1 9 S Morgan St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank 2, 3 or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main (9/) 9 2 2,2 $2,8,9 SITE $,88 Campus Total 2,2 $2,330,0 Building: Main (9/) Category: Building Exterior Entrance Entrance Control EA Entrance Control - Audio and Video EA Exterior Doors - Exterior FRP Door 0 EA $,3 Exterior Doors - Exterior FRP Door 2 EA Exterior Doors - Exterior Steel Door 2 EA $9 Exterior Doors - Exterior Wood Door 3 EA $,2 Exterior Doors - Transom Lite EA $33 Exterior Stairs - Concrete 30 LF $3,28 Exterior Stairs - Concrete LF $2, Exterior Stairs - Concrete LF Exterior Stairs - Stone 3 LF $3,8 Power Door Operator and Controls EA Ramp Handrail - Steel_Ramp Handrail LF $,00 Ramps - Concrete 2 LF $3,0 Ramps - Concrete 8 LF Stair Handrail - Steel_Stair Handrail 28 LF $23 Foundation Foundation - Concrete 88 LF Superstructure - Concrete 2,8 SF WACKER Page of 3 Assessment Date: /8/20

2 Building: Main (9/) Category: Building Exterior Lighting 9 S Morgan St Chicago, IL 03 Exterior Lighting - Parapet or Roof Mounted 8 EA $,292 Exterior Lighting - Wall Mounted 2 EA $8 Exterior Lighting - Wall Mounted EA $,909 Roof System Walls Windows Chimney - Brick Chimney- Concrete/ Mortar Liner LF $,3 Chimney - Metal Flue 0 LF $,00 Coping - Metal LF $,82 Downspouts - Exterior Downspouts 3 LF $,8 Downspouts - Interior Downspouts LF $2,92 Parapet - " - 30" Height 38 LF $, Roof - Asphalt Gravel Ballast,98 SF $33,89 Roof - Asphalt Gravel Ballast 8,999 SF $22,0 Roof Structure - Steel / Metal Deck/ Concrete Topping 20,9 SF Canopy - Concrete/ Stucco 0 SF $,02 Canopy - Concrete/ Stucco SF $2, Canopy - Concrete/ Stucco 3 SF Canopy - Metal 23 SF Cornice - Wood 92 LF $,0 Exterior Walls - Brick 9,83 SF $,3 Exterior Walls - Stone-Cast 0 SF $ Exterior Walls - Stone-Cast 0 SF $,3 Exterior Walls - Stone-Cut 0 SF $ Exterior Walls - Stone-Cut 2,3 SF $8,382 Exterior Walls - Terra Cotta 9 SF $,3 Clerestory - Glass Double-Pane 0 SF $,88 Clerestory - Glass Double-Pane 8 SF $ Curtain wall - Louver 3 SF $38 Lintels - Steel 2 LF $,2 Windows - Casement Aluminum Double-pane 3, SF $92,32 Building Exterior Subtotal: $,0,3 Building: Main (9/) WACKER Page 2 of 3 Assessment Date: /8/20

3 Category: Electrical System Emergency System 9 S Morgan St Chicago, IL 03 Automatic Transfer Switch EA $08 Emergency A/C Power - Corridors and Stairs,80 SF $,3 Emergency A/C Power - Multipurpose Room 2,39 SF $890 Emergency A/C Power - Students Toilets,2 SF $8 Emergency Battery Packs - Corridors and Stairs EA Emergency Battery Packs - Students Toilets EA Exit Signs - Corridors and Stairs EA Exit Signs - Multipurpose Room 3 EA Security System - CCTV 2,2 SF $8,2 Security System - Intrusion Detection 2,2 SF $,092 Main Service Power Distribution Independent Electrical Service for emergency power EA Main Electrical Service A and Less than 20/208/3PH EA $3,398 PA System 2,2 SF $9,02 Lighting and Power Panels - 00 A EA $,89 Lighting and Power Panels - 00 A 2 EA $98 Lighting and Power Panels - Above 00 A 3 EA $,9 Electrical System Subtotal: $3,93 Building: Main (9/) Category: Safty System Fire Alarm Fire Alarm Panel EA Fire Alarm Strobe Lights 2,3 SF Safty System Subtotal: Building: Main (9/) Category: Mechanical System Air Conditioning Condensing Unit- Roof Mounted - Less than tons EA $3,33 WACKER Page 3 of 3 Assessment Date: /8/20

4 Building: Main (9/) Category: Mechanical System Air Handling Systems 9 S Morgan St Chicago, IL 03 Air Handling Unit- Package Single Zone- Indoor- Steam Coils cfm EA $2,2 Air Intake EA $, Auxiliaries cfm EA Boiler Systems Heating Devices Temperature Control Unit Ventilation Ventilation Boiler Auxiliary- Steam Boiler HP 2 EA $,0 Chemical Feed System EA $3,0 Chemical Feeder EA $3,0 Combustion Dampers 2 EA $88 Condensate Pump EA $8,9 Feed Water Pumps and Tank EA $2, on Condensing- Water Tube- Flexible Tube- Force Draft- Steam Boiler HP 2 EA $,0 Piping - Condensate Pipe- Steel 300 LF $,8 Piping - Steam Pipe- Steel 300 LF $,22 Steam Traps 8 EA $23,8 Vacuum Pump EA $,0 Fin Tube - Steam 20 LF $,33 Wall Heater - Electric EA $39 Pneumatic System 2,2 SF $9,92 Thermostats - Pneumatic EA Unit Ventilators- Floor Mounted- Steam Heating Coils Only EA $33,0 Exhaust Fans- Indoor CFM 2 EA $,8 Exhaust Fans- Indoor - Less than 00 CFM EA $29 Exhaust Fans- Roof Mounted CFM 2 EA $8,89 Exhaust Fans- Roof Mounted - Less than 00 CFM EA $,92 Mechanical System Subtotal: $39,288 Building: Main (9/) Category: Plumbing System WACKER Page of 3 Assessment Date: /8/20

5 Building: Main (9/) Category: Plumbing System Hot Water 9 S Morgan St Chicago, IL 03 Gas Heater BTU/HR EA $30 Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures 2,2 SF $9,00 Domestic Piping-Cold Water Horizontal Lines 2,2 SF $39,93 Domestic Piping-Cold Water Risers 2,2 SF $22,0 Domestic Piping-Hot Water from Risers to Fixtures 2,2 SF $,92 Domestic Piping-Hot Water Horizontal Lines 2,2 SF $3,9 Domestic Piping-Hot Water Return Lines 2,2 SF $23,0 Domestic Piping-Hot Water Return Risers 2,2 SF $3,39 Sanitary Piping 2,2 SF $2,2 Storm Piping 2,2 SF $2,03 Vent Piping 2,2 SF $8,8 Pumps - Domestic Booster Pump-Simplex EA $, Pumps - Sump-Simplex EA $ Plumbing System Subtotal: $239,29 Building: Main (9/) Category: Classrooms Computer Lab ( room) AC Units EA $9 Casework 3 LF $909 Ceiling - Splined,0 SF $82 Charging Station EA Doors - Wood Doors inclu hw EA $30 Floor - Tile,0 SF $2,28 Lighting - Pendent/Surface 2 EA Storage/ Closet 3 SF $32 Walls - Concrete Block,38 SF Wireless System EA Kindergarten ( room) Casework 2 LF $,88 Ceiling - Splined 90 SF $ WACKER Page of 3 Assessment Date: /8/20

6 Building: Main (9/) Category: Classrooms Kindergarten ( room) 9 S Morgan St Chicago, IL 03 Doors - Wood Doors inclu hw 2 EA 2 Floor - Tile/Sheet 90 SF $9 Lighting - Pendent/Surface 8 EA $2,230 Marker Board 8 LF $38 Storage/ Closet 2 SF $89 Student Lockers - One Tier 2 EA $2, Walls - Concrete Block,0 SF $3,2 Work Sink EA $39 Office ( room) Pre School ( room) Casework 3 LF $88 Ceiling - Plaster/Drywall 28 SF $2,9 Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet 28 SF $29 Lighting - Pendent/Surface 8 EA $2,230 Marker Board 3 LF $ Walls - Concrete Block 8 SF $2, Casework LF Ceiling - Splined,28 SF $,0 Chalk Board 2 LF $,02 Doors - Wood Doors inclu hw EA $30 Floor - Tile,28 SF $2,30 Lighting - Pendent/Surface 3 EA Storage/ Closet 3 SF $32 Walls - Concrete Block, SF (8 rooms) AC Units EA $9 Casework 23 LF $,39 Casework 29 LF Ceiling - Plaster/Drywall 28 SF $,3 Ceiling - Plaster/Drywall 2,3 SF $,20 Ceiling - Plaster/Drywall SF Ceiling - Splined 2,990 SF $2,3 Doors - Transom Window SF $ Doors - Wood Doors inclu hw 8 EA $2,08 Floor - Tile 3,8 SF $,23 WACKER Page of 3 Assessment Date: /8/20

7 Building: Main (9/) Category: Classrooms (8 rooms) Science Classroom ( room) 9 S Morgan St Chicago, IL 03 Floor - Tile/Sheet 3,2 SF $3,2 Lighting - Pendent/Surface 3 EA $,0 Lighting - Pendent/Surface 0 EA Marker Board LF $3,299 Marker Board LF Storage/ Closet 98 SF $, Storage/ Closet 3 SF Student Lockers - One Tier 8 EA $,2 Walls - Concrete Block,0 SF $0,9 Walls - Concrete Block,20 SF $2,2 Work Sink 3 EA $,3 Casework 3 LF $88 Ceiling - Plaster/Drywall 28 SF $2,9 Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet 28 SF $29 Lighting - Pendent/Surface 8 EA Marker Board 3 LF $0 Walls - Concrete Block 82 SF $2,2 Work Sink 2 EA $8 Classrooms Subtotal: $32,2 Building: Main (9/) Category: Rooms (Other Than Classrooms) Administrative Suites/Offices AC Unit 2 EA $99 Ceiling - Plaster/Drywall 23 SF $2, Ceiling - Plaster/Drywall 0 SF $3 Ceiling - Plaster/Drywall 0 SF Ceiling - Splined 9 SF $30 Ceiling - Splined 320 SF Doors - Steel Doors incl hw 2 EA Doors - Wood Doors inclu hw 3 EA $903 Doors - Wood Doors inclu hw EA WACKER Page of 3 Assessment Date: /8/20

8 Building: Main (9/) Category: Rooms (Other Than Classrooms) Administrative Suites/Offices 9 S Morgan St Chicago, IL 03 Floor - Tile 23 SF $,0 Floor - Tile 9 SF $,2 Lighting - Pendent/Surface EA Power Distribution 30 EA Storage/ Closet 9 SF Walls - Concrete Block 982 SF $2,89 Walls - Concrete Block,03 SF Kitchen Ceiling - Plaster/Drywall 38 SF $2, Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet 38 SF $39 Lighting - Pendent/Surface 8 EA $2,230 Serving Line 8 LF $ Walls - Concrete Block,0 SF $3,00 Lunch & Multipurpose Room Ceiling - Plaster/Drywall 2,39 SF Doors - Steel Doors incl hw EA Floor - Tile 2,39 SF $,238 Lighting - Metal Halide/Sodium Vapor 2 EA $,0 Walls - Concrete Block,903 SF Walls - Structural Glazed Tile,903 SF MDF_IDF Doors - Steel Doors incl hw EA Finishes 3 SF $2,9 Ventilation and Cooling EA Mechanical/ Service Rooms Boiler Room 3 SF $,0 Crawl Space - Unfinished 2,00 SF $0,2 Interior Stairs 32 LF $289 Janitor's Closet 80 SF $3 Mechanical/ Service Rooms 23 SF $,2 Storage Room 39 SF $2,823 Vaults 8 SF Restroom Accessories,0 SF $2,9 WACKER Page 8 of 3 Assessment Date: /8/20

9 Building: Main (9/) Category: Rooms (Other Than Classrooms) Restroom 9 S Morgan St Chicago, IL 03 Accessories 28 SF Ceiling - Lay-in 8 SF $3 Ceiling - Plaster/Drywall,209 SF $,8 Ceiling - Plaster/Drywall 2 SF Doors - Wood Doors inclu hw 9 EA $,9 Doors - Wood Doors inclu hw EA Floor - Terrazzo SF $3 Floor - Tile 8 SF $0 Floor - Tile Ceramic/ Porcelain 982 SF $2,08 Floor - Tile/Sheet 9 SF $9 Floor Drain EA $,29 Floor Drain EA Lavatory 2 EA $3,9 Lavatory 3 EA $, Lavatory EA Lighting 2 Lighting - Lay-in 2 EA $238 Lighting - Lay-in EA Lighting - Pendent/Surface EA $,33 Lighting - Pendent/Surface 2 EA Lighting - Wall Mounted 3 EA $32 Partitions 3 EA $2,23 Partitions 0 EA $2,99 Student Lockers 3 EA Urinals 2 EA $2,88 Urinals 2 EA $2 Urinals 2 EA Walls - Concrete Block 28 SF $,2 Walls - Concrete Block 00 SF Walls - Plaster/Drywall 0 SF $ Walls - Structural Glazed Tile 3,28 SF $0,338 Walls - Structural Glazed Tile 33 SF Water Closet EA $,3 Water Closet EA Rooms (Other Than Classrooms) Subtotal: $2,00 WACKER Page 9 of 3 Assessment Date: /8/20

10 Building: Main (9/) Category: Building Interior Corridor 9 S Morgan St Chicago, IL 03 Ceiling - Plaster/Drywall 2,3 SF $,80 Ceiling - Splined,9 SF $,3 Doors - Wood Doors include hw 2 EA $3,2 Drinking Fountains - Double Fountain 2 EA $2 Drinking Fountains - Single Fountain 2 EA $ Floor - Tile/Sheet,0 SF $2,2 Lighting - Pendent/Surface 39 EA $,832 Student Lockers - Two Tiers 3 EA $,33 Walls - Concrete Block 3,03 SF $0,2 Walls - Structural Glazed Tile 3,88 SF $2,0 Safety Stairs Camera Viewing Station 3 EA $2,08 Security Cameras EA $, Ceiling - Plaster/Drywall 92 SF $,99 Floor - Terrazzo 80 SF $,08 Handrails 28 LF $,09 Lighting - Pendent/Surface 8 EA $99 Stairs - Terrazzo 0 LF $ Walls - Concrete Block,90 SF $3,88 Walls - Structural Glazed Tile,90 SF $3, Building Interior Subtotal: $8,000 Total Building Cost $2,8,9 SITE Category: Site Civil/Drainage Fencing Civil/ Drainage - Catch Basin EA Civil/ Drainage - Site Manhole EA Fencing - ew Standard Ornamental LF Fencing - Wood Fencing w/ Steel Frame 2 LF $,82 WACKER Page 0 of 3 Assessment Date: /8/20

11 9 S Morgan St Chicago, IL 03 SITE Category: Site Fencing Landscape Parking Lot Playground Sidewalks Signage Benches EA Irrigation 2,38 SF $33,293 Landscape - Grass 29,2 SF $2,22 Parkway trees EA Planting Beds/ Area,239 SF $2,038 Play Area - Asphalt/ Hardscape 9,83 SF $23,9 Retaining Wall - Concrete 88 SF $2,03 Concrete Curbs 32 LF $, Interior Plantings 3 LF $,32 Lighting - Pole Mounted EA $,80 Surface - Asphalt,3 SF $0,8 Trash Compactor EA Trash Enclosure - Chain Links 89 SF Vehicular Screening 9 LF $,9 Equipment - Combo 3-2 EA Equipment - Pre K 3- EA Equipment - Swingset EA Surface - Poured Surface 3,2 SF Sidewalks - Internal Walks 8 LF $2, Sidewalks - Perimeter Sidewalks,03 SF $3,9 Flag Pole - Flag Pole EA $, Marquee - Free Standing Back Lighted EA Monument - Building Mounted Cut Letter Sign EA $0, Monument - Building Mounted Cut Letter Sign EA Site Subtotal: $,88 Total Site Cost $,88 WACKER Page of 3 Assessment Date: /8/20

12 9 S Morgan St Chicago, IL 03 Campus Total ² ³ $2,330,0 ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. WACKER Page 2 of 3 Assessment Date: /8/20

13 9 S Morgan St Chicago, IL 03 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main (9/) Computer Lab Kindergarten Office Pre School Science Classroom Kindergarten Kindergarten Pre School Science Classroom st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor 2nd Floor 2nd Floor 2nd Floor 2nd Floor , ,28 90,02, WACKER Page 3 of 3 Assessment Date: /8/20