THE SPENCER RESIDENCE J&S ARCHITECT

Size: px
Start display at page:

Download "THE SPENCER RESIDENCE J&S ARCHITECT"

Transcription

1 THE SPENCER RESIDENCE J&S ARCHITECT

2 75 POURED CONCRETE FOUNDATION WALL (0MPa) Ø WEEPER TILE C/W SOCK W/MIN. 50 GRANULAR COVER F.D. E.P.B. F.D. 00 POURED CONCRETE FOUNDATION WALL (0MPa) 475 X 00 REINFORCED CONCRETE STRIP FOOTINGS ONE STEP WOOD DECK A/C CONDENSER UNIT 5 : slope 3 TYPICAL STEEL BEAM BEARING POCKET TO BE 00 MIN. 000 X 000X 450 PAD FOOTING 75Ø ADJUSTABLE W30X3 STEEL BEAM UNEXCAVATED BELOW GARAGE 4 GAS GAS GAS GAS GAS GAS GAS GAS M SAN SAN SAN SAN SAN M WTR WTR WTR WTR flat roof GARDEN/PATH LAMPS WALKWAY ONE STEP WOOD DECK ASPHALT DRIVE WAY CBL CBL CBL CBL CBL CBL CBL CBL CBL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL M PWR PWR PWR PWR PWR PWR PWR PWR PWR H.W.H. F.D. FURNACE BASEMENT 00 POURED CONCRETE SLAB ON 6mil POLYETHELYNE VAPOUR BARRIER, 50 RIGID INSULATION, 5 SAND, 00 COMPACTED GRANULAR FILL UP 600 DEEP CHECK DOWN FOR OVERHEAD GARAGE DOOR 50 X 50 CONCRETE COLUMN ON 870 X 870 X 300 PAD FOOTING. MIN. 00 BELOW FINISHED GRADE A6 SITE PLAN FOUNDATION PLAN :50 A SITE PLAN :00 A SITE AREA SITE NO sqm BUILDING FOOTPRINT AREA 35.30sqm Mengyao Wang April 4,04 WTR WTR PWR TEL CBL SAN GAS PWR TEL CBL SAN GAS PROPOSED COVERAGE 45% PERMITTED COVERAGE 44% SITE PLAN/ FOUNDATION PLAN ZONING RC A

3 ONE STEP WOOD DECK WASHROOM WASHROOM HEATING REGISTER KITCHEN LIVING ROOM KITCHEN 3 DINING ROOM 40Ø ADJUSTABLE GARAGE Ø ADJUSTABLE DINING ROOM 4 BATHROOM 50Ø WOOD HANDRAIL SUNDECK BEDROOM LIVING ROOM DN UP A6 DN UP A6 FOYER ONE STEP WOOD DECK Mengyao Wang April 4,04 FIRST FLOOR PLAN :50 A SECOND FLOOR PLAN :50 A FIRST & SECOND FLOOR PLAN A

4 WASHROOM KITCHEN 3 DINING ROOM 4 40Ø ADJUSTABLE 50Ø WOOD HANDRAIL SUNDECK LIVING ROOM DN UP A6 THIRD FLOOR PLAN :50 A3 Mengyao Wang April 4,04 STAIR SECTION :0 A3 THIRD FLOOR PLAN & STAIR SECTION A3

5 -38X84 SPF No., LINTEL 9 T&G PLYWOOD SHEATHING 9 T&G PLYWOOD SHEATHING SPF NO., SPF NO., 40Ø ADJUSTABLE 000 X 000X 450 PAD FOOTING W30X3 STEEL BEAM W30X3 STEEL BEAM 75Ø ADJUSTABLE SPF NO., SPF NO., DOUBLE HEADER & TRIMMER UNEXCAVATED BELOW GARAGE SPF NO., DOUBLE HEADER & TRIMMER 5X90X8 STEEL LINTEL STAIR WELL STAIR WELL SPF No., 38X300 HEADER SPF No., 38X300 HEADER FIRST FLOOR FRAMING PLAN :50 A4 SECOND FLOOR FRAMING PLAN :50 A4 Mengyao Wang April 4,04 FIRST & SECOND FLOOR FRAMING A4

6 -38X84 SPF No., LINTEL -38X84 SPF No., LINTEL 9 T&G PLYWOOD SHEATHING SPF NO., SPF No., ROOF RAFTERS W/ 38X86 SPF No., WOOD CEILING 400 O.C. W30X3 STEEL BEAM W30X3 STEEL BEAM 40Ø ADJUSTABLE 40Ø ADJUSTABLE NOTE: SPF NO., DOUBLE HEADER & TRIMMER NOTE: ALL LINTELS ARE -38X84 SPF No., UNLESS OTHERWISE NOTED. ALL BLOCKING TO BE 38X84 SPF No., UNLESS OTHERWISE NOTED SPF NO., ROOF JOISTS ALL LINTELS ARE -38X84 SPF No., UNLESS OTHERWISE NOTED. ALL BLOCKING TO BE 38X84 SPF No., UNLESS OTHERWISE NOTED. STAIR WELL SPF No., 38X300 HEADER THIRD FLOOR FRAMING PLAN :50 ROOF FRAMING PLAN :50 Mengyao Wang April 4,04 THIRD FLOOR & ROOF FRAMING

7 400 MAIN ROOF PEAK FLAT ROOF 900 CLAY SHAKE SHINGLES 9000 CEILING 3RD FL RD FLOOR PREFACED BRICKS 3000 ND FLOOR 000 ST FLOOR BASEMENT SLAB BOTTOM OF STRIP FOOTING SOUTH ELEVATION NORTH ELEVATION :50 :50 Mengyao Wang April 4,04 SOUTH & NORTH ELEVATION A6

8 WEST ELEVATION EAST ELEVATION :50 A7 :50 A7 Mengyao Wang April 4,04 EAST & WEAT ELEVATION A7

9 Asphalt Shingle 6mm Plywood Sheathing 38x40 Roof Rafter with Baffle 38x89 Ceiling Joist w/batt Insulation, R0.5 Vapour Barrier INSULATION BAFFLE Insulated Exterior Foundation Wall 38 X 40 FASCIA 6mm Cement Parging 50mm Conc. Foundation Wall 40mm Batt Insulation, R4 3mm GWB Drywall VENTED ALUMINUM SOFFIT Insulated Interior Foundation Wall Platon Drainage Mat Sprayed On Bichumen Damooroofing 00mm Conc. Foundation Wall 9x64 Vertical Strapping 3mm GWB Drywall Non-Insylated Exterior Foundation Wall BASEBOARD 75 Poured Concrete (0 MPa) 0mm Floor Tile 3mm Plywood Subfloor 84mm Floor Joist 3mm GWB Ceiling Interior Loading Bearing Wall 3 Gypsum Wall Board 38x40 SPF # Wood Stud 3 Gypsum Wall Board Insulated Exterior Block Veneer Wall SPF No., -38X35 LINTEL 90mm Brick Veneer 5mm Air Space Air Barrier 3mm OSB Sheathing 38x40 SPF # Wood 400mm w/batt Insulation, R4 Vapour Barrier 3mm GWB Drywall Interior Partition Wall 3 Gypsum Wall Board 38x89 SPF # Wood Stud 3 Gypsum Wall Board Interior Plumbing Wall 3 Gypsum Wall Board 38x89 SPF # Wood Stud Offset To Achieve 38x84 Plate Width 3 Gypsum Wall Board 90mm Brick Veneer 5mm Air Space Air Barrier 3mm OSB Sheathing 38x40 400mm w/batt Insulation, R4 Vapour Barrier 3mm GWB Drywall 38X40 WOOD SILL PLATE WITH GASKET ANCHORED INTO FOUNDATION WALL WITH ANCHOR BOLTS 0mm Floor Tile 3mm Plywood Subfloor 84mm Floor Joist 3mm GWB Ceiling Non-Insulated Exterior Garage Wall 90mm Brick Veneer 5mm Air Space 3mm OSB Sheathing 38x40 SPF # Wood 400mm Insulated Interior-Garage Loadbearing Wall SLOPE GRADE AWAY FROM FOUNDATION 6mm Cement Parging 50mm Conc. Foundation Wall 40mm Batt Insulation, R4 3mm GWB Drywall GASKET 00 Concrete Slab 0 mil POLYETHELYNE VAPOUR BARRIER 50 RIGID INSULATION 5 SAND 50 COMPACTED GRANULAR FILL Air Barrier 3mm OSB Sheathing 38x40 SPF # Wood 400mm w/batt Insulation, R4 Vapour Barrier 3mm GWB Drywall Mengyao Wang April 4,04 UNDISTURBED SOIL WALL SECTION & WALL SCHEDULE 645X00 STRIP FOOTING 50Ø WEEPER TILE WITH SOCK 50 COURSE GRAVEL FILTER CLOTH PREMOULDED JOINT FILLER WALL SECTION :0 WALL TYPE SCHEDULE :0

10 400 MAIN ROOF PEAK FLAT ROOF CEILING 3RD FL HALLWAY EXTERIOR DOORS: MASTER BEDROOM RD FLOOR HALLWAY D D4 D7 LIVINGROOM INTERIOR DOORS: 3000 ND FLOOR FOYER BASEMENT 000 ST FLOOR D D3 D5 D6 BASEMENT SLAB -800 BASEMENT DOOR ELEVATIONS :50 A9-300 BOTTOM OF STRIP FOOTING BUILDING SECTION :50 A9 DOOR SCHEDULE DOOR DOOR NO DOOR TYPE HINGE HEIGHT WIDTH THICKNESS MATERIAL GLAZING FINISH REMARKS D A L SOLID CORE N PAINT D B L HOLLOW CORE N PAINT D3 C L HOLLOW CORE N PAINT D4 D L GLASS Y PAINT D5 E L STEEL N PAINT D6 F L STEEL N PAINT D7 G R SOLID CORE Y PAINT FRAME TYPE HEIGHT WIDTH THICKNESS MATERIAL FINISH REMARKS A WOOD PAINT B WOOD PAINT C WOOD PAINT D GWB RETURN PAINT E STEEL PAINT F STEEL PAINT G GWB RETURN PAINT Mengyao Wang April 4,04 BUILDING SECTION, DOOR ELEVATION & DOOR SCHEDULE A9