Attachment A Repair Knee Brace on High Arch Salt Building Fayette County, Mill Run Stockpile #24 Project # Building #PA
|
|
- Lionel Young
- 5 years ago
- Views:
Transcription
1 I. Base Bidding Requirements This is a Base Bid project; the following describes the Base Bid requirements. Contractors are to provide bids for Base Bid #1. A. BASE BID #1: II. Work Included The following items are site specific requirements of the project. A. Contractor to repair, replace and install the necessary materials to complete the work identified below per each building identified in the Base Bid requirements. B. Contractor to engage the services of a structural engineer for design and installation guidance. C. Select demolition of existing bracing material, excavation for foundation work, and existing concrete foundation. D. Replacement of the building foundation to include epoxy coated reinforcing bar. E. Installation of new Knee Brace. F. Backfill and Paving to existing grades. III. GENERAL A. The Contractor shall provide all labor, materials, apparatus, trucking, tools, superintendence, and services required for completion of the work as described on the Statement of Work, Specifications, and Drawings. B. The Contractor is responsible for obtaining all necessary Permits from the Department of Labor and Industry (L&I) ( there are no fees for the Permits as long as the contractor notifies the L&I that this project is for the Commonwealth of Pennsylvania, PennDOT and is to be completed on state owned or state leased property. 1. Contractor shall provide all design, calculations, and final plans sealed by a Professional Engineer licensed in the state of Pennsylvania, as required. 2. This building does not have an occupancy permit. The Contractor will be responsible to obtain the occupancy permit for this building as part of the project. Page 1 of 7
2 C. Contractor shall maintain and log, all mail receipts regarding L&I correspondence and submittals, and provide copies to PennDOT upon request. D. Contractor to confirm all dimensions and quantities before bidding. Any stated dimensions/quantities are estimates only. IV SELECT DEMOLITION A. Remove damaged treated wood framing materials. B. Saw cut existing asphalt paving. C. Excavate to expose the foundation. D. Demolish the foundation concrete to expose the embedded wood framing members. 1) Contractor to legally dispose of all construction debris. V. MATERIALS A. New treated wood framing member(s) to be pressure treated for direct ground contact. B. Wood framing member(s) shall be solid sawn timbers or glue laminated timbers specified for outdoor exposure. C. Concrete to be 5000 PSI. D. Reinforcing bar to be grade 60, epoxy coated deformed round bars. E. Fasteners to be hot dipped galvanized. F. Asphalt paving to be hot mixed 19mm. G. Pipe Bollards shall be eight inch (8 ) schedule 40 galvanized steel pipe, eight feet (8 ) total length. VI. INSTALLATION A. Install new wood framing member(s) to the lines and angles as the existing framing member(s). B. Cross drill the embedded end of the timber to accept a # 6 X 16 (minimum) epoxy coated rebar. C. Install epoxy coated reinforcing bars as directed by engineer of record. D. Place new concrete so as to embed the new timber framing member(s) to a depth of the existing timber. E. Backfill excavation with 2A stone in compacted lifts in no more than eight inch (8 ) depths. F. Pave the area with 19mm hot asphalt paving to meet existing lines and grades. G. Seal all asphalt joints with liquid asphalt sealer. H. Install four (4) pipe bollards in front of the building. Page 2 of 7
3 I. Install a pipe bollard at the outer most corners of the building and at both door edges of the main door opening. J. Set pipe bollards one foot six inches (1-6 ) out from the face of the building, inline from side to side. K. Pipe bollards to be installed with three feet (3 ) embedded in concrete, in the ground and five feet (5 ) exposed. (see attached drawing) L. Pipe bollards shall be filled with concrete. M. Pipe bollards shall receive a Safety Yellow PVC sleeve with Red & White reflective tape. VII. SUBMITTALS AND FINAL DELIVERABLE ITEMS A. Submittals and final Deliverable items 1. The Department will provide the awarded contractor a complete breakdown of the required submittals based off of the System identified, I.E. Roofing System 2. Contractor to provide three (3) copies of the entire project documentation in three (3) ring Binders. 3. Binders to include the following items: a. Bid Documents & Specifications b. All project meeting minutes (pre-bid, pre-job, Interim, and Final inspection) c. Correspondence d. Submittals e. L&I approved Engineered Drawings (Paper/CD) f. L&I Building Permits, Inspection Logs, Occupancy Permit, Other correspondence g. Certifications h. Certified Payrolls (Prevailing Wage rates) if applicable i. Waste receipts j. Photos Before, during and after 1) A sufficient amount of Photos is required for all phases of construction on all buildings, base on award. 2) Building Final-Exterior all four sides k. Operation and Maintenance manuals l. Contractors Warranty m. Manufactures Warranty VIII. SUBMITTAL PROCEDURE Page 3 of 7
4 A. Submit Two (2) copies of all items shown on submittal schedule except for "samples". B. Identify project number, project name and location, and contractor's name and address on all submittals. C. Provide space for review stamps of Contractor and Department. Put contractor stamp of approval on each item submitted. D. Revise and resubmit submittals as required, identify all changes made since previous submittal. E. No work shall be performed until all submittals are approved by the Department. Work performed prior to submittal approval is performed at the Contractor's risk and may be subject to repair, replacement or other corrective measures as deemed necessary by the Department with no additional contract time or money. F. Review of shop drawings will be general and for the limited purpose of checking for general conformance with the design; and shall not relieve the Contractor from the responsibility for proper fitting and construction of the work, nor from furnishing materials and work required by the Contract which may not be indicated on the shop drawings when reviewed. G. The submittals required by this contract are subject to reproduction for the Department's internal use only. By signature on this bid proposal, both the Contractor and the equipment manufacturer authorize the Department to reproduce any materials including printed literature and training aids, submitted in fulfillment of this contract. IX. MANUFACTURER'S INSTRUCTIONS A. When specified in individual specification sections, submit manufacturer's printed instructions for delivery, storage, assembly, installation, start-up, adjusting and finishing, and maintenance, in quantities specified for product data. B. Identify conflicts between manufacturer's instructions and contract documents. X. MANUFACTURER'S CERTIFICATES A. When specified in individual specification sections or on submittal schedule, submit manufacturer's certificates to for review. Page 4 of 7
5 B. Indicate that material or product conforms to or exceeds specified requirements. Submit supporting reference date, affidavits and certifications as appropriate. C. Certificates may be recent or previous test results on material or product, but in all cases must be acceptable to Department. XI. SUBMITTAL SCHEDULE A. Abbreviations: SoSu - Source of Supply DeDa - Descriptive Data or Catalog Cuts ShDr - Shop or Installation Drawings CoCh - Color Chart Cert - Certificates Samp Samples B. Schedule: Description of items to be submitted SoSu DeDa ShDr CoCh Samp Cert 1. Cost Breakdown X X 2. Work Schedule X X 3. Engineered Stamped Drawings X X X X 4. L&I Permit Documents X X X 5. Waste receipts X 6. Digital Photos X 7. Final Deliverable Items 3 ring binder X 8. Wood framing timbers X X 9. Concrete X X 10. Epoxy coated Reinforcing bar X X X Page 5 of 7
6 Drawing for information only. Page 6 of 7
7 Drawings are for information only. Page 7 of 7
Attachment A Concrete Curb and Sidewalk Replacement Cambria County, Johnstown Driver s Exam Center Project# Building# 093DL01
I. Bidding Requirements The Contractor to provide bid for entire project. II. Work Included The following items are site specific requirements of the project. Contractor to repair, replace and install
More informationAttachment A Project Specification Repair of a Salt Dome Building Philadelphia County, Betsy Ross Stockpile # Dome# Project #
I. Base Bidding Requirements This is not a Base Bid project. II. Work Included The following items are site specific requirements of the project. A. Contractor to repair, replace and install the necessary
More informationAttachment A Exterior Building Improvements Susquehanna County, Roadside Rest Site #56, I-81 SB Project # Building # 045R561
I. Bidding Requirements Contractor to provide one bid for the following: Planter removal, sidewalk repair/replacement/installation, exterior thru wall in fill. II. Work Included The following items are
More informationATTACHMENT A Sanitary Sewage Line Replacement Columbia County, Roadside Rest Site# 38, I-80 WB Project# Roadside Rest Grounds# 031R380
I. Base Bidding Requirements This is not a base bid project. II. Work Included The following items are site specific requirements of the project. Contractor to repair, replace and install the necessary
More informationAttachment A Perry County Maintenance Facility 8-9 Floor Repair New Bloomfield
I. Bidding Requirements The following describes the Bid Requirements. Contractors are to provide bid for the entire project which includes: Provide concrete floor repairs to the 2 nd level of the maintenance
More informationPOST FRAME BUILDING STANDARDS
CASS COUNTY, MISSOURI BUILDING CODES, ENVIRONMENTAL HEALTH AND ZONING DEPARTMENT 30508 S. West Outer Road, Harrisonville, MO 64701 P- (816) 380-8134 F- (816) 380-8130 POST FRAME BUILDING STANDARDS 201.3
More informationSECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS
SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.
More informationMODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications
MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications Mar/2008 v1.0 SECTION 02255 HYDRAULICLY DRIVEN STEEL UNDERPINNING PILES PART 1 GENERAL 1.01 SCOPE OF WORK The work shall
More informationG. Shop drawing of wall with all dimensions, details, and finishes. Drawings must include post foundations.
DURA-CRETE S-SERIES PRECAST CONCRETE WALL SPECIFICATIONS PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete Screen Wall Description: Work under this item shall consist of furnishing and erecting a wall in
More informationREQUEST FOR PROPOSAL Asphalt & Concrete Repair
REQUEST FOR PROPOSAL 2017 Asphalt & Concrete Repair English Landing Elementary School Union Chapel Elementary School Lakeview Middle School Park Hill High School Prairie Point Elementary School Congress
More informationDESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General
DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES
Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle
More informationENGINEERING BUILDING ROOF REPLACEMENT
ENGINEERING BUILDING ROOF REPLACEMENT SOLICITATION NO. 2017-06 March 13, 2017 St. Clair County, Illinois, through the Public Building Commission (herein after referred to as OWNER ), hereby gives notice
More informationITEM 555 CHAIN LINK FENCING
ITEM 555 AFTER MARCH 1, 2012 CHAIN LINK FENCING 555.1 Description. This item shall govern for furnishing the quantities of chain link fencing and gates as shown on the plans, including all posts, bracing
More informationRESIDENTIAL RE-ROOFING PERMIT APPLICATION
RESIDENTIAL RE-ROOFING PERMIT APPLICATION Effective date: October 1, 2007. Note: These requirements apply to residential structures built prior to implementation of the FBC on March 1, 2002. I. LEGAL DESCRIPTION:
More informationThe work required for this project includes, but is not limited to, the following items, not listed in order of execution.
ESTIMATE OF QUANTITIES SPECIFICATIONS Construction Specifications: South Dakota Standard Specifications for Roads and Bridges, 2004 Edition and Required Provisions, Supplemental Specifications and/or Special
More informationITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION
SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the
More informationSpecification Lightning Protection Systems
Specification Lightning Protection Systems General: Summary A) This Section specifies the lightning protection system for the building(s) or structure(s). This system provides safety for the building and
More informationUniversity of Delaware
University Contact: Energy & Engineering Group (302) 831-1744 SECTION 03 45 00_PRECAST CONCRETE STRUCTURES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including
More informationSECTION UNDERGROUND STORAGE TANK REMOVAL
SECTION 02 65 00 UNDERGROUND STORAGE TANK REMOVAL SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Consider including unit prices for additional
More informationSECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.
SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section
More informationSECTION BORING AND/OR JACKING PIPE
02910-1 of 6 SECTION 02910 BORING AND/OR JACKING PIPE 02910.01 GENERAL A. Description Boring and/or jacking pipe shall include, but not necessarily be limited to, furnishing and installing carrier pipe
More informationITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS
ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing
More informationCity of Augusta SIDEWALK REPLACEMENT PROGRAM
CONDITIONS 1. This program is designed to replace older public sidewalks in the City. 2. This program will not cover new sidewalks, driveways or sidewalks from the public sidewalk to the dwelling or business.
More informationTOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:
TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be
More informationCITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS
CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS PART 1 - GENERAL 1.01 SUMMARY A. Section Includes furnishing and installing chain-link fabric fence, gate, and appurtenances. 1.02
More informationADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:
ADDENDUM NO. 1 TO THE DRAWINGS AND SPECIFICATIONS FOR THE New Dishman-McGinnis Elementary School Bowling Green Independent Schools Bowling Green, Kentucky BG 12-256 RTA 1209 March 11, 2013 To All Plan
More informationDBI-SALA Uni 8 Horizontal Lifeline Cable System
SECTION 112429.17 - HORIZONTAL FALL PROTECTION - CABLE PART 1 - GENERAL 1.1 SECTION INCLUDES A. Provide horizontal cable fall protection system, including end anchors, energy absorbers, intermediate cable
More informationCITY OF CHINO HILLS. Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems
CITY OF CHINO HILLS Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems February 18, 2016 Department: Public Works Proposal Due Date: March 17, 2016
More informationPIPE CULVERTS. Construct pipe culverts, beveled ends, pipe aprons, and associated appurtenances.
PIPE CULVERTS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe Culverts B. Pipe Aprons and Beveled Ends C. Footings for Concrete Pipe Aprons D. Pipe Apron Guards 1.02 DESCRIPTION OF WORK Construct pipe culverts,
More information02800 SHADE STRUCTURES
02800 SHADE STRUCTURES for PLAY AREAS ****************************************** SPECIFIER: The shade structure shall utilize a four point hypar system with four columns located a minimum of 10 feet from
More informationJob Order Sewer Repair Services
Job Order Sewer Repair Services Bid Addendum No. 1 October 10, 2018 All Contractual Requirements as defined within the Contract Documents shall remain in full force to the extent that they are not modified
More informationSECTION LIGHTNING PROTECTION SYSTEM
SECTION 16670 - LIGHTNING PROTECTION SYSTEM PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationBULWARK BOLLARDS M30 & M50
BOLLARDS M30 & M50 SINGLE & ARRAY CONFIGURATIONS FIXED & REMOVABLE SHALLOW MOUNT INSTALLATION M30 SINGLE BOLLARD FIXED W/ CAP OPTION SHOWN ABOVE NOTE: Installation drawing shown above, rebar is not included
More informationADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1
ADDENDUM No. 6 ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1 Due: June 9, 2016 at 2:00 p.m. (local time) The following changes, additions, and/or deletions
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,
More informationSECTION STORM DRAINAGE
SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS
Section SECTION 39 - MANHOLES TABLE OF CONTENTS Page 39-1 GENERAL... 39.1 39-2 CONCRETE MANHOLES... 39.1 39-2.01 NOT USED... 39.1 39-2.02 Concrete Storm Drain Manholes... 39.1 39-3 SADDLE SEWER MANHOLES...
More informationSECTION IRRIGATION WATER WELL
PART 1 GENERAL 1.1 SECTION INCLUDES: SECTION 02670 IRRIGATION WATER WELL A. The work shall consist of furnishing all labor, material, equipment and services necessary for the drilling of irrigation water
More informationMinimum Standards for Construction of Aircraft Hangars MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS
Minimum Standards for Construction of Aircraft Hangars ARTICLE 1. MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS Section 1. - Purpose Section 2. - Goals Section 3. General Provisions Section 4.
More informationUPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04
UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 1. Description This work shall consist of the design, manufacture and construction of a T-WALL structure
More informationTABLE OF CONTENTS Structural Library
Title Description DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 000101 Project Title Page Project Manual title page. 000107 Seals Page For seals of design professionals on Project Manual. 000115
More information1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.
SECTION 05500- METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION TIMBER FLOATS
SECTION 06210 PART 1 - GENERAL 1.01 SUMMARY A. This section covers furnishing and installing the timber float framing for the pile guide area, and all other components not specifically mentioned, necessary
More informationSection [ ] Storm Water Treatment Device
PART 1 GENERAL Section [ ] Storm Water Treatment Device 01.01.00 Purpose The purpose of this specification is to establish generally acceptable criteria for Storm Water Treatment Devices (SWTD) that treat
More informationProject Address: Name of Person Completing Form:
Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties
More informationPhenolic Exterior Wall Cladding
Phenolic Exterior Wall Cladding SECTION 07 42 43 COMPOSITE WALL PANELS This specification includes hidden text for editing for a project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Phenolic wall
More informationAMERICAN SAMOA POWER AUTHORITY Materials Management Office INVITATION FOR BIDS ( IFB ) EAST SIDE WELLS-BOOSTERS SECURITY FENCE REPLACEMENT
AMERICAN SAMOA POWER AUTHORITY Materials Management Office INVITATION FOR BIDS ( IFB ) EAST SIDE WELLS-BOOSTERS SECURITY FENCE REPLACEMENT Issuance Date: March 24, 2016 Closing Date: March 31, 2016 APPROVED
More informationWEST BOUNTIFUL CITY, UTAH REQUEST FOR PROPOSAL. City Park Playground Equipment.
1.0 INTRODUCTION WEST BOUNTIFUL CITY, UTAH REQUEST FOR PROPOSAL City Park Playground Equipment The West Bountiful City, Utah is seeking proposals from interested Applicants to furnish and install playground
More informationSECTION ORNAMENTAL ALUMINUM RAILING
SECTION 05730 ORNAMENTAL ALUMINUM RAILING PART 1 GENERAL 1.1 SECTION INCLUDES A. Aluminum Pipe Railing 1.2 RELATED SECTIONS A. Section 03300 Cast-In-Place Concrete: Placement of sleeves cast in concrete.
More informationWhapmagoostui & Waskaganish Addendum no AR01 August 15, 2017 Cree Daycare Centres Cree Nation Government RRA 1728 Page 1 of 6
RRA 1728 Page 1 of 6 Rubin & Rotman 270 Prince, suite 200 Montreal, Quebec H3C 2N3 514-861-5122 514-861-5383 The following information supplements and/or supersedes the bid documents issued on 07/24/2017.
More informationSECTION STRUCTURE MOUNT RAILING SYSTEM
SECTION 05520 STRUCTURE MOUNT RAILING SYSTEM Peak Fall Protection specializes in the design, engineering, fabrication, installation, and certification of fall protection safety systems. Our team of safety
More informationStructural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)
Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction
More informationSECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.
SECTION 02830 CHAIN LINK FENCES AND GATES (GALVANIZED) 1.0 GENERAL 1.1 Section Includes A. Fence framework, fabric, gates, and accessories. B. Excavation for post bases; concrete footing for posts. C.
More information2012 International Building Code 2011 National Electrical Code Local amendments to the codes are in Chapter 6 of the Code of City Ordinances
Sign Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning districts, each with minimum
More informationDIVISION II TECHNICAL SPECIFICATIONS SECTION S-003 SANITARY SEWER FORCE MAIN SYSTEM
DIVISION II TECHNICAL SPECIFICATIONS SECTION S-003 SANITARY SEWER FORCE MAIN SYSTEM TABLE OF CONTENTS: I. DESCRIPTION:... 2 II. COORDINATION:... 2 III. CONSTRUCTION LAYOUT:... 3 IV. MATERIALS:... 3 V.
More informationSTATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014
STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural
More informationSPECIAL INSPECTION AGREEMENT
DEVELOPMENT SERVICES DEPARTMENT BUILDING AND SAFETY DIVISION 156 S. BROADWAY, SUITE 130 TURLOCK, CALIFORNIA 95380 PHONE 209-668-5560 FAX 209-668-5107 SPECIAL INSPECTION AGREEMENT PERMIT NUMBER: DATE: OWNER:
More informationTOWN OF HOLLIS, NEW HAMPSHIRE
TOWN OF HOLLIS, NEW HAMPSHIRE ROAD and DRIVEWAY SPECIFICATIONS APPENDIX (Adopted 10/7/08) APPENDIX A A. Road Design Standards 1. Pavement and drainage facilities, curbs and sidewalks, when required, shall
More informationSECTION PORTLAND CEMENT CONCRETE
PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including the supplemental documents as indicated in the Site Work General Provisions, apply to work of this
More informationSection CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.
PART 1 GENERAL 1.01 SUMMARY A. This Section includes the following: Section 02775 1. Reinforced concrete sidewalks. 2. Wheelchair Ramps. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for concrete
More informationRe: Concrete Installation/Demolition and Bollards Request for Proposal # R-RFP. Addendum 1 Clarifications to Request for Proposal
June 22, 2017 Re: Concrete Installation/Demolition and Bollards Request for Proposal #17-05-5325R-RFP Addendum 1 Clarifications to Request for Proposal Notifications regarding Cypress-Fairbanks Independent
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 808 REINFORCED CONCRETE VAULTS
San Antonio Water System Standard Specifications for Construction ITEM NO. 808 REINFORCED CONCRETE VAULTS 808.1 DESCRIPTION: Reinforced concrete vaults shall be cast-in-place and shall include reinforcing
More informationCommercial Submittal Packet
Commercial Submittal Packet City of Pepper Pike Building Department 28000 Shaker Boulevard Pepper Pike, Ohio 44124 Phone: (216) 896-6134 Fax: (216) 831-6525 www.pepperpike.org Submitting for the Architectural
More informationA. Drawings and general provisions of the Contract, including General Conditions Specification Sections, apply to this section.
Page 1 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions Specification Sections, apply to this section. 1.2 SUMMARY A. The shade structure
More informationDIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012
2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include
More informationSECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION
820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing
More informationFOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 REVISION 7 ITEM 516 INSTALLATION OF FLEX BEAM GUARDRAIL
AFTER NOVEMBER 1, 2008 ITEM 516 INSTALLATION OF FLEX BEAM GUARDRAIL 516.1 Description. This item shall govern for furnishing and placing 10 or 12 gauge galvanized flex beam guardrail, complete with timber
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION
Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION Delete SECTION 812 and replace with the following: SECTION 812 PERMANENT SIGNING 812.1 DESCRIPTION
More informationFinance & Technology Administrator (815) ext 223
2017 PAVING IMPROVEMENTS BID PACKET Due: Location: April 26, 2017 by 10:00 am Oregon Park District Fairgrounds Park 607 Fair Park Drive Oregon, IL 61061 Bid Proposal: 2017 Paving Improvements Administrative
More informationSECTION PRECAST CONCRETE COVER SYSTEM
SECTION 13500 PRECAST CONCRETE COVER SYSTEM PART 1 GENERAL 1.1 SYSTEM DESCRIPTION A. Design Criteria: 1. Precast manufacturer shall be responsible for structural design of individual precast components,
More informationSECTION CANOPIES. Display hidden notes to specifier. (Don't know how? Click Here) Copyright ARCAT, Inc. - All rights reserved
SECTION 10538 CANOPIES Display hidden notes to specifier. (Don't know how? Click Here) Copyright 2009-2011 ARCAT, Inc. - All rights reserved PART 1 GENERAL 1.1 SECTION INCLUDES A. Freestanding, pre-engineered
More informationSECTION DECORATIVE METAL FENCES AND GATES
SECTION 32 31 19 SPEC WRITER NOTE: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section
More informationA. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.
ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 05 28 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationSECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and
More informationSECTION IRRIGATION WATER WELL
PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 33 21 16 IRRIGATION WATER WELL A. The work shall consist of furnishing all labor, material, equipment, and services necessary for the drilling of irrigation
More informationSECTION 2831 ITEM F-162 CHAIN-LINK FENCES
SECTION 2831 ITEM F-162 CHAIN-LINK FENCES PART 1 - GENERAL 1.1 DESCRIPTION. This item shall consist of furnishing and erecting a chain-link fence in accordance with these specifications and the details
More informationSECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS
SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required
More informationQUOTE Quote Process City Of Taylor
PROJECT SPECIFICATIONS QUOTE Quote Process City Of Taylor Budget & Finance Dept. Purchasing Manager: RMM 23555 Goddard Road Taylor, MI 48180 734-374-1459 The City of Taylor Central Purchasing Division
More informationWall bracing panel requirements
Wall bracing panel requirements Building Inspections Exterior and interior walls must be braced in accordance with Minnesota State Building Code section R602 to resist wind loads and racking. Locations,
More informationSPECIAL INSPECTION AND TESTING AGREEMENT
COUNTY OF MENDOCINO DEPARTMENT OF PLANNING AND BUILDING SERVICES 860 NORTH BUSH STREET UKIAH CALIFORNIA 95482 120 WEST FIR STREET FT. BRAGG CALIFORNIA 95437 STEVE DUNNICLIFF, DIRECTOR PHONE: 707-234-6650
More informationINSTRUCTIONS AND GUIDELINES
INSTRUCTIONS AND GUIDELINES NOISEBLOCK TM MODULAR PANEL SYSTEMS ENCLOSURES & PRESSURIZED PLENUMS PLANNING HINTS & NOTES: 1. Review the Kinetics Noise Control submittal and installation drawings and bill
More informationRapid Axial Load Testing of Drilled Shafts
Supplemental Technical Specification for Rapid Axial Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 4, 2015 1.0 GENERAL This work shall consist of performing a rapid axial
More informationLITHOCRETE ARCHITECTURAL CONCRETE PAVING
LITHOCRETE ARCHITECTURAL CONCRETE PAVING PART 1 GENERAL 1.1 GENERAL CONDITIONS A. Requirements of "General Conditions of the Contract" and of Division 1, "General Requirements," apply to work in this Section
More informationBID INSTRUCTIONS. Montour County Courthouse Retaining Wall Repair Project
BID INSTRUCTIONS Montour County Courthouse Retaining Wall Repair Project The Montour County Commissioners are receiving bids for the Courthouse Retaining Wall Repair Project. The parking lot is located
More informationTABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages
TABLE OF CONTENTS VOLUME 1 DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages SCHEDULE OF DRAWINGS...... 1 PROJECT PERSONNEL & DIRECTORY......
More informationSECTION BASIC ELECTRICAL MATERIALS AND METHODS
SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:
More informationCONCRETE FORMWORK. .2 CSA , Supplement No.1 to CAN/CSA , Engineering Design in Wood. .4 CSA O151, Canadian Softwood Plywood.
CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 03100-1 PART 1 GENERAL 1.1 Related Work.1 All Division 1 Specification Sections.2 Section 02233 Granular Base.3 Section 02311 Site Grading.4 Section 03200
More informationMulti-Institutional Academic Health Science & Research Center Evansville, IN
SECTION 05 5117 ALTERNATING TREAD STEEL STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSPECIFICATIONS FOR ON-SITE REBUILD OF TRAVELING WATER SCREENS
SPECIFICATIONS FOR ON-SITE REBUILD OF TRAVELING WATER SCREENS 1. GENERAL 1.1. WORK INCLUDED 1.1.1. Includes all replacement parts and labor necessary for the rebuild of two Traveling Water Screens. The
More informationAutomated Cantilevered Aluminum Sliding Gate
Town of Derry, New Hampshire REQUEST FOR PROPOSALS B18-128 January 25, 2018 The Town of Derry - Department of Public Works is seeking proposals for: Automated Cantilevered Aluminum Sliding Gate Introduction
More informationSPECIAL SPECIFICATION 5989 Settlement Gauge
2004 Specifications CSJ 0047-14-067 SPECIAL SPECIFICATION 5989 Settlement Gauge Description. Install, maintain, and subsequently abandon settlement gauges as indicated for the purpose of obtaining foundation
More informationSECTION 716 SIGN MATERIALS SCOPE
716 716.01.01 MATERIALS COVERED SECTION 716 SIGN MATERIALS SCOPE A. This specification covers the kind and quality of materials used in the construction and fabrication of traffic control devices used
More informationSECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS
SECTION 02670 UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of containment
More informationLAGRANGE TOWNSHIP 353 South center street p.o. box 565 lagrange ohio 44050
LAGRANGE TOWNSHIP 353 South center street p.o. box 565 lagrange ohio 44050 Resolution 2004-5 Resolution of the Board of Trustees of LaGrange Township, Lorain County, Ohio, adopting general rules and regulations
More informationSECTION ROCK REMOVAL
SECTION 31 23 16.26 ROCK REMOVAL PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required to perform rock
More informationUNISTRUT CORPORATION GENERAL NOTES 1. THIS UNISTRUT SUPPORT SYSTEM IS DESIGNED TO SUPPORT A MAXIMUM UNIFORM LOAD OF PSF.
1. THIS SUPPORT SYSTEM IS DESIGNED TO 4. ALL CHANNEL & FITTINGS TO HAVE STANDARD 1. THIS SUPPORT SYSTEM IS DESIGNED TO 4. ALL CHANNEL & FITTINGS TO HAVE STANDARD 1. THIS SUPPORT SYSTEM IS DESIGNED TO 4.
More informationATTACHMENT A. Bid # 6793
ATTACHMENT A SCOPE OF WORK TECHNICAL SPECIFICATIONS AND CONTRACT DRAWINGS STORAGE SHED INSTALLATION AT THE SAN JOAQUIN COUNTY HOUSEHOLD HAZARDOUS WASTE FACILITY Bid # 6793 Department of Public Works Solid
More information