Newport News Public Schools

Size: px
Start display at page:

Download "Newport News Public Schools"

Transcription

1 PURCHASING DEPARTMENT Newport News Public Schools / FAX WARWICK BOULEVARD NEWPORT NEWS, VIRGINIA Addendum #2 TO: RE: ALL BIDDERS IFB # LC Carver ES HVAC System Replacement 1. The above referenced IFB is hereby amended and clarified as follows: a. See Thompson Consulting Engineers Addendum 2 dated. b. See revised bid response form attached to Addendum All other provisions of the IFB shall remain unchanged. Note: Electronic copies of plans and drawings available on the NNPS website. Signature: (Bidder) Sincerely, Lisa A. Cumming, CPPO, C.P.M., CPPB, VCO Director of Purchasing

2 THOMPSON Consulting Engineers 22 Enterprise Parkway Suite 200 Hampton, VA Tel: (757) Fax: (757) Principals MARK W. THOMPSON, P. E. KEVIN D. ALLEN, P. E. KENZIE CAMBAR, P.E. Senior Associates MATTHEW N. HALTINER Associates MICHAEL D. STOVER JOEY ALLEN, P.E. JASON A. MINER ADDENDUM No. 2 HVAC System Replacement Carver Elementary School Newport News, Virginia IFB # LC MJT #14114 Except as may be otherwise described, bidding requirements, materials, and workmanship for the work described herein shall conform to all requirements of the original Contract Documents, Project Manual dated February 19, 2016 and Drawings dated February 19, 2016 The following Addendum to the specifications and drawings are made a part of the project and take precedence over the section of the specifications, in part, as originally written and over the drawings, in part, as originally drawn and/or written. Each Bidder is responsible for obtaining all addenda and shall acknowledge receipt of all addenda in the space provided on the Bid Form or by returning a copy of each signed addendum. Failure to do so may result in rejection of the bid. All addenda issued shall become part of the IFB and any resulting contract documents. CHANGES TO THE BID FORM: REPLACE: Bid form with attached Bid Form. CHANGES TO THE DRAWINGS: DRAWING M0.01: REVISE deductive alternate no. 2 to read as follows: Deductive Alternate No. 2: Condenser water piping 4 and smaller (outside mechanical room) shall be Aquatherm piping in lieu of Type L copper with soldered fittings and condenser water piping above 4 and inside the mechanical room shall be schedule 40 black steel grooved piping in lieu of welded steel piping. REQUEST FOR INFORMATION: Question 1: Please provide photos of kitchen cooking equipment located under the existing kitchen hood? Answer: Photos are included as an attachment.

3 Carver ES Addendum No. 2 #14114 Page 2 of 5 ATTACHMENTS: 1. Kitchen equipment photos 2. Bid Form END OF ADDENDUM NO.2

4 Carver ES Addendum No. 2 #14114 Page 3 of 5

5 Carver ES Addendum No. 2 #14114 Page 4 of 5

6 Carver ES Addendum No. 2 #14114 Page 5 of 5

7 Attachment A IFB LC Carver Elementary School HVAC System Replacement BID RESPONSE FORM In compliance with solicitation dated February 23, 2016 the undersigned proposes to furnish all labor equipment and materials and perform all work in strict accordance with all requirements for: Carver Elementary School HVAC System Replacement The above scope of work to be performed at the dollar amount(s) stated herein. The undersigned agrees and assures that:. All prices stated herein shall be firm for a period of calendar days. (90 days minimum). If bidder's response is accepted and a purchase order issued, bidder will accept same and fulfill requirements in strict compliance with all terms and conditions.. If in acceptance of bidder's response, bidder is required to furnish a payment bond and a performance bond; and/or a certificate of insurance, bidder will execute and furnish same within five (5) calendar days of such notice, and that failure to do so will mean forfeiture of any surety bidder may have been required to post as part of bidder's response.. Bidder s business is organized as a stock or nonstock corporation, limited liability company, business trust, or limited partnership or registered as a registered limited liability partnership and is authorized to transact business in the Commonwealth as a domestic or foreign business entity if so required by Title 13.1 or Title 50 of the code of Virginia, as amended, or as otherwise required by law.. If a Contractor, Bidder is registered with the Commonwealth of Virginia as a Class ; Registration No. ;. Bidder meets all licensing and permit requirements to conduct business in the City of Newport News, Virginia Page 1 of 5

8 Attachment A IFB LC Carver Elementary School HVAC System Replacement Submitted By: IFB Project No LC Company Name Street Address City/State/Zip Phone FAX Date: Federal ID # SCC Registration # DUNS # The BIDDER, in compliance with the Invitation For Bids (IFB LC) for HVAC System Replacement and having carefully examined the Conditions of the Contract, Specifications, Drawings, and Addenda numbers (s) (Bidder to insert Addenda number(s); if none, so state) and having carefully examined the site and all conditions affecting the Work, HEREBY PROPOSE to furnish all labor, materials and equipment, and to complete the project in accordance with the Contract Documents, within the time set forth therein, and for the Bid price stated herein. Said price shall cover all expenses incurred in performing the work required by the Contract Documents, of which this proposal is a part. All labor equipment necessary for Carver Elementary School HVAC System Replacement: 1. LUMP SUM BASE BID FOR CARVER ELEMENTARY SCHOOL HVAC SYSTEM REPLACEMENT LUMP SUM BASE BID AMOUNT DOLLARS (Written) ($ USD) (Figure) Discrepancies between multiplication of units of work and unit prices will be resolved in favor of unit prices, discrepancies between the indicated sum of any column of figures and the correct some thereof will be resolved in the favor of the correct sum. Discrepancies between words and figures will be resolved in favor of words. AWARD WILL BE BASED ON LUMP SUM BASE BID AMOUNT. Page 2 of 5

9 Attachment A IFB LC Carver Elementary School HVAC System Replacement BID ALTERNATES Alternate Bid Item: Replacement of Corridor Lighting with LED Fixtures. ALTERNATE BID ITEM DOLLARS (Written) ($ USD) (Figure) Deductive Alternate No. 1: Condenser water piping shall be schedule 40 black steel grooved piping in lieu of welded piping as specified under specification section section 2.6.B. DEDUCTIVE ALTERNATE NO. 1 DOLLARS (Written) ($ USD) (Figure) Deductive Alternate No. 2: Condenser water piping 4 and smaller (outside mechanical room) shall be Aquatherm piping in lieu of Type L copper with soldered fittings and condenser water piping above 4 and inside the mechanical room shall be schedule 40 black steel grooved piping in lieu of welded steel piping. DEDUCTIVE ALTERNATE NO. 2 DOLLARS (Written) ($ USD) (Figure) Page 3 of 5

10 Attachment A IFB LC Carver Elementary School HVAC System Replacement The undersigned agrees that if awarded a Contract, bidder will commence work within 10 calendar days after the date of notice to proceed letter, and that bidder will complete all work, as specified (to include codes inspection and Owner acceptance) shall be completed by September 15, 2016 acknowledging the Owner s right per Section IV L., of the Contract Documents, to assess Liquidated Damages of Two Hundred Fifty Dollars $ USD per day. (For individual trading in his individual name) (Print) (Signature) (For use by an individual trading under trade name) (Print) (Signature) Trading as (Print) (Signature) (For use by partnership) (Partnership Name Printed) (Partner/Signature) (For use by a corporation) By (Corporate Name Printed) (Corporate Officer Signature) (Name Printed) Indicate Official Position Attest: Corporate Secretary (Name Printed) Page 4 of 5

11 Attachment A IFB LC Carver Elementary School HVAC System Replacement CERTIFICATION REGARDING DEBARMENT This is to certify that this person/firm/corporation is not now debarred by the Federal Government or by the Commonwealth of Virginia or by any other state, or by any town, city, or county, from submitting Bids on contracts for construction covered by this solicitation, nor are they an agent of any person or entity that is now so debarred. Name of Official Title Firm or Corporation Date Page 5 of 5