3

4

5

6

7 THERMAL POWER GENERATION EXPERIENCE 1. GUDDU COMBINED CYCLE THERMAL POWER STATION. Capacity Water & Power Development Authority (USAID Fundings) 300 MW Scope of work Design, Construction Supervision, Testing and Commissioning of Oil Fired Gas Turbines. : 4½ years M/s Gibbs & Hill (U.S.A.) 2. MUZAFFARGARH THERMAL POWER STATION EXTENSION PROJECT UNITS 4, 5 & 6. Capacity Water and Power Development Authority 720 MW Scope of work Planning, Designing, Vetting of Manufacturer Designs, Construction Supervision, Testing and Commissioning of 300 and 2 x 210 MW sets. Starting date of Assignment April 1992 Date of completion 1998 (Unit 4) : National Engineering Services Pakistan (Pvt) Ltd. (NESPAK) Pakistan Engineering Services (Pvt) Ltd. (PES) Associated Consulting Engineers (Pvt) Ltd. TurkPak International (Pvt) Ltd.

8 3. SAHIWAL COMBINED CYCLE POWER STATION PROJECT Capacity Water & Power Development Authority. 600 MW Scope of work Planning, Designing, Preparation of Technical Specifications, and Bid Documents 6 Months : National Engineering Services Pakistan (Pvt) Ltd. (NESPAK) Pakistan Engineering Services (Pvt) Ltd. (PES) 4. DIESEL GENERATING PLANT, ORMARA, BALUCHISTAN, PAKISTAN. Capacity Scope of work : Water & Power Development Authority. 20 MW Planning, Designing, Layout, Preparation of Technical Specifications and Bid Documents for 4 x 5 MW Station. 6 months 5. SHAUKAT KHANUM MEMORIAL, CANCER HOSPITAL, LAHORE. Shaukat Khanum Memorial, Cancer Hospital Lahore. Capacity Scope of work : 5.4 MW Prefeasibility Report for 2 x 2.7 MW Diesel Power Plant at Shaukat Khanum Memorial, Cancer Hospital, Lahore. 3 months.

9 6. SMALL INDUSTRIAL ESTATE FEROZWALA. Capacity Scope of work : M/s Crescent Development, Corporation (Pvt) Ltd. Lahore. 12 MW Prefeasibility Report for 2 x 6 MW Diesel Power Plant at Small Industrial Estate, Ferozwala, Near Shahdara, Lahore. 3 months. 7. KOHINOOR ENERGY LTD. Capacity Scope of work : M/s Saigols (Pvt) Ltd., Lahore. 120 MW Survey and Special Technical report for 120 MW Diesel Power Plant near Lahore. 2 months. 8. OIL FIRED STEAM POWER PLANT. Capacity Scope of work : M/s Sunpower Ltd., Gujranwala. 50 MW Pre-Feasibility study for oil fired steam plant, 2x25 MW, located near Fatehjang. 3 months 9. DIESEL POWER PLANT M/s Siddiqsons Industrial Group, Karachi Capacity 114 MW Scope of work Feasibility studies, planning and design of 114 MW Diesel Power Station, Karachi. 18 months.

10 : 10. STEAM POWER PLANT Capacity Scope of work : M/s MAKKAYS Ltd., Islamabad 110 MW Pre-Feasibility studies of 110 MW, steam fired power plant, located near Tallagang, (Pindi) 9 months. 11. NATURAL GAS TURBINE Capacity Kunnar Power Group. 16 MW Scope of work Feasibility study, specifications, & tender documents for private power plant Fired on Natural Gas Turbine/Gas sets of 4x4 MW located near Kunnar (Sind). : 9 months. 12. ROUSCH PRIVATE POWER LTD. Capacity Scope of work : M/s K&M Engineering & Consulting Corporation, USA. 412 MW Monitoring of project O&M as the Engineers of ANZ Grindlays Bank. 3 Years.

11

12 HYDROPOWER GENERATION EXPERIENCE 1. CHASHMA HYDROPOWER PROJECT Capacity Water and Power Development Authority 184 MW Scope of work Planning, Designing, Vetting of Manufacturer Designs, Construction Supervision, Testing and Commissioning of 8 sets of 23 MW each Bulb Turbines. Starting date of Assignment March 1990 Scheduled date for completion 2002 : Sogreah France CNR France ACE (Pvt) Ltd. Pakistan NESPAK (Pvt) Ltd. 2. GHAZI BAROTHA HYDRO POWER PROJECT Capacity Scope of work Water & Power Development Authority. (OECF, ADB, Other Fundings) 1450 MW Construction Supervision of Electrical and Mechanical Works, Testing & Commissioning of 5 sets of 290 MW each. Starting date of Assignment January 1997 Scheduled date for Completion December : Pakistan Hydro Consultants (A Joint Venture of NESPAK (Pvt) Ltd., ACE (Pvt) Ltd., EWbank Preece Ltd., Harza Engg. International L.P., Binnie and Partners (Overseas) Ltd.

13 3. BS LINK-1 TAIL, HYDEL POWER STATION Capacity Scope of work M/s ABACUS, Abacus House Lahore. 6 MW Prefeasibility Report for 6 MW Hydel Power Station on Balloki-Suleimanki Link-1 Canal at Tail. 2 months. 4. KOTLI HYDRO PROJECT Capacity Scope of work M/s Naseer Siddiqui and Partners. 150 MW Pre-Feasibility studies and preliminary design for private power plant project of 3x50 MW, High Head Project, on river Punch, near Kotli, Azad Jamu and Kashmir. 6 months. 5. SAARC - HYDEL PROJECT - BHUTAN & NEPAL, (PRIVATE) Capacity Scope of work American Investors Group. 25 MW & 40 MW. Bhutan 25 M.W, Nepal 40 MW, for Private Parties, very high head stations. Pre-Feasibility and Preliminary Design. 9 months.

14 6. BUNJI HYDRO POWER PROJECT Water and Power Development Authority Capacity Scope of work 5400 MW Pre-Feasibility study, Survey, Geotech studies, bore holes, hydrological investigation, preliminary design of structures, E&M Equipment, tunnel, dam and outlets, etc. Starting date of Assignment January 15, 2003 Scheduled date for completion January 16, 2005 Scott Wilson Piesold Ltd., U.K. Progressive Consultants (Pvt) Ltd. Sampak International (Pvt) Ltd. 7. SATAPARA DAM PROJECT Capacity Scope of work Water and Power Development Authority 128ft high Dam Across Satpara Nallah Review the design, reports/data, surveys and investigation, checking of supplier designs, drawings and specifications, carryout detail design and preparation of construction drawings of the civil works. Supervision of construction works including installation of the E&M equipments. Checks and certify Contractors monthly payments bills, submission of the inception report, progress reports, design reports, manual and completion reports. Starting date of Assignment November, 2002 Scheduled date for completion November, 2006 PES (Pvt) Ltd. M.M. Pakistan (Pvt) Ltd. Zaheeruddin Consultants (Pvt) Ltd. In-Consult (Pvt) Ltd. Technical International

15

16 DISTRIBUTION SYSTEM & NETWORK EXPERIENCE 1. Rural Electrification Baluchistan Province WAPDA Scope of work 11KV lines, Transformer L.T. Distributation in whole of Baluchistan Province 1150 Villas Duration of job 5 years 2. M.A. JAUHAR TOWN, LAHORE. Lahore Development Authority. Scope of work Electrical Utility Services Network Design. 6 months. 3. SABZAZAR TOWN, LAHORE. Lahore Development Authority. Scope of work Electrical Utility Services Network Design. 3 months. 4. SHER SHAH HOUSING SCHEME, LAHORE. Housing & Physical Planning Department. Govt. of Punjab. Scope of work Electrical Utility Services Network Design. 3 months 5. PUNJAB BOARD OF REVENUE EMPLOYEES HOUSING SCHEME, LAHORE. Punjab Board of Revenue.

17 Scope of work Electrical Utility Services Network Design. 3 months 6. BEGUM SHER ALI AND FAMILY HOUSING SCHEME, LAHORE. General Sher Ali. Scope of work Electrical Utility Services Network Design. 2 months. 7. SMALL INDUSTRIAL ESTATE, FEROZEWALA, LAHORE. Crescent Development Corp. Lahore. Scope of work Electrical Utility Services Network Design. 2 months. 8. LABOUR COLONY CHAK NO. 71 G.B. SARGODHA. Housing & Physical Planning Division, Sargodha. Scope of work Electrical Utility Services Network Design of the Labour Colony. 3 months 9. GOVT. OFFICERS/OFFICIALS COOPERATIVE HOUSING SOCIETY LIMITED, BHAKKAR. Ali & Co, Shadman Market, Lahore. Scope of work Electrical Utility Services Network Design. 2 weeks.

18 10. ARMY WELFARE TRUST HOUSING SCHEME, LAHORE. M/S Army Welfare Trust Housing Scheme, 150-G, Commercial Area, Lahore Cantt. Scope of work Electrical Utility Services Network Design. 3 months 11. GUJRANWALA COLLEGES EMPLOYEES COOPERATIVE HOUSING SOCIETY LTD., GUJRANWALA. The Gujranwala Colleges Employees Cooperative Housing Society Ltd., Gujranwala. Scope of work Electrical Utility Services Network Design. 2 months 12. SABZAZAR TOWN EXTENSION, LAHORE. Lahore Development Authority. Scope of Work Electrical Utility Services Network Design. 3 months 13. ARMY OFFICERS WELFARE HOUSING SCHEME, MORGAH Head Quarter Frontier Work Organization, Rawalpindi. Scope of Work Electrical Utility Services Network Design. 6 months

19 14. DISTRIBUTION SYSTEM DESIGN AND CONSTRUCTION SUPERVISION FOR WAPDA TOWN MULTAN WAPDA Employees. Co-op. Housing Society Ltd., Khanewal Road Multan. Scope of work Electrical Utility Services Network Design and Construction Supervision. 3 years 15. DISTRIBUTION SYSTEM DESIGN & CONSTRUCTION SUPERVISION FOR ARMY WELFARE TRUST HOUSING SCHEME, PESHAWAR. Army Welfare Trust, Rawalpindi. Scope of Work Complete planning, designing and Construction Supervision of electrification system for Army Welfare Trust Housing Scheme Peshawar. 2 years. 16. DISTRIBUTION SYSTEM DESIGN FOR RAIL TOWN, LAHORE. Lahore Railway Employees Cooperative Housing Society Ltd., Lahore. Scope of Work Electrical Utility Services Network Design of Rail Town, Lahore. 1 year. 17. STUDY OF EARTHING SYSTEMS FOR ACCIDENT PREVENTION OF ALLAMA IQBAL TOWN & FORT DIVISIONS, LAHORE WAPDA Scope of work Testing & Improvements of Earthing of L.T / H.T. Poles / Structures and Distribution Transformers. 5 years.

20 18. DISTRIBUTION SYSTEM DESIGN & CONSTRUCTION SUPERVISION FOR PUBLIC HEALTH ENGG. DEPTT. EMPLOYEES COOPERATIVE HOUSING SOCIETY LTD., LAHORE. Public Health Engineering Deptt. Employees Cooperative Housing Society Ltd. Lahore. Scope of work Electrical Utility Services Network Design and Construction supervision of PHEDCHS. Lahore. 3 years 19. DISTRIBUTION SYSTEM DESIGN & CONSTRUCTION SUPERVISION FOR PASCO EMPLOYEES HOUSING SOCIETY, LTD., LAHORE. PASCO Employees Cooperative Housing Society, Ltd., Lahore. Scope of Work Electrical Utility Services Network Design. 1 year. 20. DISTRIBUTION SYSTEM DESIGN OF STATE BANK STAFF COLONY AT ICHHRA, LAHORE. State Bank of Pakistan. Scope of Work Electrical Utility Services Network Design. Duration of job 3 months. 21. REVIEW AND RECOMMENDATIONS FOR WAPDA SYSTEM Scope of work Pakistan WAPDA This study was carried out to review the existing procedure of Power Utility Services and recommend measures for improvements. 6 months.

21

22 TRANSMISSION LINE & SCADA EXPERIENCE 1. TRANSMISSION LINE PROJECT Saudi Electric Company West, Saudi Arabia. Scope of work Design Review and Construction Supervision of Transmission Line of Yanbu & Madina 2 Years. Al-jazirah Engineers & Consultants (AJEC) Saudi Arabia 2. TABUK TAIMA OVERHEAD LINE PROJECT Saudi Electric Company West, Saudi Arabia. Scope of work Construction Supervision 2 Years. Al-jazirah Engineers & Consultants (AJEC) Saudi Arabia 3. AL-ULA SUB-STATION PROJECT Saudi Electric Company West, Saudi Arabia. Scope of work Construction Supervision 2 Years. Al-jazirah Engineers & Consultants (AJEC) Saudi Arabia 4. AL-WADJH SUB-STATION PROJECT Saudi Electric Company West, Saudi Arabia. Scope of work Construction Supervision 2 Years.

23 Al-jazirah Engineers & Consultants (AJEC) Saudi Arabia 5. SCADA/TELECOM NETWORK PROJECT Saudi Electric Company West, Saudi Arabia. Scope of work Study, Designing, Up gradation, construction supervision and commissioning of new systems. 1 Year. Al-jazirah Engineers & Consultants (AJEC) Saudi Arabia

24

25 RURAL ELECTRIFICATION EXPERIENCE 1. RURAL ELECTRIFICATION PROJECT, QUETTA, BALUCHISTAN. Water and Power Development 7Authority. Scope of work Power Distribution Network Design, Preparation of Technical Specification and Tenders Documents and Construction Supervision. Economic Evaluation of the Whole Project. The Project Covered 614 villages in Baluchistan. Starting date of Assignment October Date of Completion June 1999 TECHRED (Pvt) Ltd.

26 NON-CONVENTIONAL POWER GENERATION EXPERIENCE 1. WIND POWER ENERGY Water & Power Development Authority. Scope of work MAES has in conjunction with Vestas Co., of Denmark prepared viability and cost estimation studies for wind power project at Ormara site on Sea-coast of Mekran, Baluchistan. 2 Months Vestas Co., Denmark. 2. WASTE TO ENERGY PROJECT Scope of work Lahore Municipal Corporation. MAES in conjunction with Vestas Co., of Denmark has made viability and cost estimation studies for energy generation from municipal garbage at landfills. 2 Months Vestas Co., Denmark.

27

28 GIS, TOPOGRAPHY & CONTOURING EXPERIENCE CLIENT: Pakistan Water & Power Development Authority (WAPDA) PROJECT NAME: RURAL ELECTRIFICATION PROJECT BALUCHISTAN SCOPE OF WORK: Plotting of villages in the area with a minimum population of 200 or 25 Houses on a base map of scale 1:50,000. DATABASE, Village Population, Housing Units, Electrified /Un-electrified, Nearest Grid station / 11 Kv feeder, Settlements of 100 persons within 10 K.M distance from existing feeder. SOFTWARE MapInfo CLIENT: Pakistan Water & Power Development Authority (WAPDA) PROJECT: WAPDA/USAID POWER DISTRIBUTION PROGRAM SCOPE OF WORK Development of a digital database for WAPDA Distribution network. The work consists of the physical and electrical field survey and the generation of mapping database and associated maps for all of the grid stations / feeder in the AEB. Mapping: UTM location of each Structure/Pole of HT/LT line. Location of Permanent references. Major Geographical features. DATABASE: Structure / Pole type, height, assigned identification number. LT include number of Single / three phase service drop. Transformer type, Rating, Associated equipment. All Accessories Assemble on Structure / Pole. Conductor length / size /type. SOFTWAREAutoCAD MS Access CLIENT: WASA PROJECT: WASA MAPPING PACKAGE-C SCOPE OF WORK To Prepare a complete data map for WASA existing network of sewerage system. MAPPING: Location Survey of Sewer / Drains, Leveling Survey of Sewer / Drains Condition Survey of sewer / Manholes Up dating of base Maps, 3500 K.M of Sewers, 110 K.M of Drains, DATABASE: Size & Type of Manhole / sever CLIENT :- PUNJAB MATERNITY & CHILD WELFARE ASSOCIATION. PROJECT :- Mapping of YEAR served by MCH Complex Gulberg Lahore. YEAR :- 1988

29 CLIENT :- PEPAC LAHORE. PROJECT :- Topography, Contouring of G.V.I at Jaranwala. YEAR : CLIENT :- REPUBLIC ENGINEERING CONSORTIUM LAHORE. PROJECT :- Plane table Survey of 902 Katchi-Abadies at different cities of Punjab. YEAR : CLIENT :- N.D.C (PVT.) LTD. LAHORE. PROJECT :- Topography, Contouring and Development of GIS Database of four flood Irrigation schemes at Lasbela. YEAR : CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE. PROJECT :- Quaid-e-Azam University Islamabad Topography, Contouring. YEAR : CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE. PROJECT :- Institute of Medical Sciences Islamabad.Topography, Contouring. YEAR : CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE. PROJECT :- Exxon Chemicals Pakistan Dharki. Topography, Contouring, H&V Control Points. YEAR : CLIENT :- PAKISTAN TELEVISION CORPORATION LIMITED ISLAMABAD. PROJECT :- RBS CHISTIAN, topography, Contouring YEAR : CLIENT :- ACE LAHORE. PROJECT :- Mapping of SKARDU Town. Topography, Contouring, H&V Control. YEAR : CLIENT :-M.C HASSANABDAL. PROJECT :-Survey & Mapping of HASSANABDAL Town, Topography, Contouring YEAR : CLIENT :-N.T.D.C DERAMURAID JAMMALI. PROJECT :-Survey & Mapping of Naseerabad Township. Topography, Contouring YEAR : CLIENT :-MIRPUR DEVELOPMENT AUTHORITY AJ&K.

30 PROJECT :-Survey & Mapping of Housing Colony. Topography, Contouring YEAR : CLIENT :-D.D&C (GHQ) RAWALPINDI. PROJECT :-Survey & Mapping of Sawan River. Topography, Contouring, X- Sections and Development of GIS Database. YEAR : CLIENT :-CWO RAWALPINDI. PROJECT :-Survey & Mapping of Different YEARs. Topography, Contouring, DTM and Development of GIS Database YEAR : CLIENT :- PROGRESSIVE CONSULTANTS (PVT) LTD. LAHORE PROJECT :-Christian Memorial hospital Sialkot. Topography, spot leveling, production of Maps and as built Drawings. YEAR : CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE. PROJECT :- Muslim Insurance Company Building at Lahore. Production of Maps and As built Drawings YEAR :-1989 CLIEN :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE. PROJECT :- State Bank of Pakistan old Building Lahore As Built drawings. YEAR : CLIENT :- PACKAGES LIMITED LAHORE. PROJECT :- Survey Of Packages Factory at Lahore. YEAR : CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE. PROJECT :- Survey Of TDCP Sites Multan, D.G.Khan, Faisalabad. YEAR : CLIENT :- NESTLE MILKPAK LIMITED LAHORE. PROJECT :- Survey Of Lahore office. YEAR : CLIENT :-PROGRESSIVE CONSULTANTS (PVT.) LIMITED LAHORE. PROJECT :-R.C.C Drain at ATTOCK REFINERY at Rawalpindi. Topography, Leveling & GIS YEAR :- 1994

31 CLIENT :-NESPAK-MMI PROJECT :-Topography Survey and GIS of Drains in Lasbela Canal Command Drainage Project. YEAR : CLIENT :-PROGRESSIVE CONSULTANTS (PVT.) LIMITED LAHORE. PROJECT :-Storm Water Drains ATTOCK REFINERY at Rawalpindi. Topography, Leveling and GIS YEAR : CLIENT :-PROGRESSIVE CONSULTANTS (PVT.) LIMITED LAHORE. PROJECT :-Storm Water Drains ICI Chemicals at Khewara. Topography, Leveling & GIS YEAR : CLIENT :-IN-CONSULT (PVT.) LIMITED LAHORE. PROJECT :-CETPT, Kasur Taneries Project. Topography, Contouring, As Built Survey. YEAR : CLIENT :- ICC TEXTILES (Pvt.) LTD. LAHORE. PROJECT :- ICC Textile mill at Sunder Topography, Contouring. YEAR : CLIENT :- BECO EDIBLE OILS LTD. AT SHEIKHUPURA. PROJECT :- Factory Site, Topography, Contouring. YEAR : CLIENT :- IMRAN RAD ASSOCIATES LAHORE. PROJECT :- Jam Textile Pattoki, Topography, Contouring YEAR : CLIENT : DRILLING ENHINEERS (PVT) LIMITED LAHORE. PROJECT :- PARCO REFINERY Mehmood Kot Muzaffargarh. Topography, Contouring, Meterology & Geological Study YEAR : CLIENT PROJECT :-ARL RAWALPINDI. :-Survey & Mapping of ATTOCK REFINERY at Rawalpindi. Topography, Leveling YEAR : CLIENT :-PROGRESSIVE CONSULTANTS (Pvt) LAHORE. PROJECT :-Survey & Mapping of RAVI CHEMICALS at Sheikhpura. Topography, Leveling YEAR :- 1996

32 CLIENT PROJECT CLIENT PROJECT :-SARAH TEXTILE MILLS AT LAHORE. :-Survey & Mapping of SARA Textile Mills at Lahore Topography, Leveling :-SARAH ENTERPRISERS AT LAHORE. :-Survey & Mapping of SARA Enterprisers Textile Mills at Lahore Topography, Leveling CLIENT :-MATSUI ENGINEERING & SHIPBUILDING CO., LTD., JAPAN. PROJECT :-ARL UpGradation Project. Survey & Mapping, H&V Control of ATTOCK REFINERY at Rawalpindi YEAR : 1997 CLIENT PROJECT :-AMMAR TEXTILE MILLS AT LAHORE. :-Survey & Mapping of Ammar Textile Mills at Lahore Topography, Leveling CLIENT :-ALVERA TEXTILE MILLS AT SHEIKHPURA. PROJECT :-Survey & Mapping of Alvera Textile Mills at Sheikhpura- Faisalabd road. Topography, Contouring. YEAR : CLIENT PROJECT :-MILLAC FOODS (PVT) LIMITED. :-Survey & Mapping of Millac Foods at Raiwand Road Lahore. CLIENT :-D.D & C GHQ RAWALPINDI. PROJECT :-RDA Commercial Complex at Rawalpindi. YEAR : 2000 CLIENT :- DESIGN CENTER LAHORE. PROJECT :- Route, Topography, X & L -Sections and GIS of road in District Sialkot. YEAR : CLIENT :- PUNJAB HIGHWAY DEPARTMENT (MIANWALI DIVISION). PROJECT :- Route, P.T, X-Section and GIS of roads, Kot Chandana to tola Mangali.Mithakhattak to Sultankhel. Awan wala to Sarkia. YEAR : CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE. PROJECT :- WECHS Gujranwala Profile, X-Section and GIS of roads. YEAR : CLIENT :- PUNJAB HIGHWAY DEPARTMENT (SIALKOT DIVISION). PROJECT :- Over Head Bridge near Jinnah Stadium Sialkot. Topography, Profile and X-Sections and GIS YEAR :- 1990

33 CLIENT :- PUNJAB HIGHWAY DEPARTMENT (SIALKOT DIVISION). PROJECT :- Road from Bund road to Rangpura Bridge. Topography, profile, X-Sections and GIS. YEAR : CLIENT :- EPSILON ENGINEERING INTERNATIONAL (PVT.) LTD. LAHORE. PROJECT :- 4 Canal Crossings in Lahore. Topography, Profile, X-Sections. YEAR : CLIENT :-PROGRESSIVE CONSULTANTS (PVT.) LIMITED LAHORE. PROJECT :-Road at ICC Soda ash Plant Khewra. Topography, Layout, Leveling. YEAR : CLIENT :-D.D & C (GHQ) RAWALPINDI. PROJECT :-M-II Link Road Rawat-Chakri. Route, Topography, DTM. YEAR : CLIENT :- PUNJAB HIGHWAY DEPARTMENT (SIALKOT DIVISION). PROJECT :- 4 Roads in Sialkot Sub-Division. : Topography, profile, X-Sections. YEAR : CLIENT :- NESPAK LAHORE. PROJECT :- Lahore-Kasur Express way. Topography, Profile, X-Sections and GIS. YEAR : CLIENT :-J & M PAKISTAN (Pvt) LIMITED LAHORE. PROJECT :-Road in Jhelum Highway Division. Topography, Layout, Leveling and GIS YEAR : CLIENT :-D.D & C (GHQ) RAWALPINDI. PROJECT :-Zhob-D.I.Khan road. Route, Topography, DTM and GIS YEAR : CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE. PROJECT :- SNGPL Officers Co-Operative housing society Lahore. Topography, Contouring. Layout YEAR :- 1990

34 CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE. PROJECT :- HBFC Officers CO-Operative Housing Society Lahore. Topography, Contouring, Layout. YEAR : CLIENT :- AHBAB CO-OPERATIVE HOUSING SOCIETY LAHORE. PROJECT :- Topography, Contouring, Town Planing, Layout. YEAR : CLIENT :-IEP TOWN LAHORE. PROJECT :- IEP Town Lahore. Layout, Leveling. YEAR : CLIENT :-PROGRESSIVE CONSULTANTS (PVT.) LIMITED LAHORE. PROJECT :-AECHS Housing Project Faisalabad. Topography, Contouring, Layout. YEAR : CLIENT :-PROGRESSIVE CONSULTANTS (PVT.) LIMITED LAHORE. PROJECT :-Housing Project at Rahimyarkhan. Topography, Contouring. YEAR : CLIENT :-PROGRESSIVE CONSULTANTS (PVT.) LIMITED LAHORE. PROJECT :-Lums housing Project at Lahore. Topography, Contouring. YEAR : CLIENT :-PUNJAB COOPERATIVE BOARD FOR LIQUIDATION LAHORE. PROJECT :-PALACE City housing Project at Lahore. Topography, Contouring. YEAR : CLIENT :-MDA MIRPUR AJK. PROJECT :-MDA housing Project at Mirpur city. Topography, Contouring. YEAR : CLIENT :-HOUSING DIRECTORATE GHQ RAWALPINDI. PROJECT :-ASKARI Housing Scheme at Rawalpindi. Topography, Contouring. YEAR : CLIENT :-PROGRESSIVE CONSULTANTS (PVT.) LIMITED LAHORE. PROJECT :-D.H.A LAHORE. Topography, Contouring. YEAR : CLIENT :- SIEMENS PAKISTAN ENGINEERING COMPANY LTD.

35 PROJECT :- 300 MW Combined Cycle Guddu. Traverse, Topography, Contouring, Layout and GIS YEAR : CLIENT :- TRANSANERGY INTERNATIONAL (PVT.) LTD. PROJECT :- 132/220/500 KV JAMSORO /DAWOOD KHEL GRID STATIONS (EXTENSION) Topography, Contouring, Layout and GIS YEAR : CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE. PROJECT :- Comprehensive study and Development of Database on Transportation System of Lahore. Screen line 36 Stations, Corden line 9 stations, Parking Study 12 hours x 3 days. YEAR :-1990 CLIENT :- HAISTE INTERNATIONAL LIMITED. PROJECT :- Lahore WASA System Mapping Package - C. Data Collection of Location & Leveling of Sewers / Drains, Location & Leveling of Sewer and Development of GIS Database. YEAR : CLIENT :- ICC (PVT.) LTD. PROJECT :- WAPDA/USAID Power Distribution Program WAPDA Feeder Survey, Data Collection, Mapping and Development of GIS Database, AEB Islamabad. YEAR : CLIENT :- ICC (PVT.) LIMITED LAHORE PROJECT :- WAPDA FEEDER Survey, Data Collection, Mapping and GIS Database Development AEB Peshawar. YEAR : CLIENT :- LUCKY GOLD STAR CABLE COMPANY (KOREA). PROJECT :- 132 KV U/G CABLE Route, Topography, Profile, As Built Drawings and GIS Database. Rewaz Garden s/s to fort s/s. Mecleod road s/s to Badamibagh s/s. YEAR : CLIENT :- GREAVES COTTON PAKISTAN (PVT.) LTD. LAHORE. PROJECT :- Burhan-Islamabad 132 Kv D/C OHTL. Route, Profile, Design, Staking of towers. YEAR : CLIENT :- ARL RAWALPINDI. PROJECT :- Sub-Soil Investigation for Open Land. YEAR :- 1998

36 CLIENT :- ARL RAWALPINDI. PROJECT :- Sub-Soil Investigation for New Power House. YEAR : CLIENT :- ARL RAWALPINDI. PROJECT :-Sub-Surface Resistivity Survey for New Power House. YEAR : CLIENT :- ZISHAN ENGINEERS (PVT) LIMITED KARACHI. PROJECT :-Sub-SOIL investigation for Tank 5. YEAR : CLIENT :- GANDAHARA CONSULTANTS (PVT) LTD KARACHI. PROJECT :-Sub-SOIL investigation for 85 PSO sites YEAR : CLIENT :- ZISHAN ENGINEERS (PVT) LIMITED KARACHI. PROJECT :-Sub-SOIL investigation for 3 Nos. new Tanks YEAR : CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE. PROJECT :- Bulk Water supply Project Mirpur AJ&K YEAR : CLIENT :- GUJRANWALA CANTTONMENT BOARD. PROJECT :- Sewerage & disposal Design of Gujranwala Cantt. Topography, Profile & Design. YEAR : CLIENT : DRILLING ENGINEERS (PVT) LIMITED LAHORE. PROJECT :- PARCO REFINERY Mehmood Kot Muzaffargarh. Meterology & Geological Study YEAR :- 1995

37

38 TELECOMMUNICATIONS EXPERIENCE 1. Optical Fiber Cable Project between Mansehra to Gilgit Special Communications Organization, Government of Pakistan. (SCO) Scope of Work: Identification of Project Route on 1:50,000 Maps provided by the SCO. Preparation of Conceptual Plan of the Project Presentation and Discussions on Conceptual Plan, Finalization and Approval by SCO. Preparation of Detailed Design of the Project. Preparation of following Specifications: Cable Trench and Cable Laying. O/F Cable and its Accessories. Test and Measurement Equipment. Terminal Equipment. All Allied Systems. Presentation and Discussion with SCO. Cable Trench and Cable Laying. Preparation of Addendum to Bid Documents if required. Participation in Bidders Conference. Preparation of Evaluation Criteria and Forms. Evaluation of Bids. Financial Bid Opening and Evaluation. Preparation of Final Evaluation Report. Presentation and Discussion with SCO. Assistance to SCO in negotiations with Successful Bidder and Finalization of Contract(s). Preparation of Contract Award and Documents and Vetting of Contract(s).

39 2. RURAL TELECOMMUNICATION NETWORK EXPANSION PROJECT FOR NORTHERN AREAS OF PAKISTAN Scope of Work Special Communications Organization, Government of Pakistan. (SCO) Project Planning & Designing for Himalaya and Korakuram Mountain regions, Preparation of Tender Documents, Preparation of Technical Specifications and BOQs of Switching. WLL, M/Wave, VSAT, Towers and Electric Protection System, Bids Evaluation and Contract Negotiations, Preparation of Contract Agreement. Duration 1 Year 3. ANALYSIS OF Y2K PREPAREDNESS OF PTCL Scope of Work ScowCroft Group, USA. A detailed study of the state of preparedness of Pakistan Telecommunication Corporation Limited to handle any problems which may arise due to Y2K issue. The scope covered whole of PTCL network (internal and international). The Phase-II of this study covered duration from Dec. 31, 1999 to March 2000 to evaluate the after effects of Y2K Duration Oct. Dec March DESIGNING, IMPLEMENATION AND OPERATIONS OF ACCOUNTING, BILLING AND BILLS PRINTING SYSTEM. ScowCroft Group, USA.

40 Scope of Work Designing of system parameters, Defining of specifications for software development. Analyze and suggest modifications to existing telecom network with respect to new billing system Duration 1 Year. 5. STUDY AND ANALYSIS OF STRUCTURAL REFORMS IN TELECOM SECTOR OF PAKISTAN Public Interest Monitoring Group. Scope of Work Detailed study on effects due to restructuring of telecommunication sector of Pakistan Analysed the achieved versus planned objectives, reasons for reforms project was funded by the World Bank. Duration August to October SURVEY AND ANALYSIS OF MICROWAVE NETWORKS IN PAKISTAN ScowCroft Group, USA. Scope of Work Prepared a comprehensive survey report on Microwave Networks in Private and Public Sector of Pakistan. Their present condition and possibilities of their future improvements. The survey was aimed at finding possible future openings for US microwave equipment suppliers in the market. Duration March to July TECHNICAL AUDIT OF PTCL Inter Active Communications (Pvt) Ltd. (IAC), Islamabad. Scope of Work Critical Assessment of Digital and Analogue Network, Quality of Service, Network Maintenance and Security, Strategy Planning for Rural Telecommunications Development.

41 Duration July 1998 to May AJ&K RURAL TELECOMMUNICATION UPLIFT PROJECT Special Communications Organization, Government of Pakistan. (SCO) MAES has done this project through sister concern SA&S (Pvt) Ltd. Scope of Work Preparation of Project Feasibility, Project approval from Government of Pakistan. Designing and Planning of 96,000 lines Rural Network including Switching Plan, Routing Plan, Signaling Plan, Numbering Plan, Charging Plan, Billing and Fraud Control Systems, Availability and Security Plan, TDMA and WILL Induction Plan, Networking Management System, Preparation of Tender and Technical Specifications, Bids Evaluation, etc. Duration Special Assignments & Systems (Pvt) Ltd., Sister Concern of MAES. 9. ESTABLISHMENT OF EMC LABS Secretary, National Communication Security Board, Government of Pakistan. Scope of Work Preparation of Technical and Financial Feasibility, Project Designing and Recommendations for Equipment, recommendations on legal aspects of the Project Technical and Legal Comments on Draft Ordinance for the Establishment of Pakistan Telecommunication Authority.

42 Duration CONVENTION CENTRE ISLAMABAD Govt. of Pakistan. Scope of Work Duration MAES has the pride of being the consultants and designers of all electronics systems installed at the Islamabad Convention Centre and for the OIC Summit Conference During the Conference, MAES had been awarded the responsibility of overall management, control and operations Supervision of all electronics, electrical, mechanical, public health, etc. systems and services operating inside and around the venue of the conference. 1 Year.