1 AAFES Mini Mall Image Upgrade, Ft. Benning, Georgia PN Refer to Sheet T1.0: Under Code Review Summary, add the following applicable codes: 2016 date for all listed codes shall be 2015 instead of Under Building Data, Type of Construction: Type II, unprotected, sprinklered. Total square footage is 26,720 sf. Refer to Sheet T1.2: Add attached detail indicating typical temporary wall partition to be used to separate the various phases of work. Update phasing schedule to indicate phase FC-3 Revise Snack Avenue layout per Sheet A4.1. Refer to Sheet A0.0: Substitute the attached New Monument Sign Detail for that shown on this sheet. Scale indicated for the Site Plan shall be 1 =40-0 Refer to Sheet A1.1: Door 104 is a double swing impact door Refer to Sheet A1.2: Revise Snack Avenue layout per Sheet A4.1 reissued. Door 104 is a double swing impact door Refer to Sheet A1.3: This sheet reissued to indicate revised QDOBA and Charley s Steakery. Refer to Sheet A4.0: Add the following note: AAFES to initially position equipment, General Contractor to move equipment once in place and set as required. Revise Snack Avenue Schedule issued this sheet. Revise Snack Avenue layout per Sheet A4.1 reissued. Refer to Sheet A4.1: Add the following note: General Contractor to make all final connections including plumbing and drain piping of soda machine to hub drain and other machines. See attached drawing of vicinity of island cooler indicating floor drain for condensate. Python serving drink station to be plenum rated pvc. Refer to Sheet A4.2:

2 Reissue this sheet. Large equipment schedule to at upper right area of sheet is for QDOBA. See attached list of new equipment in the Charley s Steakery. Refer to Sheet A4.3: Reissue this sheet. Refer to Sheet A5.0: Incorporate QDOBA changes as indicated on Sheet A1.3 Refer to Sheet A5.1: At enlarged QDOBA renovated reflecting ceiling plan, the ceilings referred to as D will remain. Provide new ceiling at ceiling areas marked A. Refer to revised Sheet A1.3. Refer to Sheet A6.1: Reissue this sheet. Refer to Sheet A6.2: Substitute new interior elevation 3 of updated Snack Avenue for that indicated on this sheet. Refer to Sheet A7.0: Revise snack avenue layout per Sheet A4.1 reissued. Revise QDOBA layout per Sheet A1.3 reissued. Room 206 should be the Back of House located behind doors 104 & 106. Refer to Sheet A7.1: New updated finish schedule. Refer to Sheet DA1.2: At Food Court 102 remove entire existing ceiling as well as oval bulkhead. Apply note 1 to this entire area. Delete notes 5 this area. At Shoe repair 106, follow note 3 only. Ignore note 1. At Petals & Blooms 110 follow note 3 only. Ignore note 1. Refer to Sheet DA1.3: te at lower left corner of the sheet is to read: te: Remove and protect all miscellaneous wall mounted items to include but not limited to all posters, signs, clocks, fire system devices, wall mounted lights, etc. After the new finishes are applied, these items shall be rehung/ installed. Coordinate with building manager.

3 Refer to Sheet M1.1 Refer to Sheet M1.2 Refer to Sheet P1.1 Refer to Sheet P1.2 Refer to Sheet P2.1 Refer to Sheet FP1.1 Refer to Sheet E1.1 Refer to Sheet E1.2 Refer to Sheet E1.3 Refer to Sheet E1.4 Refer to Sheet FA1.1 Refer to Specification Section Y Delete this entry entirely. MC/AC cables shall be acceptable for use per section

4 Refer to Specification Section Y Delete this entry entirely. MC/AC cables shall be acceptable for use per section Question & Answers 1. Are we required to use union contractors? 2. Is there a sprinkler system in the space? If yes, is there a required contractor? Contact Info? 3. Is there a fire alarm system in the space? If yes: Is it a full system with horns, strobes, pull stations, duct detectors, etc.? Fire alarm work shown on plans(either FA or E3 sheet). Existing system to be reworked to coordinate with new construction. Will this build-out require any work to be done on or with the system?, see plans. Is there a required fire alarm system vendor? What are their responsibilities? Contact info? See specifications. 4. Is there a required roofing contractor? Contact Info? Based on previous information the roof is a single ply Membrane: Copolymer alloy (CPA) thermoplastic,.040 inch (.94 mm) thick by Duro-Last Inc. GC is required to maintain the manufacturer s warranty when doing work on the roof. 5. Are there any additional contractors we are required to use? (ie Final Electrical tie-ins, etc.) 6. Do you have a list of preferred contractors? If so, please list or attach. 7. Is there a security deposit? Is it refundable or non-refundable? How much? 8. Are there any other fees for construction? Are they refundable or non-refundable? How much? t on AAFES s part. 9. What store is currently in this space? 10. Do you have a copy of written Construction Rules & Regulations that you could forward to me?

5 11. Can subcontractor do site visits? If so, who do they need to contact to setup an appointment? Store Manager If awarded the project, are there special requirements for our working crews to get on and off the base? (to include utility vans and or work trucks) See Section SPECIAL REQUIREMENTS OF FORT BENNING 13. What are the material delivery requirements from our suppliers? See Section SPECIAL REQUIREMENTS OF FORT BENNING 14. Will there be an area to store tools and material during the remodel process?, See Section MATERIAL AND EQUIPMENT 15. Should heavy tools and or equipment be required, will there be access to power for charging? (i.e. Scissor lifts, forklifts, pallet jacks, terminators, etc.) Contractor is responsible for provision connection for utilities to support equipment. 16. What are the requirements for dumpsters and or storage containers, if needed? Contractor is responsible for providing dumpsters/ collection of construction debris for demolition and new work, comply with all Post regulations concerning construction waste. 17. As per my door supplier He has stated the only door hardware schedule found for this project is in the Aluminum Entrances and Storefront Specifications. There is no hardware schedule listed for the remaining doors in the Specifications under Door Hardware. Janitor, Utility Room Doors Door Each Hinges FBB x 4.5 US26D NRP 1 Each Lock 45H7D15H US26D 1 Each Cylinder 1E74 US26D 1 Each Wall Stop WS402CCV US26D 1 Each Kickplate 10 x 2 LDW US32D 3 Each Silencer SR64 Office Doors: Doors 108 & Each Hinges FBB x 4.5 US26D 1 Each Lock 45H7A15H US26D 1 Each Cylinder 1E74 US26D 1 Each Closer 4011 Alum Lacq or 4111 Alum Lacq, as applicable 1 Each Wall Stop WS402CCV US26D 1 Each Kickplate 10 x 2 LDW US32D 3 Each Silencer SR64 1 Each Viewer Door Scope US28 (Door 120a only) 18. Sheet A5.0 has renovation note 7 which reads New air curtain grilles coordinate with mechanical sheets. Sheet M 1.2, note 4 for the same location indicates existing fly fan to remain. Please clarify intent. The fly fan at the food court entry is existing to remain (also at the MPA entries)

6 19. Sheet A7 General note 2, All painted walls to have level 4 finish with semi-gloss paint. Keyed note 2 on same sheet, New paint on all walls (level 3 finish) refer to finish schedule sheet A7.1. (this note appears in most spaces being renovated). Finish schedule on A7.1 indicates level 4 finish for all four colors of paint in Retail 201, but does not indicate wall finish level for any other rooms. Please clarify. All surfaces will have Level 4 finishes. 20. RE: te 1 on Sheet M1.1, If there is a roof warranty in place, would it possible to get warranty holder s name and contact information? Based on previous information the roof is a single ply Membrane: Copolymer alloy (CPA) thermoplastic,.040 inch (.94 mm) thick by Duro-Last Inc. GC is required to maintain the manufacturer s warranty when doing work on the roof. 21. Section Selective Demo - Project Conditions 1.6 paragraph (C) Hazardous Materials Is there any reports available listing where the Asbestos and lead Paint is located and the quantity? reports are available. The building was built around In the specs, there is a conflict on whether we can use MC cable. There is a missing section (16150) that would clarify this? The specs mention two pages on MC installation, but then reads that all branch wiring be in raceways. Please clarify if you would like us to use MC cable where applicable. Delete this entry entirely. MC/AC cables shall be acceptable for use per section