231 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ "x12" Dark Brown w/light Brown Streaks Floor Tile Mastic Engineer's Office 176 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

232 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 89 12"x12" Brown w/black & White Streaks Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Engineer's Washroom 99 COMMENTS: Inspector's Signature: 3/4/216

233 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ "x12" Brown w/black & White Streaks Floor Tile Engineer's Washroom 99 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

234 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 9 12"x12" Brown w/black & White Streaks Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Engineer's Washroom 99 COMMENTS: Inspector's Signature: 3/4/216

235 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ "x12" Brown w/black & White Streaks Floor Tile Mastic Engineer's Washroom 99 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

236 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 91 Chalkboards HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Classrooms COMMENTS: t observed 216 Inspector's Signature: 3/4/216

237 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Chalkboards Throughout Classrooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

238 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 91A Chalkboard Adhesive HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Classrooms 2 COMMENTS: Inspector's Signature: 3/4/216

239 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 91A Chalkboard Adhesive Throughout Classrooms 2 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

240 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 92 Mastic Beneath Wood Flooring HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Stage 64 COMMENTS: Inspector's Signature: 3/4/216

241 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Mastic Beneath Wood Flooring Stage 64 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

242 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 93 Terrazzo HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Entrances and Corridors 15 COMMENTS: Inspector's Signature: 3/4/216

243 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Terrazzo Entrances and Corridors 15 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

244 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 94 Accoustical Plaster HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Auditorium 3 COMMENTS: Inspector's Signature: 3/4/216

245 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Accoustical Plaster Auditorium 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

246 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 95 Grey & Black Terrazzo HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Hallway (Trim) & Stairwells 1 COMMENTS: Inspector's Signature: 3/4/216

247 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Grey & Black Terrazzo Hallway (Trim) & Stairwells 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

248 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 96 Blue Carpet Adhesive HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 16 COMMENTS: t observed 216 Inspector's Signature: 3/4/216

249 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Blue Carpet Adhesive Room 16 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified, implement O&M Management Planner's Signature: 6/14/216

250 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 97 12X12 White w/grey & Brown Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st & 2nd Floor Halls, Café, 3rd Floor Hall, Lower Level Hall 25 COMMENTS: Inspector's Signature: 3/4/216

251 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ X12 White w/grey & Brown Floor Tile 1st & 2nd Floor Halls, Café, 3rd Floor Hall, Lower Level Hall 25 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

252 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 98 12X12 White w/grey & Brown Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st & 2nd Floor Halls, Café, 3rd Floor Hall, Lower level Hall 25 COMMENTS: Inspector's Signature: 3/4/216

253 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ X12 White w/grey & Brown Floor Tile Mastic 1st & 2nd Floor Halls, Café, 3rd Floor Hall, Lower level Hall 25 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

254 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION 99 Tan terrazzo HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st Floor Elevator Lobby 4 COMMENTS: Inspector's Signature: 3/4/216

255 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Tan terrazzo 1st Floor Elevator Lobby 4 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

256 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION A Vibration Duct Sleeves HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Mechanical Areas 2 COMMENTS: Inspector's Signature: 3/4/216

257 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 A Vibration Duct Sleeves Mechanical Areas 2 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

258 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION B Vibration Dampers HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1978 Mechanical Room 3 COMMENTS: Inspector's Signature: 3/4/216

259 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 B Vibration Dampers 1978 Mechanical Room 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

260 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION C Aircell Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY 1 Damaged or significantly damaged friable thermal system insulating ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Repair ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 1. Damaged or significantly damaged friable thermal system insulating ACBM DAMAGE REASON: Deterioration DISTURBANCE POTENTIAL: MODERATE 1894 Bldg, Locker Room, Store room, Lunch room, 1st, 2nd Floor Corridor 11 LF LF COMMENTS: Inspector's Signature: 3/4/216

261 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 C Aircell Pipe Insulation 1894 Bldg, Locker Room, Store room, Lunch room, 1st, 2nd Floor Corridor 11 LF 5 LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Repair Comments: Management Planner's Signature: 6/14/216

262 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION D Fittings on Aircell Insulation HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: 1894 Bldg, Locker room, store room, Lunch room, 1st, 2nd Floor Corridor 1 LF LF COMMENTS: Inspector's Signature: 3/4/216

263 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 D Fittings on Aircell Insulation 1894 Bldg, Locker room, store room, Lunch room, 1st, 2nd Floor Corridor 1 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

264 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION E Cardboard Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY 1 Damaged or significantly damaged friable thermal system insulating ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Repair ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 1. Damaged or significantly damaged friable thermal system insulating ACBM DAMAGE REASON: Deterioration DISTURBANCE POTENTIAL: MODERATE 1894 Basement, Pipe Chase and Tunnel 325 LF LF COMMENTS: Inspector's Signature: 3/4/216

265 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 E Cardboard Pipe Insulation 1894 Basement, Pipe Chase and Tunnel 325 LF 2 LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Repair Comments: Repair or Remove as applicable. Continue O&M Management Planner's Signature: 6/14/216

266 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION F Joint Insulation On Cardboard Insulated Piping HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: 1984 Basement, Tunnel and Pipe Chases 3 LF LF COMMENTS: Inspector's Signature: 3/4/216

267 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 F Joint Insulation On Cardboard Insulated Piping 1984 Basement, Tunnel and Pipe Chases 3 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

268 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION G Mag-Block Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: 1894 Bldg, Lunch room, Store Room, Locker Room, and Engineers Room 4 LF LF COMMENTS: Inspector's Signature: 3/4/216

269 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 G Mag-Block Pipe Insulation 1894 Bldg, Lunch room, Store Room, Locker Room, and Engineers Room 4 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

270 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION H Pipe Fitting Insulation on Mag Block Insulated Piping HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: 1894 Bldg, Lunch Room, Store Room, Locker Room, and Engine Room 4 LF LF COMMENTS: Inspector's Signature: 3/4/216

271 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 H Pipe Fitting Insulation on Mag Block Insulated Piping 1894 Bldg, Lunch Room, Store Room, Locker Room, and Engine Room 4 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

272 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION I Fiberglass Duct Covers HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room 1 COMMENTS: Inspector's Signature: 3/4/216

273 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 I Fiberglass Duct Covers Boiler Room 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

274 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION J Fiberglass Duct Insulation HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Crocidolite FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: 1978 Mechanical Room 16 COMMENTS: Inspector's Signature: 3/4/216

275 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 J Fiberglass Duct Insulation 1978 Mechanical Room 16 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

276 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION K Fiberglass Tank Insulation HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room 24 COMMENTS: Inspector's Signature: 3/4/216

277 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 K Fiberglass Tank Insulation Boiler Room 24 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

278 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION L Tank Insulation ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1894 Bldg, Boiler Room COMMENTS: Inspector's Signature: 3/4/216

279 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 L Tank Insulation ABATED 1894 Bldg, Boiler Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

280 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION M Vibration Duct Sleeves HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Crocidolite FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Mechanical Rooms 22 COMMENTS: Inspector's Signature: 3/4/216

281 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 M Vibration Duct Sleeves Mechanical Rooms 22 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

282 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION MOD-2 Wall Panels HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Modular Building COMMENTS: Inspector's Signature: 3/4/216

283 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 MOD-2 Wall Panels Throughout Modular Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

284 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION Mod-1 9"x9" Tan Floor Tile Mastic (Abated)(Building Demolished) HISTORICAL AHERA DAMAGE CATEGORY ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Gym and Store Room COMMENTS: Inspector's Signature: 3/4/216

285 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 Mod-1 9"x9" Tan Floor Tile Mastic (Abated)(Building Demolished) Gym and Store Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

286 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION Mod-1 12" x 12" Brown Floor Tile (Abated)(Building Demolished) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Thoughout Corridor COMMENTS: Inspector's Signature: 3/4/216

287 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 Mod-1 12" x 12" Brown Floor Tile (Abated)(Building Demolished) Thoughout Corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

288 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION Mod-11 12" x 12" Brown Floor Tile Mastic (Abated)(Building Demolished) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Thoughout Corridor COMMENTS: Inspector's Signature: 3/4/216

289 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 Mod-11 12" x 12" Brown Floor Tile Mastic (Abated)(Building Demolished) Thoughout Corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

290 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION Mod-12 Orange Carpet Mastic (Abated)(Building Demolished) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Office, Teachers Lounge, Principal's Office, Store Room COMMENTS: Inspector's Signature: 3/4/216

291 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 Mod-12 Orange Carpet Mastic (Abated)(Building Demolished) Office, Teachers Lounge, Principal's Office, Store Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

292 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION Mod-13 Blue Carpet Mastic (Abated) (Building Demolished) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Classrooms COMMENTS: Inspector's Signature: 3/4/216

293 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 Mod-13 Blue Carpet Mastic (Abated) (Building Demolished) Throughout Classrooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

294 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION Mod-4 9"x9" Tan Floor Tile (Abated)(Building Demolished) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Gym and Store Room COMMENTS: Inspector's Signature: 3/4/216

295 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 Mod-4 9"x9" Tan Floor Tile (Abated)(Building Demolished) Gym and Store Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

296 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION Mod-5 Baseboard (Building Demolished) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Gym, Mechanial Equipment Room, Store Room COMMENTS: Inspector's Signature: 3/4/216

297 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 Mod-5 Baseboard (Building Demolished) Gym, Mechanial Equipment Room, Store Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

298 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION Mod-6 Baseboard mastic (Building Demolished) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Gym, Mechanial Equipment Room, Store Room COMMENTS: Inspector's Signature: 3/4/216

299 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 Mod-6 Baseboard mastic (Building Demolished) Gym, Mechanial Equipment Room, Store Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

300 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION Mod-7 Drywall (Building Demolished) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Building COMMENTS: Inspector's Signature: 3/4/216

301 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 Mod-7 Drywall (Building Demolished) Throughout Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

302 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION Mod-8 12" x 12" Beige Floor Tile (Abated) (Building Demolished) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Corridor COMMENTS: Inspector's Signature: 3/4/216

303 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 Mod-8 12" x 12" Beige Floor Tile (Abated) (Building Demolished) Throughout Corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

304 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION Mod-9 12" x 12" Beige Floor Tile Mastic (Building demolished) HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: thoughout Corridor COMMENTS: Inspector's Signature: 3/4/216

305 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 Mod-9 12" x 12" Beige Floor Tile Mastic (Building demolished) thoughout Corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

306 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION Mod-B Pipe Fitting Insulation on Fiberglass Insulated Piping (Abated) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boy's and Girls Toilets COMMENTS: Inspector's Signature: 3/4/216

307 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 Mod-B Pipe Fitting Insulation on Fiberglass Insulated Piping (Abated) Boy's and Girls Toilets In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

308 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION N Fiberglass Duct HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Above Lunchroom 2 LF LF COMMENTS: Inspector's Signature: 3/4/216

309 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 N Fiberglass Duct Above Lunchroom 2 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

310 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION O Aircell Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Assistant Priincipal's Office, 1st Floor Corridor, Room 2, Boiler Room, Pump Room, Store Room, and Unexcavated Area 42 LF LF COMMENTS: Inspector's Signature: 3/4/216

311 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 O Aircell Pipe Insulation 1926 Bldg, Assistant Priincipal's Office, 1st Floor Corridor, Room 2, Boiler Room, Pump Room, Store Room, and Unexcavated Area 42 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

312 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION P Aircell Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: 1936 Bldg, Crawlspace 15 LF LF COMMENTS: Inspector's Signature: 3/4/216

313 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 P Aircell Pipe Insulation 1936 Bldg, Crawlspace 15 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

314 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION Q Pipe Fitting Insulation on Aircell Insulated Piping HISTORICAL AHERA DAMAGE CATEGORY 1 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 1. Damaged or significantly damaged friable thermal system insulating ACBM DAMAGE REASON: Deterioration DISTURBANCE POTENTIAL: 1926 Bldg, Assistant Priincipal's Office, 1st Floor Corridor, Room 2, Boiler Room, Pump Room, Store Room, and Unexcavated Area 75 LF LF COMMENTS: Inspector's Signature: 3/4/216

315 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 Q Pipe Fitting Insulation on Aircell Insulated Piping 1926 Bldg, Assistant Priincipal's Office, 1st Floor Corridor, Room 2, Boiler Room, Pump Room, Store Room, and Unexcavated Area 75 LF 1 LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Repair or Remove as applicable. Continue O&M Management Planner's Signature: 6/14/216

316 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION R Pipe Joint Insulation On Aircell Insulated Piping HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: 1936 Bldg, Crawlspace 15 LF LF COMMENTS: Inspector's Signature: 3/4/216

317 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 R Pipe Joint Insulation On Aircell Insulated Piping 1936 Bldg, Crawlspace 15 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

318 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION S Paper wrap insulation HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Crawlspace 1 LF LF COMMENTS: Inspector's Signature: 3/4/216

319 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 S Paper wrap insulation 1926 Bldg, Crawlspace 1 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

320 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION T Pipe Fitting Insulation on Paper Wrap Insulated Piping ABATED HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Crawlspase COMMENTS: Inspector's Signature: 3/4/216

321 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 T Pipe Fitting Insulation on Paper Wrap Insulated Piping ABATED 1926 Bldg, Crawlspase In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

322 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION U Boiler Gaskets HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Boiler Room 3 LF LF COMMENTS: Inspector's Signature: 3/4/216

323 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 U Boiler Gaskets 1926 Bldg, Boiler Room 3 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

324 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION V Pipe Fitting Insulation on Fiberglass Insulated Piping HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: 1894 Bldg, Locker Room, Store Room, Lunch Room 8 LF LF COMMENTS: Inspector's Signature: 3/4/216

325 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 V Pipe Fitting Insulation on Fiberglass Insulated Piping 1894 Bldg, Locker Room, Store Room, Lunch Room 8 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

326 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION W Fittings on Fiberglass abated HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1926 Bldg, Basement Unexcavated area COMMENTS: Inspector's Signature: 3/4/216

327 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 W Fittings on Fiberglass abated 1926 Bldg, Basement Unexcavated area In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

328 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM PREVIOUS INSPECTION X Pipe Fitting Insulation on Fiberglass Insulated Piping HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: 1936 Bldg, Crawlspase 2 LF LF COMMENTS: Inspector's Signature: 3/4/216

329 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/216 X Pipe Fitting Insulation on Fiberglass Insulated Piping 1936 Bldg, Crawlspase 2 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216

330 Inspector Assessment Form (New Homogeneous Area) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM CURRENT INSPECTION 19 2" x 2" Light Tan Ceramic Tile Room 112 Kindergarten Restroom 9 MATERIAL CATEGORY: FRIABLE: ASBESTOS TYPE: DISTURBANCE POTENTIAL: AHERA DAMAGE CATEGORY: CONDITION: 6 ACBM with the potential for damage ACCESSIBILITY: Within Reach DAMAGE REASON: DAMAGE REASON: DAMAGE REASON: COMMENTS: Inspector's Signature: 3/4/216

331 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 2" Light Tan Ceramic Tile Room 112 Kindergarten Restroom 9 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: COMMENTS: Management Planner's Signature: 6/14/216

332 Inspector Assessment Form (New Homogeneous Area) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM CURRENT INSPECTION 11 Grout Associated w/ 2" x 2" Light Tan Ceramic Tile Room 112 Kindergarten Restroom 9 MATERIAL CATEGORY: FRIABLE: ASBESTOS TYPE: DISTURBANCE POTENTIAL: AHERA DAMAGE CATEGORY: CONDITION: 6 ACBM with the potential for damage ACCESSIBILITY: t Reachable DAMAGE REASON: DAMAGE REASON: DAMAGE REASON: COMMENTS: Inspector's Signature: 3/4/216

333 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Grout Associated w/ 2" x 2" Light Tan Ceramic Tile Room 112 Kindergarten Restroom 9 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: COMMENTS: Management Planner's Signature: 6/14/216

334 Inspector Assessment Form (New Homogeneous Area) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM CURRENT INSPECTION 112 Mastic Associated w/ 12" x 12" Beige w/ Dark Spots Floor Tile Room 319 Coat Room 17 MATERIAL CATEGORY: FRIABLE: ASBESTOS TYPE: DISTURBANCE POTENTIAL: AHERA DAMAGE CATEGORY: CONDITION: 6 ACBM with the potential for damage ACCESSIBILITY: t Reachable DAMAGE REASON: DAMAGE REASON: DAMAGE REASON: COMMENTS: Inspector's Signature: 3/4/216

335 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ Mastic Associated w/ 12" x 12" Beige w/ Dark Spots Floor Tile Room 319 Coat Room 17 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: COMMENTS: Management Planner's Signature: 6/14/216

336 Inspector Assessment Form (New Homogeneous Area) AHERA INSPECTOR: Robert DeBord INSPECTION DATE: 3/4/216 INFORMATION FROM CURRENT INSPECTION " x 12" Beige w/ Dark Spots Floor Tile Room 319 Coat Room 17 MATERIAL CATEGORY: FRIABLE: ASBESTOS TYPE: DISTURBANCE POTENTIAL: AHERA DAMAGE CATEGORY: CONDITION: 6 ACBM with the potential for damage ACCESSIBILITY: Within Reach DAMAGE REASON: DAMAGE REASON: DAMAGE REASON: COMMENTS: Inspector's Signature: 3/4/216

337 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau REVIEW DATE: 6/14/ " x 12" Beige w/ Dark Spots Floor Tile Room 319 Coat Room 17 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: COMMENTS: Management Planner's Signature: 6/14/216

338 APPENDIX B Inspector and Management Planner Licenses

339

340

341