Trent Hills Public Library 98 Bridge Street East Campbellford, Ontario

Size: px
Start display at page:

Download "Trent Hills Public Library 98 Bridge Street East Campbellford, Ontario"

Transcription

1 ± 688± 0± 86± 8± 68± 878± A U/S OF SOFFIT,68± 66± A0 STACK PENETRATION RIDGE HEIGHT 7,7± A0 7 King St. Peterborough ON K9J R8 t f B NOTE: ROOFTOP MECHANICAL UNITS ARE TO BE LIFTED TO PROPERLY TIE DOWN ROOF. 68± MECHANICAL UNIT Bx C U/S OF SOFFIT,68± 78± MECHANICAL UNIT LIBRARY ADDITION AREA IN CONTRACT RIDGE HEIGHT 7,7± A0 NOTE: FLAT ROOFS TO BE SLOPED TO DIRECT WATER AWAY FROM MECHANICAL UNITS AND TOWARDS SCUPPERS. EXISTING RAILING D 806± MECHANICAL UNIT HERITAGE BUILDING N.I.C. N N E Issued for Review 0// Issued for Tender 7/06/ A0 Ex 66± F U/S OF SOFFIT,68± ROOF PLAN LINE OF AREA IN CONTRACT PARAPET HEIGHT,67± :0 : June 7, 0-8 A00

2 REMOVE BATT INSULATION FROM ROOF WHEREVER POSSIBLE DECK/ PLY GENERAL DEMOLITION NOTES. COORDINATE DEMOLITION/REMOVAL OF ALL EXISTING SERVICES WITH RENOVATION DRAWINGS.. MAINTAIN MAXIMUM SAFETY PRECAUTIONS TO ALL BUILDING OCCUPANTS DURING HOURS OF OPERATION. TAKE MEASURES TO CONTROL NOISE AT ALL TIMES. DECK. MAKE SITE VISITS BEFORE RFP COMMENCES TO VERIFY ALL EXISTING SERVICES. MAKE SURE TO DOCUMENT EXISTING SERVICES AS REQUIRED TO UNDERTAKE WORK AS SHOWN ON DRAWINGS AND PROVIDE PROPER ALLOWANCE IN FEE.. WORK TO BE UNDERTAKEN IN ACCORDANCE WITH ALL APPLICABLE CODES, BYLAWS AND ALL OTHER AUTHORITIES HAVING JURISDICTION. ENSURE ALL APPROPRIATE PERMITS ARE OBTAINED PRIOR TO COMMENCEMENT OF WORK OUTLINED ON THE DRAWINGS.. USE TECHNICIANS COMPETENT AND LICENSED FOR THEIR WORK TO MAKE SYSTEMS SAFE. SPECIFIC DEMOLITION NOTES. BALAST TO BE REMOVED FOR REUSE IF POSSIBLE.. ALL FASCIAS AND EAVES TO BE REMOVED COMPLETE.. ROOFTOP UNIT DISCONNECTION, LIFTING, AND RECONNECTION TO BE CO-ORDINATED BY CONTRACTOR FOR PROPER ROOF FLASHING AND TIE IN. 7 King St. Peterborough ON K9J R8 t f REMOVE BATT INSULATION FROM SOFFIT SOFFIT SOFFIT A0 TYP. EXISTING ROOF SECTION A0 EXISTING SECTION AT VESTIBULE DECK CUT EXISTING A&V BARRIER WHEN REACHES EXISTING FLASHING AT WALL REMOVE FLASHING AND A&V BARRIER FROM PARAPET Issued for Review 0// Issued for Tender 7/06/ % SLOPED ROOF TO SCUPPERS REMOVE BATT INSULATION FROM ROOF REMOVE COMLPETE EXISTING ROOF & ROOF DEMO :8 : June 7, 0-8 A0 EXISTING SECTION THROUGH ADDITION N-W WALL A0 EXISTING SECTION THROUGH ADDITION N-E WALL A0

3 GENERAL DEMOLITION NOTES. COORDINATE DEMOLITION/REMOVAL OF ALL EXISTING SERVICES WITH RENOVATION DRAWINGS.. MAINTAIN MAXIMUM SAFETY PRECAUTIONS TO ALL BUILDING OCCUPANTS DURING HOURS OF OPERATION. TAKE MEASURES TO CONTROL NOISE AT ALL TIMES.. MAKE SITE VISITS BEFORE RFP COMMENCES TO VERIFY ALL EXISTING SERVICES. MAKE SURE TO DOCUMENT EXISTING SERVICES AS REQUIRED TO UNDERTAKE WORK AS SHOWN ON DRAWINGS AND PROVIDE PROPER ALLOWANCE IN FEE. DECK/ PLY. WORK TO BE UNDERTAKEN IN ACCORDANCE WITH ALL APPLICABLE CODES, BYLAWS AND ALL OTHER AUTHORITIES HAVING JURISDICTION. ENSURE ALL APPROPRIATE PERMITS ARE OBTAINED PRIOR TO COMMENCEMENT OF WORK OUTLINED ON THE DRAWINGS.. USE TECHNICIANS COMPETENT AND LICENSED FOR THEIR WORK TO MAKE SYSTEMS SAFE. SPECIFIC DEMOLITION NOTES. BALAST TO BE REMOVED FOR REUSE IF POSSIBLE.. ALL FASCIAS AND EAVES TO BE REMOVED COMPLETE.. ROOFTOP UNIT DISCONNECTION, LIFTING, AND RECONNECTION TO BE CO-ORDINATED BY CONTRACTOR FOR PROPER ROOF FLASHING AND TIE IN. 7 King St. Peterborough ON K9J R8 t f REMOVE EXT. MECHANICAL WALL BACK TO SHEATHING REMOVE BATT INSULATION FROM ROOF WHEREVER POSSIBLE ROOF COMPLETE TO SHEATHING REMOVE COMPLETE EXISTING ROOF % SLOPED ROOF REMOVE SOFFIT COMPLETE STEEL ROOF COMPLETE TO DECK/ PLY 60 Issued for Review 0// Issued for Tender 7/06/ A0 EXISTING ROOF SECTION AT MECHANICAL DECK/ PLY & BATT INSULATION FLASHING & ROOF DEMO :8 : June 7, 0-8 A0 EXISTING DORMER A0 EXISTING SECTION AT TOWER ROOF A0

4 -TRADITION 0 VICWEST (COLOUR BY CONSULTANT) -9 - AIRSPACE - 00 POLYISO. INSULATION MECH. FASTENED - Z-GIRTS -ICE & WATER SHIELD -9 EXISTING -TRADTION 0 VICWEST (COLOUR BY CONSULTANT) -9 PLWOOD - AIRSPACE -00 POLYISO. INSULATION MECH. FASTENED - Z-GIRTS -ICE & WATER SHIELD -9 EXISTING PULL EXISTING VAPOUR BARRIER BACK OVER AS SHOWN FLASHING W/ FORMED 6mm 6mm.7 EXT. GRADE CAULK 7 King St. Peterborough ON K9J R8 TRADITION 0 SEAM CAP EAVESTROUGH (COLOUR BY CONSULTANT) TYPICAL FASCIA SEE TRADITION 0 KR - CLIP t f TRADITION 0 ROOF PANEL X 6 00 O.C. SCALE: : PROVIDE 9mm VENT HOLES BETWEEN RAFTERS NEW SOFFIT TYP. FASCIA SCALE: : NEW SOFFIT BUTYL TAPE TRADITION 0 ROOF PANEL CONTINUOUS STARTER STRIP 9 X 00 FINISHED FASCIA TYP. ROOF SEE SLIDING PIECE CONNECTION GABLE FLASHING STARTER STRIP TYP. ROOF SECTION SECTION AT VESTIBULE MEMBRANE FLASHING UP AND OVER PARAPET AND EDGE OF ROOFING AS SHOWN. PROVIDE CONT. CAP FLASHING OVER PARAPET AND EDGE OF ROOFING AS SHOWN. CONTINUOUS BINDER BAR TOOLED CANT SCALE: : - POLYISO. INSULATION REGLET FLASHING INTO MORTAR JOINT, AND PROVIDE SEALANT FLASHING W/ SECTION AT RIDGE RUN MEMBRANE FLASHING ALONG EXISTING EXT. WALL AND FASTEN AS SHOWN PROVIDE NEW CONTINUOUS FLASHING UP WALL AS SHOWN. PERF. SCREEN OPENING TOOLED CANT Issued for Review 0// Issued for Tender 7/06/ SCALE: : TIE ICE AND WATER SHIELD INTO WINDOW SYSTEM % SLOPED ROOF TO SCUPPERS % SLOPED ROOF TO SCUPPERS -METAL ROOF -.7 EXT. GRADE - X 6 PURLINS AT EACH RAFTER FILL W/ SPRAY FOAM INSUL..7 EXT. GRADE NEW ROOF SECTIONS X 00 O.C. FORMED METAL EDGE DRIP SCREEN BY FRY-REGLET OR : EX. CONC. LINTEL SCALE: : As Noted June 7, 0-8 SECTION THROUGH ADDITION N-W WALL SECTION THROUGH ADDITION N-E WALL

5 RIDGE FLASHING SEE X 00 O.C. PROVIDE BLOCKING AS REQUIRED BLOCKING CAULKING CONTINUOUS BRING MEMBRANE FLASHING UP BLOCKING AND FASTEN AS SHOWN TOOLED CANT EDGE DRIP SEE 7 King St. Peterborough ON K9J R8 t f SCALE: : PROVIDE NEW STEEL GUARD TO COMPLY WITH MINISTY REQUIREMENTS. PAINTED BLACK S TO BE MOVED TO BE IN LINE WITH NEW SLOPED ROOF. SEE - POLYISO. INSULATION - METAL SHEET AIR SPACE - 00 O.C RIGID INSULATION - ICE AND WATER SHIELD - EX. EXT. GRADE TYP. SLEEPER SEE A0 NEW ICE AND WATER SHIELD TO EXISTING DECK TYP. FASCIA SEE % SLOPED ROOF TO SCUPPERS EDGE DRIP FLASHING W/ MEMBRANE FLASHING UP TIE INTO SYSTEM AND PROVIDE NEW FLASHING AS SHOWN. TOOLED CANT SCALE: : A0 SECTION AT TOWER ROOF Issued for Review 0// Issued for Tender 7/06/ A0 ROOF SECTION AT MECHANICAL DECK PROVIDE BLOCKING AS REQUIRED MEMBRANE FLASHING UP AND OVER PARAPET AND EDGE OF ROOFING AS SHOWN. PROVIDE CONT. CAP FLASHING OVER PARAPET AND EDGE OF ROOFING AS SHOWN. 98 SEE WHERE DORMER MEETS ROOF EPDM CAP LOOSE FILL INSULATION PIPE (EXTEND IF NECESSARY) CONT. STARTER STRIP 7 7 CONT. STARTER STRIP X 6 00 O.C..7 EXT. GRADE SCREEN BY FRY-REGLET OR CONTINUE ICE AND WATER SHIELD ALONG VENT STACK WOOD BLOCKING AROUND VENT STACK SEE TOOLED CANT NEW ROOF SECTIONS 00 RIGID INSUL. As Noted A0 DORMER A0 SECTION AT VENT STACK A0 SPACE NEW SLEEPERS TO REFLECT LAYOUT OF EXISTING SLEEPERS. TYP. SLEEPER : - POLYISO. INSULATION : June 7, 0-8 A0