1 RECAPP Facility Evaluation Report Edmonton School District No. 7 Hazeldean Elementary School B3146A Edmonton Report run on: April 7, 211 5:2 PM

2 Building Name: Address: Location: Building Id: Gross Area (sq. m): Replacement : Construction : Facility Details Hazeldean Elementary Scho Street Edmonton B3146A 4,29.1 $11,53, Edmonton - Hazeldean Elementary School (B3146A) Evaluation Company: Francis Ng Architect Ltd. Evaluation Date: September 1 21 Evaluator Name: Evaluation Details Francis Ng Total Maintenance Events Next 5 years: $13, 5 year Facility Condition Index (FCI): 1.13% General Summary: This school for Grades K through 6 was originally built in Edmonton in 195. The school faces two streets - 97 Street on the West, 96 Street on the East and service lane on the South. It is under the jurisdiction of Edmonton School District No. 7. The room numbers and names are based on the School Board Room Data sheet. The current student enrollment is 24. The original square metres school was built in 195. The first addition of square metres was added in The second addition of 53.9 square metres was added in The second addition of 712. square metres was added in Total building area is square metres. PVC windows were installed in Handicap ramps were installed in Administration area was renovated in SBS roofing for (1972) Addition was installed in Barrier free washrooms were upgraded in 23. Modernization was done in 23. Partial (1957) Addition was demolished in 23. SBS roofing for (195) original Building, (1954) Addition and (1957) Addition was installed in 25. ABC Group A Division 2 - School. The (195) original building and all additions are single storey and have noncombustible and combustible construction and are unsprinklered. Overall rating: Acceptable (4). Structural Summary: (195) Original Building has wood load bearing frame on concrete foundation walls on concrete strip footings along perimeter and Corridors; concrete piers on concrete footing for interior; Main Floor has concrete slab; has wood studs interior partitions. Basement for Mechanical Room has concrete walls and concrete slab on grade. Roof has T & G plank deck on wood trusses on wood load bearing frame. Mezzanine has wood joists on wood studs. Return air tunnel crawl space is under corridor. (1954) Addition has wood load bearing frame on concrete foundation walls on concrete strip footings along perimeter and Corridors; concrete piers on concrete footing for interior; Main Floor has concrete slab and wood studs interior partitions. Basement for Mechanical Room has concrete walls and concrete slab on grade. Roof for Classrooms has T & G plank deck on wood joist on wood load bearing frame. Roof for Mechanical Room has T & G plank deck on concrete block wall. Return air tunnel crawl space is under corridor. (1957) Addition has wood load bearing frame on concrete foundation walls on concrete strip footings along perimeter and Corridors; concrete piers on concrete footing for interior; Main Floor has concrete slab and wood studs interior partitions; Roof has T & G plank deck on wood trusses on wood load bearing frame. Return air tunnel crawl space is under corridor. (1972) Addition has concrete foundation walls on concrete strip footings along perimeter and under load bearing walls; concrete slab on grade. Roof has concrete spandeck slab on concrete blocks. Recommendations for future action: not required. Overall structural system rating is 4 (acceptable). Envelope Summary: (195) Original Building has SBS roofing and built-up roofing, face brick; stucco; prefinished metal siding fascia, PVC windows, metal framed storefront for Main Entrance and metal doors and frame for Corridor entrances; metal utility Report run on: April 7, 211 5:2 PM Page 2 of 52

3 doors; painted stucco soffit; Penthouse has metal panel siding. (1954) East Addition has SBS roofing; stucco; prefinished metal siding fascia, PVC windows; metal framed storefront for Corridor Entrances and for inner Courtyard Exits; metal utility doors; painted plywood soffit. (1957) Addition has SBS roofing, face brick; stucco; prefinished metal siding fascia, PVC windows. (1972) Addition has SBS roofing, split rib masonry block; concrete block; prefinished metal siding fascia, metal siding above low roof; PVC windows; metal framed storefront for Corridor entrances, metal utility doors; painted concrete spandeck soffit; Gymnasium and Mechanical Room has prefinished metal panel siding above low roof. Recommendations for future action include: repair precast concrete window sills replace wood window frames; repair SBS roofing; repair roof drains. Overall envelope system rating is acceptable. Interior Summary: (195) Original Building has wood stud partitions, painted plaster for Classrooms and Corridors; suspended T-bar ceiling system and carpet flooring in Administration areas; suspended T-bar ceiling system, carpet and sheet vinyl flooring in Staff Room; suspended T-bar ceiling system and terrazzo flooring in Corridors; painted plaster ceiling and vinyl tile flooring in Boys and Girls Washrooms; painted plaster ceiling and vinyl tile flooring and carpet flooring in Classrooms; Acoustic ceiling tile, tentest wall board and plywood dado and wood strip flooring for Gymnasium; painted plaster ceiling and wood strip flooring for Stage; wood doors and wood frames; whiteboards, Smart boards, tackboards and projection screens in Classrooms. (1954) Addition has wood stud partitions and painted plaster for Classrooms and Corridors; suspended T-bar ceiling system and carpet flooring in Corridors; painted plaster ceiling and vinyl tile flooring in Boys and Girls Washrooms; painted plaster ceiling, carpet and sheet vinyl flooring in Classrooms; wood doors and metal frames; whiteboards, Smart boards, tackboards and projection screens in Classrooms. (1957) Addition has wood stud partitions, painted plaster for Corridor; painted plaster ceiling and sheet vinyl flooring in Storage; suspended T-bar ceiling system and terrazzo flooring in Corridors; wood doors and wood frames. (1972) Addition has suspended T-bar ceiling system, metal stud partition and carpet flooring in Library; concrete spandeck ceiling and sheet vinyl flooring in Gymnasium; suspended T-bar ceiling system, sheet vinyl flooring in Science Room; suspended T-bar ceiling system and carpet flooring in Music Room; painted concrete spandeck ceiling and vinyl tile flooring in Storage; wood doors and metal frames. Recommendations for future action include: replace flexboard; replace resilient stair finish; install stair handrails; replace resilient flooring; replace acoustical ceiling tiles; replace millwork; paint parking lot pavement markings; provide barrier free entrance; provide wheelchair platform to Stage. Overall interior system rating is 4 (acceptable). Mechanical Summary: Ventilation system consists of five roof mounted, indirect fired air handling units which supply air through low velocity ductwork in ceiling space. Ventilation is adequate and can meet latest ASHRAE standards. No air conditioning system has been provided for computer classroom. Heating is provided by three gas fired boilers to re-heat coils, perimeter radiation and unit heaters. Domestic water system is served by two gas fired water heaters complete with in-line recirculation pump. Conventional plumbing fixtures with manual and infrared operated faucets. BMCS controls for heating and ventilation system. Fire protection consists of fire extinguishers. Overall rating is "good" (5). Electrical Summary: The school has been provided with a 1A, 12/28V, 3 phase, 4 wire service obtained from a pad mounted transformer. The transformer is owned and maintained by the utility company, Epcor. The main distribution centre is located in the electrical room. Lighting is of the fluorescent type with fixtures utilizing T8 lamps and electronic ballasts. The school underwent a complete modernization in 23, at which time all the electrical systems were modernized including lighting, fire alarm, intrusion alarm, etc. Report run on: April 7, 211 5:2 PM Page 3 of 52

4 Overall electrical systems are in good condition. Guide Condition Performance 1 - Critical Unsafe, high risk of injury or critical system failure. 2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs. 3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs. Meets present requirements, minor deficiencies. Average operating/maintenance costs. Meets all present requirements. No deficiencies. 6 - Excellent As new/state of the art, meets present and foreseeable requirements. Report run on: April 7, 211 5:2 PM Page 4 of 52

5 S1 STRUCTURAL Edmonton - Hazeldean Elementary School (B3146A) A11 Standard Foundations* (195) Original Building - has concrete foundation walls on concrete strip footings along perimeter and Corridors; concrete piers on concrete footing for interior. 195 A11 Standard Foundations* (1954) Addition - has concrete foundation walls on concrete strip footings along perimeter and Corridors; concrete piers on concrete footing for interior A11 Standard Foundations* (1957) Addition - has concrete foundation walls on concrete strip footings along perimeter and Corridors; concrete piers on concrete footing for interior A11 Standard Foundations* (1972) Addition - has concrete foundation walls on concrete strip footings along perimeter and under load bearing walls A13 Slab on Grade* (195) Original Building (Basement - Mechanical Room 7, 74, Meter Room 71, Office 72, Storage 73, 75) - have 1mm concrete slab on grade. (195) Original Building - has crawl space c/w 75mm concrete slab on grade. 195 A13 Slab on Grade* (1954) Addition (Conference 18, Laundry 19; Electrical Room 2; Boys Washroom 21, Girls Washroom 22, Staff Womens Washroom 23; Kitchen 24; Corridor C4, C5) - have 125mm concrete slab on grade Report run on: April 7, 211 5:2 PM Page 5 of 52

6 A13 Slab on Grade* (1957) Addition - has 1mm concrete slab on grade A13 Slab on Grade* (1972) Addition - has 1mm concrete slab on grade A22 Basement Walls (& Crawl Space)* (195) Original Building (Basement - Mechanical Room 7, 74, Meter Room 71, Office 72, Storage 73, 75) - have concrete foundation walls on concrete strip footing. (195) Original Building - has crawl space. 195 A22 Basement Walls (& Crawl Space)* (1954) Addition - has crawl space A22 Basement Walls (& Crawl Space)* (1957) Addition - has crawl space B11.1 Floor Structural Frame (Building Frame)* (195) Original Building - has 38x14mm studs at 4m o.c. on concrete foundation walls. 195 B11.1 Floor Structural Frame (Building Frame)* (1954) Addition - has 38x14mm wood frame load bearing wall Report run on: April 7, 211 5:2 PM Page 6 of 52

7 B11.1 Floor Structural Frame (Building Frame)* (1957) Addition - has 38x14mm wood studs at 4mm o.c. Edmonton - Hazeldean Elementary School (B3146A) 1957 B11.1 Floor Structural Frame (Building Frame)* (1972) Addition (Gymnasium 42; Music 41) - have 2mm concrete blocks for lower walls and 15mm concrete block above low roof; and concrete pilasters; (1972) Addition (Other Areas) - have 2mm concrete block B11.2 Structural Interior Walls Supporting Floors (or Roof)* (195) Original Building - has 38x14mm wood stud walls. 195 B11.2 Structural Interior Walls Supporting Floors (or Roof)* (1954) Addition (Corridors; Classrooms) - have 38x14mm wood studs at 4mm o.c. on 19mm subfloor on 38x235mm wood joists at 4mm o.c. (1954) Addition (Meter Room 16) - has 2mm concrete block B11.2 Structural Interior Walls Supporting Floors (or Roof)* (1957) Original Building - has 38x14mm wood stud walls B11.2 Structural Interior Walls Supporting Floors (or Roof)* (1972) Addition (Music 41, Gymnasium 42; Gym Storage 43; Ancillary 47) - have 2mm concrete blocks Report run on: April 7, 211 5:2 PM Page 7 of 52

8 Edmonton - Hazeldean Elementary School (B3146A) B11.3 Floor Decks, Slabs, and Toppings* (195) Original Building (Main Floor) - has approx. 114mm concrete slab. (195) Original Building (Stage 6) - has concrete slab. (1954) Addition (Conference 18, Laundry 19; Electrical Room 2; Boys Washroom 21, Girls Washroom 22, Staff Womens Washroom 23; Kitchen 24; Corridor C4, C5) - has 125mm concrete slab on grade. (1957) Addition - has 1mm concrete slab on grade. (1972) Addition - has 1mm concrete slab on grade. 195 B11.5 Mezzanine Construction* (195) Original Building (Mezzanine) - has 38x184mm floor joists at 4mm o.c. (195) Original Building (Stage 6) - has concrete slab. (1972) Addition (Mezzanine - Mechanical Room 44) - has 14mm concrete slab. 195 B11.6 Ramps: Exterior* (1954) Addition (North Corridor Entrance) - has concrete ramp c/w metal pipe railing. (installed in 1991) (1954) Addition (West Exit from Play Gym 28) - has concrete ramp c/w metal pipe railing. (installed in 1991) (1954) Addition (East Exit from Special Education 32) - has concrete ramp c/w metal pipe railing. (installed in 1991) (1954) Addition (North Entrance of Meter Room 16) - has concrete ramp c/w metal pipe railing. (installed in 1991) (1954) Addition (North Corridor Entrance near Meter Room 16) - has concrete ramp c/w metal pipe railing. (installed in 1991) (1972) Addition (East Corridor Entrance) - has concrete ramp c/w metal pipe railing. (installed in 1991) 3 - Marginal 1991 Repair handrails. (5 ramps) Concern: (1954) Addition (North Corridor Entrance; West Exit from Play Gym 28; East Exit from Special Education 32) - ramps do not meet barrier free standards for handrails. (1972) Addition (East Corridor Entrance) - ramp does not meet barrier free standards for handrails. Recommendation: Repair handrails. (5 ramps) Repair 211 Low : Report run on: April 7, 211 5:2 PM $5, (1954) Addition (North Corridor Entrance) - ramp does not meet barrier free standards for handrails. Page 8 of 52

9 B11.7 Exterior Stairs* (1954) Addition (North Corridor Entrance) - has concrete stair c/w metal pipe railing B11.9 Floor Construction Fireproofing* (195) Original Building - has concrete slab. (1954) Addition - has concrete slab. (1957) Addition - has concrete slab. (1972) Addition - has concrete slab on grade 195 B11.1 Floor Construction Firestopping* (195) Original Building - has concrete slab. (1954) Addition - has concrete slab. (1957) Addition - has concrete slab. (1972) Addition - has concrete slab on grade 195 B12.1 Roof Structural Frame* (195) Original Building (Classrooms) - has 38mm T&G plank deck on 38x235mm wood joists on 38x184mm struts on 38x184mm joists. (195) Original Building (Gymnasium 22 roof) - has 38mm T&G plank deck on 64x235mm wood purlins on built-up plank trusses c/w 38x14mm braces and 64x184mm exposed purlins. (195) Original Building (Stage 23 roof) - has 38mm T&G plank deck on 38x286mm roof joists at 3mm o.c. 195 B12.1 Roof Structural Frame* (1954) East Addition (Classrooms) - have 19mm wood roof deck on 38x336mm wood joists at 3mm o.c. (1954) East Addition (Corridors) - have 19mm wood roof deck on 38x235mm wood joists at 3mm o.c B12.1 Roof Structural Frame* (1957) East Addition (Classrooms) - has 19mm wood roof deck on 38x34mm wood joists at 4mm o.c Report run on: April 7, 211 5:2 PM Page 9 of 52

10 B12.1 Roof Structural Frame* (1972) Addition (Music 41, Gymnasium 42; Gym Storage 43, Library 65) - have concrete spandeck slab on concrete blocks. (1972) Addition (Ancillary 47) - has acoustic concrete spandeck slab on concrete blocks B12.4 Canopies* (195) Original Building (All Overhangs) - have 38x14mm wood framed canopies at 4mm o.c. (195) Original Building (West Main Entrance, South Corridor Entrance, East Corridor Entrance) - have 38x14mm wood framed canopies at 4mm o.c. (1954) Addition (North Corridor Entrance) - has 38x184mm rafters at 3mm o.c. (1954) Addition (North Corridor Entrance near Meter Room; South Corridor Entrances to Courtyard) - have 38x235mm rafters at 4mmo.c., 16mm plywood soffit. (1972) Addition (East Corridor Entrance) - has concrete spandeck slab. 195 B12.6 Roof Construction Fireproofing* (1972) Addition - has concrete spandeck slab. 195 Report run on: April 7, 211 5:2 PM Page 1 of 52

11 S2 ENVELOPE Edmonton - Hazeldean Elementary School (B3146A) B Brick Masonry: Ext. Wall Skin* (195) Original Building - has face brick veneer walls at lower portions of exterior walls and full height at all entrances. (1954) Addition - has face brick veneer walls at lower portions of exterior walls and full height at all entrances. (1957) Addition - has face brick veneer walls at lower portions of exterior walls and full height at all entrances. 195 B Concrete Block: Ext. Wall Skin* (1972) Addition (East and South sides) - have split rib masonry block B Metal Siding** (195) Original Building (Penthouse; Walls of Girls Washroom 12, Staff Work Room 14, Conference Room 6 above low roof) - have vertical prefinished metal panels. (approx. 45 sq. m.) (installed in 23) (1972) Addition (North and South walls of Gymnasium above low roof) - have vertical prefinished metal panels. (approx. 12 sq. m.) (installed in 23) (195)(1954)(1957)(1972) - have prefinished metal siding fascia. (approx. 42 linear metres) 23 4 Replace metal siding. (approx. 375 sq. m.) 243 $37, : B Cement Plaster (Stucco): Ext. Wall* (195) Original Building (Classrooms) - have stucco fascia. (installed in approx. 1991) (195) Original Building (Gymnasium 22) - has stucco walls above facing brick. (installed in approx. 1991) (1954) Addition (Classrooms) - have stucco fascia and walls above facing brick. (installed in approx. 1991) (1957) Addition - has stucco fascia and walls above facing brick. (installed in approx. 1991) 1991 B Expansion Control: Exterior Wall Skin* School does not have expansion control joints. 195 Report run on: April 7, 211 5:2 PM Page 11 of 52

12 B Joint Sealers (caulking): Ext. Wall** (195) Original Building - has joint sealants around window openings and door openings. (installed in 1991) (1954) Addition - has joint sealants around window openings and door openings. (installed in 1991) (1957) Addition - has joint sealants around window openings. (installed in 1991) (1972) Addition - has joint sealants around window openings and door openings. (installed in 1991) 3 - Marginal 23 2 Replace joint sealers (caulking): ext. wal. (approx. 15 linear metres) Concern: (1972) Addition (Library 65) - wood frames with PVC windows have open gaps. Recommendation: Replace joint sealers (caulking): ext. wal. (approx. 15 linear metres) Failure Replacement 211 $1,5 Low : Replace joint sealers (caulking): ext. wal. (approx. 5 linear metres) 223 $5, : B Paints (& Stains): Exterior Wall** (195)(1954)(1957) - has painted cement plaster (stucco). (re-painted in 23) (1972) Addition - has painted split concrete blocks. (re-painted in 23) (195)(1954)(1957)(1972) - have painted exterior metal doors and frames. (21 doors) (installed in 23) Replace paints (& Stains): exterior wall. (approx. 33 square metres) 218 $165, : Report run on: April 7, 211 5:2 PM Page 12 of 52

13 Edmonton - Hazeldean Elementary School (B3146A) B Precast Concrete: Ext. Wall Const.* (195) Original Building - has precast concrete window sills. (1954) Addition - has precast concrete window sills. (1957) Addition - has precast concrete window sills. (1972) Addition - has precast concrete window sills. 3 - Marginal 195 Repair precast concrete window sills. (approx. 37 linear metres) Concern: (195) (1954) (1957) (1972) - precast concrete window sills have deteriorated and have open joints. Recommendation: Repair precast concrete window sills. (approx. 37 linear metres) Repair 211 Low $18,5 (195) Original Building - precast concrete window sills have deteriorated and have open joints. : B Masonry Units: Ext. Wall Const.* (1972) Addition - has concrete block B Wood Framing: Ext. Wall Const.* (195) Original Building - has 38x14mm studs at 4m o.c. on concrete foundation walls. (1954) Addition - has 38x14mm studs at 4m o.c. on concrete foundation walls. (1957) Addition - has 38x14mm studs at 4m o.c. on concrete foundation walls. 195 B21.3 Exterior Wall Vapor Retarders, Air Barriers, and Insulation* (195) Original Building - has insulation between wood studs. (1954) Addition - has building paper, 19mm sheathing, 5mm mineral wool insulation, vapor barrier, 19mm sheathing. (1957) Original Building - has insulation between wood studs. (1972) Addition - has air space, 25mm rigid insulation. 195 Report run on: April 7, 211 5:2 PM Page 13 of 52

14 Edmonton - Hazeldean Elementary School (B3146A) B21.6 Exterior Louvers, Grilles, and Screens* (195) Original Building - has metal air intake grilles on the Mechanical tower above roof. (195) Original Building - has fresh air grilles and crawl space ventilation screens under windows. (1954) Addition - has fresh air grilles and crawl space ventilation screens under windows. (1957) Addition - has fresh air grilles and crawl space ventilation screens under windows. (1972) Addition (Mezzanine Mechanical Room 44) - has metal louvres. 195 B21.9 Exterior Soffits* (195) Original Building (All Overhangs) - have stucco soffit. (195) Original Building (West Main Entrance, South Corridor Entrance) - have stucco soffit. (1954) Original Building (North Corridor Entrance) - has painted plywood soffit. (1954) Addition (North Corridor Entrance near Meter Room; South Corridor Entrances to Courtyard) - have painted plywood soffit. (1972) Addition (East Corridor Entrance) - has painted concrete soffit. 23 B Wood Windows (Glass & Frame)** (1972) Addition (Library 65) - has PVC windows c/w double seal glazed units, operable vents and screens. (approx. 5 windows) 3 - Marginal Replace wood window frames. (5 windows) Concern: (1972) Addition (Library 65) - original wood frames with PVC windows have rotten and open gaps. Recommendation: Replace wood window frames. (5 windows) Failure Replacement 211 Low $1, : (1972) Addition (Library 65) - original wood frames with PVC windows have rotten and open gaps. Report run on: April 7, 211 5:2 PM Page 14 of 52

15 B Vinyl, Fibreglass &Plastic Windows** Edmonton - Hazeldean Elementary School (B3146A) (195) Original Building - has PVC windows c/w double seal glazed units, operable vents and screens. (approx. 96 windows) (replaced in 1991) (1954) Addition - has PVC windows c/w double seal glazed units, operable vents and screens. (approx. 76 windows) (replaced in 1991) (1957) Addition - has PVC windows c/w double seal glazed units, operable vents and screens. (approx. 4 windows) (replaced in 1991) (1972) Addition - has PVC windows c/w double seal glazed units, operable vents and screens. (approx. 7 windows) (replaced in 23) Replace PVC windows. (approx. 183 windows) 231 $274,5 : B22.4 Other Exterior Windows* - Glass Blocks (195) Original Building (Classrooms 5, 61, 62; Staff Room 9) - have glass blocks above Classroom windows. (195) Original Building (Gymnasium 1) - has glass blocks above. (1954) Addition (Play Gym 28; Special Education 3; ECS 67; Storage 69) - have glass blocks above Classroom windows. 195 B Steel-Framed Storefronts: Doors** (195) Original Building (West Main Entrance) - has metal doors and pressed steel frames with half glass panels and fixed glazed panels above doors. (3 doors) (installed in 23) (1954) Addition (North Corridor Entrance; North Corridor Entrance near Meter Room; South Corridor Entrances to Courtyard) - have metal doors and pressed steel frames with half glass panels. (8 doors) (installed in 23) (1957) Addition (North Corridor Entrance) - has metal doors and pressed steel frames with half glass panels. (2 doors) (installed in 23) (1972) Addition (East Corridor Entrance) - has metal doors and pressed steel frames with half glass panels. (2 doors) (installed in 23) 23 3 Replace steel-framed storefront and doors. (approx. 15 doors) 233 $3, : Report run on: April 7, 211 5:2 PM Page 15 of 52

16 B23.2 Exterior Utility Doors** (195) Original Building (Gymnasium 1; Corridor C2) - have metal doors and metal frames. (3 doors) (installed in 23) (195) Original Building (Penthouse) - has metal door and metal frame. (1 door) (installed in 23) (1954) Addition (Meter Room 16; West Exit from Play Gym 28; East Exit from Special Education 32) - have metal doors and metal frames. (3 doors) (installed in 23) (1972) Addition (Electrical Room 51) - has metal door and metal frame. (1 door) (installed in 23) 23 4 Replace exterior utility doors. (8 doors) 243 $12, : B31.1 Deck Vapor Retarder and Insulation* (195) Original Building - has rigid insulation and vapour barrier. (re-roofed in 25) (1954) Addition - has rigid insulation and vapour barrier. (re-roofed in 25) (1957) Addition - has rigid insulation and vapour barrier. (re-roofed in 25) (1972) Addition - has rigid insulation and vapour barrier. (re-roofed in 1999) 23 Report run on: April 7, 211 5:2 PM Page 16 of 52

17 B Modified Bituminous Membrane Roofing (SBS)** Edmonton - Hazeldean Elementary School (B3146A) (195) Original Building - has SBS roofing. (approx square metres) (re-roofed in 25) (1954) Addition - has SBS roofing. (approx. 152 square metres) (re-roofed in 25) (1957) Addition - has SBS roofing. (approx. 55 square metres) (re-roofed in 25) (1972) Addition - has SBS roofing. (approx. 685 square metres) (re-roofed in 1999) 3 - Marginal Repair SBS roofing. (approx. 15 square metres) Concern: (1957) Addition - SBS roofing has ponding. (1972) Addition (Gymnasium Roof) - SBS roofing has ponding. Recommendation: Repair SBS roofing. (approx. 1 square metres) Repair 211 $22,5 Low : (1972) Addition - SBS roofing has ponding. Replace SBS roofing. (approx square metres) 224 $627,75 : Report run on: April 7, 211 5:2 PM Page 17 of 52

18 B Metal Gutters and Downspouts** (195) Original Building (Gymnasium) - has roof drains connecting to interior downspouts and to main sewer system. (8 roof drains) (re-roofed in 25) (195) Original Building (low roof) - has roof drains connecting to interior downspouts and to main sewer system. (9 roof drains) (re-roofed in 25) (1954) Addition - has roof drains connecting to interior downspouts and to main sewer system. (5 roof drains) (re-roofed in 25) (1957) Addition - has roof drain connecting to interior downspouts and to main sewer system. (1 roof drain) (re-roofed in 25) (1972) Addition (Gymnasium Roof) - has roof drain connecting to interior downspouts and to main sewer system. (1 roof drain) (re-roofed in 1999) (1972) Addition (Gymnasium Roof) - has roof scuppers and exterior downspouts to low roof. (2 scuppers) (re-roofed in 1999) (1972) Addition (low roof) - has roof drains connecting to interior downspouts and to main sewer system. (2 roof drains) (re-roofed in 1999) 3 - Marginal Repair 1 roof drain and 2 scuppers. Concern: (1957) Addition - SBS roofing has ponding. (1972) Addition (Gymnasium Roof) - SBS roofing has ponding. Recommendation: Repair 1 roof drain and 2 scuppers. Repair 211 $1,5 Low : Replace roof drains and downspouts. (approx. 12 linear metres) 229 $12, : B31.9 Roof Specialties and Accessories* (195) Original Building (low roof to Gymnasium roof) - has metal cat ladder. (installed in 27) (1972) Addition (from low roof to (1954) Addition roof) - has metal cat ladder. (installed in 27) (1972) Addition (from low roof to (195) Original Building low roof) - has metal cat ladder. (installed in 27) (1972) Addition (from low roof to Gymnasium Roof) - has metal cat ladder. (installed in 27) (195) Original Building (West side of Gymnasium roof) - has metal railing along the roof edge. (installed in 27) (1954) Addition (North side of low roof) - has metal railing along the roof edge. (installed in 27) (1972) Addition (South side of low roof) - has metal railing along the roof edge. (installed in 27) 27 Report run on: April 7, 211 5:2 PM Page 18 of 52

19 B32.2 Other Roofing Openings (Hatch, Vent, etc)* (1972) Addition (Gym Storage 43 to Mezzanine Mechanical Room 44) - has roof hatch. Edmonton - Hazeldean Elementary School (B3146A) 1972 Report run on: April 7, 211 5:2 PM Page 19 of 52

20 Edmonton - Hazeldean Elementary School (B3146A) S3 INTERIOR C11.1 Interior Fixed Partitions* (195) Original Building (Corridors; Classrooms) - have 38x14mm wood studs. (1954) Addition (Corridors; Classrooms) - have 38x14mm wood studs. (1954) Addition (Meter Room 16) - has 2mm concrete blocks. (1957) Addition (Corridor; Classroom) - have 38x14mm wood studs. (1972) Addition (Library 65) - has 64mm metal stud partition. (1972) Addition (Music 41; Gymnasium 42; Gym Storage 43, 45; Storage 46; Ancillary 47; Electrical Room 51) - have 2mm concrete blocks. 195 C11.5 Interior Windows* (195) Original Building (Administration 56) - has metal framed window c/w clear glass. (1954) Addition (Special Education 3, 32, 34, 36, 38) - have metal framed windows c/w one way mirrors. (1954) Addition (ECS 66, 67) - have metal framed windows c/w wired glass. 195 C11.6 Interior Glazed Partitions and Storefronts* (195) Original Building (Staff Work Room 14; Administration 56; Office 59; Conference Room 6) - have metal frame storefronts. (installed in 23) (1954) Addition (Resource Room 17) - has metal frame storefront. (installed in 23) 23 C11.7 Interior Partition Firestopping* (195) Original Building (Basement - Mechanical Room 7) - west wall has opening. 3 - Marginal 195 Repair wall. (approx. 5 sq. m.) Concern: (195) Original Building (Basement - Mechanical Room 7) west wall has opening. Recommendation: Repair wall. (approx. 5 sq. m.) Repair 211 Low $1, : (195) Original Building (Basement - Mechanical Room 7) - west wall has opening. Report run on: April 7, 211 5:2 PM Page 2 of 52

21 C12.1 Interior Swinging Doors (& Hardware)* (195) Original Building - has wood doors and wood frames. (1954) Addition - has wood doors and metal frames. (1957) Addition - has wood door and wood frame. (1972) Addition - has wood doors and metal frames. 23 C12.3 Interior Fire Doors* (195) Original Building (Gymnasium 1; Storage 7) - have 3/4 hour fire rated metal doors and metal frames. (195) Original Building (Corridor C8) - has metal doors and metal frame. (1954) Addition (Electrical Room 2) - has 3/4 hour fire rated metal door and metal frame. (1954) Addition (South Corridor) - has 1.5 hour fire rated metal doors and metal frame. (1972) Addition (Storage 46; Janitor 48) - have 3/4 hour fire rated metal doors and metal frames. 195 C13.1 Visual Display Boards** (195) Original Building (Gymnasium 1) - has 1 projection screen. (195) Original Building (Staff Room 9) - has 2 whiteboards, 1 tackboard and 1 projection screen. (195) Original Building (Staff Work Room 14) - has 2 tackboards. (195) Original Building (Janitor's Office 15) - has 1 tackboard. (195) Original Building (Resource Room 49) - has 1 whiteboard, 2 tackboards and 1 Smart board. (195) Original Building (Classrooms 5, 52, 53, 54, 55, 61; Computer Room 62) - have 17 whiteboards, 7 tackboards, 6 Smart boards and 6 projection screens. (195) Original Building (Office 64) - has 1 tackboard. (1954) Addition (Kitchen 24) - has 1 whiteboard and 1 tackboard. (1954) Addition (Conference 27) - has 1 whiteboard and 3 tackboards. (1954) Addition (Special Education 3, 32, 34, 36, 38) - have 5 whiteboards and 8 tackbaords. (1954) Addition (Classroom 4) - has 3 whiteboards, 1 tackboard, 1 Smart board and 1 projection screen. (1954) Addition (ECS 66, 67) - have 1 whiteboard, 2 tackboards, 1 Smart board and 1 projection screen. (1954) Addition (Storage 69) - has 1 tackboard. (1954) Addition (Corridor C5) - has 1 tackboard. (1972) Addition (Music 41) - has 1 whiteboard, 2 tackboards and 1 projection screen. (1972) Addition (Gymnasium 42) - has 1 tackboard. (1972) Addition (Science 47) - has 1 whiteboard, 1 tackboard and 1 projection screen. (1972) Addition (Library 65) - has 2 tackboards Replace visual display boards. (approx. 82 boards) 223 $82, : Report run on: April 7, 211 5:2 PM Page 21 of 52

22 C13.2 Fabricated Compartments (Toilets/Showers)** Edmonton - Hazeldean Elementary School (B3146A) (195) Original Building (Boys Washroom 1, Girls Washroom 12, Staff Men Washroom 11; Staff Women 13) - have prefinished metal toilet partitions. (12 partitions) (upgraded in 23) (1954) Addition (Boys Washroom 21, Girls Washroom 22) - have prefinished metal toilet partitions. (6 partitions) (upgraded in 23) (1954) Addition (Laundry 19) - has prefinished metal shower partition. (1 partition) (upgraded in 23) 23 3 Replace fabricated compartments (Toilets and Showers). (approx. 19 partitions) 233 $9,5 : C13.5 Wall and Corner Guards* (195) Original Building (Corridors) - have plastic corner guards. (1954) Addition (Corridors) - have plastic corner guards. 23 C13.8 Interior Identifying Devices* (195)(1954)(1957)(1972) - All rooms have interior identifying devices. 23 C13.1 Lockers** (1954) Addition (Corridor near Meter Room 16) - has 2 prefinished single tier metal lockers and 1 prefinished double tier metal lockers. (3 lockers) 23 3 Replace lockers. (3 lockers) 233 $1,5 : Report run on: April 7, 211 5:2 PM Page 22 of 52

23 C13.12 Storage Shelving* (195) Original Building (Gym Storage 5; Storage 7; Janitor 48; Office 64) - have wood shelves. (1954) Addition (Storage 69; Basement Storage 77) - have metal shelves. (1957) Addition (Storage 8) - has wood shelves. 23 C13.14 Toilet, Bath, and Laundry Accessories* (195) Original Building (Boys Washroom 1, Girls Washroom 12, Staff Men Washroom 11; Staff Women 13) - have toilet accessories. (upgraded in 23) (1954) Addition (Boys Washroom 21, Girls Washroom 22, Staff Women Washroom 23, Special Education Washroom 31, 33, 35, 37, 39, ECS Washroom 68) - have toilet accessories. (upgraded in 23) (1954) Addition (Laundry 19) - has shower accessories. (upgraded in 23) 23 C13.17 Other Fittings* - Boot Racks (195) Original Building (South Entrance Vestibule) - has metal boot racks. (1957) Addition (North Corridor Entrance Vestibule) - has metal boot racks. (1972) Addition (East Corridor Entrance) - has metal boot racks. 3 - Marginal 195 Replace boot racks. (6 boot racks) Concern: Boot racks are worn out. Recommendation: Replace boot racks. (6 boot racks) Failure Replacement 211 $3, Low : C13.17 Other Fittings* - Coat Hooks (195) Original Building (Corridors) - have coat hooks. (1954) Addition (Corridors) - have coat hooks. 195 Report run on: April 7, 211 5:2 PM Page 23 of 52

24 C21 Stair Construction* (195) Original Building (West Main Entrance, South Corridor Entrance, Gymnasium 1 and Corridor C1 to Stage 6, Corridor C1 to Basement Mechanical Room 7) - have concrete stairs. (195) Original Building (Gym Storage 2 to Mezzanine Storage 3) - has wood stair. (195) Original Building (Basement - Mechanical Room 7 to crawl space) - has metal cat ladders. (195) Original Building (Stage 6 to Roof) - has wood cat ladder. (1954) Addition (Meter Room 71 to Basement) - has concrete stair. (1972) Addition (Gym Storage 43 to Mezzanine Mechanical Room 44) - has metal cat ladder. 195 C22.2 Terrazzo Stair Finishes* (195) Original Building (West Main Entrance, South Corridor Entrance) - concrete stairs has terrazzo finish c/w metal nosing. 195 C22.5 Resilient Stair Finishes** (195) Original Building (Gym Storage 2 to Mezzanine Storage 3) - wood stair has sheet vinyl treads c/w metal nosing. 3 - Marginal Replace resilient stair finish. (1 stair) Concern: (195) Original Building (Gym Storage 2 to Mezzanine Storage 3) - sheet vinyl has worn out. Recommendation: Replace resilient stair finish. (1 stair) Failure Replacement 211 $2, Low : Report run on: April 7, 211 5:2 PM Page 24 of 52

25 Edmonton - Hazeldean Elementary School (B3146A) C22.8 Stair Railings and Balustrades* (195) Original Building (Gym Storage 2 to Mezzanine Storage 3) - wood stair has wood railing. (195) Original Building (Corridor C1 to Basement Mechanical Room 7) - concrete stair has metal pipe railing. 3 - Marginal 195 Install railings. (6 railings) Concern: (195) Original Building (West Main Entrance, South Corridor Entrance, Gymnasium 1 and Corridor C1 to Stage 6) concrete stairs do not have railings. (1954) Addition (Meter Room 71 to Basement) - concrete stair does not have railing. Recommendation: Install railings. (6 railings) Failure Replacement 211 Low $6, : C22.1 Stair Painting* (195) Original Building (Gymnasium 1 and Corridor C1 to Stage 6, Corridor C1 to Basement Mechanical Room 7) have painted concrete stairs. (1954) Addition (Meter Room 16 to Basement Mechanical Room 7) - has painted concrete stair. 23 C23 Interior Ramps* (195) Original Building (West Main Entrance Vestibule) - has a wood ramp covered with carpet and metal railing. (installed in 1991) 3 - Marginal 1991 Repair handrail. (1 handrail) Concern: Handrail does not meet handicap standards. Recommendation: Repair handrail. (1 handrail) Repair 211 Low $1, : Handrail does not meet handicap standards. Report run on: April 7, 211 5:2 PM Page 25 of 52

26 C31.1 Concrete Wall Finishes (Unpainted)* (1954) Addition (Meter Room 16) - has concrete block walls. (1972) Addition (Gymnasium 42; Gym Storage 43, 45; Storage 46; Science 47; Electrical Room 51; Library 65) - have concrete block walls C31.2 Wall Paneling** - Flexboards (Asbestos Panels) (195) Original Building (Gym Storage 5; Stage 6; Storage 7; Janitor 48; Resource Room 49; Classrooms 5, 52, 53, 54, 55, 61; Corridor C1, C2, C3, C8, C9) - have 1.2 metre high flexboards (asbestos panels) dado. 3 - Marginal Replace wall panels. (approx. 5 sq. m.) Concern: Flexboards dado has asbestos. Recommendation: Replace wall panels. (approx. 5 sq. m.) Failure Replacement 211 $5, Low : C31.2 Wall Paneling** - Plywood (195) Original Building (Gymnasium 1) - has plywood boards along lower walls. (approx. 8 sq.m.) (upgraded in 23) 23 3 Replace plywood. (approx. 8 sq. m.) 233 $8, : Report run on: April 7, 211 5:2 PM Page 26 of 52

27 C31.2 Wall Paneling** - Tentest Boards (195) Original Building (Gymnasium 1) - has Tentest boards above plywood dado. (approx. 13 sq.m.) (upgraded in 23) 23 3 Replace Tentest boards. (approx. 13 sq. m.) 233 $13, : C31.3 Plaster Wall Finishes (Unpainted)* (195) Original Building - has plaster wall finish. (1954) Addition - has plaster wall finish. (1957) Addition - has plaster wall finish. 195 C31.4 Gypsum Board Wall Finishes (Unpainted)* (1954) Addition (Conference 18) - has gypsum board wall finish. 23 C31.6 Tile Wall Finishes** (195) Original Building (Boys Washroom 1) - has ceramic tile wall finish around urinals. (1954) Addition (Boys Washroom 21) - has ceramic tile wall finish around urinals Replace tile wall finish. (approx. 1 sq. m.) 214 $1, : Report run on: April 7, 211 5:2 PM Page 27 of 52

28 C31.9 Acoustical Wall Treatment** (1972) Addition (Gymnasium 42) - has fabric acoustic wall panels above wall. (approx. 9 sq. m.) (upgraded in 23) 23 2 Replace acoustical wall treatment. (approx. 9 sq. m.) 223 $9, : C31.11 Interior Wall Painting* (195) Original Building (Gymnasium 1) - has painted plywood boards. (195) Original Building - has painted plaster wall finish. (1954) Addition - has painted plaster wall finish. (1954) Addition (Conference 18) - has painted gypsum board wall finish (1954) Addition (Meter Room 16) - has painted concrete block walls. (1957) Addition - has painted plaster wall finish. (1972) Addition (Gymnasium 42; Gym Storage 43, 45; Storage 46; Science 47; Electrical Room 51; Library 65) - have painted concrete block walls. 23 C Paint Concrete Floor Finishes* (195) Original Building (Basement - Mechanical Room 7, 74; Meter Room 71; Office 72; Storage 73, 75) - have painted concrete floor finish. (1954) Addition (Basement - Electrical Room 76; Storage 77; Corridor C1) - have painted concrete floor finish. 23 Report run on: April 7, 211 5:2 PM Page 28 of 52

29 C32.3 Terrazzo Floor Finishes* (195) Original Building (Corridors C1, C2, C9) - have terrazzo floor finish. 3 - Marginal 195 Repair terrazzo floor finish. (approx. 2 sq. m.) Concern: Terrazzo floor finish has cracks. Recommendation: Repair terrazzo floor finish. (approx. 2 sq. m.) Repair 211 $2, Low : C32.4 Wood Flooring** (195) Original Building (Gymnasium 1; Gym Storage 2, 5; Stage 6; Storage 7) - have wood strip flooring Replace wood strip flooring. (approx. 325 sq. m.) 22 $81,25 : C32.7 Resilient Flooring** (195) Original Building (Mezzanine - Storage 3, 4) - have sheet vinyl flooring. (approx. 3 sq. m.) 3 - Marginal Replace resilient flooring. (approx. 3 sq. m.) Concern: Sheet vinyl flooring has worn out. Recommendation: Replace resilient flooring. (approx. 3 sq. m.) Failure Replacement 211 $3, Low : Report run on: April 7, 211 5:2 PM Page 29 of 52

30 C32.7 Resilient Flooring** - 23 (195) Original Building (partial Staff Room 9; Staff Work Room 14; partial Classrooms 5, 52, 53, 54, 55, 61; partial Administration 56) - have sheet vinyl flooring. (approx. 32 sq. m.) (195) Original Building (Boys Washroom 1, Girls Washroom 12, Staff Men Washroom 11; Staff Women 13; Janitor 48; Server 63; Office 64) - have vinyl tile flooring. (approx. 1 sq. m.) (1954) Addition (Laundry 19; Kitchen 24; Play Gym 28; partial Storage 29; partial Special Education 3, 32, 34, 36, 38; Classroom 4; partial ECS 66, 67; Storage 69; partial Corridor C4) - has sheet vinyl flooring. (approx. 59 sq. m.) (1954) Addition (Electrical Room 2; Boys Washroom 21, Girls Washroom 22, Staff Women Washroom 23, Special Education Washroom 31, 33, 35, 37, 39, ECS Washroom 68; Quiet Room 26) - have vinyl tile flooring. (approx. 85 sq.. m.) (1957) Addition (Storage 8) - has sheet vinyl flooring. (approx. 2 sq. m.) (1972) Addition (Gymnasium 42; Science 47) - have sheet vinyl flooring. (approx. 2 sq. m.) (1972) Addition (Gym Storage 43, 45; Storage 46) - have vinyl tile flooring. (approx. 4 sq. m.) 23 2 Replace resilient flooring. (approx sq.m.) 223 $135,5 : C32.8 Carpet Flooring** - 23 (195) Original Building (partial Staff Room 9; Janitor's Office 15; Resource Room 49; partial Classrooms 5, 52, 53, 54, 55, 61; Administration 56; Vice Principal 57; Principal 58; Office 59; Conference Room 6; Computer Room 62; Corridor C3) - have carpet flooring. (approx. 5 sq. m.) (1954) Addition (Resource Room 17, 25; Conference 18, 27; partial Special Education 3, 32, 34, 36, 38; partial Classroom 4; partial ECS 66, 67; partial Storage 69; Corridors C5, C6) - have carpet flooring. (approx. 75 sq. m.) (1972) Addition (Music 41; Library 65; Corridor C7) - have carpet flooring. (approx. 41 sq. m.) Replace carpet flooring. (approx. 166 sq. m.) 218 $166, : C33.1 Concrete Ceiling Finishes (Unpainted)* (195) Original Building (Basement - Mechanical Room 7, 74; Meter Room 71; Office 72; Storage 73, 75) - have concrete ceiling finish. (1954) Addition (Basement - Electrical Room 76; Storage 77; Corridor C1) - have concrete ceiling finish. (1972) Addition (Gymnasium 42; Gym Storage 43; Storage 46; Electrical Room 51) - have concrete ceiling finish. 195 Report run on: April 7, 211 5:2 PM Page 3 of 52

31 C33.3 Plaster Ceiling Finishes (Unpainted)* (195) Original Building (Janitor 48; Resource Room 49; Classrooms 5, 52, 53, 54, 55, 61; Computer Room 62) - have textured plaster ceiling finish. (1954) Addition (Conference 18; Laundry 19; Play Gym 28; Special Education 3, 32, 34, 36, 38; Classroom 4; ECS 66, 67; Storage 69; Corridor C4) - have textured plaster ceiling finish. (1957) Addition (Storage 8) - has textured plaster ceiling finish. 195 C33.4 Gypsum Board Ceiling Finishes (Unpainted)* (195) Original Building (Gym Storage 2, 5; Stage 6; Storage 7; Boys Washroom 1, Girls Washroom 12, Staff Men Washroom 11; Staff Women 13; Server 63; Office 64; Corridor C3) - have gypsum board ceiling finish. (195) Original Building (Mezzanine - Storage 3, 4) - have gypsum board ceiling finish. (1954) Addition (Meter Room 16; Electrical Room 2; Boys Washroom 21, Girls Washroom 22, Staff Women Washroom 23, Special Education Washroom 31, 33, 35, 37, 39, ECS Washroom 68) - have gypsum board ceiling finish. (1972) Addition (Gym Storage 45) - has gypsum board ceiling finish. 195 Report run on: April 7, 211 5:2 PM Page 31 of 52

32 C33.6 Acoustic Ceiling Treatment (Susp. T-Bar)** Edmonton - Hazeldean Elementary School (B3146A) (195) Original Building (Staff Room 9; Staff Work Room 14; Administration 56; Vice Principal 57; Principal 58; Office 59; Conference Room 6; Corridors C1, C9) - have suspended T-bar ceiling system c/w acoustic ceiling tiles. (approx. 62 sq. m.) (upgraded in 23) (1954) Addition (Resource Room 17, 25; Quiet Room 26; Conference 27; Corridors C4, C5, C6) - have suspended T-bar ceiling system c/w acoustic ceiling tiles. (approx. 43 sq. m.) (upgraded in 23) (1972) Addition (Music 41; Science 47; Library 65) - have suspended T-bar ceiling system c/w acoustic ceiling tiles. (approx. 5 sq. m.) (upgraded in 23) 3 - Marginal Replace suspended T-bar ceiling system c/w acoustic ceiling tiles. (approx. 1 tiles) Concern: Acoustic ceiling tiles are stained and dirty. Recommendation: Replace suspended T-bar ceiling system c/w acoustic ceiling tiles. (approx. 1 tiles) Repair 211 $2, Low : Replace suspended T-bar ceiling system c/w acoustic ceiling tiles. (approx. 155 sq. m.) 228 $116,25 : C33.7 Interior Ceiling Painting* (195) Original Building (Basement - Mechanical Room 7, 74; Meter Room 71; Office 72; Storage 73, 75) - have painted concrete ceiling finish. (195) Original Building (Janitor 48; Resource Room 49; Classrooms 5, 52, 53, 54, 55, 61; Computer Room 62) - have painted textured plaster ceiling finish. (195) Original Building (Gym Storage 2, 5; Stage 6; Storage 7; Boys Washroom 1, Girls Washroom 12, Staff Men Washroom 11; Staff Women 13; Server 63; Office 64; Corridor C3) - have painted gypsum board ceiling finish. (195) Original Building (Mezzanine - Storage 3, 4) - have painted gypsum board ceiling finish. (1954) Addition (Basement - Electrical Room 76; Storage 77; Corridor C1) - have painted concrete ceiling finish. (1954) Addition (Conference 18; Laundry 19; Play Gym 28; Special Education 3, 32, 34, 36, 38; Classroom 4; ECS 66, 67; Storage 69; Corridor C4) - have painted textured plaster ceiling finish. (1954) Addition (Meter Room 16; Electrical Room 2; Boys Washroom 21, Girls Washroom 22, Staff Women Washroom 23, Special Education Washroom 31, 33, 35, 37, 39, ECS Washroom 68) - have painted gypsum board ceiling finish. (1957) Addition (Storage 8) - has painted textured plaster ceiling finish. (1972) Addition (Gymnasium 42; Gym Storage 43; Storage 46; Electrical Room 51) - have painted concrete ceiling finish. (1972) Addition (Gym Storage 45) - has painted gypsum board ceiling finish. 23 Report run on: April 7, 211 5:2 PM Page 32 of 52

33 C33.9 Other Ceiling Finishes* - Acoustic Ceiling Tiles Edmonton - Hazeldean Elementary School (B3146A) (195) Original Building (Gymnasium 1) - has acoustic ceiling tiles between trusses. (upgraded 23) 23 Report run on: April 7, 211 5:2 PM Page 33 of 52

34 S4 MECHANICAL Edmonton - Hazeldean Elementary School (B3146A) D21.4 Sinks** Single and two compartment Stainless steel, swing spout brass. Floor mounted mop sinks in Janitor rooms Replace 17 S/S sinks and 2 Mop sinks. 233 $15, : D21.5 Showers** Metal shower stall in laundry room Replace shower stall. 233 $3,5 : D21.8 Drinking Fountains/Coolers** Wall hung, stainless steel non-refrigerated throughout school. Mainly in corridors Replace 7 drinking fountains. 238 $6, : Report run on: April 7, 211 5:2 PM Page 34 of 52

35 D21.1 Washroom Fixtures (WC, Lav, Urnl)** Floor mounted water closets, elongated bowls, open front seats, infrared operated flush valve. Floor mounted, flush tanks in office areas. Wall hung Urinals, infrared operated flush valve. Stainless steel Lavs, countertop, metering faucets Replace 25 WCs, 32 Lavs, 6 Urinals. 238 $12, : D Pipes and Tubes: Domestic Water* Mainly copper piping and fittings with soldered joints throughout building. 23 D Valves: Domestic Water** Mixture of Standard stem type gate valves and quarter turn ball valves. Mainly isolation service Replace 5 Valves. 243 $25, : D Piping Specialties (Backflow Preventors)** Backflow preventors installed on boiler makeup water line Replace Boiler make up line Backflow Preventor. 223 $2,5 : Report run on: April 7, 211 5:2 PM Page 35 of 52

36 D Domestic Water Heaters** 2 Domestic water heaters are A.O.Smith model no. BTRC Input capacity is 274,5 Btuh. Storage capacity: 65 Gals. c/w Grundfoss recirculation pump Replace 2 Domestic Water Heaters and recirc. pump. 223 $7,5 : D22.3 Water Supply Insulation: Domestic* All domestic cold, hot and recirculation piping insulated and canvas covered in exposed areas. 23 D23.1 Waste and Vent Piping* Waste and vent piping is PVC and ABS type. 23 D Floor Drains* Conventional floor drains in Washrooms and Mechanical rooms. Cast iron strainers. 23 D24.1 Rain Water Drainage Piping Systems* Rain water drainage piping is PVC & Cast Iron. Collects rainwater from roof and discharges to City storm system. 23 D Roof Drains* Deep sump, cast iron, full open flow. 23 Report run on: April 7, 211 5:2 PM Page 36 of 52

37 D31.2 Gas Supply Systems* Gas distribution piping to heating boilers, air handling units and domestic hot water heaters. Steel schedule D Heating Boilers and Accessories: H.W.** Three gas fired boilers equal to Weil McLain BG-788-WF, 478.3kW output each Replace 3 Heating Boilers and Accessories. 238 $15, : D Chimneys (& Comb. Air): H.W. Boiler** Class B chimneys. The combustion air duct complete with gooseneck, baffle trap and unit heater to temper combustion air Replace Boiler Chimneys (&Comb. Air). 238 $4, : D Water Treatment: H. W. Boiler* Boiler water is tested. Chemical pot feeder provided. 23 Report run on: April 7, 211 5:2 PM Page 37 of 52