1 Schedule A Development Permit No Issued this 18 day of April, 2018 N No. Revision/Issue Date MM/DD/YY 1 ISSUED FOR TENDER 10/26/17 LEGEND: WORK AREA VILLAGE STROLL VILLAGE GREEN SOUTH WING C O P P I N G S T R E E T Project: FLATROOFREPLACEMENTDESIGN WHISTLER WAY Drawing Title: MOUNTAIN LANE MOUNTAIN SQUARE Drawn by: Checked By: BGV SITE PLAN Project Number: Scale: Date: AUG. 23, 2017 Drawing Number: A-1.01

2 Schedule A Development Permit No Issued this 18 day of April, 2018 N No. Revision/Issue Date MM/DD/YY 1 ISSUED FOR TENDER 10/26/17 2 ISSUED FOR ADDENDUM #1 11/02/17 LEGEND: WORK AREA SOUTH WING MATERIAL HOIST/DISPOSAL BIN LOCATION (SEE A-1.03) D-4.06 D-4.07 D C O P P I N G S T R E E T Project: FLATROOFREPLACEMENTDESIGN Drawing Title: SOUTH WING ROOF PLAN Drawn by: Checked By: BGV Project Number: Scale: Date: AUG. 23, 2017 Drawing Number: A-1.02

3 LEGEND: NOTES: MATERIAL HOIST/DISPOSAL BIN LOCATION. 1. CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL STREET PERMITS, AS REQUIRED. 2. DO NOT BLOCK ACCESS TO PARKING GARAGE. FLATROOFREPLACEMENTDESIGN MOUNTAIN LANE BUILDING ELEVATION ISSUED FOR ADDENDUM #1: NOV. 2, 2017 BGV NOV.2, 2017 A-1.03

4 FLAT ROOF ASSEMBLY 2-PLY MODIFIED BITUMEN WATERPROOFING COVER BOARD NEW INSULATION VAPOUR BARRIER DENSDECK SHEATHING STEEL DECKING (EXISTING) ROOF ASSEMBLY D-4.01

5 NEW DRAIN EMBED DRAIN FLANGE IN BED OF MASTIC 2-PLY MODIFIED BITUMEN WATERPROOFING INSTALLED OVER DRAIN BODY AND SECURED WITH DRAIN CLAMPING RING 100 MIN. 300 NOTES: 2. REFER TO D-4.01 FOR TYPICAL ASSEMBLY. NEW DRAIN OUTLET SEALED TO EXISTING PIPING TYPICAL ROOF DRAIN D-4.02

6 MIN. 200 NEW ALUMINUM PLUMBING VENT. SIZE TO FIT EXISTING PIPING. MASTIC BACK WRAP VAPOUR BARRIER MIN. NOTE: TYPICAL PLUMBING VENT D-4.03

7 BATT INSULATION NEW VENT, SIZE TO MATCH EXISTING FULLY REINFORCED PMMA WATERPROOFING BACK WRAP VAPOUR BARRIER 100 MIN. MASTIC MIN. 150 NOTE: 2. REFER TO D-4.01 FOR TYPICAL ASSEMBLY. TYPICAL EXHAUST VENT PENETRATION D-4.04

8 CAULKING & TERMINATION BAR EXISTING CORRUGATED SHEET METAL CLADDING. REMOVE AND REINSTALL PANELS AS NECESSARY TO COMPLETE RE-ROOFING. 300 MIN. NEW 13mm DFP PLYWOOD FASTENED TO STEEL STUDS. BACK WRAP VAPOUR BARRIER NOTES: 2. REFER TO D-4.01 FOR TYPICAL ROOF ASSEMBLY. ROOFING UPTURN AT METAL CLADDING D-4.05

9 EXISTING CAP FLASHING. CAULK ALL JOI. SHEET METAL EXTERIOR WALL CLADDING. MASTIC CAULKING MEMBRANE & TERMINATION BAR AT VERTICAL FACE REMOVE AND REINSTATE SHEET METAL PARAPET CLADDING TO COMPLETE WATERPROOFING. CAULK JOI IN CLADDING. 300 MIN. NEW 13mm DFP PLYWOOD FASTENED TO STEEL STUDS. BACK WRAP VAPOUR BARRIER NOTES: 2. REFER TO D-4.01 FOR TYPICAL ROOF ASSEMBLY. PARAPET WATERPROOFING (RETAINED SHEET METAL) D-4.06

10 5% SLOPE 75 MIN. NEW PREFINISHED SHEET METAL CAP FLASHING LIQUID-APPLIED FLASHING (ALSAN FLASHING OR PRE-APPROVED ALTERNATE) FULLY REINFORCED AND LAPPED OVER EXTERIOR METAL CLADDING. EXISTING SHEET METAL EXTERIOR WALL CLADDING. SHEET METAL EXTERIOR WALL CLADDING. NEW SELF-ADHERED WATERPROOFING WITH SANDED SURFACE. 300 MIN. 100 MIN. NEW PREFINISHED SHEET METAL CLADDING FOR PARAPET WALLS. DEGRANULATE CAP SHEET PRIOR TO INSTALLING SELF-ADHERED WATERPROOFING NEW 13mm DFP PLYWOOD FASTENED TO STEEL STUDS. BACK WRAP VAPOUR BARRIER NOTES: 2. REFER TO D-4.01 FOR TYPICAL ROOF ASSEMBLY. 3. AT MECHANICAL ROOM ROOF PARAPET, CARRY BASE AND CAP MODIFIED BITUMEN SHEETS OVER PARAPET. PARAPET WATERPROOFING (NEW SHEET METAL FLASHING) D-4.06A

11 EXISTING MECHANICAL ROOM DOOR. ALUMINUM TERMINATION BAR AND CAULKING STRIP IN 2-PLY MODIFIED BITUMEN AT DOOR SILL. COMPLETE PMMA WATERPROOFING UPTURNS AT DOOR JAMBS (MIN. 100mm UPTURN). REPLACE WOOD CURB BELOW DOOR. BACK WRAP VAPOUR BARRIER NOTES: 2. REFER TO D-4.01 FOR TYPICAL ROOF ASSEMBLY. MECHANICAL ROOM DOOR D-4.07

12 NOTES: 2. REFER TO D-4.01 FOR TYPICAL ROOF ASSEMBLY. 3. REFER TO D-4.03 FOR TYPICAL 2-PLY STRIPPING INSTALL DETAILS. EXISTING CHIMNEY STACK SILICONE CAULKING NEW GALVANIZED STORM COLLAR 50 NEW 16 DFP PLYWOOD 100 NEW PRE-FINISHED SHEET METAL CAP FLASHING NEW 16 DFP PLYWOOD SHIMMED TO PROVIDE 5% SLOPE NEW CHIMNEY CAP AND FLASHING D-4.08

13 NOTES: 1. DISPOSE OF THESE ITEMS DURING ROOF DEMOLITION. FLATROOFREPLACEMENTDESIGN MISCELLANEOUS ITEMS STORED ON ROOF ISSUED FOR ADDENDUM #1: NOV. 2, 2017 BGV NOV.2, 2017 D-4.09