1 Wall Plan (00 Design Requirements, Section..5..) First Floor, Building 5 Replace roll-up door, reusing the drum, motor, and cover Replace door hardware, including keyed lock () Replace piping and patch CMU wall to match existing Replace door frame weathering strip () 5 Replace door hardware, to include new panic bar () Demo and do not replace wood wainscot Demo and do not replace windows 8 Patch over wall inset Remove door frames Include -hr fire rated enclosure for stairwell walls Replace door, door frame, and hardware () 8 Patch over wall window opening Replace door, door frame, and hardware () Replace piping and patch CMU wall to match existing Replace personnel door, door frame, and hardware (5) Relocate wall to be flush with exterior wall Door Replacement Plan Demo walls, replace with framed walls w/drywall. Walls separating office area from the warehouse must meet fire-rating and insulation requirements. Replace all specified details. Doors and windows leading to the warehouse must meet firerating requirements. Load bearing walls systems. Paint walls and install cove base, color to be approved through CO. Include new electrical and LAN receptacles and lighting switches. Demo and replace drywall and protect/repair wall framing. Replace all specified details. Doors and windows leading to the warehouse must meet firerating requirements. Load bearing walls systems. Paint walls and install cove base, color to be approved through CO. Include new electrical and LAN receptacles and lighting switches.. Patch and paint walls, color to be approved through CO. Demo and replace drywall and protect/repair wall framing. Replace all specified details. Load bearing walls systems. Paint walls, color to be approved through CO. Include tile wainscot per the DCG. Include new electrical receptacles and lighting switches. 5 7 Glazed steel doors w/ cipher lock to access warehouse Glazed wood doors Solid core wood doors Fire-rated glazed steel door Fire-rated steel door Fire-rated steel door w/ cipher lock to access warehouse Steel door 8 Glass storefront door Demo steel warehouse doors and infill with CMU block to match existing wall. Restore wall where the door was located Notes: Protect and preserve all doors not indicated for replacement. Any door requirements to meet fire code, UFC , and the base DCG that differ from what is specified shall override door plan. section..5. and... of the 00 Design Requirements. Paint all exterior wall surfaces, to include sanding and painting doors and door frames. Replace storefront windows in warehouse area.

2 Wall Plan (00 Design Requirements, Section..5..) Second Floor, Building 5 Demo and do not replace wood wainscot throughout Demo walls, replace with framed walls w/drywall. Walls separating office area from the warehouse must meet fire-rating and insulation requirements. Replace all specified details. Doors and windows leading to the warehouse must meet firerating requirements. Load bearing walls systems. Paint walls and install cove base, color to be approved through CO. Include new electrical and LAN receptacles and lighting switches. Demo and replace drywall and protect/repair wall framing. Replace all specified details. Doors and windows leading to the warehouse must meet firerating requirements. Load bearing walls systems. Paint walls and install cove base, color to be approved through CO. Include new electrical and LAN receptacles and lighting switches.. Paint walls, color to be approved through CO. Demo and replace drywall and protect/repair wall framing. Replace all specified details. Load bearing walls systems. Paint walls, color to be approved through CO. Include tile wainscot per the DCG. Include new electrical receptacles and lighting switches. 5 7 Door Replacement Plan Glazed steel doors w/ cipher lock to access warehouse Glazed wood doors Solid core wood doors Fire-rated glazed steel door Fire-rated steel door Fire-rated steel door w/ cipher lock to access warehouse Steel door 8 Glass storefront door Notes: Protect and preserve all doors not indicated for replacement. Any door requirements to meet fire code, UFC , and the base DCG that differ from what is specified shall override door plan. section..5. and... of the 00 Design Requirements,.

3 Flooring Plan (00 Design Requirements, Section..5..) First Floor, Building 5 Remove tile floor finishing, restore concrete as required, and paint to match warehouse concrete floor install new carpet. install new ceramic tile. install new rubber flooring. install new tile flooring to match wall wainscot and meet base DCG requirements. Notes: Any requirements to meet code, specified shall override plan. section..5. and... of the 00 Design Requirements. Apply skid resistant/non-slip epoxy paint finish throughout warehouse floor.

4 Flooring Plan (00 Design Requirements, Section..5..) Second Floor, Building 5 install new carpet. install new ceramic tile. install new rubber flooring. install new tile flooring to match wall wainscot and meet base DCG requirements. Notes: Any requirements to meet code, specified shall override plan. section..5. and... of the 00 Design Requirements. Apply skid resistant/non-slip epoxy paint finish throughout warehouse floor.

5 Ceiling Plan (00 Design Requirements, Section..5..) First Floor, Building 5 Demo and install ceiling. Ceiling must include fire-rated separation to meet UFC and NFPA 0 requirements for separation between office area and warehouse area. Ceiling must also include insulation. Construct fire separation ceiling with suspended drop ceiling underneath. Run all required electrical and HVAC components in the space between the fire separation and drop ceiling. Replace all HVAC diffusers, air vents, fire suppression sprinklers, lighting, and emergency egress lightings and signs. Ensure ceiling is structurally designed to support loads. Demo and install drop ceiling. Replace all HVAC diffusers, fire suppression sprinklers, lighting, and emergency egress lighting and signs. Modify ceiling to meet UFC and NFPA 0 requirements for separation between office area and warehouse area. Protect and preserve existing ceiling components. Demo and install ceiling. Ceiling must include fire-rated separation to meet UFC and NFPA 0 requirements for separation between office area and warehouse area. Ceiling must also include insulation. Ceiling should be hard board and meet base DCG standards for bathroom ceilings. Replace all HVAC diffusers, air vents, exhaust fan vents, fire suppression sprinklers, lighting, and emergency egress lighting and signs. Notes: Any requirements to meet code specified shall override plan. section..5. and... of the 00 Design Requirements. Fire suppression shall be incorporated into the ceiling of and provided to all office areas.

6 Ceiling Plan (00 Design Requirements, Section..5..) Second Floor, Building 5 Demo and install ceiling. Ceiling must include fire-rated separation to meet UFC and NFPA 0 requirements for separation between office area and warehouse area. Ceiling must also include insulation. Construct fire separation ceiling with suspended drop ceiling underneath. Run all required electrical and HVAC components in the space between the fire separation and drop ceiling. Replace all HVAC diffusers, air vents, fire suppression sprinklers, lighting, and emergency egress lightings and signs. Ensure ceiling is structurally designed to support loads. Demo and install drop ceiling. Replace all HVAC diffusers, fire suppression sprinklers, lighting, and emergency egress lighting and signs. Modify ceiling to meet UFC and NFPA 0 requirements for separation between office area and warehouse area. Protect and preserve existing ceiling components. Demo and install ceiling. Ceiling must include fire-rated separation to meet UFC and NFPA 0 requirements for separation between office area and warehouse area. Ceiling must also include insulation. Ceiling should be hard board and meet base DCG standards for bathroom ceilings. Replace all HVAC diffusers, air vents, exhaust fan vents, fire suppression sprinklers, lighting, and emergency egress lighting and signs. Notes: Any requirements to meet code specified shall override plan. section..5. and... of the 00 Design Requirements. Fire suppression shall be incorporated into the ceiling of and provided to all office areas.

7 Details (00 Design Requirements, Section..) First Floor, Building 5 Demo and replace counter and display boards, match existing. Install gov t furnished display case Provide comm requirements for SIPR data ports..5.. Demo cubbies. Do not replace Protect and relocate (if required) the guard rail Install a/v hookups Include motiondetector sensed lighting..0.8.

8 Details (00 Design Requirements, Section..) Second Floor, Building 5 Install a/v hookups Relocate wall to adjust room sizes to accommodate new restroom Construct new unisex bathroom Include motiondetector sensed lighting..0.8.

9 Number of Workstations First Floor, Building Notes: Any requirements to meet code specified shall override plan. Electrical outlets and supply, data ports, and telephone ports should be provided to meet the requirements for the indicated number of workstations and, at a minimum, the base DCG. The number of workstations is not necessarily an indication of building occupancy and should not be used to calculate building occupancy.

10 Number of Workstations Second Floor, Building 5 Notes: Any requirements to meet code specified shall override plan. Electrical outlets and supply, data ports, and telephone ports should be provided to meet the requirements for the indicated number of workstations and, at a minimum, the base DCG. The number of workstations is not necessarily an indication of building occupancy and should not be used to calculate building occupancy.