Explain in writing if the address of the building is different than the address on this form:

Size: px
Start display at page:

Download "Explain in writing if the address of the building is different than the address on this form:"

Transcription

1 ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO SCHOOL DIST S. Throop Chicago, IL, 6636 DATE LAST THREE YEAR REINSPECTION WAS COMPLETED 3/13/213 If the address on this form is different than the address of the building, submit a written explanation. SECTION II (Please type or print) PLEASE COMPLETE THE FOLING FOR YOUR THREE YEAR REINSPECTION: DATE REINSPECTION COMPLETED: 4/11/216 IDPH INSPECTOR LICENSE NUMBER: IDPH LICENSED INSPECTOR NAME (Please Print): John Feely IDPH MP LICENSE NUMBER: IDPH LICENSED MANAGEMENT PLANNER NAME (Please Print): DESIGNATED PERSON (Please Print): Robert Christlieb ENROLLMENT 314 Todd Huffer PHONE: (773) /11/216 Signature of Designated Person Date SECTION III PLEASE COMPLETE THE FOLING INFORMATION FOR ANY CHANGES WITHIN THE SCHOOL DISTRICT. School building has been sold. Date of Sale: School has been closed. Date closed: School building has been demolished. School building is asbestos free since last reinspection: Please explain in writing why the school building is now asbestos free and include the supporting documentation. If a new school building has been added to the district, submit either and exclusionary statement or a management plan and inspection report. Include the complete name, address and city of school building. Explain in writing if the address of the building is different than the address on this form: IL Revised 1.3

2 THREE YEAR REINSPECTION CHICAGO SCHOOL DIST S. Throop Chicago, IL, 6636 Unit: Building ID: 29 IDPH ID Number: REPORT DATE: Monday, April 11, 216 Prepared for: 125 S. Clark Street Chicago, IL 663 Prepared by: 6 West Van Buren St., Ste 5 Phone (312) Fax (312) DO NOT REMOVE FROM SCHOOL REQUIRED BY FEDERAL LAW

3 March 23, 216 Mr. R. Kent Cook Asbestos Program Illinois Department of Public Health 525 West Jefferson Street Springfield, Illinois Re: Three-Year Reinspections Dear Mr. Cook:, Managing Environmental Consultant (MEC), conducted the ThreeYear Reinspections and performed management plan updates for the (CPS) facilities in Region 3,4,5 Elementary Schools. Please update your records with the following information. School District: 299 Unit: School: Region: 5 IDPH ID: Building ID: 29 Address: 61 S. Throop Chicago, IL, 6636 Building Contact: Hicks, Fatina Contact Phone: Current Building Owners: Review 4/11/216 Inspector: John Feely Management Planner: Todd Huffer Inspector IDPH License: Management Planner IDPH License: If you have any questions or comments, please contact us at (312) Sincerely, Todd Huffer 1-987

4 Environmental tification to Occupants To: Faculty, Staff and Parents From: March 23, 216 RE:, Unit 61 S. Throop Chicago, IL, 6636 Dear Faculty, Staff and Parents, This letter is to notify you that the 216 asbestos three year re-inspection has been completed at, following the Federal Asbestos Hazard Emergency Response Act (AHERA), 4 CFR Part 763, Subpart E and is available for your review at the main office of the school. Although asbestos-containing materials have been identified at, there is no reason to believe that any threat to the health of students or staff exists at this time. CPS will continue to carefully monitor the condition of asbestos-containing materials and if conditions warrant, all appropriate steps will be taken to maintain the health and safety of all building occupants. If you have any questions regarding this matter or require additional information, please feel free to contact Robert Christlieb, the designated Local Education Authority's Designated Person at (773)

5 Table of Contents I. School and Inspection Information II. Executive Summary III. Methodology IV. Abatement History V. Reassessments and Recommendations VI. Conclusions Table I: Inspector's Reinspection Findings Table II: Management Planner's Review APPENDICES: Appendix A: Assessment Sheets, Drawings and Photos Appendix B: Inspector and Management Planner Licenses Appendix C: Laboratory Accreditations Appendix D: Laboratory Results Appendix E: Chain of Custody Forms

6 SCHOOL AND INSPECTION INFORMATION 1. School Information School: Address: IDPH ID: Contact: S. Throop Hicks, Fatina Unit: Chicago, IL, 6636 Building ID: 29 Phone: Description of Facility Original Construction: 1964 Total Square Footage: Current Occupancy: Additional Construction: of Floors: 3 LEA Designated Person Contact: Robert Christlieb Address: 125 South Clark Street, 17th Floor Chicago, IL Phone: (773) Managing Environmental Consultant MEC: Contact: Dan Juneau Address 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector Inspector Name: John Feely Signature: 3/23/216 Inspector IDPH license # Region: 5 Management Planner Management Planner Name: Todd Huffer Management Planner IDPH license # Review 4/11/ LEA Designated Person's Acknowledgement Signature: 4/11/216 The reinspection report and recommendations have been received by me and appropriate action will be taken by the School District. Signature: 4/11/216 Name: Robert Christlieb Unit : Building: 29

7 II. EXECUTIVE SUMMARY was retained by the (CPS) to perform a three-year asbestos reinspection of the. This inspection was conducted in accordance with the United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) part (b), and the ongoing Operations and Maintenance Program (O&M) originally designed in the School's Asbestos Management Plan. The purpose of this three-year reinspection is to record any condition changes in the asbestos-containing building material (ACBM) in the school since the previous three-year reinspection and the six-month periodic surveillance, to identify, assess, and include any Homogeneous Areas (HA) not identified in the Management Plan, and to recommend an appropriate response action to manage asbestos. The inspector conducted a three-year reinspection of this facility under Illinois Department of Public Health (IDPH) school reinspection requirements and AHERA, sections and The main building and each addition to the main building, if constructed at different dates, were inspected separately. Laboratory accreditations are included in Appendix C, laboratory results are included in Appendix D, and chain of custody forms are included in Appendix E. te: During previous inspections, some of the HA(s) were identified together as 9" x 9" floor tile (FT), mastics assoc. with 9" x 9" FT, 12" x 12" FT, mastics assoc. with 12" x 12" FT, pipe insulation, etc. Some of these HA(s) have been re-identified by areas that are uniform in color, texture, construction date, application date, and general appearance. The inspector has determined the following: A. The following HAs have changed assessment categories for Building 29: Unit: 28 Plaster E cardboard pipe insulation F cardboard pipe joints G preformed tank insulation Building: 29

8 B. The following new homogenous areas have been identified for Building 29: 28 Unit: Plaster Building: 29

9 C. This reinspection covered only physically accessible and visible areas and materials that were identified in the LEA's management plan. The following materials were concealed and/or contained in areas that were inaccessible for sampling and have been classified as Assumed: 2 4A 5 5C 8 8A 9 9A 1 14B E F H 12x12 brown specked floor tile green linoleum 12x12 brown specked floor tile mastic 12x12 light browm floor tile mastic brown vinyl baseboard mastic black vinyl baseboard mastic brown vinyl baseboard black vinyl baseboard grey carpet mastic Black Linoleum 9x9 white/red-brown floor tile 12x12 brown floor tile 12x12 brown floor tile mastic 12x12 blue floor tile 12x12 blue floor tile mastic 12x12 brown 12x12 aqua 12x12 Brown mastic aqua mastic 12x12 dark blue 12x12 mastic cardboard pipe insulation cardboard pipe joints 12"X12" Floor Tile The following areas were deemed to be inaccessible: 5 5B 7 7A 8 8A Unit: 12x12 brown specked floor tile mastic 12x12 green floor tile mastic dark brown with black spots linoleum mastic green linoleum mastic brown vinyl baseboard mastic black vinyl baseboard mastic grey carpet mastic 12x12 brown floor tile mastic 12x12 blue floor tile mastic 12x12 Brown mastic aqua mastic 12x12 mastic Building: 29

10 Materials were also listed as "assumed" if they were in good condition and sampling was not conducted to avoid damage. This reinspection was conducted by John Feely, IDPH License # The Management Plan was updated by Todd Huffer, IDPH License # Inspector and Management Planner Licenses are included in Appendix B. Unit: Building: 29

11 III. METHODOLOGY Tasks performed on-site included the following: IV. 1. Review current management plan, identify HA(s) and extract appropriate information. 2. Examine and verify abatement records. 3. Touch and visually and physically reinspect and reassess the condition of all friable known or assumed ACBM. 4. Touch and visually and physically reinspect all non-friable known or assumed ACBM to determine whether these materials have become friable since the last inspection or periodic surveillance. 5. Identify any condition changes that may affect Hazard Ranking of known ACBM or Assumed ACBM, as well as any HA(s) that have become friable since the last reinspection. 6. Collect bulk samples from each newly discovered friable HA or previously assumed and submit for laboratory analysis. 7. Tabulate reinspection findings and submit for management planner review and recommendations with appropriate response actions based on the AHERA Damage Category of the ACBM. 8. Submit reinspection findings and management planner recommendations to the LEA within thirty (3) days for inclusion into the management plan. ABATEMENT HISTORY The information collected from the existing management plan and inspection report(s) and from interviews with the school official revealed that the following asbestos abatement was conducted at the school since the previous Three year Reinspection. Abatement Dates: V. REASSESSMENTS AND RECOMMENDATIONS The reassessments and recommendations are summarized in Tables I and II on the following pages. Detailed Hazard Assessment Sheets and Drawings and Photos (if applicable) are included in Appendix A. VI. CONCLUSIONS The Building 29 Three-Year reinspection has been completed and response actions have been recommended for both friable and non-friable materials. A timely execution of the response actions recommended will enable the LEA and the Designated Person(s) to effectively manage the existing ACBM. This three-year reinspection report should be inspected in the current Management plan at the CPS Central Office, and one (1) copy should be kept at the school for use when planning any renovation and/or demolition activities in areas where ACBM has been identified. Also, periodic surveillance documentation and any summary reports from any response actions that are executed at the school should be used to update the Management Plan. Unit: Building: 29

12 Table I Inspector's Reinspection Findings

13 School Unit Building ID 29 Address 61 S. Throop Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 2 12x12 brown specked floor tile 2A 12x12 cream floor tile 2B 12x12 green floor tile 2C 12x12 light brown floor tile 3 9x9 brown w/ red floor tile 3A 9x9 light brown floor tile 3B 3C 3D Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units 13,415 throughout building ASSUMED N NONE Change in Assessment Category 852 CHR N NONE 1,316 CHR N NONE 852 CHR N NONE 1,361 CHR N 432 2nd floor womens toilet, lunchroom, kitchen, lunchroom managers office, room 25 1/2 main office, store room, principal's office rm 25 1/2, lunchroom, kitchen, lunchroom managers office, teachers lounge 2nd floor ladies washroom, basement library entr., rm 9, ec office toilet office vault CHR 9x9 red floor tile 9x9 green floor tile 9x9 dark brown &tan floor tile 1,84 South vestibule #2 e.c. office library room 2 CHR CHR CHR 4 dark brown with black spots linoleum 1,98 stage auditorium 4A green linoleum 1,168 room 37 and closet 5 12x12 brown specked floor tile mastic 13,415 5A 12x12 cream floor tile mastic 852 5B 12x12 green floor tile mastic 1,316 5C 12x12 light browm floor tile mastic 825 Damage Category Damage Reason Disturbance Potential ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage NONE ACBM with the potential for damage N NONE ACBM with the potential for damage N NONE CHR N NONE ASSUMED N NONE throughout building ASSUMED N NONE 2nd floor womens toilet, lunchroom, kitchen, lunchroom managers office, room 25 1/2 main office, store room, principal'soffice rm 25 1/2, lunchroom, kitchen, lunchroom managers office, teachers lounge 2nd floor CHR N NONE ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage CHR N NONE ACBM with the potential for damage ASSUMED N NONE ACBM with the potential for damage

14 School Unit Building ID 29 Address 61 S. Throop Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 6 9x9 brown w/ red floor tile mastic 6A 9x9 light brown floor tile mastic 6B 6C 6D 9x9red floor tile mastic 9x9 green floor tile mastic 9x9 dark brown & tan floor tile mastic 7 7A dark brown with black spots linoleum mastic green linoleum mastic 8 Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units Change in Assessment Category Damage Category CHR CHR N NONE ACBM with the potential for damage CHR CHR CHR N ne NONE ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage Damage Reason Disturbance Potential 2 ladies washroom, basement library entr., rm 9, ec office toilet main office, main office vault & washroom south vestibule #2 e.c. office library 1,98 stage auditorium CHR N NONE 1,168 room 37 and closet CHR N NONE brown vinyl baseboard mastic 591 ASSUMED N NONE 8A black vinyl baseboard mastic 5 LF ASSUMED N NONE ACBM with the potential for damage 9 brown vinyl baseboard 591 LF ASSUMED N NONE ACBM with the potential for damage 9A black vinyl baseboard 5 LF ASSUMED N NONE ACBM with the potential for damage 1 grey carpet mastic 1,74 ASSUMED N NONE ACBM with the potential for damage 14B 15 Black Linoleum 9x9 white/red-brown floor tile 1,8 ASSUMED ASSUMED SURFACE N NONE 12x12 brown floor tile 1,188 ASSUMED N NONE ACBM with the potential for damage ACBM with the potential for damage 16 main entrance, all stair landings, stage, gym, room 18, teacher's lounge e.c. washroom, kitchen, ladies toilet (east basement), 3rd floot t.l, (mens & womens washrooms) main entrance, all stair landings, stage, gym, room 18, teacher's lounge e.c. washroom, kitchen, ladies toilet (east basement), 3rd floot t.l, (mens & womens washrooms) auditorium, computer lab, 2nd floor teachers lounge Room 13 2nd floor office ( classrooms) main office, clerk space, principals office and library 432 Low Low

15 School Unit Building ID 29 Address 61 S. Throop Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 17 12x12 brown floor tile mastic 18 12x12 blue floor tile 19 12x12 blue floor tile mastic 2 12x12 brown 21 12x12 aqua 22 12x12 Brown mastic 23 aqua mastic Plaster C aircell insulation D Material Quantity Material Units Material Location 2,576 6 entrance main office, clerk space, principal's office and library entrance Room 9 Asbestos Type Material Category Friable Damage Type ASSUMED N NONE ASSUMED N Damage Quantity Damage Units Change in Assessment Category Damage Category ACBM with the potential for damage NONE ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM ACBM with the potential for damage 6 Room 9 ASSUMED N NONE 1,185 ASSUMED N NONE 227 ASSUMED N NONE 1,168 Main office, clerk space, Principal office and Library entrance E.C. office, Counselor Room 37 & Closet ASSUMED N NONE 227 ASSUMED N NONE 12x12 dark blue 1,88 E.C. counselor's office Stage auditorium ASSUMED N NONE 12x12 mastic 1,88 Stage auditorium ASSUMED N NONE 15, Throughout CHR SURFACE N DIST 2 LF boiler room, fan room CHR TSI Y NONE air cell joints 3 LF basement CHR TSI Y NONE E cardboard pipe insulation 5 LF basement ASSUMED TSI Y NONE Yes F cardboard pipe joints 1 LF basement ASSUMED TSI Y NONE Yes G preformed tank insulation 375 boilerroom CHR TSI Y NONE Yes H 12"X12" Floor Tile 1,6 Room 2, 113 ASSUMED N NONE 9 Yes Damage Reason Disturbance Potential 1

16 School Unit Building ID 29 Address 61 S. Throop Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report Reinspection Date 3/23/216 Inspector Name Inspector's Comments John Feely /15/216 Inspector's IDPH License Number / Expiration Date HA Number: 2 2A 2B 2C 3 3A 3B 3C 3D 4 4A 5 5A 5B 5C 6 6A 6B 6C 6D 7 7A 8 8A Inspector Comments: t observed 216 t observed 216 t observed 216 t observed 216

17 School Unit Building ID 29 Address 61 S. Throop Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: 9 9A 1 14B C D E F G H Inspector Comments: t observed 216 Damage located in Rms. 31, 33, 39, 3rd Floor Hallway West and South

18 Table II Management Planner's Review

19 School Address Unit 61 S. Throop Building ID Chicago, IL, Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response 2 2A 12x12 brown specked floor tile 12x12 cream floor tile 13, Assumed Chrysotile 2B 12x12 green floor tile 1,316 Chrysotile 2C 12x12 light brown floor tile 852 Chrysotile 3 9x9 brown w/ red floor tile 1,361 Chrysotile 3A 3B 3C 3D 4 4A 5 5A 9x9 light brown floor tile 9x9 red floor tile 9x9 green floor tile 9x9 dark brown &tan floor tile dark brown with black spots linoleum green linoleum 12x12 brown specked floor tile mastic 12x12 cream floor tile mastic 432 Chrysotile Chrysotile Chrysotile Chrysotile Chrysotile Assumed Assumed Chrysotile 1,84 1,98 1,168 13, B 5C 12x12 green floor tile mastic 12x12 light browm floor tile mastic 1, Chrysotile Assumed 6 9x9 brown w/ red floor tile mastic Chrysotile 6A 9x9 light brown floor tile mastic Chrysotile 6B 6C 6D 7 7A 8 9x9red floor tile mastic 9x9 green floor tile mastic 9x9 dark brown & tan floor tile mastic dark brown with black spots linoleum mastic green linoleum mastic brown vinyl baseboard mastic throughout building 2nd floor womens toilet, lunchroom, kitchen, lunchroom managers office, room 25 1/2 main office, store room, principal's office rm 25 1/2, lunchroom, kitchen, lunchroom managers office, teachers lounge 2nd floor ladies washroom, basement library entr., rm 9, ec office toilet office vault South vestibule #2 e.c. office library room 2 stage auditorium room 37 and closet throughout building 2nd floor womens toilet, lunchroom, kitchen, lunchroom managers office, room 25 1/2 main office, store room, principal'soffice rm 25 1/2, lunchroom, kitchen, lunchroom managers office, teachers lounge 2nd floor ladies washroom, basement library entr., rm 9, ec office toilet main office, main office vault & washroom south vestibule #2 e.c. office library stage auditorium room 37 and closet main entrance, all stair landings, stage, gym, room 18, teacher's lounge Chrysotile Chrysotile Chrysotile Chrysotile Chrysotile Assumed ,98 1,

20 School Address Unit 61 S. Throop Building ID Chicago, IL, Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response 8A black vinyl baseboard mastic 5 LF Assumed LF 9 brown vinyl baseboard 591 LF Assumed LF 9A black vinyl baseboard 5 LF Assumed LF 1 grey carpet mastic 1,74 Assumed 14B Black Linoleum 9x9 white/red-brown floor tile 12x12 brown floor tile 1,8 1,188 Assumed Assumed Assumed SURFACE 17 12x12 brown floor tile mastic 2,576 Assumed x12 blue floor tile 12x12 blue floor tile mastic 12x12 brown 6 6 1,185 Assumed Assumed Assumed C 12x12 aqua 12x12 Brown mastic aqua mastic 12x12 dark blue 12x12 mastic Plaster aircell insulation 227 1, ,88 1,88 15, 2 LF e.c. washroom, kitchen, ladies toilet (east basement), 3rd floot t.l, (mens & womens washrooms) main entrance, all stair landings, stage, gym, room 18, teacher's lounge e.c. washroom, kitchen, ladies toilet (east basement), 3rd floot t.l, (mens & womens washrooms) auditorium, computer lab, 2nd floor teachers lounge Room 13 2nd floor office ( classrooms) main office, clerk space, principals office and library entrance main office, clerk space, principal's office and library entrance Room 9 Room 9 Main office, clerk space, Principal office and Library entrance E.C. office, Counselor Room 37 & Closet E.C. counselor's office Stage auditorium Stage auditorium Throughout boiler room, fan room Assumed Assumed Assumed Assumed Assumed Chrysotile Chrysotile SURFACE TSI Yes 9 LF Remove D air cell joints 3 LF basement Chrysotile TSI Yes LF E cardboard pipe insulation 5 LF basement Assumed TSI Yes LF F cardboard pipe joints 1 LF basement Assumed TSI Yes LF G preformed tank insulation 375 boilerroom Chrysotile TSI Yes 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM

21 School Address Unit 61 S. Throop Building ID Chicago, IL, Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response H 12"X12" Floor Tile 1,6 Room 2, 113 Assumed Review Date Manager Planner Name /11/216 Todd Huffer 5/15/216 HA Number 2 2A 2B Management Comments

22 School Address 61 S. Throop Unit Building ID Chicago, IL, 6636 Region 29 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report Manager IDPH License /Expiration HA Number 2C 3 3A 3B 3C 3D 4 4A 5 5A 5B 5C 6 6A 6B 6C 6D 7 7A 8 8A 9 9A 1 14B Management Comments material not observed material not observed material not observed material not observed material not observed material not observed

23 School Address 61 S. Throop Unit Building ID Chicago, IL, 6636 Region 29 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number C D E F G H Management Comments Damage located in Rms. 31, 33, 39, 3rd Floor Hallway West and South. Material

24 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 2 12x12 brown specked floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: throughout building COMMENTS: Inspector's Signature: 3/23/216

25 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop x12 brown specked floor tile throughout building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

26 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 2A 12x12 cream floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 2nd floor womens toilet, lunchroom, kitchen, lunchroom managers office, room 25 1/2 852 COMMENTS: Inspector's Signature: 3/23/216

27 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop A 12x12 cream floor tile 2nd floor womens toilet, lunchroom, kitchen, lunchroom managers office, room 25 1/2 852 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

28 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 2B 12x12 green floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: main office, store room, principal's office 1316 COMMENTS: Inspector's Signature: 3/23/216

29 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop B 12x12 green floor tile main office, store room, principal's office 1316 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

30 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 2C 12x12 light brown floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: rm 25 1/2, lunchroom, kitchen, lunchroom managers office, teachers lounge 2nd floor 852 COMMENTS: Inspector's Signature: 3/23/216

31 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop C 12x12 light brown floor tile rm 25 1/2, lunchroom, kitchen, lunchroom managers office, teachers lounge 2nd floor 852 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

32 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 3 9x9 brown w/ red floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: ladies washroom, basement library entr., rm 9, ec office toilet 1361 COMMENTS: Inspector's Signature: 3/23/216

33 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop x9 brown w/ red floor tile ladies washroom, basement library entr., rm 9, ec office toilet 1361 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

34 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 3A 9x9 light brown floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: office vault 432 COMMENTS: Inspector's Signature: 3/23/216

35 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop A 9x9 light brown floor tile office vault 432 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

36 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 3B 9x9 red floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: South vestibule #2 COMMENTS: t observed 216 Inspector's Signature: 3/23/216

37 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop B 9x9 red floor tile South vestibule #2 29 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: material not observed Management Planner's Signature: 4/11/216

38 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 3C 9x9 green floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: e.c. office COMMENTS: Inspector's Signature: 3/23/216

39 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop C 9x9 green floor tile e.c. office 29 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: material not observed Management Planner's Signature: 4/11/216

40 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 3D 9x9 dark brown &tan floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: library room COMMENTS: Inspector's Signature: 3/23/216

41 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop D 9x9 dark brown &tan floor tile library room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

42 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 4 dark brown with black spots linoleum HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: stage auditorium 198 COMMENTS: Inspector's Signature: 3/23/216

43 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop dark brown with black spots linoleum stage auditorium 198 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

44 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 4A green linoleum HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: room 37 and closet 1168 COMMENTS: Inspector's Signature: 3/23/216

45 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop A green linoleum room 37 and closet 1168 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

46 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 5 12x12 brown specked floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: throughout building COMMENTS: Inspector's Signature: 3/23/216

47 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop x12 brown specked floor tile mastic throughout building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

48 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 5A 12x12 cream floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 2nd floor womens toilet, lunchroom, kitchen, lunchroom managers office, room 25 1/2 852 COMMENTS: Inspector's Signature: 3/23/216

49 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop A 12x12 cream floor tile mastic 2nd floor womens toilet, lunchroom, kitchen, lunchroom managers office, room 25 1/2 852 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

50 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 5B 12x12 green floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: main office, store room, principal'soffice 1316 COMMENTS: Inspector's Signature: 3/23/216

51 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop B 12x12 green floor tile mastic main office, store room, principal'soffice 1316 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

52 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 5C 12x12 light browm floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: rm 25 1/2, lunchroom, kitchen, lunchroom managers office, teachers lounge 2nd floor 825 COMMENTS: Inspector's Signature: 3/23/216

53 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop C 12x12 light browm floor tile mastic rm 25 1/2, lunchroom, kitchen, lunchroom managers office, teachers lounge 2nd floor 825 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

54 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 6 9x9 brown w/ red floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Low ladies washroom, basement library entr., rm 9, ec office toilet COMMENTS: t observed 216 Inspector's Signature: 3/23/216

55 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop x9 brown w/ red floor tile mastic ladies washroom, basement library entr., rm 9, ec office toilet 29 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: material not observed Management Planner's Signature: 4/11/216

56 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 6A 9x9 light brown floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: main office, main office vault & washroom 432 COMMENTS: Inspector's Signature: 3/23/216

57 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop A 9x9 light brown floor tile mastic main office, main office vault & washroom 432 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

58 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 6B 9x9red floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: south vestibule #2 COMMENTS: t observed 216 Inspector's Signature: 3/23/216

59 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop B 9x9red floor tile mastic south vestibule #2 29 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: material not observed Management Planner's Signature: 4/11/216

60 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 6C 9x9 green floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Low e.c. office COMMENTS: t observed 216 Inspector's Signature: 3/23/216

61 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop C 9x9 green floor tile mastic e.c. office 29 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: material not observed Management Planner's Signature: 4/11/216

62 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 6D 9x9 dark brown & tan floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: library 2 COMMENTS: Inspector's Signature: 3/23/216

63 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop D 9x9 dark brown & tan floor tile mastic library 2 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

64 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 7 dark brown with black spots linoleum mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: stage auditorium 198 COMMENTS: Inspector's Signature: 3/23/216

65 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop dark brown with black spots linoleum mastic stage auditorium 198 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

66 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 7A green linoleum mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: room 37 and closet 1168 COMMENTS: Inspector's Signature: 3/23/216

67 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop A green linoleum mastic room 37 and closet 1168 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

68 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 8 brown vinyl baseboard mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: main entrance, all stair landings, stage, gym, room 18, teacher's lounge 591 COMMENTS: Inspector's Signature: 3/23/216

69 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop brown vinyl baseboard mastic main entrance, all stair landings, stage, gym, room 18, teacher's lounge 591 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

70 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 8A black vinyl baseboard mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: e.c. washroom, kitchen, ladies toilet (east basement), 3rd floot t.l, (mens & womens washrooms) 5 LF LF COMMENTS: Inspector's Signature: 3/23/216

71 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop A black vinyl baseboard mastic e.c. washroom, kitchen, ladies toilet (east basement), 3rd floot t.l, (mens & womens washrooms) 5 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

72 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 9 brown vinyl baseboard HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: main entrance, all stair landings, stage, gym, room 18, teacher's lounge 591 LF LF COMMENTS: Inspector's Signature: 3/23/216

73 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop brown vinyl baseboard main entrance, all stair landings, stage, gym, room 18, teacher's lounge 591 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

74 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 9A black vinyl baseboard HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: e.c. washroom, kitchen, ladies toilet (east basement), 3rd floot t.l, (mens & womens washrooms) 5 LF LF COMMENTS: Inspector's Signature: 3/23/216

75 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop A black vinyl baseboard e.c. washroom, kitchen, ladies toilet (east basement), 3rd floot t.l, (mens & womens washrooms) 5 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

76 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 1 grey carpet mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: auditorium, computer lab, 2nd floor teachers lounge 174 COMMENTS: Inspector's Signature: 3/23/216

77 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop grey carpet mastic auditorium, computer lab, 2nd floor teachers lounge 174 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

78 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 14B Black Linoleum HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 13 COMMENTS: t observed 216 Inspector's Signature: 3/23/216

79 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop B Black Linoleum Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: material not observed Management Planner's Signature: 4/11/216

80 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 15 9x9 white/red-brown floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 2nd floor office ( classrooms) 18 COMMENTS: Inspector's Signature: 3/23/216

81 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop x9 white/red-brown floor tile 2nd floor office ( classrooms) 18 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

82 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 16 12x12 brown floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: main office, clerk space, principals office and library entrance 1188 COMMENTS: Inspector's Signature: 3/23/216

83 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop x12 brown floor tile main office, clerk space, principals office and library entrance 1188 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

84 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 17 12x12 brown floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: main office, clerk space, principal's office and library entrance 2576 COMMENTS: Inspector's Signature: 3/23/216

85 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop x12 brown floor tile mastic main office, clerk space, principal's office and library entrance 2576 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

86 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 18 12x12 blue floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room 9 6 COMMENTS: Inspector's Signature: 3/23/216

87 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop x12 blue floor tile Room 9 6 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

88 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 19 12x12 blue floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room 9 6 COMMENTS: Inspector's Signature: 3/23/216

89 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop x12 blue floor tile mastic Room 9 6 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

90 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 2 12x12 brown HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Main office, clerk space, Principal office and Library entrance 1185 COMMENTS: Inspector's Signature: 3/23/216

91 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop x12 brown Main office, clerk space, Principal office and Library entrance 1185 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

92 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 21 12x12 aqua HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: E.C. office, Counselor 227 COMMENTS: Inspector's Signature: 3/23/216

93 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop x12 aqua E.C. office, Counselor 227 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

94 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 22 12x12 Brown mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room 37 & Closet 1168 COMMENTS: Inspector's Signature: 3/23/216

95 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop x12 Brown mastic Room 37 & Closet 1168 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

96 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 23 aqua mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: E.C. counselor's office 227 COMMENTS: Inspector's Signature: 3/23/216

97 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop aqua mastic E.C. counselor's office 227 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

98 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 26 12x12 dark blue HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Stage auditorium 188 COMMENTS: Inspector's Signature: 3/23/216

99 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop x12 dark blue Stage auditorium 188 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

100 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION 27 12x12 mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Stage auditorium 188 COMMENTS: Inspector's Signature: 3/23/216

101 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop x12 mastic Stage auditorium 188 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

102 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION C aircell insulation HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: boiler room, fan room 2 LF LF COMMENTS: Inspector's Signature: 3/23/216

103 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop C aircell insulation boiler room, fan room 2 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

104 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION D air cell joints HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: basement 3 LF LF COMMENTS: Inspector's Signature: 3/23/216

105 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop D air cell joints basement 3 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

106 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION E cardboard pipe insulation HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: basement 5 LF LF COMMENTS: Inspector's Signature: 3/23/216

107 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop E cardboard pipe insulation basement 5 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

108 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION F cardboard pipe joints HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: basement 1 LF LF COMMENTS: Inspector's Signature: 3/23/216

109 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop F cardboard pipe joints basement 1 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

110 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION G preformed tank insulation HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: boilerroom 375 COMMENTS: Inspector's Signature: 3/23/216

111 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop G preformed tank insulation boilerroom 375 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

112 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM PREVIOUS INSPECTION H 12"X12" Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room 2, COMMENTS: Inspector's Signature: 3/23/216

113 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop H 12"X12" Floor Tile Room 2, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/11/216

114 216 AHERA REINSPECTION Inspector Assessment Form (New Homogeneous Area) AHERA INSPECTOR: John Feely INSPECTION DATE: 3/23/ S. Throop INFORMATION FROM CURRENT INSPECTION 28 Plaster Throughout 15 MATERIAL CATEGORY: SURFACE FRIABLE: ASBESTOS TYPE: Chrysotile DISTURBANCE POTENTIAL: AHERA DAMAGE CATEGORY: CONDITION: ACCESSIBILITY: Within Reach 9 DAMAGE REASON: DAMAGE REASON: DAMAGE REASON: COMMENTS: Damage located in Rms. 31, 33, 39, 3rd Floor Hallway West and South Inspector's Signature: 3/23/216

115 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/11/ S. Throop Plaster Throughout 15 9 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: COMMENTS: Damage located in Rms. 31, 33, 39, 3rd Floor Hallway West and South. Material Management Planner's Signature: 4/11/216

116 APPENDIX B Inspector and Management Planner Licenses

117

118

119