1 June 6, 2011 ADDENDUM 2 (Rev.1) For Snow Removal Equipment Storage Building URS Project No Prepared For 2933 Airport Blvd. Abilene, TX Prepared By URS Corporion 1950, North Stemmons Freeway Suite 6000 Dallas, Texas (P) (F)

2 ADDENDUM #2 (Rev. 1) Snow removal Equipment Storage Building A.I.P No URS Project No Page 2 of 3 ADDENDUM 2 (Rev. 1) To Bidding Documents stamped May 06, This Addendum becomes a part of the Contract Documents for this job supersedes the original Documents in case of conflict. DATE ISSUED June 6, 2011 ISSUED TO PURPOSE NOTICE ACKNOWLEDGMENT All Plan Holders of Record. To supplement modify Bidding Requirements Contract Documents. This Addendum is hereby made a part of the original Contract Documents, supersedes the original in case of conflict. All bidders shall carefully note all of the omissions, changes, additions or clarificions included herein will be responsible for taking into account any changes th will affect their work. Bidders are required to acknowledge receipt of this Addendum by inserting its number de on the Proposal Form in accordance with the "Competitive Sealed Proposals" "Instructions to Offerors". Failure to acknowledge all Addenda may subject bidder to disqualificion. This Addendum forms part of the Contract Documents. CONTENTS This Addendum consists of the following parts: A. Changes to Project Manual The Bidding Documents for solicition of competitive sealed proposals of the above project are hereby changed in part as follows: A. CHANGES TO PROJECT MANUAL Spec. Section INVITATION FOR BIDS Bid Schedule Addendum description The bid due de has been extended to 2:00 pm, Wednesday, June 8, The City of Abilene will receive sealed, written bids in the Purchasing Office, 555 Walnut, Room 201-A, Abilene, Texas 79601, until 2:00 pm, Monday, June 6, June 8, 2011, for: SNOW REMOVAL EQUIPMENT STORAGE BUILDING Revise Line 6, Item P Lime-Treed Subgrade, 6 Depth to read: 1,934 SY

3 ADDENDUM #2 (Rev. 1) Snow removal Equipment Storage Building A.I.P No URS Project No Page 3 of 3 B. CHANGES TO DRAWINGS Sheet No. Addendum description A5.00 Detail 1/A5.00: Delete part of note Hoist crane by Owner replace with Hoist crane Contractor provided contractor installed Scope includes a complete functional electrical hoist crane monorail system: Span=77 ; Lift=24 ; Capacity=3 Ton, as part of the base bid. Delete all references to Alterne #1. END OF ADDENDUM 2

4 BID SCHEDULE SNOW REMOVAL EQUIPMENT STORAGE BUILDING CITY OF ABILENE It is understood the quantities of work to be done unit prices are approxime are intended for bidding purposes only. Show bid prices in both words numerals. In case of discrepancy, the amount shown in words shall govern over numerals. Round off unit prices to two decimal places only. These Bid prices must include all labor, merials, equipment, insurance, overhead, superintendence, transportion, profit, incidentals to cover the finished Work called for in the Contract Documents. LINE DESCRIPTION, 1 G Mobilizion 1 LS 2 G Temporary Marking, Barricades, Lighting, Facilities 1 LS 3 P Pavement Removal 104 SY 4 P Clearing Grubbing 0.80 AC 5 P Embankment in Place 1,328 CY 6 P Lime-Treed Subgrade, 6 Depth 1,934 SY 7 P Lime 32 Ton 8 P Temporary Air Wer Pollution, Soil Erosion, Siltion Control 1 LS 11

5 LINE DESCRIPTION, 9 P Crushed Aggrege Base Course 440 CY 10 P Portl Cement Concrete Pavement 1,856 SY 11 T Seeding 1,600 SY 12 T Sodding 250 SY 13 T Topsoiling 180 CY 14 T Mulching 1,600 SY Precast Reinforced Concrete Sanitary Sewer Manhole, 5-foot Dia. 2 EA Fire Hydrant w/appurtenances 1 EA inch Dia. Ge Valve 1 EA inch inch Air Release Valve 1 EA 12

6 LINE DESCRIPTION, Wer Service Connection 1 EA Wastewer Service Connection 1 EA inch Dia. PVC Wer Line, AWWA C inch Dia. PVC Wer Line, AWWA C LF 21 LF /2 Poly Service Line, AWWA C LF inch Dia. PVC Sanitary Sewer Line, SDR L C #350 kcmil, THWN-2, Installed in Duct or Conduit, Complete In-Place 26 L inch Diameter Schedule 40 PVC Underground Electrical Conduit, Complete In-Place 421 LF 400 LF 400 LF Utility Cost Allowance 1 LS $75, $75, Seventy-Five Thous No 13

7 LINE DESCRIPTION, 28 A Snow Removal Equipment Storage Building 1 LS TOTAL BID: $ TOTAL BID (WRITTEN IN WORDS): Bidder agrees th the Work will be completed within one-hundred twenty (120) calendar days after the de established in the Notice to Proceed. SUBMITTED on,