1 ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO SCHOOL DIST Chicago, IL, DATE LAST THREE YEAR REINSPECTION WAS COMPLETED 3/14/2013 If the address on this form is different than the address of the building, submit a written explanation. SECTION II (Please type or print) PLEASE COMPLETE THE FOLLOWING FOR YOUR THREE YEAR REINSPECTION: DATE REINSPECTION COMPLETED: 5/9/2016 ENROLLMENT IDPH INSPECTOR LICENSE NUMBER: IDPH LICENSED INSPECTOR NAME (Please Print): Dionne Carey IDPH MP LICENSE NUMBER: IDPH LICENSED MANAGEMENT PLANNER NAME (Please Print): Evan Christian DESIGNATED PERSON (Please Print): Robert Christlieb PHONE: 511 (773) /9/2016 Signature of Designated Person Date SECTION III PLEASE COMPLETE THE FOLLOWING INFORMATION FOR ANY CHANGES WITHIN THE SCHOOL DISTRICT. School building has been sold. Date of Sale: School has been closed. Date closed: School building has been demolished. School building is asbestos free since last reinspection: Please explain in writing why the school building is now asbestos free and include the supporting documentation. If a new school building has been added to the district, submit either and exclusionary statement or a management plan and inspection report. Include the complete name, address and city of school building. Explain in writing if the address of the building is different than the address on this form: IL Revised 10.03

2 THREE YEAR REINSPECTION CHICAGO SCHOOL DIST 299 Chicago, IL, Unit: Building ID: IDPH ID Number: REPORT DATE: Monday, May 09, 2016 Prepared for: 125 S. Clark Street Chicago, IL Prepared by: 600 West Van Buren St., Ste 500 Phone (312) Fax (312) DO NOT REMOVE FROM SCHOOL REQUIRED BY FEDERAL LAW

3 April 12, 2016 Mr. R. Kent Cook Asbestos Program Illinois Department of Public Health 525 West Jefferson Street Springfield, Illinois Re: Three-Year Reinspections Dear Mr. Cook:, Managing Environmental Consultant (MEC), conducted the ThreeYear Reinspections and performed management plan updates for the (CPS) facilities in Region 3,4,5 Elementary Schools. Please update your records with the following information. School District: 299 Unit: School: Region: 04 IDPH ID: Building ID: Address: Chicago, IL, Building Contact: Lechowicz, Denis Contact Phone: Current Building Owners: Review 05/09/2016 Inspector: Dionne Carey Management Planner: Evan Christian Inspector IDPH License: Management Planner IDPH License: If you have any questions or comments, please contact us at (312) Sincerely, Evan Christian

4 Environmental Notification to Occupants To: Faculty, Staff and Parents From: April 12, 2016 RE:, Unit Chicago, IL, Dear Faculty, Staff and Parents, This letter is to notify you that the 2016 asbestos three year re-inspection has been completed at, following the Federal Asbestos Hazard Emergency Response Act (AHERA), 40 CFR Part 763, Subpart E and is available for your review at the main office of the school. Although asbestos-containing materials have been identified at, there is no reason to believe that any threat to the health of students or staff exists at this time. CPS will continue to carefully monitor the condition of asbestos-containing materials and if conditions warrant, all appropriate steps will be taken to maintain the health and safety of all building occupants. If you have any questions regarding this matter or require additional information, please feel free to contact Robert Christlieb, the designated Local Education Authority's Designated Person at (773)

5 Table of Contents I. School and Inspection Information II. Executive Summary III. Methodology IV. Abatement History V. Reassessments and Recommendations VI. Conclusions Table I: Inspector's Reinspection Findings Table II: Management Planner's Review APPENDICES: Appendix A: Assessment Sheets, Drawings and Photos Appendix B: Inspector and Management Planner Licenses Appendix C: Laboratory Accreditations Appendix D: Laboratory Results Appendix E: Chain of Custody Forms

6 SCHOOL AND INSPECTION INFORMATION 1. School Information School: Address: IDPH ID: Contact: Lechowicz, Denis Unit: Chicago, IL, Building ID: Phone: Description of Facility Original Construction: 1956 Total Square Footage: Current Occupancy: Additional Construction: No of Floors: 3 LEA Designated Person Contact: Robert Christlieb Address: 125 South Clark Street, 17th Floor Chicago, IL Phone: (773) Managing Environmental Consultant MEC: Contact: Dan Juneau Address 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector Inspector Name: Dionne Carey Signature: 4/12/2016 Inspector IDPH license # 6. Region: 04 Management Planner Management Planner Name: Evan Christian Management Planner IDPH license # Review 05/09/ LEA Designated Person's Acknowledgement Signature: 05/09/2016 The reinspection report and recommendations have been received by me and appropriate action will be taken by the School District. Signature: 5/9/2016 Name: Robert Christlieb Unit : Building:

7 II. EXECUTIVE SUMMARY was retained by the (CPS) to perform a three-year asbestos reinspection of the. This inspection was conducted in accordance with the United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) part (b), and the ongoing Operations and Maintenance Program (O&M) originally designed in the School's Asbestos Management Plan. The purpose of this three-year reinspection is to record any condition changes in the asbestos-containing building material (ACBM) in the school since the previous three-year reinspection and the six-month periodic surveillance, to identify, assess, and include any Homogeneous Areas (HA) not identified in the Management Plan, and to recommend an appropriate response action to manage asbestos. The inspector conducted a three-year reinspection of this facility under Illinois Department of Public Health (IDPH) school reinspection requirements and AHERA, sections and The main building and each addition to the main building, if constructed at different dates, were inspected separately. Laboratory accreditations are included in Appendix C, laboratory results are included in Appendix D, and chain of custody forms are included in Appendix E. Note: During previous inspections, some of the HA(s) were identified together as 9" x 9" floor tile (FT), mastics assoc. with 9" x 9" FT, 12" x 12" FT, mastics assoc. with 12" x 12" FT, pipe insulation, etc. Some of these HA(s) have been re-identified by areas that are uniform in color, texture, construction date, application date, and general appearance. The inspector has determined the following: A. The following HAs have changed assessment categories for Building : Unit: 13 F 9"x9" Gray FloorTile w/lt. Gray & Blk Strks Mastic 2J 9" x 9" Brown Floor Tile w/ White Streaks 47 2' x 4' Lay-In Ceiling Panels 72 2' x 4' Ceiling Panels 88 12" x 12" Red Floor Tile 89 Mastic Associated w/ 12" x 12" Red Floor Tile A Aircell Pipe Insulation B (Cardboard) Paperwrap Pipe Insulation J Cementitious Pipe Joint Insulation on Aircell Pipe Building:

8 B. The following new homogenous areas have been identified for Building : Unit: 88 12" x 12" Red Floor Tile 89 Mastic Associated w/ 12" x 12" Red Floor Tile Building:

9 C. This reinspection covered only physically accessible and visible areas and materials that were identified in the LEA's management plan. The following materials were concealed and/or contained in areas that were inaccessible for sampling and have been classified as Assumed: 1B 1C 13 F 14 AA 14 AB 14 AE 14 AF 14 Q 14 R 14 S 14 T 14 U 16 C 16 D 17 C 17 D 2J AA 3 AB 3 AE 3 AF 3B 3C 3E 3F 3H 3I 3J 3N 3O 3P 3Q 3R 3S 3T 3X 3Y 3Z 3A Unit: Beige Carpet Mastic Gold Carpet Mastic 12" x 12" White Floor Tile w/ Blue Streaks Mastic 9"x9" Gray FloorTile w/lt. Gray & Blk Strks Mastic 12" x 12" Gray Floor Tile Mastic 12" x 12" Multi-Blue Floor Tile Mastic 12" x 12" White Floor Tile w/ Blue Streaks Mastic 12" x 12" Gray Floor Tile w/ Black Streaks Mastic 12" x 12" Black Floor Tile Mastic 12" x 12" White Floor Tile Mastic 12" x 12" Light Blue Floor Tile Mastic 12" x 12" Light Brown Floor Tile Mastic 12" x 12" Beige Floor Tile Mastic 4" Beige Baseboard 4" Dark Gray Baseboard 4" Beige Baseboard Mastic 4" Dark Gray Baseboard Mastic 9" x 9" Brown Floor Tile w/ White Streaks Gray Carpet Adhesive 12" x 12" Gray Floor Tile 12" x 12" Multi-Blue Floor Tile 12" x 12" White Floor Tile w/ Blue Streaks 12" x 12" Gray Floor Tile w/ Black Streaks 12"x12" Gray Floor Tile w/ White & Black Streaks 12"x12" Dark Gray Floor Tile w/ Black Streaks 12"x12" White Floor Tile w/ Brown Streaks 12"x12" Light Brown Floor Tile w/ White Streaks 12"x12" Beige Floor Tile w/ White Streaks 12"x12" Brown Floor Tile 12"x12" Beige Floor Tile 12" x 12" Gray Floor Tile w/white Streaks 12" x 12" White Floor Tile 12" x 12" Blue Floor Tile 12" x 12" Black Floor Tile 12" x 12" White Floor Tile 12" x 12" Light Blue Floor Tile 12" x 12" Light Brown Floor Tile 12" x 12" Multi-Brown Floor Tile 12" x 12" Beige Floor Tile 12" x 12" Light Green Floor Tile 12" x12" White Floor Tile w/ Blue and Gray Streaks Building:

10 M G J Lab Tops and Sinks Vibration Collars Insulation Inside Firedoors Roof - Not AHERA Roof Flashing - Not AHERA Roof - Not AHERA Roof Flashing - Not AHERA 1' x 1' Fissured Ceiling Tile Mastic 2' x 4' Ceiling Panels Drywall Drywall Compound Boiler Gaskets 12" x 12" Multi-Gray Floor Tile 12" x 12" Multi-Gray Floor Tile Mastic 1' x 1' White Small Fissured Ceiling Tile Plaster Above Ceiling Tiles 12 x 12 gold and beige pattern FT 12 x 12 gold and beige pattern VFT mastic 12x12 Blueish Grey w/ Dark Grey & White Floor Tile 12x12 Blueish Grey w/dark Grey & White Floor Tile Mastic 12x12 Lt Grey w/dark Grey & White Floor Tile 12x12 Lt Grey w/dark Grey & White Floor Tile Mastic 12" X 12" Blotted Blue VFT 12" X 12" Light Blue VFT Mastic for HA 85 and 86 12" x 12" Red Floor Tile Mastic Associated w/ 12" x 12" Red Floor Tile Fittings on Fiberglass Pipe Insulation Cementitious Pipe Joint Insulation on Aircell Pipe The following areas were deemed to be inaccessible: 1B 13 G 14 AA 14 AB 14 AE 14 AF 14 B 14 C 14 F 14 G Unit: Beige Carpet Mastic 9" x 9" Lt Gray VFT w/ Gray & Blk Strks Mastic 12" x 12" Gray Floor Tile Mastic 12" x 12" Multi-Blue Floor Tile Mastic 12" x 12" White Floor Tile w/ Blue Streaks Mastic 12" x 12" Gray Floor Tile w/ Black Streaks Mastic 12" x 12" Gray VFT w/ Wh & Blk Streaks Mastic 12" x 12" Dk Gray Floor Tile w/blk Streaks Mastic 12"x12" Lt Brown Floor Tile w/white Streaks Mastic 12"x12"Gray Floor Tile w/dk Gray/Wh Streaks Building:

11 14 H 14 M 14 Q 14 R 14 S 14 T 14 U 17 C 17 D Mastic 12" x 12" Beige Floor Tile w/white Streaks Mastic 12" x 12" Gray Floor Tile Mastic 12" x 12" Black Floor Tile Mastic 12" x 12" White Floor Tile Mastic 12" x 12" Light Blue Floor Tile Mastic 12" x 12" Light Brown Floor Tile Mastic 12" x 12" Beige Floor Tile Mastic 4" Beige Baseboard Mastic 4" Dark Gray Baseboard Mastic 1' x 1' Fissured Ceiling Tile Mastic Boiler Gaskets 12x12 Blueish Grey w/dark Grey & White Floor Tile Mastic 12x12 Lt Grey w/dark Grey & White Floor Tile Mastic Mastic for HA 85 and 86 Mastic Associated w/ 12" x 12" Red Floor Tile Materials were also listed as "assumed" if they were in good condition and sampling was not conducted to avoid damage. This reinspection was conducted by Dionne Carey, IDPH License #. The Management Plan was updated by Evan Christian, IDPH License # Inspector and Management Planner Licenses are included in Appendix B. Unit: Building:

12 III. METHODOLOGY Tasks performed on-site included the following: IV. 1. Review current management plan, identify HA(s) and extract appropriate information. 2. Examine and verify abatement records. 3. Touch and visually and physically reinspect and reassess the condition of all friable known or assumed ACBM. 4. Touch and visually and physically reinspect all non-friable known or assumed ACBM to determine whether these materials have become friable since the last inspection or periodic surveillance. 5. Identify any condition changes that may affect Hazard Ranking of known ACBM or Assumed ACBM, as well as any HA(s) that have become friable since the last reinspection. 6. Collect bulk samples from each newly discovered friable HA or previously assumed and submit for laboratory analysis. 7. Tabulate reinspection findings and submit for management planner review and recommendations with appropriate response actions based on the AHERA Damage Category of the ACBM. 8. Submit reinspection findings and management planner recommendations to the LEA within thirty (30) days for inclusion into the management plan. ABATEMENT HISTORY The information collected from the existing management plan and inspection report(s) and from interviews with the school official revealed that the following asbestos abatement was conducted at the school since the previous Three year Reinspection. Abatement Dates: V. REASSESSMENTS AND RECOMMENDATIONS The reassessments and recommendations are summarized in Tables I and II on the following pages. Detailed Hazard Assessment Sheets and Drawings and Photos (if applicable) are included in Appendix A. VI. CONCLUSIONS The Building Three-Year reinspection has been completed and response actions have been recommended for both friable and non-friable materials. A timely execution of the response actions recommended will enable the LEA and the Designated Person(s) to effectively manage the existing ACBM. This three-year reinspection report should be inspected in the current Management plan at the CPS Central Office, and one (1) copy should be kept at the school for use when planning any renovation and/or demolition activities in areas where ACBM has been identified. Also, periodic surveillance documentation and any summary reports from any response actions that are executed at the school should be used to update the Management Plan. Unit: Building:

13 Table I Inspector's Reinspection Findings

14 School Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description 1A Blue Carpet Mastic 1B Beige Carpet Mastic 200 1C 10 Gold Carpet Mastic Ceramic Floor Tile Grout 12" x 12" White Floor Tile w/ Blue Streaks Mastic Peg Board A 13 B 13 D 13 E 13 F 9" x 9" Brown Floor Tile w/ Brown Streaks Mastic 9"x9" Gray FloorTile w/lt. Gray & Blk Strks Mastic 9" x 9" Lt Gray VFT w/ Gray & Blk Strks Mastic 13 H 9"x9" Lt Brn Floor Tile w/wh & Blk Streaks Mastic 9" x 9" Brown Floor Tile w/white Streaks Mastic 9" x 9" Bright Grn Floor Tile w/ Wh Streaks Mastic 13C 14 A 14 AA Material Units Material Location Asbestos Type Office Complex, 101, 106, 132 Engineer's Office NO_ACBM 600 2,000 Terrazzo 9"x9" Dk Green Floor Tile w/ White Streaks Mastic (REMOVED) 9" x 9" White Floor Tile w/dark Grn Streaks Mastic 9" x 9" White Floor Tile w/ Lt Grn Streaks Mastic 13 G 13 J Material Quantity 12" x 12" White FT w/blue & Grey Streaks Mastic 12" x 12" Gray Floor Tile Mastic 1,250 10,692 1,200 Material Category Friable Damage Type Damage Quantity Damage Units Change in Assessment Category Damage Category 0 No ACBM with the potential for damage NONE 0 No NONE 0 No ACBM with the potential for damage ACBM with the potential for damage Damage Reason ASSUMED N NONE Room 9-C Washrooms 208 ASSUMED NO_ACBM ASSUMED N Auditorium Walls CHR N Foyer 1st, 2nd & 3rd Floor Corridors 1st, 2nd & 3rd Floor Corridors As Patches in the 1st & 3rd Floor Corridors 1st Floor Corridor, Rooms A&B, Dressing Rms,100,103105,119,120,128,14 0,200,208,211,212,2 14,217,221A&B,225,300, 301, 214, 223, Band Room, 223A, and 222I 3 A&B, Dressing Rooms, and Various Classrooms Throughout Building Rooms 212 & 311 NO_ACBM ABATED None Moderate ABATED None Moderate ABATED None Moderate ABATED None Moderate ASSUMED N DIST CHR N NONE ABATED Auditorium NO_ACBM As Patches in the 1st & 3rd Floor Corridors Rooms 222, 224, 310, and 312 Band Room Hall, Chorus Room, ABATED ABATED ASSUMED LOW None Moderate Yes ACBM with the potential for damage No ACBM with the potential for damage LOW LOW 5 LOW LOW None Moderate None Moderate None N Disturbance Potential NONE Moderate 0 No ACBM with the potential for damage LOW

15 School Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description 14 AB 12" x 12" Multi-Blue Floor Tile Mastic 14 AC 12" x 12" Beige Floor Tile Mastic Replaced 12" x 12" Blue Floor Tile Mastic Replaced 12" x 12" White Floor Tile w/ Blue Streaks Mastic 12" x 12" Gray Floor Tile w/ Black Streaks Mastic 12" x 12" Gray VFT w/ Wh & Blk Streaks Mastic 12" x 12" Dk Gray Floor Tile w/blk Streaks Mastic 14 AD 14 AE 14 AF 14 B 14 C 14 D 12" x12" Brown VFT w/ Dk Brn & White Strks Mastic 14 E 12" x 12" White Floor Tile w/brown Streaks Mastic 14 F 12"x12" Lt Brown Floor Tile w/white Streaks Mastic 14 G 12"x12"Gray Floor Tile w/dk Gray/Wh Streaks Mastic 14 H 12" x 12" Beige Floor Tile w/white Streaks Mastic 14 I 14 J 14 K 12'" x 12" Brown Floor Tile Mastic 12" x 12" Beige Floor Tile Mastic 12" x 12" Green Floor Tile Mastic Material Quantity 1,600 Material Units Material Location Asbestos Type Material Category Friable Damage Type Foyer & Practice Room Room 208 ASSUMED N NONE Room 128 ABATED Room 128 ABATED Damage Quantity Damage Units Change in Assessment Category Damage Category Damage Reason Disturbance Potential 0 No ACBM with the potential for damage LOW ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage LOW 600 Room 208 ASSUMED N NONE 0 No 20 Room 208 ASSUMED N NONE 0 No 200 Men's Lounge CHR N NONE 0 No 5,400 Rooms 140, 211, 214, 217, 305, 308, and 313 Boys Gym, Lunchroom, 1st and 2nd Floor Corridors, 114, 201, 213, 215, 216, , 223, 227, 303 Boys Gym, Lunchroom, 1st and 2nd Floor Corridors, 114, 201, 213, 215, 216, , 223, 227, 303 1st Floor Corridor by Ramps and as a Patch in the 2nd Floor Corridor Rooms 100, 119, 121, 140, 305, 306, 308, 313, 209 Library 1st Floor Corridor by Ramps and as a Patch in the 2nd Floor Corridor Room 138 Room 138 1st, 2nd & 3rd Floor CHR N NONE 0 No CHR CHR N DIST 20 No ACBM with the potential for damage CHR N NONE 0 No ACBM with the potential for damage LOW CHR N NONE 0 No ACBM with the potential for damage LOW CHR N NONE 0 No ACBM with the potential for damage LOW CHR CHR ABATED 25, , None LOW LOW LOW 3 LOW Moderate

16 School Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description 14 L 12" x 12" Light Green Floor Tile Mastic 14 M 12" x 12" Gray Floor Tile Mastic 14 N 14 O 14 P 14 Q 12" x 12" Gray Floor Tile w/white Streaks Mastic 12" x 12" White Floor Tile Mastic 12" x 12" Blue Floor Tile Mastic 12" x 12" Black Floor Tile Mastic 1, R 12" x 12" White Floor Tile Mastic 1, S 12" x 12" Light Blue Floor Tile Mastic 14 T 12" x 12" Light Brown Floor Tile Mastic 14 U 12" x 12" Beige Floor Tile Mastic 14 V 14 X 14 Y 14 Z 12"x12" Dk Brn Floor Tile w/dk Brn & Lt Brn Mastic 12"x12" Gray Floor Tile w/lt. Gray Streaks Mastic 12" x 12" Multi-Brown Floor Tile Mastic 12" x 12" Beige Floor Tile Mastic 12" x 12" Light Green Floor Tile Mastic 15 Drywall 16 A Black Baseboard 16 B Blue Baseboard 16 C 4" Beige Baseboard 300 LF 16 D 4" Dark Gray Baseboard 150 LF 17 A Black Baseboard Mastic 14 W Material Quantity 550 Material Units Material Location Corridors as Patches 1st, 2nd & 3rd Floor Corridors as Patches 1st Floor Corridor Ramps Room 104 Asbestos Type Material Category ABATED CHR Friable Damage Type Damage Quantity Damage Units Change in Assessment Category Damage Category None Damage Reason Disturbance Potential Moderate N NONE 0 No ACBM with the potential for damage LOW ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage LOW ACBM with the potential for damage LOW NO_ACBM Room 132 Room 132 Room 105 NO_ACBM NO_ACBM ASSUMED N NONE 0 No Room 105 ASSUMED N NONE 0 No 600 N NONE 0 No ASSUMED N NONE 0 No 700 Room 104, 221B, 223 Rooms114, 117, 119, 130, 206, & 207 Rooms 114, 117, 119, 130, 206, & 207 On Cabinets in Various Classrooms On Cabinets in Various Classrooms Room 201 and 203 Rooms 201 and 203 Band Room, Chorus Room, Hall and Foyer Rooms 132 & 303 and the Office Complex Throughout Building Office Complex and Room 310 Band Room, Hall, Foyer and Chorus Room Room 208 ASSUMED 700 ASSUMED N NONE 0 No ABATED None Moderate ABATED None Moderate CHR CHR CHR None Moderate NO_ACBM NO_ACBM NO_ACBM ASSUMED N NONE 0 No ACBM with the potential for damage LOW ASSUMED N NONE 0 No ACBM with the potential for damage LOW Throughout Building NO_ACBM LOW LOW LOW

17 School Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description 17 B Blue Baseboard Mastic 17 C 4" Beige Baseboard Mastic 300 LF 17 D 4" Dark Gray Baseboard Mastic 150 LF 18 Tank # 1 Insulation Jacket (Closest to Door) Tank Insulation Jacket (Middle Tank) 9" x 9' Dark Green Floor Tiles w/white Streaks 19 2A 2B 9" x 9" White Floor Tile w/dark Green Streaks 2C 9" x 9" Bright Green Floor Tile w/ White Streaks 2D 9" x 9" White Floor Tile w/bright Green Streaks 9" x 9" Brown w/brown Floor Tile 2E Material Quantity Material Units 2F 9"x9" Gray w/lt. Gray & Black Streaks Floor Tile 10,692 2G 9" x 9" Lt. Gray Floor Tile w/gray & Black Streaks 10,692 2H 9" x 9" Light Brn Floor Tile w/white & Blk Streaks 9" x 9" White Floor Tile w/lt Brn & Blk Streaks 9" x 9" Brown Floor Tile w/ White Streaks 2I 2J 20 Tank Insulation Jacket (Farthest From Door) 3,800 Material Location Asbestos Type Material Category Friable Damage Type Office Complex and Room 310 Band Room, Chorus Room, Hall and Foyer Room 208 NO_ACBM ASSUMED Damage Quantity Damage Units Change in Assessment Category Damage Category N NONE 0 No ACBM with the potential for damage LOW ASSUMED N NONE 0 No ACBM with the potential for damage LOW Boiler House NO_ACBM TSI Boiler House 1st, 2nd and 3rd Floor Corridors and Gym Balcony, Closet Various 1st, 2nd, and 3rd Floor Corridors and Gym Balcony, Closet As Patches in the 1st and 3rd Floor Corridors 1st, 2nd, and 3rd Floor Corridors Rooms 100 & 140 and the 1st Floor Corridor 13 A & B, Dressing Rooms, and Various Classrooms Throughout Building 13 A & B, Dressing Rooms, and Various Classrooms Throughout Building Rooms 311 and 212 NO_ACBM CHR TSI CHR ABATED None Moderate CHR None Moderate CHR CHR N DIST 50 No ACBM with the potential for damage 3 LOW CHR N DIST 50 No ACBM with the potential for damage 3 LOW ABATED Rooms 212 and 311 CHR Auditorium ASSUMED Boiler House NO_ACBM TSI None N NONE Damage Reason Disturbance Potential Moderate 0 Yes ACBM with the potential for damage LOW

18 School Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description Tank Insulation Jacket (Lower Level) Linear Pipe Insulation Steam Line Joints Cinder Block Cinder Block Mortar Gray Carpet Adhesive 26 Finished Brick (Glazed) 27 Finished (Glazed) Brick Mortar 28 Terrazzo Stall Panels 29 Aircell Pipe Insulation 3 AA 12" x 12" Gray Floor Tile 3 AB 3 AC 3 AD 3 AE 12" x 12" Multi-Blue Floor Tile 12" x 12" Beige Floor Tile - Removed 12" x 12" Gray Floor Tile - Removed 12" x 12" White Floor Tile w/ Blue Streaks AF 12" x 12" Gray Floor Tile w/ Black Streaks 20 3B 12"x12" Gray Floor Tile w/ White & Black Streaks 12"x12" Dark Gray Floor Tile w/ Black Streaks 12"x12" Brown Floor Tile w/ Dk Brn & Wh Streaks (Removed) 3C 3D 3E 12"x12" White Floor Tile w/ Brown Streaks 3F 12"x12" Light Brown Floor Tile w/ White Streaks 3G 12"x12" Gray Floor Tile w/ Dk Gray & White Streaks Material Quantity 1,200 Material Units Material Location Asbestos Type Material Category Friable Damage Type Boiler House Boiler House Boiler House Boiler House Boiler House 1st Floor Corridor, CPS ID Boiler House Washroom Boiler House Washroom Boiler House Washroom Boiler House Washroom Behind Wall- In Chase Band Room, Chorus Room, Hall, Foyer & Practice Room Room 208 Room 128 Room 128 Room 208, 100, 128 NO_ACBM NO_ACBM NO_ACBM NO_ACBM NO_ACBM ASSUMED TSI TSI TSI NO_ACBM NO_ACBM NO_ACBM CHR TSI ASSUMED N NONE ASSUMED ABATED ABATED ASSUMED N Room 206, 204, 208, 100, 128 Men's Lounge ASSUMED N ASSUMED Rooms 100, 140, 305, 308, and 313 Boys Gym, Lunch Room, Classrooms and Corridors Boys Gym, Lunch Room, Classrooms and Corridors 1st Floor Corridor by Ramps and as a Patch in 2nd Floor Corridor, 114, 207 Rooms 100, 119, 121, 140, 305, 306, 308, and 313 ASSUMED ABATED ASSUMED ASSUMED ABATED Damage Quantity Damage Units Change in Assessment Category Damage Category Damage Reason Disturbance Potential 0 No ACBM with the potential for damage LOW NONE 0 No 0 No ACBM with the potential for damage ACBM with the potential for damage LOW NONE LOW

19 School Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description 3H 12"x12" Beige Floor Tile w/ White Streaks 3I 3J 3K 12"x12" Brown Floor Tile 12"x12" Beige Floor Tile 12"x12" Green Floor Tiles 3L 12"x12" Light Green Floor Tiles 3M 12" x 12" Gray Floor Tile 3N 12" x 12" Gray Floor Tile w/white Streaks 600 3O 12" x 12" White Floor Tile 900 3P 12" x 12" Blue Floor Tile 3Q 12" x 12" Black Floor Tile 3R 12" x 12" White Floor Tile 3S 12" x 12" Light Blue Floor Tile 3T Material Location Asbestos Type Material Category ASSUMED ASSUMED ASSUMED ABATED ABATED NO_ACBM 1st Floor Corridor by Ramps and as a Patch in 2nd Floor Corridor, 114, 207, 307 Room 138 Room 138 As Patches in the 1st and 3rd Floor Corridors As Patches in the 1st and 3rd Floor Corridors 1st Floor Corridor Ramps Room 104 ASSUMED Room 132,106 ASSUMED 450 Room 132 1,100 Room 105 1, " x 12" Light Brown Floor Tile 2,400 3U 12" x 12" Beige Floor Tile 2,400 3V 3X 3Y 3Z 12" x 12" Dark Brown w/dk Brn & Lt Brn Streak FT (Removed) 12" x 12" Gray Floor Tile w/ Light Gray Streaks (Removed) 12" x 12" Multi-Brown Floor Tile 12" x 12" Beige Floor Tile 12" x 12" Light Green Floor Tile Tank Insulation Cinder Block Mortar 3W Material Quantity Material Units Friable Damage Type N NONE N NONE ASSUMED N ASSUMED N Room 105 ASSUMED Room 104, 134, Social Room, 300B Rooms 114, 116, 117, 119, 130, and 206 Rooms 114, 116, 117, 119, 130, and 206 On Cabinets in Various Classrooms On Cabinets in Various Classrooms Rooms 201 and 203 Rooms 201 Band Room, Chorus Room, Hall and Foyer Basement Throughout ASSUMED ASSUMED Damage Quantity Damage Units Change in Assessment Category Damage Category Damage Reason Disturbance Potential 0 No No NONE 0 No NONE 0 No N NONE 0 No N NONE 0 No N NONE 0 No ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage LOW 0 ANT N NONE 0 No ACBM with the potential for damage LOW ABATED ABATED ASSUMED ASSUMED ASSUMED NO_ACBM NO_ACBM TSI LOW LOW LOW LOW LOW LOW

20 School Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description 32 Interior Brick 33 Interior Brick Mortar 34 Ceiling Material 35 Terrazzo Stairs and Landings/foyers Clay Tile Clay Tile Mortar Window Glazing 39 Window Caulk (Grout) 3A 12" x12" White Floor Tile w/ Blue and Gray Streaks 4 40 Outer Wrap Over Fiberglass Insulation on HVAC Unit Window Sill Mortar 41 Finished (Glazed) Brick 42 Finished (Glazed) Brick Mortar Terrazzo Stall Panels 1' x 1' Ceiling Tile (Acoustical) 45 1' x 1' Ceiling Tiles 46 1' x 1' (Spline) Ceiling Tiles with Holes 47 2' x 4' Lay-In Ceiling Panels 48 1' x 2' Slotted Ceiling Tile 49 2' x 8' Textured Ceiling Panels Insulation on Suspended HVAC Unit 2' x 8' Smooth Ceiling Tile Insulation Behind Pegboard Walls Material Quantity 2,700 1,500 Material Units Material Location Building Throughout Building Throughout Building Basement Boiler Room Throughout Stairways Entrances and Exits Entrances and Exits Throughout Building Throughout Building Rms 224, 222, 310, 225, 221A, 217, 211, 207, 306and 312 Room 122ABATED Throughout Classrooms Throughout Building Throughout Building All Washrooms As Patches in Foyer and Corridors 1st, 2nd, and 3rd Floor Corridors 1st, 2nd, and 3rd Floor Corridors Rooms 311 and 110 Shop Wing and Gym Rms 122, 124, and 126 Room 122 Shop Wing Auditorium Asbestos Type Material Category NO_ACBM NO_ACBM NO_ACBM NO_ACBM NO_ACBM NO_ACBM NO_ACBM NO_ACBM ASSUMED ABATED TSI NO_ACBM NO_ACBM NO_ACBM NO_ACBM NO_ACBM NO_ACBM NO_ACBM AMO NO_ACBM NO_ACBM NO_ACBM NO_ACBM NO_ACBM TSI TSI Friable Damage Type N NONE Y NONE Damage Quantity Damage Units Change in Assessment Category Damage Category Damage Reason Disturbance Potential 0 No ACBM with the potential for damage LOW 0 Yes Any remaining friable ACBM or friable suspect ACBM LOW

21 School Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description Roof Flashing - Not AHERA Lab Tops and Sinks Fiberglass Insulation on Suspended HVAC Unit Vibration Collars Terrazzo Sinks Insulation Inside Firedoors 58 Exterior Dark Brick - Not AHERA 59 Exterior Dark Brick Mortar - Not AHERA 6 Fiberglass Insulation Backing on HVAC Unit Exterior Light Face Brick - Not AHERA Exterior Light Face Brick Mortar - Not AHERA Exterior Door Grout - Not AHERA 63 Exterior Blue Brick - Not AHERA 64 Exterior Blue Brick Mortar - Not AHERA 65 Exterior Window Grout - Not AHERA Roof - Not AHERA Roof Flashing - Not AHERA Roof - Not AHERA Roof Flashing - Not AHERA Plaster 70 Mastic on Wall 71 1' x 1' Fissured Ceiling Tile Mastic 72 2' x 4' Ceiling Panels 61 Material Quantity 500 Material Units 50 LF ,000 2,400 Material Location Asbestos Type Material Category Friable Damage Type Shop Roof Rooms 117, 310, 312, 222, and 224 Room 122 NO_ACBM ASSUMED NO_ACBM TSI N NONE Dressing Room, Janitor's Closet in Girl's Locker Room, Room 310 & Electrical Room in Room 206 Washrooms Exits and Boiler Room Exterior of Main Building Exterior of Main Building Room 122ABATED Exterior of Main Building Exterior of Main Building Exterior of Main Building Exterior of Main Building Exterior of Main Building Exterior of Main Building Boiler House Boiler House Main Building Main Building Throughout Building Room Material not observed Throughout Building, Cafeteria Room 208, 117 ASSUMED N NO_ACBM ASSUMED NO_ACBM NO_ACBM ABATED TSI NO_ACBM NO_ACBM NO_ACBM NO_ACBM NO_ACBM NO_ACBM ASSUMED ASSUMED ASSUMED ASSUMED NO_ACBM SURFACE CHR ASSUMED ASSUMED Damage Quantity Damage Units Change in Assessment Category Damage Category Damage Reason Disturbance Potential 0 No ACBM with the potential for damage LOW NONE 0 No ACBM with the potential for damage LOW N NONE 0 No ACBM with the potential for damage LOW N NONE 0 No Y NONE 0 Yes ACBM with the potential for damage Any remaining friable ACBM or friable LOW LOW

22 School Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description 73 Drywall 74 Drywall Compound 75 Boiler Gaskets 76 12" x 12" Multi-Gray Floor Tile 77 12" x 12" Multi-Gray Floor Tile Mastic 78 1' x 1' White Small Fissured Ceiling Tile 8 80 Material Units Material Location Asbestos Type Material Category Friable Damage Type 1,600 Room 208 ASSUMED N NONE 0 No 200 LF Room 208 ASSUMED N NONE 0 No 10 N NONE 0 No Bryan Boiler in Basement Rooms 203 & 205 ASSUMED 2,000 ASSUMED N NONE 0 No 2,000 Rooms 203 & 205 ASSUMED N NONE 0 No 4,700 Lunchroom ASSUMED Y NONE 0 No Plaster Above Ceiling Tiles 12 x 12 gold and beige pattern FT 2,000 ASSUMED ASSUMED SURFACE N NONE 0 No 80M 12 x 12 gold and beige pattern VFT mastic 2,000 ASSUMED N NONE 0 No ASSUMED N NONE 0 No 800 Rm 128, 100 ASSUMED N NONE 0 No 3,200 N NONE 0 No ASSUMED N NONE 0 No 26,000 ASSUMED N NONE 0 No 86 12" X 12" Light Blue VFT 4,000 ASSUMED N NONE 0 87 Mastic for HA 85 and 86 30,000 ASSUMED N NONE 88 12" x 12" Red Floor Tile 200 ASSUMED N 89 Mastic Associated w/ 12" x 12" Red Floor Tile Drywall Joint Compound Aircell Pipe Insulation 200 Rm 100, 128, 203, 301, 300, 308 Rm 100, 128, 203, 301, 300, 308 Throughout Hallways and Various Rooms Throughout Hallways and Various Classrooms Throughout Hallways and Various Classrooms Adjacent to Girl's Gym - 1st Floor Adjacent to Girl's Gym - 1st Floor Room 108 Pipe Chases, Boiler Room and Throughout ASSUMED 3, x12 Blueish Grey w/ Dark Grey & White Floor Tile 12x12 Blueish Grey w/dark Grey & White Floor Tile Mastic 12x12 Lt Grey w/dark Grey & White Floor Tile 12x12 Lt Grey w/dark Grey & White Floor Tile Mastic 12" X 12" Blotted Blue VFT Shop Wing 114, 207, 206, 204, , 207, 206, 204, 107 Rm 128, 100 ASSUMED NO_ACBM CHR TSI A Material Quantity 500 LF Damage Quantity Damage Units Change in Assessment Category Damage Category Damage Reason suspect ACBM ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage Any remaining friable ACBM or friable suspect ACBM Disturbance Potential LOW LOW LOW LOW LOW LOW ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage LOW No ACBM with the potential for damage LOW 0 No ACBM with the potential for damage LOW NONE 0 Yes LOW N NONE 0 Yes ACBM with the potential for damage ACBM with the potential for damage Y LOC 15 Yes Damaged or significantly damaged friable thermal system LOW LOW LOW LOW LOW LOW LOW 5 MODERATE

23 School Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description B (Cardboard) Paperwrap Pipe Insulation C Aircell Duct Insulation D Mag Block Insulation E Mag Block Pipe Insulation F Mag Block Duct Insulation G Fittings on Fiberglass Pipe Insulation 60 LF HA-1000 White woven electrical wire insulation 50 LF I3 I 9"x 9" White Floor Tile w/brn & Blk Streaks Mastic Cementitious Pipe Joint Insulation on Aircell Pipe J K Cementitious Pipe Joint Insulation on Paperwrap Material Quantity 600 Material Units LF 50 LF 20 LF Material Location Asbestos Type Material Category Friable Damage Type CHR TSI Y LOC 1 Yes ABATED TSI ABATED TSI ABATED TSI ABATED TSI ASSUMED TSI Y NONE 0 No Auditorium stage light fixtures CHR Y NONE 0 No Rooms 212 and 311 CHR Pipe Chases, Boiler Room and Throughout Building Boiler Room, Pipe Chases and Throughout Building ASSUMED TSI Y NONE 0 Yes Any remaining friable ACBM or friable suspect ACBM LOW CHR TSI Y NONE 0 No Any remaining friable ACBM or friable suspect ACBM LOW Building Boiler Room and Throughout Building, rm 115, 125 Abated in See 2004 Comments Boilers in Boiler House - Abated 1992 Boiler House Abated 1992 Boiler House Abated 1992 Main Building Damage Quantity Damage Units Change in Assessment Category Damage Category insulating ACBM Damaged or significantly damaged friable thermal system insulating ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Damage Reason Disturbance Potential 3 MODERATE LOW LOW Moderate

24 School Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report Reinspection Date 4/12/2016 Inspector Name Inspector's Comments Dionne Carey 5/15/2017 Inspector's IDPH License Number / Expiration Date HA Number: 1A 1B 1C A 13 B 13 D 13 E 13 F 13 G 13 H 13 J 13C 14 A 14 AA 14 AB 14 AC 14 AD 14 AE Inspector Comments: Not observed 2016 Damage located in Band Room and Room 222, only observed in Rooms 214 and 223 Previously abated from rooms 13A&B, Dressing Rms,100,103105,119,120,128,140,200,208,211,212,217,221A&B,225,300, 301

25 School Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: 14 AF 14 B 14 C 14 D 14 E 14 F 14 G 14 H 14 I 14 J 14 K 14 L 14 M 14 N 14 O 14 P 14 Q 14 R 14 S 14 T 14 U 14 V 14 W 14 X 14 Y 14 Z A 16 B Inspector Comments: Not observed in Rooms 211, 214, 217 Not observed 2016 Damage is located in the 1st and 2nd floor corridors Not observed in Room 121 Not observed Inaccessible Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016

26 School Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: 16 C 16 D 17 A 17 B 17 C 17 D A 2B 2C 2D 2E 2F 2G 2H 2I 2J Inspector Comments: Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Damage is located in Rooms 214, 208, and 306 Damage is located in Rooms 214, 223, and 107 Not observed 2016 Not observed 2016 Not observed 2016

27 School Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: 3 AA 3 AB 3 AC 3 AD 3 AE 3 AF 3B 3C 3D 3E 3F 3G 3H 3I 3J 3K 3L 3M 3N 3O 3P 3Q 3R 3S 3T 3U 3V 3W 3X Inspector Comments: Not observed 2016 Not observed in Rooms 128 and 100 Not observed in Rooms 128 and 100 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed in Room 104 Not observed in Room 206 Not observed in Room 206 Not observed 2016

28 School Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: 3Y 3Z A Inspector Comments: Not observed 2016 Not observed 2016 Not observed in Room 225

29 School Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: Inspector Comments: Not observed 2016 Not observed 2016

30 School Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: 80M A B C D E F G HA-1000 I3 I J K Inspector Comments: Not observed 2016

31 Table II Management Planner's Review

32 School Address Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units 1A 1B 1C A 13 B 13 D Blue Carpet Mastic Beige Carpet Mastic Gold Carpet Mastic Ceramic Floor Tile Grout 12" x 12" White Floor Tile w/ Blue Streaks Mastic Peg Board Terrazzo 9"x9" Dk Green Floor Tile w/ White Streaks Mastic (REMOVED) 9" x 9" White Floor Tile w/dark Grn Streaks Mastic 9" x 9" White Floor Tile w/ Lt Grn Streaks Mastic , E 13 F 9" x 9" Brown Floor Tile w/ Brown Streaks Mastic 9"x9" Gray FloorTile w/lt. Gray & Blk Strks Mastic 1, G 9" x 9" Lt Gray VFT w/ Gray & Blk Strks Mastic 10, H 13 J 13C 9"x9" Lt Brn Floor Tile w/wh & Blk Streaks Mastic 9" x 9" Brown Floor Tile w/white Streaks Mastic 9" x 9" Bright Grn Floor Tile w/ Wh Streaks Mastic 14 A 14 AA 12" x 12" White FT w/blue & Grey Streaks Mastic 12" x 12" Gray Floor Tile Mastic 14 AB 14 AC 14 AD 14 AE 14 AF 14 B 14 C 12" x 12" Multi-Blue Floor Tile Mastic 12" x 12" Beige Floor Tile Mastic - Replaced 12" x 12" Blue Floor Tile Mastic - Replaced 12" x 12" White Floor Tile w/ Blue Streaks Mastic 12" x 12" Gray Floor Tile w/ Black Streaks Mastic 12" x 12" Gray VFT w/ Wh & Blk Streaks Mastic 12" x 12" Dk Gray Floor Tile w/blk Streaks Mastic 14 D 12" x12" Brown VFT w/ Dk Brn & White Strks 1,200 1, ,400 Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response Office Complex, 101, 106, 132 Engineer's Office Room 9-C Washrooms 208 Auditorium Walls Foyer 1st, 2nd & 3rd Floor Corridors No ACBM Assumed Assumed No ACBM Assumed Chrysotile No ACBM Abated No 0 6 ACBM with the potential for damage No No ACBM with the potential for damage 6 ACBM with the potential for damage 1st, 2nd & 3rd Floor Corridors As Patches in the 1st & 3rd Floor Corridors 1st Floor Corridor, Rooms A&B, Dressing Rms,100,103105,119,120,128,140,200,208,211,212, 214,217,221A&B,225,300, 301, 214, 223, Band Room, 223A, and 222I 3 A&B, Dressing Rooms, and Various Classrooms Throughout Building Rooms 212 & 311 Auditorium As Patches in the 1st & 3rd Floor Corridors Rooms 222, 224, 310, and 312 Band Room Hall, Chorus Room, Foyer & Practice Room Room 208 Room 128 Room 128 Room 208 Room 208 Men's Lounge Rooms 140, 211, 214, 217, 305, 308, and 313 Boys Gym, Lunchroom, 1st and 2nd Abated Abated Abated Assumed No ACBM with the potential for damage Repair Chrysotile No 0 6 ACBM with the potential for damage Abated No ACBM Abated Abated Assumed No 0 6 ACBM with the potential for damage Assumed Abated Abated Assumed Assumed Chrysotile Chrysotile No 0 6 ACBM with the potential for damage No No No No ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage Chrysotile

33 School Address Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Mastic 14 E 12" x 12" White Floor Tile w/brown Streaks Mastic 25, F 12"x12" Lt Brown Floor Tile w/white Streaks Mastic G 8, H 12"x12"Gray Floor Tile w/dk Gray/Wh Streaks Mastic 12" x 12" Beige Floor Tile w/white Streaks Mastic I 14 J 14 K 12'" x 12" Brown Floor Tile Mastic 12" x 12" Beige Floor Tile Mastic 12" x 12" Green Floor Tile Mastic 14 L 12" x 12" Light Green Floor Tile Mastic 14 M 14 N 14 O 14 P 14 Q 14 R 14 S 14 T 14 U 14 V 14 W 14 X 14 Y 14 Z 12" x 12" Gray Floor Tile Mastic 12" x 12" Gray Floor Tile w/white Streaks Mastic 12" x 12" White Floor Tile Mastic 12" x 12" Blue Floor Tile Mastic 12" x 12" Black Floor Tile Mastic 12" x 12" White Floor Tile Mastic 12" x 12" Light Blue Floor Tile Mastic 12" x 12" Light Brown Floor Tile Mastic 12" x 12" Beige Floor Tile Mastic 12"x12" Dk Brn Floor Tile w/dk Brn & Lt Brn Mastic 12"x12" Gray Floor Tile w/lt. Gray Streaks Mastic 12" x 12" Multi-Brown Floor Tile Mastic 12" x 12" Beige Floor Tile Mastic 12" x 12" Light Green Floor Tile Mastic 15 Drywall 16 A Black Baseboard 550 1,100 1, Material Location Floor Corridors, 114, 201, 213, 215, 216, , 223, 227, 303 Boys Gym, Lunchroom, 1st and 2nd Floor Corridors, 114, 201, 213, 215, 216, , 223, 227, 303 1st Floor Corridor by Ramps and as a Patch in the 2nd Floor Corridor Rooms 100, 119, 121, 140, 305, 306, 308, 313, 209 Library 1st Floor Corridor by Ramps and as a Patch in the 2nd Floor Corridor Room 138 Room 138 1st, 2nd & 3rd Floor Corridors as Patches 1st, 2nd & 3rd Floor Corridors as Patches 1st Floor Corridor Ramps Room 104 Room 132 Room 132 Room 105 Room 105 Room 104, 221B, 223 Rooms114, 117, 119, 130, 206, & 207 Rooms 114, 117, 119, 130, 206, & 207 On Cabinets in Various Classrooms On Cabinets in Various Classrooms Room 201 and 203 Rooms 201 and 203 Band Room, Chorus Room, Hall and Foyer Rooms 132 & 303 and the Office Complex Throughout Building Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response Chrysotile No 20 6 ACBM with the potential for damage Repair Chrysotile No 0 6 ACBM with the potential for damage Chrysotile No 0 6 ACBM with the potential for damage Chrysotile No 0 6 ACBM with the potential for damage Chrysotile Chrysotile Abated Abated Chrysotile No ACBM No ACBM No ACBM Assumed Assumed Assumed Assumed Assumed Abated Abated Chrysotile Chrysotile Chrysotile No ACBM No ACBM No 0 6 ACBM with the potential for damage No No No No No ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage

34 School Address Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units 16 B 16 C Blue Baseboard 4" Beige Baseboard 300 LF 16 D 17 A 17 B 17 C 4" Dark Gray Baseboard Black Baseboard Mastic Blue Baseboard Mastic 4" Beige Baseboard Mastic 150 LF 300 LF 17 D A 4" Dark Gray Baseboard Mastic Tank # 1 Insulation Jacket (Closest to Door) Tank Insulation Jacket (Middle Tank) 9" x 9' Dark Green Floor Tiles w/white Streaks 150 LF 2B 9" x 9" White Floor Tile w/dark Green Streaks 2C 9" x 9" Bright Green Floor Tile w/ White Streaks 2D 2E 9" x 9" White Floor Tile w/bright Green Streaks 9" x 9" Brown w/brown Floor Tile 2F 9"x9" Gray w/lt. Gray & Black Streaks Floor Tile 10,692 2G 9" x 9" Lt. Gray Floor Tile w/gray & Black Streaks 10,692 2H 2I 2J " x 9" Light Brn Floor Tile w/white & Blk Streaks 9" x 9" White Floor Tile w/lt Brn & Blk Streaks 9" x 9" Brown Floor Tile w/ White Streaks Tank Insulation Jacket (Farthest From Door) Tank Insulation Jacket (Lower Level) Linear Pipe Insulation Steam Line Joints Cinder Block Cinder Block Mortar 3,800 Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response Office Complex and Room 310 Band Room, Hall, Foyer and Chorus Room Room 208 Throughout Building Office Complex and Room 310 Band Room, Chorus Room, Hall and Foyer Room 208 Boiler House Boiler House 1st, 2nd and 3rd Floor Corridors and Gym Balcony, Closet Various 1st, 2nd, and 3rd Floor Corridors and Gym Balcony, Closet As Patches in the 1st and 3rd Floor Corridors 1st, 2nd, and 3rd Floor Corridors Rooms 100 & 140 and the 1st Floor Corridor 13 A & B, Dressing Rooms, and Various Classrooms Throughout Building 13 A & B, Dressing Rooms, and Various Classrooms Throughout Building Rooms 311 and 212 Rooms 212 and 311 Auditorium Boiler House Boiler House Boiler House Boiler House Boiler House Boiler House No ACBM Assumed No 0 LF 6 ACBM with the potential for damage Assumed No ACBM No ACBM Assumed No 0 LF 6 ACBM with the potential for damage No 0 LF 6 ACBM with the potential for damage Assumed No ACBM No ACBM Chrysotile TSI TSI No 0 LF 6 ACBM with the potential for damage Chrysotile Abated Chrysotile Chrysotile Chrysotile No 50 6 ACBM with the potential for damage Repair Chrysotile No 50 6 ACBM with the potential for damage Repair Abated Chrysotile Assumed No ACBM No ACBM No ACBM No ACBM No ACBM No ACBM TSI TSI TSI TSI No 0 6 ACBM with the potential for damage

35 School Address Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Gray Carpet Adhesive Finished Brick (Glazed) Finished (Glazed) Brick Mortar Terrazzo Stall Panels Aircell Pipe Insulation 3 AA 12" x 12" Gray Floor Tile 3 AB 3 AC 3 AD 3 AE 3 AF 3B 3C 3D 3E 12" x 12" Multi-Blue Floor Tile 12" x 12" Beige Floor Tile - Removed 12" x 12" Gray Floor Tile - Removed 12" x 12" White Floor Tile w/ Blue Streaks 12" x 12" Gray Floor Tile w/ Black Streaks 12"x12" Gray Floor Tile w/ White & Black Streaks 12"x12" Dark Gray Floor Tile w/ Black Streaks 12"x12" Brown Floor Tile w/ Dk Brn & Wh Streaks (Removed) 12"x12" White Floor Tile w/ Brown Streaks 3F 12"x12" Light Brown Floor Tile w/ White Streaks 3G 3H 12"x12" Gray Floor Tile w/ Dk Gray & White Streaks 12"x12" Beige Floor Tile w/ White Streaks 3I 3J 3K 12"x12" Brown Floor Tile 12"x12" Beige Floor Tile 12"x12" Green Floor Tiles 3L 12"x12" Light Green Floor Tiles 3M 3N 3O 12" x 12" Gray Floor Tile 12" x 12" Gray Floor Tile w/white Streaks 12" x 12" White Floor Tile Material Quantity 1, Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response 1st Floor Corridor, CPS ID Boiler House Washroom Boiler House Washroom Boiler House Washroom Boiler House Washroom Behind WallIn Chase Band Room, Chorus Room, Hall, Foyer & Practice Room Room 208 Room 128 Room 128 Room 208, 100, 128 Room 206, 204, 208, 100, 128 Men's Lounge Rooms 100, 140, 305, 308, and 313 Boys Gym, Lunch Room, Classrooms and Corridors Boys Gym, Lunch Room, Classrooms and Corridors 1st Floor Corridor by Ramps and as a Patch in 2nd Floor Corridor, 114, 207 Rooms 100, 119, 121, 140, 305, 306, 308, and 313 1st Floor Corridor by Ramps and as a Patch in 2nd Floor Corridor, 114, 207, 307 Room 138 Room 138 As Patches in the 1st and 3rd Floor Corridors As Patches in the 1st and 3rd Floor Corridors 1st Floor Corridor Ramps Room 104 Room 132,106 Assumed No ACBM No ACBM No ACBM Chrysotile TSI Assumed Assumed Abated Abated Assumed Assumed Assumed Assumed Abated Assumed Assumed Abated Assumed Assumed Assumed Abated Abated No ACBM Assumed Assumed No 0 6 ACBM with the potential for damage No No No No ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage

36 School Address Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response 3P 3Q 3R 3S 3T 12" x 12" Blue Floor Tile 12" x 12" Black Floor Tile 12" x 12" White Floor Tile 12" x 12" Light Blue Floor Tile 12" x 12" Light Brown Floor Tile 450 1,100 1, ,400 Assumed Assumed Assumed Assumed Assumed No No No No No ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 3U 12" x 12" Beige Floor Tile 2,400 No 0 6 ACBM with the potential for damage On Cabinets in Various Classrooms Abated 3X 3Y 3Z 12" x 12" Dark Brown w/dk Brn & Lt Brn Streak FT (Removed) 12" x 12" Gray Floor Tile w/ Light Gray Streaks (Removed) 12" x 12" Multi-Brown Floor Tile 12" x 12" Beige Floor Tile 12" x 12" Light Green Floor Tile Anthophyllit e Abated 3V Room 132 Room 105 Room 105 Room 104, 134, Social Room, 300B Rooms 114, 116, 117, 119, 130, and 206 Rooms 114, 116, 117, 119, 130, and 206 On Cabinets in Various Classrooms Assumed Assumed Assumed A Tank Insulation Cinder Block Mortar Interior Brick Interior Brick Mortar Ceiling Material Terrazzo Stairs and Landings/foyers Clay Tile Clay Tile Mortar Window Glazing Window Caulk (Grout) 12" x12" White Floor Tile w/ Blue and Gray Streaks No ACBM No ACBM No ACBM No ACBM No ACBM No ACBM No ACBM No ACBM No ACBM No ACBM Assumed TSI 4 Outer Wrap Over Fiberglass Insulation on HVAC Unit Window Sill Mortar Finished (Glazed) Brick Finished (Glazed) Brick Mortar Terrazzo Stall Panels 1' x 1' Ceiling Tile (Acoustical) Rooms 201 and 203 Rooms 201 Band Room, Chorus Room, Hall and Foyer Basement Throughout Building Throughout Building Throughout Building Basement Boiler Room Throughout Stairways Entrances and Exits Entrances and Exits Throughout Building Throughout Building Rms 224, 222, 310, 225, 221A, 217, 211, 207, 306and 312 Room 122- ABATED Abated TSI Throughout Classrooms Throughout Building Throughout Building All Washrooms As Patches in Foyer and Corridors No ACBM No ACBM No ACBM No ACBM No ACBM 3W ,700 No 0 6 ACBM with the potential for damage

37 School Address Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description ' x 1' Ceiling Tiles 1' x 1' (Spline) Ceiling Tiles with Holes 2' x 4' Lay-In Ceiling Panels ' x 2' Slotted Ceiling Tile 2' x 8' Textured Ceiling Panels Insulation on Suspended HVAC Unit 2' x 8' Smooth Ceiling Tile Insulation Behind Pegboard Walls Roof Flashing - Not AHERA Lab Tops and Sinks Fiberglass Insulation on Suspended HVAC Unit Vibration Collars Terrazzo Sinks Insulation Inside Firedoors Exterior Dark Brick - Not AHERA Exterior Dark Brick Mortar - Not AHERA Fiberglass Insulation Backing on HVAC Unit Exterior Light Face Brick - Not AHERA Exterior Light Face Brick Mortar - Not AHERA Exterior Door Grout - Not AHERA Exterior Blue Brick - Not AHERA Exterior Blue Brick Mortar - Not AHERA Exterior Window Grout - Not AHERA Roof - Not AHERA Roof Flashing - Not AHERA Roof - Not AHERA Roof Flashing - Not AHERA Plaster Mastic on Wall 1' x 1' Fissured Ceiling Tile Mastic 2' x 4' Ceiling Panels Material Quantity 1,500 Material Units LF ,000 2,400 Material Location Asbestos Type Material Category 1st, 2nd, and 3rd Floor Corridors 1st, 2nd, and 3rd Floor Corridors Rooms 311 and 110 No ACBM No ACBM Amosite Shop Wing and Gym Rms 122, 124, and 126 Room 122 Shop Wing Auditorium Shop Roof Rooms 117, 310, 312, 222, and 224 Room 122 Dressing Room, Janitor's Closet in Girl's Locker Room, Room 310 & Electrical Room in Room 206 Washrooms Exits and Boiler Room Exterior of Main Building Exterior of Main Building Room 122- ABATED Exterior of Main Building Exterior of Main Building Exterior of Main Building Exterior of Main Building Exterior of Main Building Exterior of Main Building Boiler House Boiler House Main Building Main Building Throughout Building Room Material not observed Throughout Building, Cafeteria Room 208, 117 No ACBM No ACBM No ACBM No ACBM No ACBM No ACBM Assumed No ACBM Assumed TSI TSI TSI No ACBM Assumed No ACBM No ACBM Abated No ACBM No ACBM No ACBM No ACBM No ACBM No ACBM Assumed Assumed Assumed Assumed No ACBM Chrysotile Assumed Assumed TSI SURFACE Friable Damage Quantity Damage Units Damage Category Response Yes 0 7 Any remaining friable ACBM or friable suspect ACBM No 0 6 ACBM with the potential for damage No 0 LF 6 ACBM with the potential for damage No 0 6 ACBM with the potential for damage No Yes ACBM with the potential for damage 7 Any remaining friable ACBM or friable suspect ACBM

38 School Address Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response Drywall Drywall Compound Boiler Gaskets 12" x 12" Multi-Gray Floor Tile 12" x 12" Multi-Gray Floor Tile Mastic 1' x 1' White Small Fissured Ceiling Tile 1, ,000 2,000 4,700 LF Room 208 Room 208 Bryan Boiler in Basement Rooms 203 & 205 Rooms 203 & 205 Lunchroom Assumed Assumed Assumed Assumed Assumed Assumed No No No No No Yes LF 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 7 Any remaining friable ACBM or friable suspect ACBM M 81 2,000 2, Shop Wing 114, 207, 206, 204, , 207, 206, 204, 107 Rm 128, 100 Assumed Assumed Assumed Assumed SURFACE No No No ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 800 Rm 128, 100 Assumed No 0 6 ACBM with the potential for damage 3,200 3,200 Rm 100, 128, 203, 301, 300, 308 Rm 100, 128, 203, 301, 300, 308 Assumed Assumed No No ACBM with the potential for damage 6 ACBM with the potential for damage 85 Plaster Above Ceiling Tiles 12 x 12 gold and beige pattern FT 12 x 12 gold and beige pattern VFT mastic 12x12 Blueish Grey w/ Dark Grey & White Floor Tile 12x12 Blueish Grey w/dark Grey & White Floor Tile Mastic 12x12 Lt Grey w/dark Grey & White Floor Tile 12x12 Lt Grey w/dark Grey & White Floor Tile Mastic 12" X 12" Blotted Blue VFT 26,000 Assumed No 0 6 ACBM with the potential for damage 86 12" X 12" Light Blue VFT 4,000 Assumed No 0 6 ACBM with the potential for damage 87 Mastic for HA 85 and 86 30,000 Assumed No 0 6 ACBM with the potential for damage A 12" x 12" Red Floor Tile Mastic Associated w/ 12" x 12" Red Floor Tile Drywall Joint Compound Aircell Pipe Insulation TSI ACBM with the potential for damage 6 ACBM with the potential for damage LF Assumed Assumed No ACBM Chrysotile No No 500 Yes 15 LF (Cardboard) Paperwrap Pipe Insulation 600 LF Chrysotile TSI Yes 1 LF 1 Damaged or significantly damaged friable thermal system insulating ACBM 1 Damaged or significantly damaged friable thermal system insulating ACBM Repair B C D E F G Aircell Duct Insulation Mag Block Insulation Mag Block Pipe Insulation Mag Block Duct Insulation Fittings on Fiberglass Pipe Insulation Throughout Hallways and Various Rooms Throughout Hallways and Various Classrooms Throughout Hallways and Various Classrooms Adjacent to Girl's Gym - 1st Floor Adjacent to Girl's Gym - 1st Floor Room 108 Pipe Chases, Boiler Room and Throughout Building Boiler Room and Throughout Building, rm 115, 125 Abated in See 2004 Comments Boilers in Boiler House - Abated 1992 Boiler House - Abated 1992 Boiler House - Abated 1992 Main Building Abated Abated Abated Abated Assumed TSI TSI TSI TSI TSI Yes 0 LF 7 Any remaining friable ACBM or friable LF Repair

39 School Address Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units HA1000 I3 I J White woven electrical wire insulation 50 LF Auditorium stage light fixtures Chrysotile Yes 0 LF 9"x 9" White Floor Tile w/brn & Blk Streaks Mastic Cementitious Pipe Joint Insulation on Aircell Pipe 50 LF Chrysotile Assumed TSI Yes 0 LF K Cementitious Pipe Joint Insulation on Paperwrap 20 LF Rooms 212 and 311 Pipe Chases, Boiler Room and Throughout Building Boiler Room, Pipe Chases and Throughout Building Chrysotile TSI Yes 0 LF Damage Category Response suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM

40 School Address Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report 5/9/2016 Review Date Manager Planner Name Evan Christian /15/2016 Manager IDPH License No/Expiration HA Number 1A 1B 1C A 13 B 13 D 13 E 13 F 13 G 13 H 13 J 13C 14 A 14 AA 14 AB 14 AC 14 AD 14 AE 14 AF 14 B 14 C 14 D Management Comments If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. Repair as needed then follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan.

41 School Address Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number Management Comments 14 E 14 F 14 G 14 H 14 I 14 J 14 K 14 L 14 M 14 N 14 O 14 P 14 Q 14 R 14 S 14 T 14 U 14 V 14 W 14 X 14 Y 14 Z A 16 B 16 C 16 D Repair as needed then follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan.

42 School Address Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number 17 A 17 B 17 C 17 D A 2B 2C 2D 2E 2F 2G 2H 2I 2J Management Comments If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. Repair as needed then follow O&M plan. Repair as needed then follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan.

43 School Address Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number 3 AA 3 AB 3 AC 3 AD 3 AE 3 AF 3B 3C 3D 3E 3F 3G 3H 3I 3J 3K 3L 3M 3N 3O 3P 3Q 3R 3S 3T 3U 3V Management Comments If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan.

44 School Address Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number Management Comments 3W 3X 3Y 3Z A If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan.

45 School Address Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number Management Comments If identified follow O&M plan. If identified follow O&M plan.

46 School Address Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number M A B C D E F G HA-1000 I3 I J Management Comments If identified follow O&M plan. Patch and repair as needed then follow O&M plan. Patch and repair as needed then follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan.

47 School Address Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number K Management Comments

48 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 1A Blue Carpet Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Office Complex, 101, 106, 132 COMMENTS: Inspector's Signature: 04/12/2016

49 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 1A Blue Carpet Mastic Office Complex, 101, 106, 132 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

50 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 1B Beige Carpet Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Engineer's Office 200 COMMENTS: Inspector's Signature: 04/12/2016

51 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 1B Beige Carpet Mastic Engineer's Office In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

52 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 1C Gold Carpet Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Room 9-C COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

53 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 1C Gold Carpet Mastic Room 9-C In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

54 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 10 Ceramic Floor Tile Grout HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Washrooms COMMENTS: Inspector's Signature: 04/12/2016

55 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Ceramic Floor Tile Grout Washrooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

56 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 12" x 12" White Floor Tile w/ Blue Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW COMMENTS: Inspector's Signature: 04/12/2016

57 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ " x 12" White Floor Tile w/ Blue Streaks Mastic In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

58 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 11 Peg Board HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Auditorium Walls 2000 COMMENTS: Inspector's Signature: 04/12/2016

59 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Peg Board Auditorium Walls In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

60 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 12 Terrazzo HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Foyer COMMENTS: Inspector's Signature: 04/12/2016

61 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Terrazzo Foyer In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

62 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 13 A 9"x9" Dk Green Floor Tile w/ White Streaks Mastic (REMOVED) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate 1st, 2nd & 3rd Floor Corridors COMMENTS: Inspector's Signature: 04/12/2016

63 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ A 9"x9" Dk Green Floor Tile w/ White Streaks Mastic (REMOVED) 1st, 2nd & 3rd Floor Corridors In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

64 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 13 B 9" x 9" White Floor Tile w/dark Grn Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate 1st, 2nd & 3rd Floor Corridors COMMENTS: Inspector's Signature: 04/12/2016

65 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ B 9" x 9" White Floor Tile w/dark Grn Streaks Mastic 1st, 2nd & 3rd Floor Corridors In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

66 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 13 D 9" x 9" White Floor Tile w/ Lt Grn Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate As Patches in the 1st & 3rd Floor Corridors COMMENTS: Inspector's Signature: 04/12/2016

67 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ D 9" x 9" White Floor Tile w/ Lt Grn Streaks Mastic As Patches in the 1st & 3rd Floor Corridors In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

68 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 13 E 9" x 9" Brown Floor Tile w/ Brown Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate 1st Floor Corridor, Rooms 100 COMMENTS: Inspector's Signature: 04/12/2016

69 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ E 9" x 9" Brown Floor Tile w/ Brown Streaks Mastic 1st Floor Corridor, Rooms 100 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

70 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 13 F 9"x9" Gray FloorTile w/lt. Gray & Blk Strks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: Physical Damage DISTURBANCE POTENTIAL: LOW 13A&B, Dressing Rms,100,103105,119,120,128,140,200,208,211,212,214,217,221A&B,225,300, 301, 214, 223, Band Room, 223A, and 222I 1250 COMMENTS: Damage located in Band Room and Room 222, only observed in Rooms 214 and Previously abated from rooms 13A&B, Dressing Rms,100, ,119,120,128,140,200,208,211,212,217,221A&B,225,300, 301 Inspector's Signature: 04/12/2016

71 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ F 9"x9" Gray FloorTile w/lt. Gray & Blk Strks Mastic 13A&B, Dressing Rms,100, ,119,120,128,140,200,208,211,212,214,217,221A&B,225,300, 301, 214, 223, Band Room, 223A, and 222I In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Repair as needed then follow O&M plan. Management Planner's Signature: 05/09/2016

72 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 13 G 9" x 9" Lt Gray VFT w/ Gray & Blk Strks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW 3 A&B, Dressing Rooms, and Various Classrooms Throughout Building COMMENTS: Inspector's Signature: 04/12/2016

73 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ G 9" x 9" Lt Gray VFT w/ Gray & Blk Strks Mastic 3 A&B, Dressing Rooms, and Various Classrooms Throughout Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

74 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 13 H 9"x9" Lt Brn Floor Tile w/wh & Blk Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Rooms 212 & 311 COMMENTS: Inspector's Signature: 04/12/2016

75 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ H 9"x9" Lt Brn Floor Tile w/wh & Blk Streaks Mastic Rooms 212 & 311 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

76 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 13 J 9" x 9" Brown Floor Tile w/white Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Auditorium COMMENTS: Inspector's Signature: 04/12/2016

77 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ J 9" x 9" Brown Floor Tile w/white Streaks Mastic Auditorium In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

78 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 13C 9" x 9" Bright Grn Floor Tile w/ Wh Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate As Patches in the 1st & 3rd Floor Corridors COMMENTS: Inspector's Signature: 04/12/2016

79 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ C 9" x 9" Bright Grn Floor Tile w/ Wh Streaks Mastic As Patches in the 1st & 3rd Floor Corridors In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

80 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 A 12" x 12" White FT w/blue & Grey Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Rooms 222, 224, 310, and 312 COMMENTS: Inspector's Signature: 04/12/2016

81 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ A 12" x 12" White FT w/blue & Grey Streaks Mastic Rooms 222, 224, 310, and 312 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

82 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 AA 12" x 12" Gray Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Band Room Hall, Chorus Room, Foyer & Practice Room 1200 COMMENTS: Inspector's Signature: 04/12/2016

83 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ AA 12" x 12" Gray Floor Tile Mastic Band Room Hall, Chorus Room, Foyer & Practice Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

84 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 AB 12" x 12" Multi-Blue Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room COMMENTS: Inspector's Signature: 04/12/2016

85 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ AB 12" x 12" Multi-Blue Floor Tile Mastic Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

86 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 AC 12" x 12" Beige Floor Tile Mastic - Replaced HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 128 COMMENTS: Inspector's Signature: 04/12/2016

87 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ AC 12" x 12" Beige Floor Tile Mastic - Replaced Room 128 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

88 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 AD 12" x 12" Blue Floor Tile Mastic - Replaced HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 128 COMMENTS: Inspector's Signature: 04/12/2016

89 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ AD 12" x 12" Blue Floor Tile Mastic - Replaced Room 128 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

90 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 AE 12" x 12" White Floor Tile w/ Blue Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room COMMENTS: Inspector's Signature: 04/12/2016

91 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ AE 12" x 12" White Floor Tile w/ Blue Streaks Mastic Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

92 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 AF 12" x 12" Gray Floor Tile w/ Black Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room COMMENTS: Inspector's Signature: 04/12/2016

93 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ AF 12" x 12" Gray Floor Tile w/ Black Streaks Mastic Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

94 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 B 12" x 12" Gray VFT w/ Wh & Blk Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Men's Lounge 200 COMMENTS: Inspector's Signature: 04/12/2016

95 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ B 12" x 12" Gray VFT w/ Wh & Blk Streaks Mastic Men's Lounge In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

96 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 C 12" x 12" Dk Gray Floor Tile w/blk Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rooms 140, 211, 214, 217, 305, 308, and COMMENTS: Not observed in Rooms 211, 214, 217 Inspector's Signature: 04/12/2016

97 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ C 12" x 12" Dk Gray Floor Tile w/blk Streaks Mastic Rooms 140, 211, 214, 217, 305, 308, and In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

98 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 D 12" x12" Brown VFT w/ Dk Brn & White Strks Mastic HISTORICAL AHERA DAMAGE CATEGORY ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boys Gym, Lunchroom, 1st and 2nd Floor Corridors, 114, 201, 213, 215, 216, , 223, 227, 303 COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

99 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ D 12" x12" Brown VFT w/ Dk Brn & White Strks Mastic Boys Gym, Lunchroom, 1st and 2nd Floor Corridors, 114, 201, 213, 215, 216, , 223, 227, 303 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

100 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 E 12" x 12" White Floor Tile w/brown Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: Deterioration Physical Damage DISTURBANCE POTENTIAL: LOW Boys Gym, Lunchroom, 1st and 2nd Floor Corridors, 114, 201, 213, 215, 216, , 223, 227, COMMENTS: Damage is located in the 1st and 2nd floor corridors Inspector's Signature: 04/12/2016

101 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ E 12" x 12" White Floor Tile w/brown Streaks Mastic Boys Gym, Lunchroom, 1st and 2nd Floor Corridors, 114, 201, 213, 215, 216, , 223, 227, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Repair as needed then follow O&M plan. Management Planner's Signature: 05/09/2016

102 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 F 12"x12" Lt Brown Floor Tile w/white Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW 1st Floor Corridor by Ramps and as a Patch in the 2nd Floor Corridor 750 COMMENTS: Inspector's Signature: 04/12/2016

103 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ F 12"x12" Lt Brown Floor Tile w/white Streaks Mastic 1st Floor Corridor by Ramps and as a Patch in the 2nd Floor Corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

104 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 G 12"x12"Gray Floor Tile w/dk Gray/Wh Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rooms 100, 119, 121, 140, 305, 306, 308, 313, 209 Library 8300 COMMENTS: Not observed in Room 121 Inspector's Signature: 04/12/2016

105 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ G 12"x12"Gray Floor Tile w/dk Gray/Wh Streaks Mastic Rooms 100, 119, 121, 140, 305, 306, 308, 313, 209 Library In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

106 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 H 12" x 12" Beige Floor Tile w/white Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW 1st Floor Corridor by Ramps and as a Patch in the 2nd Floor Corridor 250 COMMENTS: Inspector's Signature: 04/12/2016

107 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ H 12" x 12" Beige Floor Tile w/white Streaks Mastic 1st Floor Corridor by Ramps and as a Patch in the 2nd Floor Corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

108 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 I 12'" x 12" Brown Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 138 COMMENTS: Not observed Inaccessible Inspector's Signature: 04/12/2016

109 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ I 12'" x 12" Brown Floor Tile Mastic Room 138 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

110 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 J 12" x 12" Beige Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 138 COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

111 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ J 12" x 12" Beige Floor Tile Mastic Room 138 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

112 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 K 12" x 12" Green Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate 1st, 2nd & 3rd Floor Corridors as Patches COMMENTS: Inspector's Signature: 04/12/2016

113 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ K 12" x 12" Green Floor Tile Mastic 1st, 2nd & 3rd Floor Corridors as Patches In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

114 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 L 12" x 12" Light Green Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate 1st, 2nd & 3rd Floor Corridors as Patches COMMENTS: Inspector's Signature: 04/12/2016

115 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ L 12" x 12" Light Green Floor Tile Mastic 1st, 2nd & 3rd Floor Corridors as Patches In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

116 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 M 12" x 12" Gray Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW 1st Floor Corridor Ramps 550 COMMENTS: Inspector's Signature: 04/12/2016

117 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ M 12" x 12" Gray Floor Tile Mastic 1st Floor Corridor Ramps In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

118 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 N 12" x 12" Gray Floor Tile w/white Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 104 COMMENTS: Inspector's Signature: 04/12/2016

119 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ N 12" x 12" Gray Floor Tile w/white Streaks Mastic Room 104 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

120 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 O 12" x 12" White Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 132 COMMENTS: Inspector's Signature: 04/12/2016

121 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ O 12" x 12" White Floor Tile Mastic Room 132 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

122 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 P 12" x 12" Blue Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 132 COMMENTS: Inspector's Signature: 04/12/2016

123 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ P 12" x 12" Blue Floor Tile Mastic Room 132 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

124 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 Q 12" x 12" Black Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room COMMENTS: Inspector's Signature: 04/12/2016

125 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Q 12" x 12" Black Floor Tile Mastic Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

126 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 R 12" x 12" White Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room COMMENTS: Inspector's Signature: 04/12/2016

127 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ R 12" x 12" White Floor Tile Mastic Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

128 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 S 12" x 12" Light Blue Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room 104, 221B, COMMENTS: Inspector's Signature: 04/12/2016

129 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ S 12" x 12" Light Blue Floor Tile Mastic Room 104, 221B, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

130 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 T 12" x 12" Light Brown Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rooms114, 117, 119, 130, 206, & COMMENTS: Inspector's Signature: 04/12/2016

131 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ T 12" x 12" Light Brown Floor Tile Mastic Rooms114, 117, 119, 130, 206, & In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

132 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 U 12" x 12" Beige Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rooms 114, 117, 119, 130, 206, & COMMENTS: Inspector's Signature: 04/12/2016

133 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ U 12" x 12" Beige Floor Tile Mastic Rooms 114, 117, 119, 130, 206, & In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

134 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 V 12"x12" Dk Brn Floor Tile w/dk Brn & Lt Brn Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate On Cabinets in Various Classrooms COMMENTS: Inspector's Signature: 04/12/2016

135 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ V 12"x12" Dk Brn Floor Tile w/dk Brn & Lt Brn Mastic On Cabinets in Various Classrooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

136 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 W 12"x12" Gray Floor Tile w/lt. Gray Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate On Cabinets in Various Classrooms COMMENTS: Inspector's Signature: 04/12/2016

137 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ W 12"x12" Gray Floor Tile w/lt. Gray Streaks Mastic On Cabinets in Various Classrooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

138 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 X 12" x 12" Multi-Brown Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 201 and 203 COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

139 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ X 12" x 12" Multi-Brown Floor Tile Mastic Room 201 and 203 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

140 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 Y 12" x 12" Beige Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Rooms 201 and 203 COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

141 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Y 12" x 12" Beige Floor Tile Mastic Rooms 201 and 203 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

142 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 14 Z 12" x 12" Light Green Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Band Room, Chorus Room, Hall and Foyer COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

143 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Z 12" x 12" Light Green Floor Tile Mastic Band Room, Chorus Room, Hall and Foyer In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

144 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 15 Drywall HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 132 & 303 and the Office Complex COMMENTS: Inspector's Signature: 04/12/2016

145 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Drywall Rooms 132 & 303 and the Office Complex In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

146 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 16 A Black Baseboard HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Building COMMENTS: Inspector's Signature: 04/12/2016

147 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ A Black Baseboard Throughout Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

148 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 16 B Blue Baseboard HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Office Complex and Room 310 COMMENTS: Inspector's Signature: 04/12/2016

149 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ B Blue Baseboard Office Complex and Room 310 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

150 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 16 C 4" Beige Baseboard HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Band Room, Hall, Foyer and Chorus Room 300 LF LF COMMENTS: Inspector's Signature: 04/12/2016

151 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ C 4" Beige Baseboard Band Room, Hall, Foyer and Chorus Room 300 LF 0 LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

152 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 16 D 4" Dark Gray Baseboard HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room LF LF COMMENTS: Inspector's Signature: 04/12/2016

153 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ D 4" Dark Gray Baseboard Room LF 0 LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

154 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 17 A Black Baseboard Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Building COMMENTS: Inspector's Signature: 04/12/2016

155 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ A Black Baseboard Mastic Throughout Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

156 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 17 B Blue Baseboard Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Office Complex and Room 310 COMMENTS: Inspector's Signature: 04/12/2016

157 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ B Blue Baseboard Mastic Office Complex and Room 310 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

158 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 17 C 4" Beige Baseboard Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Band Room, Chorus Room, Hall and Foyer 300 LF LF COMMENTS: Inspector's Signature: 04/12/2016

159 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ C 4" Beige Baseboard Mastic Band Room, Chorus Room, Hall and Foyer 300 LF 0 LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

160 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 17 D 4" Dark Gray Baseboard Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room LF LF COMMENTS: Inspector's Signature: 04/12/2016

161 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ D 4" Dark Gray Baseboard Mastic Room LF 0 LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

162 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 18 Tank # 1 Insulation Jacket (Closest to Door) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler House COMMENTS: Inspector's Signature: 04/12/2016

163 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Tank # 1 Insulation Jacket (Closest to Door) Boiler House In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

164 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 19 Tank Insulation Jacket (Middle Tank) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler House COMMENTS: Inspector's Signature: 04/12/2016

165 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Tank Insulation Jacket (Middle Tank) Boiler House In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

166 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 2A 9" x 9' Dark Green Floor Tiles w/white Streaks HISTORICAL AHERA DAMAGE CATEGORY ACBM with potential for significant damage HISTORICAL DAMAGE REASON: Physical Damage HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1st, 2nd and 3rd Floor Corridors and Gym Balcony, Closet COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

167 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 2A 9" x 9' Dark Green Floor Tiles w/white Streaks 1st, 2nd and 3rd Floor Corridors and Gym Balcony, Closet In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

168 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 2B 9" x 9" White Floor Tile w/dark Green Streaks HISTORICAL AHERA DAMAGE CATEGORY ACBM with potential for significant damage HISTORICAL DAMAGE REASON: Physical Damage HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Various 1st, 2nd, and 3rd Floor Corridors and Gym Balcony, Closet COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

169 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 2B 9" x 9" White Floor Tile w/dark Green Streaks Various 1st, 2nd, and 3rd Floor Corridors and Gym Balcony, Closet In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

170 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 2C 9" x 9" Bright Green Floor Tile w/ White Streaks HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate As Patches in the 1st and 3rd Floor Corridors COMMENTS: Inspector's Signature: 04/12/2016

171 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 2C 9" x 9" Bright Green Floor Tile w/ White Streaks As Patches in the 1st and 3rd Floor Corridors In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

172 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 2D 9" x 9" White Floor Tile w/bright Green Streaks HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate 1st, 2nd, and 3rd Floor Corridors COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

173 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 2D 9" x 9" White Floor Tile w/bright Green Streaks 1st, 2nd, and 3rd Floor Corridors In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

174 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 2E 9" x 9" Brown w/brown Floor Tile HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 100 & 140 and the 1st Floor Corridor COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

175 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 2E 9" x 9" Brown w/brown Floor Tile Rooms 100 & 140 and the 1st Floor Corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

176 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 2F 9"x9" Gray w/lt. Gray & Black Streaks Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: Deterioration DISTURBANCE POTENTIAL: LOW 13 A & B, Dressing Rooms, and Various Classrooms Throughout Building COMMENTS: Damage is located in Rooms 214, 208, and 306 Inspector's Signature: 04/12/2016

177 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 2F 9"x9" Gray w/lt. Gray & Black Streaks Floor Tile 13 A & B, Dressing Rooms, and Various Classrooms Throughout Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Repair as needed then follow O&M plan. Management Planner's Signature: 05/09/2016

178 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 2G 9" x 9" Lt. Gray Floor Tile w/gray & Black Streaks HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: Deterioration DISTURBANCE POTENTIAL: LOW 13 A & B, Dressing Rooms, and Various Classrooms Throughout Building COMMENTS: Damage is located in Rooms 214, 223, and 107 Inspector's Signature: 04/12/2016

179 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 2G 9" x 9" Lt. Gray Floor Tile w/gray & Black Streaks 13 A & B, Dressing Rooms, and Various Classrooms Throughout Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Repair as needed then follow O&M plan. Management Planner's Signature: 05/09/2016

180 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 2H 9" x 9" Light Brn Floor Tile w/white & Blk Streaks HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Rooms 311 and 212 COMMENTS: Inspector's Signature: 04/12/2016

181 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 2H 9" x 9" Light Brn Floor Tile w/white & Blk Streaks Rooms 311 and 212 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

182 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 2I 9" x 9" White Floor Tile w/lt Brn & Blk Streaks HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 212 and 311 COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

183 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 2I 9" x 9" White Floor Tile w/lt Brn & Blk Streaks Rooms 212 and 311 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

184 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 2J 9" x 9" Brown Floor Tile w/ White Streaks HISTORICAL AHERA DAMAGE CATEGORY 6 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Auditorium 3800 COMMENTS: Inspector's Signature: 04/12/2016

185 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 2J 9" x 9" Brown Floor Tile w/ White Streaks Auditorium In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

186 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 20 Tank Insulation Jacket (Farthest From Door) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler House COMMENTS: Inspector's Signature: 04/12/2016

187 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Tank Insulation Jacket (Farthest From Door) Boiler House In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

188 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 21 Tank Insulation Jacket (Lower Level) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler House COMMENTS: Inspector's Signature: 04/12/2016

189 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Tank Insulation Jacket (Lower Level) Boiler House In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

190 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 22 Linear Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler House COMMENTS: Inspector's Signature: 04/12/2016

191 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Linear Pipe Insulation Boiler House In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

192 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 23 Steam Line Joints HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler House COMMENTS: Inspector's Signature: 04/12/2016

193 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Steam Line Joints Boiler House In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

194 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 24 Cinder Block HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler House COMMENTS: Inspector's Signature: 04/12/2016

195 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Cinder Block Boiler House In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

196 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 25 Cinder Block Mortar HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler House COMMENTS: Inspector's Signature: 04/12/2016

197 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Cinder Block Mortar Boiler House In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

198 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 251 Gray Carpet Adhesive HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1st Floor Corridor, CPS ID COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

199 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Gray Carpet Adhesive 1st Floor Corridor, CPS ID In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

200 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 26 Finished Brick (Glazed) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler House Washroom COMMENTS: Inspector's Signature: 04/12/2016

201 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Finished Brick (Glazed) Boiler House Washroom In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

202 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 27 Finished (Glazed) Brick Mortar HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler House Washroom COMMENTS: Inspector's Signature: 04/12/2016

203 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Finished (Glazed) Brick Mortar Boiler House Washroom In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

204 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 28 Terrazzo Stall Panels HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler House Washroom COMMENTS: Inspector's Signature: 04/12/2016

205 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Terrazzo Stall Panels Boiler House Washroom In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

206 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 29 Aircell Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler House Washroom Behind Wall- In Chase COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

207 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Aircell Pipe Insulation Boiler House Washroom Behind Wall- In Chase In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

208 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3 AA 12" x 12" Gray Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Band Room, Chorus Room, Hall, Foyer & Practice Room 1200 COMMENTS: Inspector's Signature: 04/12/2016

209 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ AA 12" x 12" Gray Floor Tile Band Room, Chorus Room, Hall, Foyer & Practice Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

210 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3 AB 12" x 12" Multi-Blue Floor Tile HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 208 COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

211 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ AB 12" x 12" Multi-Blue Floor Tile Room 208 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

212 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3 AC 12" x 12" Beige Floor Tile - Removed HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 128 COMMENTS: Inspector's Signature: 04/12/2016

213 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ AC 12" x 12" Beige Floor Tile - Removed Room 128 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

214 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3 AD 12" x 12" Gray Floor Tile - Removed HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 128 COMMENTS: Inspector's Signature: 04/12/2016

215 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ AD 12" x 12" Gray Floor Tile - Removed Room 128 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

216 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3 AE 12" x 12" White Floor Tile w/ Blue Streaks HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room 208, 100, COMMENTS: Not observed in Rooms 128 and 100 Inspector's Signature: 04/12/2016

217 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ AE 12" x 12" White Floor Tile w/ Blue Streaks Room 208, 100, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

218 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3 AF 12" x 12" Gray Floor Tile w/ Black Streaks HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room 206, 204, 208, 100, COMMENTS: Not observed in Rooms 128 and 100 Inspector's Signature: 04/12/2016

219 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ AF 12" x 12" Gray Floor Tile w/ Black Streaks Room 206, 204, 208, 100, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

220 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3B 12"x12" Gray Floor Tile w/ White & Black Streaks HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Men's Lounge COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

221 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3B 12"x12" Gray Floor Tile w/ White & Black Streaks Men's Lounge In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

222 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3C 12"x12" Dark Gray Floor Tile w/ Black Streaks HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 100, 140, 305, 308, and 313 COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

223 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3C 12"x12" Dark Gray Floor Tile w/ Black Streaks Rooms 100, 140, 305, 308, and 313 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

224 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3D 12"x12" Brown Floor Tile w/ Dk Brn & Wh Streaks (Removed) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boys Gym, Lunch Room, Classrooms and Corridors COMMENTS: Inspector's Signature: 04/12/2016

225 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3D 12"x12" Brown Floor Tile w/ Dk Brn & Wh Streaks (Removed) Boys Gym, Lunch Room, Classrooms and Corridors In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

226 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3E 12"x12" White Floor Tile w/ Brown Streaks HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boys Gym, Lunch Room, Classrooms and Corridors COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

227 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3E 12"x12" White Floor Tile w/ Brown Streaks Boys Gym, Lunch Room, Classrooms and Corridors In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

228 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3F 12"x12" Light Brown Floor Tile w/ White Streaks HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1st Floor Corridor by Ramps and as a Patch in 2nd Floor Corridor, 114, 207 COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

229 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3F 12"x12" Light Brown Floor Tile w/ White Streaks 1st Floor Corridor by Ramps and as a Patch in 2nd Floor Corridor, 114, 207 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

230 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3G 12"x12" Gray Floor Tile w/ Dk Gray & White Streaks HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Abated RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 100, 119, 121, 140, 305, 306, 308, and 313 COMMENTS: Inspector's Signature: 04/12/2016

231 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3G 12"x12" Gray Floor Tile w/ Dk Gray & White Streaks Rooms 100, 119, 121, 140, 305, 306, 308, and 313 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

232 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3H 12"x12" Beige Floor Tile w/ White Streaks HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1st Floor Corridor by Ramps and as a Patch in 2nd Floor Corridor, 114, 207, 307 COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

233 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3H 12"x12" Beige Floor Tile w/ White Streaks 1st Floor Corridor by Ramps and as a Patch in 2nd Floor Corridor, 114, 207, 307 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

234 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3I 12"x12" Brown Floor Tile HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 138 COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

235 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3I 12"x12" Brown Floor Tile Room 138 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

236 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3J 12"x12" Beige Floor Tile HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 138 COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

237 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3J 12"x12" Beige Floor Tile Room 138 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

238 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3K 12"x12" Green Floor Tiles HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: As Patches in the 1st and 3rd Floor Corridors COMMENTS: Inspector's Signature: 04/12/2016

239 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3K 12"x12" Green Floor Tiles As Patches in the 1st and 3rd Floor Corridors In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

240 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3L 12"x12" Light Green Floor Tiles HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: As Patches in the 1st and 3rd Floor Corridors COMMENTS: Inspector's Signature: 04/12/2016

241 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3L 12"x12" Light Green Floor Tiles As Patches in the 1st and 3rd Floor Corridors In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

242 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3M 12" x 12" Gray Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1st Floor Corridor Ramps COMMENTS: Inspector's Signature: 04/12/2016

243 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3M 12" x 12" Gray Floor Tile 1st Floor Corridor Ramps In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

244 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3N 12" x 12" Gray Floor Tile w/white Streaks HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room COMMENTS: Inspector's Signature: 04/12/2016

245 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3N 12" x 12" Gray Floor Tile w/white Streaks Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

246 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3O 12" x 12" White Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room 132, COMMENTS: Inspector's Signature: 04/12/2016

247 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3O 12" x 12" White Floor Tile Room 132, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

248 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3P 12" x 12" Blue Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room COMMENTS: Inspector's Signature: 04/12/2016

249 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3P 12" x 12" Blue Floor Tile Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

250 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3Q 12" x 12" Black Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room COMMENTS: Inspector's Signature: 04/12/2016

251 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3Q 12" x 12" Black Floor Tile Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

252 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3R 12" x 12" White Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room COMMENTS: Inspector's Signature: 04/12/2016

253 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3R 12" x 12" White Floor Tile Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

254 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3S 12" x 12" Light Blue Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room 104, 134, Social Room, 300B 175 COMMENTS: Not observed in Room 104 Inspector's Signature: 04/12/2016

255 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3S 12" x 12" Light Blue Floor Tile Room 104, 134, Social Room, 300B In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

256 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3T 12" x 12" Light Brown Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rooms 114, 116, 117, 119, 130, and COMMENTS: Not observed in Room 206 Inspector's Signature: 04/12/2016

257 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3T 12" x 12" Light Brown Floor Tile Rooms 114, 116, 117, 119, 130, and In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

258 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3U 12" x 12" Beige Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Anthophyllite FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rooms 114, 116, 117, 119, 130, and COMMENTS: Not observed in Room 206 Inspector's Signature: 04/12/2016

259 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3U 12" x 12" Beige Floor Tile Rooms 114, 116, 117, 119, 130, and In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

260 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3V 12" x 12" Dark Brown w/dk Brn & Lt Brn Streak FT (Removed) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: On Cabinets in Various Classrooms COMMENTS: Inspector's Signature: 04/12/2016

261 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3V 12" x 12" Dark Brown w/dk Brn & Lt Brn Streak FT (Removed) On Cabinets in Various Classrooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

262 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3W 12" x 12" Gray Floor Tile w/ Light Gray Streaks (Removed) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: On Cabinets in Various Classrooms COMMENTS: Inspector's Signature: 04/12/2016

263 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3W 12" x 12" Gray Floor Tile w/ Light Gray Streaks (Removed) On Cabinets in Various Classrooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

264 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3X 12" x 12" Multi-Brown Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 201 and 203 COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

265 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3X 12" x 12" Multi-Brown Floor Tile Rooms 201 and 203 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

266 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3Y 12" x 12" Beige Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 201 COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

267 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3Y 12" x 12" Beige Floor Tile Rooms 201 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

268 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3Z 12" x 12" Light Green Floor Tile HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Band Room, Chorus Room, Hall and Foyer COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

269 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3Z 12" x 12" Light Green Floor Tile Band Room, Chorus Room, Hall and Foyer In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

270 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 30 Tank Insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Basement COMMENTS: Inspector's Signature: 04/12/2016

271 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Tank Insulation Basement In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

272 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 31 Cinder Block Mortar HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Building COMMENTS: Inspector's Signature: 04/12/2016

273 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Cinder Block Mortar Throughout Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

274 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 32 Interior Brick HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Building COMMENTS: Inspector's Signature: 04/12/2016

275 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Interior Brick Throughout Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

276 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 33 Interior Brick Mortar HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Building COMMENTS: Inspector's Signature: 04/12/2016

277 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Interior Brick Mortar Throughout Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

278 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 34 Ceiling Material HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Basement Boiler Room COMMENTS: Inspector's Signature: 04/12/2016

279 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Ceiling Material Basement Boiler Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

280 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 35 Terrazzo Stairs and Landings/foyers HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Stairways COMMENTS: Inspector's Signature: 04/12/2016

281 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Terrazzo Stairs and Landings/foyers Throughout Stairways In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

282 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 36 Clay Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Entrances and Exits COMMENTS: Inspector's Signature: 04/12/2016

283 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Clay Tile Entrances and Exits In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

284 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 37 Clay Tile Mortar HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Entrances and Exits COMMENTS: Inspector's Signature: 04/12/2016

285 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Clay Tile Mortar Entrances and Exits In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

286 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 38 Window Glazing HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Building COMMENTS: Inspector's Signature: 04/12/2016

287 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Window Glazing Throughout Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

288 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 39 Window Caulk (Grout) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Building COMMENTS: Inspector's Signature: 04/12/2016

289 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Window Caulk (Grout) Throughout Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

290 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 3A 12" x12" White Floor Tile w/ Blue and Gray Streaks HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rms 224, 222, 310, 225, 221A, 217, 211, 207, 306and COMMENTS: Not observed in Room 225 Inspector's Signature: 04/12/2016

291 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 3A 12" x12" White Floor Tile w/ Blue and Gray Streaks Rms 224, 222, 310, 225, 221A, 217, 211, 207, 306and In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

292 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 4 Outer Wrap Over Fiberglass Insulation on HVAC Unit HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 122- ABATED COMMENTS: Inspector's Signature: 04/12/2016

293 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Outer Wrap Over Fiberglass Insulation on HVAC Unit Room 122- ABATED In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

294 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 40 Window Sill Mortar HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Classrooms COMMENTS: Inspector's Signature: 04/12/2016

295 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Window Sill Mortar Throughout Classrooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

296 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 41 Finished (Glazed) Brick HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Building COMMENTS: Inspector's Signature: 04/12/2016

297 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Finished (Glazed) Brick Throughout Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

298 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 42 Finished (Glazed) Brick Mortar HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Building COMMENTS: Inspector's Signature: 04/12/2016

299 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Finished (Glazed) Brick Mortar Throughout Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

300 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 43 Terrazzo Stall Panels HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: All Washrooms COMMENTS: Inspector's Signature: 04/12/2016

301 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Terrazzo Stall Panels All Washrooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

302 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 44 1' x 1' Ceiling Tile (Acoustical) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: As Patches in Foyer and Corridors COMMENTS: Inspector's Signature: 04/12/2016

303 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ ' x 1' Ceiling Tile (Acoustical) As Patches in Foyer and Corridors In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

304 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 45 1' x 1' Ceiling Tiles HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1st, 2nd, and 3rd Floor Corridors COMMENTS: Inspector's Signature: 04/12/2016

305 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ ' x 1' Ceiling Tiles 1st, 2nd, and 3rd Floor Corridors In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

306 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 46 1' x 1' (Spline) Ceiling Tiles with Holes HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1st, 2nd, and 3rd Floor Corridors COMMENTS: Inspector's Signature: 04/12/2016

307 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ ' x 1' (Spline) Ceiling Tiles with Holes 1st, 2nd, and 3rd Floor Corridors In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

308 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 47 2' x 4' Lay-In Ceiling Panels HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Amosite FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rooms 311 and COMMENTS: Inspector's Signature: 04/12/2016

309 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ ' x 4' Lay-In Ceiling Panels Rooms 311 and In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

310 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 48 1' x 2' Slotted Ceiling Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Shop Wing and Gym COMMENTS: Inspector's Signature: 04/12/2016

311 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ ' x 2' Slotted Ceiling Tile Shop Wing and Gym In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

312 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 49 2' x 8' Textured Ceiling Panels HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Rms 122, 124, and 126 COMMENTS: Inspector's Signature: 04/12/2016

313 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ ' x 8' Textured Ceiling Panels Rms 122, 124, and 126 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

314 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 5 Insulation on Suspended HVAC Unit HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 122 COMMENTS: Inspector's Signature: 04/12/2016

315 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Insulation on Suspended HVAC Unit Room 122 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

316 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 50 2' x 8' Smooth Ceiling Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Shop Wing COMMENTS: Inspector's Signature: 04/12/2016

317 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ ' x 8' Smooth Ceiling Tile Shop Wing In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

318 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 51 Insulation Behind Pegboard Walls HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Auditorium COMMENTS: Inspector's Signature: 04/12/2016

319 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Insulation Behind Pegboard Walls Auditorium In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

320 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 52 Roof Flashing - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Shop Roof COMMENTS: Inspector's Signature: 04/12/2016

321 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Roof Flashing - Not AHERA Shop Roof In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

322 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 53 Lab Tops and Sinks HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rooms 117, 310, 312, 222, and COMMENTS: Inspector's Signature: 04/12/2016

323 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Lab Tops and Sinks Rooms 117, 310, 312, 222, and In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

324 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 54 Fiberglass Insulation on Suspended HVAC Unit HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 122 COMMENTS: Inspector's Signature: 04/12/2016

325 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Fiberglass Insulation on Suspended HVAC Unit Room 122 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

326 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 55 Vibration Collars HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Dressing Room, Janitor's Closet in Girl's Locker Room, Room 310 & Electrical Room in Room LF LF COMMENTS: Inspector's Signature: 04/12/2016

327 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Vibration Collars Dressing Room, Janitor's Closet in Girl's Locker Room, Room 310 & Electrical Room in Room LF 0 LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

328 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 56 Terrazzo Sinks HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Washrooms COMMENTS: Inspector's Signature: 04/12/2016

329 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Terrazzo Sinks Washrooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

330 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 57 Insulation Inside Firedoors HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Exits and Boiler Room 160 COMMENTS: Inspector's Signature: 04/12/2016

331 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Insulation Inside Firedoors Exits and Boiler Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

332 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 58 Exterior Dark Brick - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Exterior of Main Building COMMENTS: Inspector's Signature: 04/12/2016

333 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Exterior Dark Brick - Not AHERA Exterior of Main Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

334 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 59 Exterior Dark Brick Mortar - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Exterior of Main Building COMMENTS: Inspector's Signature: 04/12/2016

335 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Exterior Dark Brick Mortar - Not AHERA Exterior of Main Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

336 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 6 Fiberglass Insulation Backing on HVAC Unit HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 122- ABATED COMMENTS: Inspector's Signature: 04/12/2016

337 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Fiberglass Insulation Backing on HVAC Unit Room 122- ABATED In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

338 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 60 Exterior Light Face Brick - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Exterior of Main Building COMMENTS: Inspector's Signature: 04/12/2016

339 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Exterior Light Face Brick - Not AHERA Exterior of Main Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

340 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 61 Exterior Light Face Brick Mortar - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Exterior of Main Building COMMENTS: Inspector's Signature: 04/12/2016

341 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Exterior Light Face Brick Mortar - Not AHERA Exterior of Main Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

342 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 62 Exterior Door Grout - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Exterior of Main Building COMMENTS: Inspector's Signature: 04/12/2016

343 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Exterior Door Grout - Not AHERA Exterior of Main Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

344 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 63 Exterior Blue Brick - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Exterior of Main Building COMMENTS: Inspector's Signature: 04/12/2016

345 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Exterior Blue Brick - Not AHERA Exterior of Main Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

346 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 64 Exterior Blue Brick Mortar - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Exterior of Main Building COMMENTS: Inspector's Signature: 04/12/2016

347 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Exterior Blue Brick Mortar - Not AHERA Exterior of Main Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

348 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 65 Exterior Window Grout - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Exterior of Main Building COMMENTS: Inspector's Signature: 04/12/2016

349 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Exterior Window Grout - Not AHERA Exterior of Main Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

350 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 66 Roof - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler House COMMENTS: Inspector's Signature: 04/12/2016

351 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Roof - Not AHERA Boiler House In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

352 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 67 Roof Flashing - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler House COMMENTS: Inspector's Signature: 04/12/2016

353 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Roof Flashing - Not AHERA Boiler House In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

354 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 68 Roof - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main Building COMMENTS: Inspector's Signature: 04/12/2016

355 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Roof - Not AHERA Main Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

356 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 69 Roof Flashing - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main Building COMMENTS: Inspector's Signature: 04/12/2016

357 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Roof Flashing - Not AHERA Main Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

358 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 7 Plaster HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Building COMMENTS: Inspector's Signature: 04/12/2016

359 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Plaster Throughout Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

360 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 70 Mastic on Wall HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room Material not observed COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

361 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Mastic on Wall Room Material not observed In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

362 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 71 1' x 1' Fissured Ceiling Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Throughout Building, Cafeteria COMMENTS: Inspector's Signature: 04/12/2016

363 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ ' x 1' Fissured Ceiling Tile Mastic Throughout Building, Cafeteria In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

364 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 72 2' x 4' Ceiling Panels HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room 208, COMMENTS: Inspector's Signature: 04/12/2016

365 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ ' x 4' Ceiling Panels Room 208, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

366 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 73 Drywall HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room COMMENTS: Inspector's Signature: 04/12/2016

367 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Drywall Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

368 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 74 Drywall Compound HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room LF LF COMMENTS: Inspector's Signature: 04/12/2016

369 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Drywall Compound Room LF 0 LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

370 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 75 Boiler Gaskets HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Bryan Boiler in Basement 10 COMMENTS: Inspector's Signature: 04/12/2016

371 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Boiler Gaskets Bryan Boiler in Basement 10 0 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

372 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 76 12" x 12" Multi-Gray Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rooms 203 & COMMENTS: Inspector's Signature: 04/12/2016

373 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ " x 12" Multi-Gray Floor Tile Rooms 203 & In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

374 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 77 12" x 12" Multi-Gray Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rooms 203 & COMMENTS: Inspector's Signature: 04/12/2016

375 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ " x 12" Multi-Gray Floor Tile Mastic Rooms 203 & In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

376 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 78 1' x 1' White Small Fissured Ceiling Tile HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Lunchroom 4700 COMMENTS: Inspector's Signature: 04/12/2016

377 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ ' x 1' White Small Fissured Ceiling Tile Lunchroom In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

378 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 8 Plaster Above Ceiling Tiles HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Shop Wing COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

379 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Plaster Above Ceiling Tiles Shop Wing In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

380 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION x 12 gold and beige pattern FT HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW 114, 207, 206, 204, COMMENTS: Inspector's Signature: 04/12/2016

381 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ x 12 gold and beige pattern FT 114, 207, 206, 204, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

382 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 80M 12 x 12 gold and beige pattern VFT mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW 114, 207, 206, 204, COMMENTS: Inspector's Signature: 04/12/2016

383 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ M 12 x 12 gold and beige pattern VFT mastic 114, 207, 206, 204, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

384 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 81 12x12 Blueish Grey w/ Dark Grey & White Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rm 128, COMMENTS: Inspector's Signature: 04/12/2016

385 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ x12 Blueish Grey w/ Dark Grey & White Floor Tile Rm 128, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

386 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 82 12x12 Blueish Grey w/dark Grey & White Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rm 128, COMMENTS: Inspector's Signature: 04/12/2016

387 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ x12 Blueish Grey w/dark Grey & White Floor Tile Mastic Rm 128, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

388 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 83 12x12 Lt Grey w/dark Grey & White Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rm 100, 128, 203, 301, 300, COMMENTS: Inspector's Signature: 04/12/2016

389 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ x12 Lt Grey w/dark Grey & White Floor Tile Rm 100, 128, 203, 301, 300, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

390 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 84 12x12 Lt Grey w/dark Grey & White Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rm 100, 128, 203, 301, 300, COMMENTS: Inspector's Signature: 04/12/2016

391 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ x12 Lt Grey w/dark Grey & White Floor Tile Mastic Rm 100, 128, 203, 301, 300, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

392 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 85 12" X 12" Blotted Blue VFT HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Throughout Hallways and Various Rooms COMMENTS: Inspector's Signature: 04/12/2016

393 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ " X 12" Blotted Blue VFT Throughout Hallways and Various Rooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

394 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 86 12" X 12" Light Blue VFT HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Assumed No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Throughout Hallways and Various Classrooms 4000 COMMENTS: Inspector's Signature: 04/12/2016

395 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ " X 12" Light Blue VFT Throughout Hallways and Various Classrooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

396 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 87 Mastic for HA 85 and 86 HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Assumed No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Throughout Hallways and Various Classrooms COMMENTS: Inspector's Signature: 04/12/2016

397 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Mastic for HA 85 and 86 Throughout Hallways and Various Classrooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

398 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION 9 Drywall Joint Compound HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 108 COMMENTS: Inspector's Signature: 04/12/2016

399 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Drywall Joint Compound Room 108 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

400 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION A Aircell Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY 1 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Remove ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 1. Damaged or significantly damaged friable thermal system insulating ACBM DAMAGE REASON: Physical Damage DISTURBANCE POTENTIAL: MODERATE Pipe Chases, Boiler Room and Throughout Building 500 LF LF COMMENTS: Inspector's Signature: 04/12/2016

401 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 A Aircell Pipe Insulation Pipe Chases, Boiler Room and Throughout Building 500 LF 15 LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Remove Comments: Patch and repair as needed then follow O&M plan. Management Planner's Signature: 05/09/2016

402 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION B (Cardboard) Paperwrap Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY 1 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Repair ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 1. Damaged or significantly damaged friable thermal system insulating ACBM DAMAGE REASON: Deterioration DISTURBANCE POTENTIAL: MODERATE Boiler Room and Throughout Building, rm 115, LF LF COMMENTS: Inspector's Signature: 04/12/2016

403 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 B (Cardboard) Paperwrap Pipe Insulation Boiler Room and Throughout Building, rm 115, LF 1 LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Repair Comments: Patch and repair as needed then follow O&M plan. Management Planner's Signature: 05/09/2016

404 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION C Aircell Duct Insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Abated in See 2004 Comments COMMENTS: Inspector's Signature: 04/12/2016

405 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 C Aircell Duct Insulation Abated in See 2004 Comments In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

406 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION D Mag Block Insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boilers in Boiler House - Abated 1992 COMMENTS: Inspector's Signature: 04/12/2016

407 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 D Mag Block Insulation Boilers in Boiler House - Abated 1992 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

408 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION E Mag Block Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler House - Abated 1992 COMMENTS: Inspector's Signature: 04/12/2016

409 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 E Mag Block Pipe Insulation Boiler House - Abated 1992 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

410 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION F Mag Block Duct Insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler House - Abated 1992 COMMENTS: Inspector's Signature: 04/12/2016

411 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 F Mag Block Duct Insulation Boiler House - Abated 1992 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

412 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION G Fittings on Fiberglass Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Main Building 60 LF LF COMMENTS: Inspector's Signature: 04/12/2016

413 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 G Fittings on Fiberglass Pipe Insulation Main Building 60 LF 0 LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

414 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION HA-1000 White woven electrical wire insulation HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Auditorium stage light fixtures 50 LF LF COMMENTS: Inspector's Signature: 04/12/2016

415 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 HA-1000 White woven electrical wire insulation Auditorium stage light fixtures 50 LF 0 LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

416 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION I3 I 9"x 9" White Floor Tile w/brn & Blk Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Rooms 212 and 311 COMMENTS: Not observed 2016 Inspector's Signature: 04/12/2016

417 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 I3 I 9"x 9" White Floor Tile w/brn & Blk Streaks Mastic Rooms 212 and 311 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 05/09/2016

418 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION J Cementitious Pipe Joint Insulation on Aircell Pipe HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Pipe Chases, Boiler Room and Throughout Building 50 LF LF COMMENTS: Inspector's Signature: 04/12/2016

419 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 J Cementitious Pipe Joint Insulation on Aircell Pipe Pipe Chases, Boiler Room and Throughout Building 50 LF 0 LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

420 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM PREVIOUS INSPECTION K Cementitious Pipe Joint Insulation on Paperwrap HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Boiler Room, Pipe Chases and Throughout Building 20 LF LF COMMENTS: Inspector's Signature: 04/12/2016

421 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/2016 K Cementitious Pipe Joint Insulation on Paperwrap Boiler Room, Pipe Chases and Throughout Building 20 LF 0 LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/09/2016

422 Inspector Assessment Form (New Homogeneous Area) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM CURRENT INSPECTION 88 12" x 12" Red Floor Tile Adjacent to Girl's Gym - 1st Floor 200 MATERIAL CATEGORY: FRIABLE: No ASBESTOS TYPE: Assumed DISTURBANCE POTENTIAL: LOW AHERA DAMAGE CATEGORY: CONDITION: 6 ACBM with the potential for damage ACCESSIBILITY: Within Reach 0 DAMAGE REASON: DAMAGE REASON: DAMAGE REASON: COMMENTS: Inspector's Signature: 04/12/2016

423 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ " x 12" Red Floor Tile Adjacent to Girl's Gym - 1st Floor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: COMMENTS: Management Planner's Signature: 05/09/2016

424 Inspector Assessment Form (New Homogeneous Area) AHERA INSPECTOR: Dionne Carey INSPECTION DATE: 4/12/2016 INFORMATION FROM CURRENT INSPECTION 89 Mastic Associated w/ 12" x 12" Red Floor Tile Adjacent to Girl's Gym - 1st Floor 200 MATERIAL CATEGORY: FRIABLE: No ASBESTOS TYPE: Assumed DISTURBANCE POTENTIAL: LOW AHERA DAMAGE CATEGORY: CONDITION: 6 ACBM with the potential for damage ACCESSIBILITY: Not Reachable 0 DAMAGE REASON: DAMAGE REASON: DAMAGE REASON: COMMENTS: Inspector's Signature: 04/12/2016

425 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian REVIEW DATE: 5/9/ Mastic Associated w/ 12" x 12" Red Floor Tile Adjacent to Girl's Gym - 1st Floor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: COMMENTS: Management Planner's Signature: 05/09/2016

426 APPENDIX B Inspector and Management Planner Licenses