1 AIR MONITORING REPORT Boiler Room Tunnel Hayden Heights Elementary School 1863 Clear Avenue St. Paul, MN September 29, 2005 Nova Client No.: STPAU006/Project No: H

2 AIR MONITORING REPORT Boiler Room Tunnel Hayden Heights Elementary School 1863 Clear Avenue St. Paul, MN Nova Client No.: STPAU006 Project No.: H September 29, 2005 Prepared For: St. Paul Schools 360 Colborne Street St. Paul, MN Prepared By: Brian Meyer, Project Manager Michael Muff, Air Monitoring Specialist Nova Consulting Group, Inc Hazeltine Boulevard, Suite #400 Chaska, MN 55318

3 Hayden Heights Elementary School, Boiler Room Tunnel, St. Paul, MN H R.004-BJM Page i September 29, 2005 TABLE OF CONTENTS Section Page 1.0 INTRODUCTION ENCLOSURE SUMMARY AIR MONITORING AND SAMPLE ANALYSIS WASTE TRACKING...4 APPENDICES A Air Sample Results Summary B: Air Sample Results Detail C: Sample Location Maps D: Daily Log Reports E: Personnel Certification Form F: Waste Tracking G: Personnel Certifications

4 Hayden Heights Elementary School, Boiler Room Tunnel, St. Paul, MN H R.004-BJM Page 1 September 29, INTRODUCTION Nova Consulting Group, Inc. (Nova) provided on-site air monitoring during the removal of asbestos-containing materials located in the Boiler Room Tunnel at the Hayden Heights Elementary School building, 1863 Clear Avenue, St. Paul, MN Removal was conducted using wet methods asbestos abatement techniques. All asbestos-related work was performed in accordance with Federal, State, and Local asbestos regulations. Asbestos-related work began and was completed on September 29, Twell Environment Inc., License #AC592, conducted the asbestos abatement. Sample collection and analysis was completed by Michael Muff, License #AS8372, of Nova Consulting Group, Inc., 1107 Hazeltine Boulevard, Suite #400, Chaska, MN

5 Hayden Heights Elementary School, Boiler Room Tunnel, St. Paul, MN H R.004-BJM Page 2 September 29, ENCLOSURE SUMMARY The following enclosure summary describes each enclosure including location of the enclosure and materials removed. Also identified is the clearance date and whether destructive means were used to access ACM located in interstitial spaces or other inaccessible areas. Specific details relating to enclosure construction and removal details can be found in the daily logs located in the appendices. Enclosure Number: 1 Enclosure Type: Wet Methods Area: Basement Location: Boiler Room Tunnel Room Number: Clearance Date: 9/29/2005 Destructive Means Used: No Material Identification Subcategory Description Damaged Pipe Insulation Debris

6 Hayden Heights Elementary School, Boiler Room Tunnel, St. Paul, MN H R.004-BJM Page 3 September 29, AIR MONITORING AND SAMPLE ANALYSIS On-site air monitoring was provided by Michael Muff, License #AS8372. PCM sample collection and analysis was completed in accordance with NIOSH Method Quality control procedures were followed as required by this method. Air sample analysis results can be found on the air sample summary table located in the appendices.

7 Hayden Heights Elementary School, Boiler Room Tunnel, St. Paul, MN H R.004-BJM Page 4 September 29, WASTE TRACKING All asbestos waste containers were labeled with the required EPA, DOT, and OSHA labels. The following waste containers were removed from the project site: Date Qty Waste Container Type of Transport Immediate Destination 5/29/ mil Poly Bags Truck Dumpster Waste was transported to the SBK Industrial Landfill located at Courthouse Blvd., Rosemount, MN A waste tracking table is located in the appendices.

8 APPENDIX A AIR SAMPLE RESULTS SUMMARY

9 Nova Consulting Group, Inc Hazeltine Boulevard, Suite #400 Chaska, MN Air Sample Results by Enclosure Project Number H Building Number NA Project Description Cleaning, Encapsulation Building Name Hayden Heights Elementary School Client Name St. Paul Schools Building Address: 1863 Clear Avenue Client Number STPAU006 St. Paul, MN Enclosure Number Enclosure Type Area Location Room Number Sample Number Sample Location Date Collected Type of Sample Sub-Type of Sample Result Enclosure # 1 Basement /29/2005 Gross Removal Adjacent 0.01 Wet Methods Boiler Room Tunnel Tunnel Entrance Enclosure # 1 Basement /29/2005 Gross Removal Adjacent 0.01 Wet Methods Boiler Room Tunnel Tunnel Entrance Friday, February 24, 2006 Page 1 of 1 Nova Consulting Group, Inc.

10 APPENDIX B AIR SAMPLE RESULTS DETAIL

11 Nova Consulting Group, Inc Hazeltine Boulevard, Suite #400 Chaska, MN Project Number H Building Number NA Project Description Cleaning, Encapsulation Building Name Hayden Heights Elementary School Client Name St. Paul Schools Building Address 1863 Clear Avenue Client Number STPAU006 St. Paul, MN Date Collected Collection Information Sample Number 9/29/ /29/ Type of Sample Sub-Type of Sample Calibrated Collected By Flow Rate Volume Date Analyzed Analysis Information Analyzed By Air Sample Results Detail Number of Fields Graticule Total Area Fibers Blank Fiber Value Density Concentration Gross Removal Adjacent Michael Muff /29/2005 Michael Muff Gross Removal Adjacent Michael Muff /29/2005 Michael Muff /29/2005 B-0001 Blank Adjacent Michael Muff 0 0 9/29/2005 Michael Muff fibers Friday, February 24, 2006 Page 1 of 1 Nova Consulting Group, Inc.

12 APPENDIX C SAMPLE LOCATION MAPS

13 Boiler Room Entrance Boiler Room Maintenance Office Hallway Tunnel Entrance LEGEND , = Adjacent Sample Locations Basement Tunnel Area of Cleaning, Encapsulation Drawing not to scale. Basement Boiler Tunnel Hayden Heights Elementary 1309 Clear Avenue St. Paul, MN H Environmental Architecture Engineering Consulting Group, Inc. Sept

14 APPENDIX D DAILY LOG REPORTS

15 Nova Consulting Group, Inc Hazeltine Boulevard, Suite #400 Chaska, MN Project Number H Project Description Cleaning, Encapsulation Client Name St. Paul Schools Client Number STPAU006 Building Number NA Building Name Hayden Heights Elementary School Daily Log Date 9/29/2005 Environmental Specialist License Number Consultant Time Sheet Michael Muff AS8372 Consultant Name Consultant License Number Contractor Name Contractor License Number Contractor Time Sheet Start Time End Time Breaks Crew Size Shift Hours Start Time End Time Breaks Crew Size Shift Hours 2:30 PM 5:30 PM :00 PM Daily Log Nova Consulting Group, Inc. AC420 Twell Environment Inc. AC592 Total Worker Hours Consultant 3.0 Contractor 0.0 Log Entries Time Description 2:30 PM Nova arrives on site. Twell is present with a crew of two. 2:45 PM Twell is presently HEPA vacuuming and encapsulating pipe end insulation in the tunnel area of the Boiler Room. The supervisor informs Nova that no glove bagging is possible. 3:00 PM Nova brings equipment to the Boiler Room tunnel area. 3:10 PM A set of adjacent samples is started by Nova at the entrance to the tunnel. 3:30 PM Nova is informed the crew has finished its work. Twell leaves site. 4:40 PM Nova collects the two adjacent samples. 5:00 PM Adjacent samples are analyzed, with both reading at under.01 f/cc. 5:15 PM Nova leaves site. Friday, February 24, 2006 Page 1 of 1 Nova Consulting Group, Inc.

16 APPENDIX E PERSONNEL CERTIFICATION FORM

17 Nova Consulting Group, Inc. Personnel Certification Report Client Number: STPAU006 Project Number: H Client Name: St. Paul Schools Project Location: Boiler Room Tunnel I hereby certify that this project was completed by me or under my supervision. Asbestos Consultant Certification Number Expiration Date EPA / State Michael Muff AS8372 1/18/2006 1/18/2006 Asbestos Contractor/Supervisor Certification Number Expiration Date EPA / State Miguel A Lopez AS7907 4/2/2006 4/2/2005 Asbestos Worker Certification Number Expiration Date EPA / State Ronnie F Vargas AW8021 4/9/2006 4/9/2006 Friday, February 24, 2006 Nova Consulting Group, Inc.

18 APPENDIX F WASTE TRACKING

19 Nova Consulting Group, Inc Hazeltine Boulevard, Suite #400 Chaska, MN Waste Tracking Report Project Number H Building Number NA Project Description Cleaning, Encapsulation Building Name Hayden Heights Elementary School Client Name St. Paul Schools Building Address: 1863 Clear Avenue Client Number STPAU006 St. Paul, MN Removal Date Immediate Destination Final Destination Type of Transport Note 5/29/2005 Twell Truck SKB Landfill Truck Quantity verified by supervisor. Container 6-mil poly bags Quantity 1 Note Double-sealed and goosenecked. Friday, February 24, 2006 Page 1 of 1 Nova Consulting Group, Inc.

20 APPENDIX G PERSONNEL CERTIFICATIONS

21 Issue Date: January 18, 2005 Expiration Date: January 18, 2006 Diploma No.: CSR Nova Consulting Group, Inc. Certifies that Michael Muff Has attended and successfully completed the Contractor/Supervisor Refresher Training Course "Practices and Procedures for Asbestos Abatement Projects" presented in Chaska, Minnesota on January 18, 2005 Course has been permitted by the State of Minnesota under Minnesota Rules, parts to and the U.S. EPA under Title II of TSCA, 40 CFR Part 763 (AHERA) Bruce Boehm Carlson Course Director Nova Consulting Group, Inc Hazeltine Boulevard, Suite #400 - Chaska, MN Telephone: (952) FAX: (952)