Thank you for your response to our Request for Bid submissions. The following is a summary of the submitted bids for this project.

Size: px
Start display at page:

Download "Thank you for your response to our Request for Bid submissions. The following is a summary of the submitted bids for this project."

Transcription

1 Thank you for your response to our Request for Bid submissions. The following is a summary of the submitted bids for this project. 1. PARKING LOT PHASE (PLP) PL - 1 Obtain Building Permit (including permit fee) $ 16, $ 5, PL - 2 Mobilization and demobilization. $ 14, $ 10, PL - 3 PL - 4 Demolition and disposal of existing parking lot including but not limited to; pavement, curbing, grass islands, trees, shrubs, etc. as specified within the construction documents. Furnish and install parking lot, including but not limited to, fill, sub-base, asphalt, crushed stone buffer, geotextile fabric, vegetated slope, stripe painting, grass islands, signs, pile clusters, trees, grass, building stairs, sidewalk, raise catch basin, etc. as specified within the construction documents. $100, $ 43, $475, $297, SUBTOTAL $605, $356, CONTINUED ON NEXT PAGE Page One of Five

2 -CONTINUED FROM PREVIOUS PAGE 2. BOAT RAMP PHASE(BRP) BR 1 Obtain Building Permit (including permit fee) $ 31, $ 26, BR 2 Mobilization and demobilization. $ 15, $ 47, BR 3 BR 4 BR - 5 Demolition and disposal of the existing timber boat ramp, including but not limited to, asphalt surface, timber decking, timber stringers, timber pile caps, foundation piles, excavated material, etc. in accordance with the construction documents. Furnish and install precast concrete boat ramp, including but not limited to, driven steel foundation piles, steel pile caps, precast concrete structural elements, cast-in-place concrete headwall, etc. in accordance with the construction documents. Remove and replace utilities in-kind along the landward edge of the boat ramp in accordance with the construction documents. Junction boxes and disconnects along the headwall shall be provided at floating dock locations. $ 67, $ 74, $1,150, $1,580, $ 7, $ 6, SUBTOTAL $1,270, $1,733, Page Two of Five

3 3. FLOATING DOCK PHASE(FDP) Phase One FD 1 Obtain Building Permit (including permit fees) $ 11, $4, FD 2 Mobilization and demobilization. $ 14, $12, FD 3 FD 4 FD 5 FD 6 Demolish and remove existing timber floating docks and associated float anchor piles and relocate the existing concrete floating docks and float anchor piles in accordance with the construction documents. Furnish and install timber floating docks and timber float anchor piles in accordance with the construction documents. Furnish and install aluminum gangways in accordance with the construction documents. Remove and replace utilities including but not limited to conduit, plumbing, wiring, reconnecting docks, etc. in accordance with the construction documents. $ 42, $32, $ 310, $220, $ 45, $25, $ 42, $22, SUBTOTAL $464, $315, Page Three of Five

4 3. FLOATING DOCK PHASE(FDP) Phase Two FD 7 Mobilization & demobilization $ 14, $26, FD 8 FD 9 FD - 10 Demolish the existing concrete floating docks and associated float anchor piles in accordance with the construction documents. Furnish and install concrete floating docks and steel float anchor piles in accordance with the construction documents. Remove and replace utilities including but not limited to power pedestals, plumbing, wiring, reconnecting docks, etc. in accordance with the construction documents. $ 100, $73, $1,048, $945, $ 190, $52,000.0 SUBTOTAL $1,352, $1,096, Page Four of Five

5 PROJECT TOTALS Parking Lot Phase Subtotal $ 605, $ 356, Boat Ramp Phase Subtotal $1,270, $1,733, Floating Dock Subtotal Phase 1 $ 464, $ 315, Floating Dock Subtotal Phase 2 $1,352, $1,096, TOTAL LUMP SUM PRICE FOR ALL PHASES LISTED ABOVE $3,692, $3,500, Page Five of Five