1 November 5, 2018 UNL East Campus Union OAC Meeting Minutes TOPICS OF DISCUSSION: 1. Introductions/Attendance a. RDg Nick Schulz, Architect b. UNL Nate Perry, Project Manager c. UNL Sneha Bhoir, Project Manager d. UNL Charlie Francis, Housing Administration Director e. UNL Ryan Lahne, Nebraska Unions Director f. UNL Andy Smriga, Nebraska Unions Assistant Director g. UNL Pamela Edwards, University Dining Services Assistant Director h. UNL Larry Shippen, Housing Facilities Operations Associate Director i. UNL Phil Haake, Construction Inspector j. UNL John Ingram, ASSOC AD k. UNL Pat Goracke, Building Mechanic l. UNL Rich Firebaugh, Building Code Official m. UNL Mike Huerta, Construction Inspector n. UNL Matt Tureck, Controls o. Hausmann Construction Brad Smith, Project Manager p. Hausmann Construction Zach Lewis, Assistant Project Manager q. Hausmann Construction Scott Waegli, Superintendent r. Hausmann Construction Mark Lureen, Superintendent 2. Contract Documents a. Bid Package 1: i. See previous meeting minutes. b. Bid Package 2: i. See previous meeting minutes. c. Bid Package 3: i. Plans dated ii. Specifications, Volumes 1 and 2 dated iii. Addenda 1 to be issued noon iv. Bid day: v. All remaining scopes d. ASI s e. RFI s i. See attached RFI Log f. Construction Change Directive (CCD) g. Change Proposal Request (CPR) i. CPR 1 GMP Amendment Status: PM Reviewer Review ii. CPR X Additional steel and helical piles for revised penthouse design iii. CPR X Demo Second layer of tile in north lounge/entry Page 1 of 3

2 November 5, 2018 h. Change Order (CO) i. CO 1 GMP Amendment: Approved 3. Safety a. See previous meeting minutes. b. Scott, any new safety concerns? 4. Schedule a. Project schedule Hausmann updating project schedule based on latest phasing plan and bid package dates. b. See attached 4 week look ahead dated c. Weather delays. d. Other delays: e. Fire suppression lines will be shut off in the union 11/5 5. Meetings a. Helical Anchor Pre-install 9:00 am b. Bid Package 3 Pre-bid meeting 1:00 pm 6. Submittals a. See attached submittal log. b. Samples delivered to RDG include: 7. Hausmann a. Does UNL want a mock-up of the brick sample? i. No need for mock-up of the brick. b. Clarifications i. Roof system 1. UNL is leaning towards EPDM with extended 30 year warranty. ii. Wall tagging system 1. Legend applies only to interior walls 2. Nick will add penthouse wall type construction to Addenda 1. iii. Fiber reinforced coating 1. FRC is not required in back of house. FRC is required for food service areas. FRP is required around the mop sinks. iv. MRL elevator? 1. Would like to have at least the passenger elevator MRL. 2. Still to be determined. c. Update on sanitary sewer? i. South of MH2 is not to be replaced. ii. Will determine if manhole needs to be replaced depending if it is concreter or brick walls. iii. Nate will Bluebeam what is to be replaced and what is to stay. d. Removal of brick on exterior south wall of Great Plains i. Andy will put together a schedule of times when Great Plains is active with events. e. Catlett is requesting access to the structural CAD drawings Page 2 of 3

3 November 5, 2018 i. Nick will send out full civil, structural, and landscaping CAD files. 8. UNL a. Comments? i. BSM is to salvage auto operators and handicap pedestal at west entrance. ii. Union Crossing will go offline at the end of spring semester per Andy. iii. Vision is waiting on fittings to relocate the CO2. iv. Fall protection will be installed on new and existing roofs. v. Hausmann will extend fencing along south exit to account for stairwell exit that currently egresses into the construction zone. 9. RDG a. Comments? i. Elevator report from Gerald was sent out. ii. No new update on Starbucks. iii. Backup generator location is okay per Nate. iv. UNL scopes 1. Fire alarms rough-in and install 2. HVAC Controls rough-in and install 3. Card Access rough-in and install v. Projection screens are included in AV. 10. Next Meeting a. November 12, Please review all minutes and respond back with any questions and/or issues End of meeting Minutes. Page 3 of 3

4 East Campus Union RFI Log 11/5/2018 Process Name Status Subject Date from GC Returned to Sub Held By RFI 001 Closed Supply fan motor for existing AHU B - 10/05/ /2/ /15/2018 Closed RFI 002 Closed Concrete piers to supports handrails at ramps. - 10/24/ /17/ /5/2018 Closed RFI 003 Closed Continuous footings along exterior stairs - 10/24/ /17/ /5/2018 Closed RFI 004 Closed Footing elevation at landscape walls (southside)- 10/24/ /17/ /5/2018 Closed RFI 005 Open Electrical vault and electrical duct bank in relation to the continuous footing /02/ /29/2018 Open Nick

5 East Campus Union Submittal Log Package Number Title Spec Section Status Date Submitted For Date Review Date Returned to Sub Held By Air Handling Units Exceptions Taken as Noted Closed Chiller Exceptions Taken as Noted Closed Fire Protection Piping Exceptions Taken as Noted Closed Helical Anchors Shop Drawings Exceptions Taken as Noted Closed Helical Anchors Product Data No Exceptions Taken Closed Reinforcing steel for S1.01B and S1.01C NEW Open Open Nick Existing Brick Sample NEW Open Open Nick/Emily Geofoam Infill NEW Open Open Nick

6 UNL East Campus Union Period From: To: WEEK PROJECT SCHEDULE SUB ACTIVITY M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S DATE OAC Meeting S S S S Forman Meeting S S S S Hausmann Bid day for bid package #3@ 1:00 pm S Hausmann Pre-install for helical 9:00 am S Hausmann Shoring Entomology steam tunnel S S Hausmann Tunnel protection for work in Great Plains S S S S S Hasumann Deliver geofoam for Hollow Infill S Hausmann Infill Hollow with Geofoam S S S S Hasumann Temporary wall 6 at north wall area B S S S S S Hasumann Knock out wall in existing mech room S UNL -- BSM UNL -- BSM Look into removing card access and handicap controls on west entrance Meeting to discuss low voltage in kitchen CIP Concrete Lay out footings for North buildout S S S CIP Concrete Dig footings for North buildout S S S S CIP Concrete Install rebar for North buildout S S S S CIP Concrete Pour footings for North buildout S S CCS Demo north wall of area B to install footings S S S S S CCS Demo brick on south wall exterior of Great Plains Room S S S S CCS Remove concrete in area B around column to install helical anchors S S Gana Excavating Mobilize to site T T Gana Excavating Site prep Great Plains S S S S S Gana Excavating Grading Great Plains S S S S Gana Excavating Demo underground utilities at Great Plains S S S Trimark Underslab rough in drawings Harris Fabricate rebar for North area B buildout S S S S S S S S S S Harris Deliver rebar for North area B buildout T T Vision Demo HVAC in mech room S S S Vision Review existing great plains addtition area to prepare for Gana S S S S S WES Temp. electrical WES Review existing great plains addtition area to prepare for Gana S S S S S WES Demo light poles at west entrance S S S = Scheduled T = Tentative Page 1 of 1 Rev 0 dated