Objective: To reduce the impact of potential earthquakes on seismically vulnerable municipalities in Nepal

Size: px
Start display at page:

Download "Objective: To reduce the impact of potential earthquakes on seismically vulnerable municipalities in Nepal"

Transcription

1 Earthquake Risk Reduction and Recovery Preparedness Programme for Nepal (UNDP/ERRRP Project:NEP/07/010) Web : ERRRP Project is a means to enable local governments for systematic implementation of Earthquake Risk Reduction The program is designed in the context of the International Recovery Platform (IRP) for the fulfillment of the Hyogo Framework for Action (HFA) : (World Conference on Disaster Reduction : Jan Kobe, Japan) Project Duration Oct to Dec Project Start March, 2008 Source of Fund: Government of Japan Project Office at DUDBC Objective: To reduce the impact of potential earthquakes on seismically vulnerable municipalities in Nepal

2 UNDP/BCPR (Bureau of Crisis Prevention and Recovery) with the support of Government of Japan initiated "Earthquake Risk Reduction and Recovery Preparedness (ERRRP) program" in five high risk South Asian countries : Nepal Bhutan Bangladesh India Pakistan. Project Initiation

3 Earthquake Risk Reduction and Recovery Preparedness Programme for Nepal Proposed Project Municipalities Far western Development Region Mid-western Development Region Kathmandu Dhangadhi Surkhet (Central Office) Pokhara Eastern Development Region Hetauda Western Development Region Central Development Biratnagar Region

4 ERRP Project in Nepal Implementing Organizations and it's roles Ministry of Physical Planning and Works (MOPPW) Department of Urban Development and Building Construction (DUDBC) and related Division Offices : Responsible for the overall implementation of the project Ministry of Home Affairs: Responsible for inter-ministerial coordination Ministry of Local Development: Responsible for inter-municipality coordination as the focal agency Selected Municipalities: Responsible for the municipality level activities of the project

5 Building Code and UNDP/ ERRRP Project Initiatives Formulation and Development of Nepal National After 1988 earthquake (6.7 Richter scale ) in eastern Nepal, More than 731 deaths and More than 20,000 buildings collapsed or damaged, including many hospitals and school buildings Ministry of Physical Planning and Works (former Ministry of Housing and Physical Planning) "Policy and Technical Support to the Urban Sector" (UNDP/UNCHS(Habitat) Nep/88/054 Sub-project "National Building Code Development Project" was formulated on within Department of Urban Development and Building Construction (former Department of Buildings) with the government counterparts from the department.

6 DUDBC had developed Nepal National Building Codes which is now recommends for update from UNDP/ERRRP Project Nepal National Building Code is in 23 Volumes Nepal National Building Code is available in CD as well as in website

7 These all codes have been formally approved by the Government of Nepal in the year Now the codes are being implemented as per "Building Act : 2055" (1998) in all public and private building throughout the country after it was activated by the cabinet decision. The department (DUDBC) is disseminate National Building Code (NBC) nation wide DUDBC has prepared Building Construction Guidelines in simple Nepali language - training for more than 5000 masons DUDBC is Working to strengthen the legal framework for NBC- Building Act 1998 and to guide the Municipalities for NBC Implementation

8 ANNUAL TARGETS of UNDP/ERRRP Project : 2009 Earthquake risk and vulnerability assessment of 5 selected municipalities completed PLANNED ACTIVITIES Task No. 1 Earthquake risk, vulnerability and capacity assessment conducted in the project areas : ICE Material, Trainings etc. Task No. 2. Prepare Municipal Profile and Report on Impact of Settlement pattern, land use practice and option in high risk areas of municipalities Task No. 3. Selection, design and cost estimation of at least 1 public building in each of the Municipalities for Demonstrative Seismic Retrofitting works Task No. 4. Preparation of recommendation for update of Nepal National Building Code Task No. 5 Preparation of Review Report on existing government and municipal policies on earthquake risk reduction, preparedness and response. Task No 6. Preparation of Seismic Vulnerability Evaluation Guideline for Private and Public Building (For pre disaster vulnerability and post disaster damage assessment)

9 Preparation of recommendation for update of Nepal National Building Code from UNDP/ERRRP Project under Task No. 4 Consulting Firm had Submitted Final Report (1 st. Draft) on April 10, This Report will be reviewed by DUDBC and other relevant stockholders

10 Various TRAININGS programs ON NBC was organized by ERRRP Project in five project municipalities in 2008

11 Training on Structural Analysis and Earthquake Resistance Design of Buildings using SAP 2000 and Nepal National Building Code training at Pokhara (July 27 th. to Aug.2 nd. 2008)

12 NBC Training Program at Birendranagar, 2008

13 Arrangement Requests regarding Technical Assistance Asian Disaster Reduction Center (ADRC) and Building Research Institute (BRI) Japan are providing technical assistance to ERRRP Nepal for retrofitting works and also attend training seminars or workshops to make presentations on retrofitting while giving on-site pieces of advice in field visits. Having Regional knowledge exchange among the SAARC countries

14 Visit of Mr. Ohori, ADRC and Mr. Imai, BRI, Japan for Pull Down Test in connection with ERRRP-Nepal (12 th -14 th. March, 2009)

15 Challenges Seismic Retrofitting Design and Construction works is one of the challenging job. Implementation of Nepal National Building Code in Project Municipalities is also a challenging job