S C H E D U L E - "B"

Size: px
Start display at page:

Download "S C H E D U L E - "B""

Transcription

1 NAME OF WORK :- S.R. TO ANKLESHWAR BURHANPUR ROAD SH-4 KM. 207/00 TO 209/00, 209/00 TO 209/600, TAL.SHIRPUR, DIST.DHULE S C H E D U L E - "B" Estimated quantity put to tender which may be more or less Item of work Estimated Rate Unit Amount In figure In words (1) Providing and laying 50 millimeter thick compacted Rupees one hundred sixty seven One Square Bitumen Bound Macadam with 80/100 grade bitumen over existing Black Topped surface including thoroughly cleaning the Black Topped surface by using mechanical broom or approved equipment, applying tack coat at the rate of 0.5 kilogram per square meter. spreading 40 millimeter size metal (Hand broken by bringing blasted rubble on site of work) at the rate of 0.06 Cubic metre per square metre, compacting metal with roller and Bitumen is then spread at the rate of 1.75 kilogram per square meter., spreading 12 millimeter metal at the rate of Cubic metre per square metre The surface shall be lightly rolled so that metal pieces get embeded in the and paise thirty eight only bitumen layer and rolling shall continue until entire surface is throughly compacted etc. complete. (With Static Roller) (including diversion road)..

2 Estimated quantity put to tender which may be more or less Item of work Estimated Rate Unit Amount In figure In words (2) Providing and laying hot mix hot laid bituminous Rupees five thousand two hundred One Cubic macadam with 60/70 grade bitumen 50/ 75 millimeter seventy nine and paise twenty only average thickness with 3% bitumen by weight of total mix including diversion of traffic, supply of all materials, heating bitumen and chips, mixing bitumen and chips in drum mix plant, laying bituminous macadam by paver finisher including compaction (including emulsion tack coat) etc. complete (3) Providing 20 millimeter thick open graded premix bituminous carpet, including supplying all material, as directed, preparing and cleaning the base, heating bitumen, applying tack coat at 0.3 Kilogram per square metre laying carpet and compacting without seal coat on Black Topped surface Hot Mix Hot laid with paver finisher. i) With static roller a) With 60/70 grade Rupees one hundred fifty one and paise forty seven only One Square (4) Providing bituminous liquid seal coat (Type A) to black top surface, with 80/100 grade bitumen including supplying all materials including all leads, preparing existing road surface, heating and applying bitumen, spreading chips and rolling complete (by using bulk asphalt) Rupees fifty two and paise ninety one only One Square (5) Supplying hard murum/ kankar at the road side, including conveying and stacking complete Rupees three hundred forty nine and paise forty seven only One Cubic (6) Spreading gravel/ sand/ soft murum/ hard murum over rubble soling / Water Bound Macadam surface complete Rupees twelve and paise six only One Cubic

3 Estimated quantity put to tender which may be more or less Item of work Estimated Rate Unit Amount In figure In words (7) Compacting the hard murum side widths with power roller 3.02 Rupees three and paise two only One Square including artificial watering complete. (Note : Rate is for actual area compacted) (8) Cutting down the road side thorney Bushes (Wedi babhule, etc) having girth from 5 centimeter To 20 centimeter Including removing their roots, stacking and conveying the materials upto 1.00 Kilometer removing vegetation including leveling the ground as directed for both sides of road etc complete Rupees five and paise fifty three only One Square (9) Excavation for catch/road side water gutter/jungle gutter in all sorts of soils strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff upto a lead of 50 meter from place of excavation as directed by Engineer in charge by Mechanical means and sectioning manually for road side gutter Rupees thirty and paise sixty five only One Cubic (10) Providing and applying Thermo Plastic Reflective Paint of any color for 10 centimeter wide lane strips of 3 millimeter thick of pigment 10%, clean, dry and good road surface with 30-40% glass beads, 20% binder and 40% of filler material etc. complete. (Note - Rate for actual area painted) Rupees fifty and paise fifty only One Running (11) Providing and laying shoulder drain including excavation for 0.45 meter to.60 meter depth in soil including filling rubble 0.30 meter 80 millimeter metail 0.15 meter size metal meter and gravel meter including all leads and lifts etc. complete Rupees ninety three and paise thirty seven only One Running

4 Estimated quantity put to tender which may be more or less Item of work Estimated Rate Unit Amount In figure In words (12) Scarifying including picking up scarified material and Rupees thirteen and paise seventy One Square stacking of old serviciable material within lead of 100 seven only meters. MORT & H, New Delhi (f) Bituminous course millimeter alongwith premix carpet and surface dressing but without disturbing the base(b with road roller attached with scarifier (13) Royalty charges Rupees seventy and paise sixty seven only One Cubic Total Rs Say Rs

5 NAME OF WORK :- S.R. TO ANKLESHWAR BURHANPUR ROAD SH-4 KM. 207/00 TO 209/00, 209/00 TO 209/600, TAL.SHIRPUR, DIST.DHULE S C H E D U L E - "C" STANDARD SPECIFICATION Sr.No. Item of work Standard Specification No. If any additional specification and Page No Providing and laying 50 millimeter thick compacted Bitumen Bound Macadam with 80/100 grade bitumen over existing Black Topped surface including thoroughly cleaning the Black Topped surface by using mechanical broom or approved equipment, applying tack coat at the rate of 0.5 kilogram per square meter. spreading 40 millimeter size metal (Hand broken by bringing blasted rubble on site of work) at the rate of 0.06 Cubic metre per square metre, compacting metal with roller and Bitumen is then spread at the rate of 1.75 kilogram per square meter., spreading 12 millimeter metal at the rate of Cubic metre per square metre The surface shall be lightly rolled so that metal pieces get embeded in the bitumen layer and rolling shall continue until entire surface is throughly compacted etc. complete. (With Static Roller) (including diversion road).. 1) Original challan of asphalt must be submitted with the bills to department. 2) Testing of asphalt done in Govt. Laboratory & site of work as per norms of V.Q.C.C.

6 Sr.No. Item of work Standard Specification No. If any additional specification and Page No Providing and laying hot mix hot laid bituminous macadam with 60/70 grade bitumen 50/ 75 millimeter average thickness with 3% bitumen by weight of total mix including diversion of traffic, supply of all materials, heating bitumen and chips, mixing bitumen and chips in drum mix plant, laying bituminous macadam by paver finisher including compaction (including emulsion tack coat) etc. complete. MOST 2000 Cl. number 504 1) Original challan of asphalt must be submitted with the bills to department. 2) Testing of asphalt done in Govt. Laboratory & site of work as per norms of V.Q.C.C. 3 Providing 20 millimeter thick open graded premix bituminous carpet, including supplying all material, as directed, preparing and cleaning the base, heating bitumen, applying tack coat at 0.3 Kilogram per square metre laying carpet and compacting without seal coat on Black Topped surface Hot Mix Hot laid with paver finisher. i) With static roller a) With 60/70 grade. M.O.S.T Cl. number 511 1) Original challan of asphalt must be submitted with the bills to department. 2) Testing of asphalt done in Govt. Laboratory & site of work as per norms of V.Q.C.C. 4 Providing bituminous liquid seal coat (Type A) to black top surface, with 80/100 grade bitumen including supplying all materials including all leads, preparing existing road surface, heating and applying bitumen, spreading chips and rolling complete (by using bulk asphalt) M.O.S.T Cl. number 513 1) Original challan of asphalt must be submitted with the bills to department. 2) Testing of asphalt done in Govt. Laboratory & site of work as per norms of V.Q.C.C. 5 Supplying hard murum/ kankar at the road side, including conveying and stacking complete. Rd.23 Page number Spreading gravel/ sand/ soft murum/ hard murum over rubble soling / Water Bound Macadam surface complete. Rd.28, 31, 36, 37 Page number 206 to 209

7 Sr.No. Item of work Standard Specification No. If any additional specification and Page No Compacting the hard murum side widths with power roller including artificial watering complete. (Note : Rate is for actual area compacted) Rd.40 Page number Cutting down the road side thorney Bushes (Wedi babhule, etc) having girth from 5 centimeter To 20 centimeter Including removing their roots, stacking and conveying the materials upto 1.00 Kilometer removing vegetation including leveling the ground as directed for both sides of road etc complete. 9 Excavation for catch/road side water gutter/jungle gutter in all sorts of soils strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff upto a lead of 50 meter from place of excavation as directed by Engineer in charge by Mechanical means and sectioning manually for road side gutter. 10 Providing and applying Thermo Plastic Reflective Paint of any color for 10 centimeter wide lane strips of 3 millimeter thick of pigment 10%, clean, dry and good road surface with 30-40% glass beads, 20% binder and 40% of filler material etc. complete. (Note - Rate for actual area painted) 11 Providing and laying shoulder drain including excavation for 0.45 meter to.60 meter depth in soil including filling rubble 0.30 meter 80 millimeter metail 0.15 meter size metal meter and gravel meter including all leads and lifts etc. complete.

8 Sr.No. Item of work Standard Specification No. If any additional specification and Page No Scarifying including picking up scarified material and stacking of old serviciable material within lead of 100 meters. MORT & H, New Delhi (f) Bituminous course millimeter alongwith premix carpet and surface dressing but without disturbing the base(b with road roller attached with scarifier. 13 Royalty charges. The Contractor should submit the receipt of payment of Royalty charges of the material used. If such a receipt is not produced by the Contractor the Royalty charges will be deducted from the bill of work done by the Contractor.

9 NAME OF WORK :- S.R. TO ANKLESHWAR BURHANPUR ROAD SH-4 KM. 207/00 TO 209/00, 209/00 TO 209/600, TAL.SHIRPUR, DIST.DHULE BAR CHART Item Of Work 1st Month 2 nd Month 3 rd Month 4 th Month 5 th Month 6th Month 7th Month 8th Month 9th Month 1 50 mm BBM on BT 2 50/75 mm tk hot mix hot laid bituminous macadam 3 20 mm OGC 4 Liquid seal coat 5 Cutting down thorney Bushes 6 Excavation for road side water gutter 7 Miscellenious No of Corrections Signature of Contractor Executive Engineer, E.G.S. (P.W.) Division, Dhule