1 CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall be considered part of the contract documents. In order to ensure that all bidders are aware of these provisions, each bidder shall sign this addendum below and attach it to the proposal. IMPORTANT: Failure to include a signed Addendum could result in the disqualification of your bid. GENERAL CLARIFICATION Schedule A and B are in place for accounting purposes only. The two schedules are considered one project and will be built together. Bid Item No. 7 shall include all base rock including the rock under the curbs, sidewalks, and roadways. Bid Item No. 33. The approximate lengths and diameters of the different pipes are as follows: Schedule A- 225 feet of 6-inch 450 feet of 8-inch 300 Feet of 15-inch Schedule B- 35 feet of 6-inch 50 feet of 12-inch SCHEDULE OF CONTRACT PRICES Replace the Schedule of Contract Prices with the new attached Schedule of Contract Prices. The new schedule corrects bid quantities and adds a new bid item for topsoil in order to avoid confusion during construction. A summary of the changes is as follows: Bid Item No changed to topsoil and quantities were added in Schedule A and B Bid Item No the item was added with a quantity in Schedule B Bid Item No. 50 item removed in Schedule B Bid Item No the quantity was reduced in Schedule A BID ITEM CHANGES The following bid item descriptions shall replace the bid item descriptions within the contract documents: Addendum #1.ST

2 Item No. 46 Topsoil: See the Construction Drawings and Standard Construction Specifications, Section 204 and the Special Provisions. This bid item includes provisions and placement of all topsoil shown on the Construction Drawings and in areas of transition where excavation has occurred but no improvements are being built. Topsoil shall be four parts topsoil to one part decomposed organic matter (compost). Payment for this bid item will be on a neat line cubic-yard basis and will include all equipment, labor, Item No. 67 Construct Private Parking Lot at 102 Main Street: See Special Provisions and Construction Drawings. This work shall include all work required to construct the private parking lot including excavation, base rock, pavement, striping, signs, curb, and storm drain work as shown on Sheet 33 of the Construction Drawings. All work shown behind the back of the new sidewalk is incidental to this bid item. The pipe work to the point of connection to a public structure is incidental. Payment for this bid item will be made on a lump-sum basis and will include all equipment, labor, Item No. 68 Construct Private Parking Lot at 230 Main Street: See Special Provisions and Construction Drawings. This work shall include all work required to construct the private parking lot including excavation, base rock, pavement, striping, signs, curb, conduit, and storm drain work as shown on Sheet 34 of the Construction Drawings. Curb along the east side adjacent to the stormwater planter will be paid for under the Storm Water Quality Planter bid item. All work shown behind the back of the planters is incidental. The pipe work to the point of connection to a public structure is incidental. Existing pavement in the 7- Eleven property is going to remain in place unless damaged during construction. It shall be incidental to remove and replace a 2-foot-wide section of existing pavement at all tie in locations with existing asphalt and along the new curb that closes the existing driveway. Payment for this bid item will be made on a lump-sum basis and will include all equipment, labor, Item No. 69 Construct Private Parking Lot at 217 Main Street and 1139 Salem Avenue: See Special Provisions and Construction Drawings. This work shall include all work required to construct the private parking lot including excavation, base rock, pavement, striping, signs, curb, and storm drain work as shown on Sheet 35 of the Construction Drawings. All work shown behind the back of the new sidewalk is incidental. The pipe work to the point of connection to a public structure is incidental. Ribbon drain will be paid for under a separate bid item. All of the asphalt at 217 Main Street shall be removed and replaced as shown on the Construction Drawings. Payment for this bid item will be made on a lump-sum basis and will include all equipment, labor, Item No. 70 Construct Private Parking Lot at 317 Main Street: See Special Provisions and Construction Drawings. This work shall include all work required to construct the private parking lot including excavation, base rock, pavement, striping, signs, curb, and storm drain work as shown on Sheet 36 of the Construction Drawings. Curb along the north side adjacent to the stormwater planter will be paid for under the Storm Water Quality Planter bid item. All work shown behind the back of the planters and back of new sidewalk is incidental. The pipe work to the point of connection to a public structure is incidental. Hatched areas are 4-inch concrete as shown on the plans. Addendum #1.ST

3 Payment for this bid item will be made on a lump-sum basis and will include all equipment, labor, CONSTRUCTION DRAWING CHANGES The construction drawings shall be completely replaced by drawings with Revision 1 dated February 12, There were printing issues that caused the scales to not measure correctly. A summary of other changes by sheet is as follows: Sheet 3: Call out for abandoned storm line added Pavement match lines added Sheet 7: Removed Transition Paving from call out to avoid confusion with bid items. Added callout for storm lateral Sheet 9: Pavement match line added Called out area of demo and topsoil Sheet 10: Pavement match line added Called out area of demo and topsoil Added callout for connection of perforated pipe under driveways Sheet 20: Scale bars corrected Sheet 21: Scale bars corrected Note added about construction timeline of island in 2 nd Street Sheet 22: Rock deleted from Detail H. Replaced with Straw or Jute Matting Detail J corrected to show 4 pipe instead of 6 Sheet 24-26: Scale bar added Sheet 35: Deleted note about work being performed under separate contract Sheet 42: Scale bar corrected Sheet 43: Scale bar was corrected Sheet 44: Approximate existing utility locations were added Scale bar was corrected Notes were changed Contractors Signature Date Company Name (Please type or print) Addendum #1.ST

4 SCHEDULE OF CONTRACT PRICES SCHEDULE A ITEM 1 Mobilization 2 Temporary Traffic Control 3 Erosion Prevention and Sediment Control 4 Unclassified Excavation 5,100 Cubic Yard 5 Overexcavation and Foundation Stabilization 1,600 Cubic Yard 6 Subgrade Geotextile Fabric 8,100 Square Yard 7 Crushed Aggregate Base 5,210 Ton 8 1/2-Inch Warm Mix Asphalt Concrete 3,300 Ton 9 Transition Paving 50 Square Yard 10 Standard Curb and Gutter 2,550 Linear Foot 11 Straight Curb 70 Linear Foot 12 Concrete Islands 13 Concrete Truck Aprons 14 4-Inch PCC Sidewalk 2,200 Square Yard 15 8-Inch PCC Driveway Approach 480 Square Yard 16 Curb Drain 50 Linear Foot 17 6-Inch PVC Storm Drain 280 Linear Foot Inch PVC Storm Drain 480 Linear Foot Inch PVC Storm Drain 200 Linear Foot Inch D.I. Storm Drain 170 Linear Foot 21 Storm Drain Property Line Clean-out 2 Each 22 Adjust Fixtures to Grade 18 Each 23 Adjust Manhole Rim to Grade 15 Each 24 Standard Precast Storm Drain Manhole 5 Each 25 Standard Curb Inlet 7 Each 26 Beehive Inlet 5 Each 27 ODOT CG-2 Inlet 2 Each 28 Area Drain 2 Each 29 Ribbon Drain 50 Linear Foot 30 Connection To Existing Storm Drain Manholes 31 Stormwater Quality Planter 7,000 Square Foot 32 Remove Existing Catch Basin 9 Each SCHEDULE OF CONTRACT PRICES Addendum No. 1 Page 4 of 43

5 33 Abandon Existing Pipes 1,100 Linear Foot 34 Abandon Existing Sewer Manhole 1 Each 35 Reconstruct 48-Inch Manhole 2 Each Inch Yellow Profiled Thermoplastic 4-Inch White Non-Profiled Thermoplastic 8-Inch White Non-Profiled Thermoplastic 12-Inch White Non-Profiled Thermoplastic 2,150 Linear Foot 175 Linear Foot 1,200 Linear Foot 1,300 Linear Foot 40 Thermoplastic Single Arrow Symbol 9 Each 41 Bid Item Not Used 0 Each 42 Thermoplastic Bicycle Lane Legend 12 Each 43 Thermoplastic Bicycle Shared Lane Legend 3 Each 44 Raise Reflectorized Pavement Marker 280 Each 45 Install New Street Signs 46 Topsoil 500 Cubic Yard 47 Install Truncated Domes 344 Square Foot 48 4-Inch Asphalt Trench Patch 390 Square Yard 49 8-Inch Ductile Iron Water Line 240 Linear Foot 50 6-Inch Gate Valve 1 Each 51 8-Inch Gate Valve 1 Each 52 Standard 1-Inch Service Assembly 23 Each 53 Abandon 6-Inch connections 54 Bid Item Not Used 0 Lump Sum STA C Inch x 6-Inch Connection Assembly STA.C Inch x 8-Inch Connection Assembly 57 Remove Fire Hydrant Assembly 1 Each 58 Standard Fire Hydrant Assembly 1 Each 59 Remove Abandoned Valve Box 1 Each 60 1-Inch Combination Air/Vacuum Release Valve 1 Each 61 8-Inch PVC Sewer Main 670 Linear Foot 62 4-Inch PVC Sewer Lateral 280 Linear Foot 63 4-Inch Property Line Sewer Cleanout 9 Each 64 Connect to Existing Sanitary Sewer Manholes 65 Standard Precast Sewer Manhole 4 Each SCHEDULE OF CONTRACT PRICES Addendum No. 1 Page 5 of 43

6 66 Add Standard Drop to Existing Manhole 1 Each 67 Bid Item Not Used 0 Lump Sum Construct Private Parking Lot at 230 Main Street Construct Private Parking Lot at 217 Main Street and 1139 Salem Avenue Construct Private Parking Lot at 317 Main Street 71 Bark Nuggets 100 Square Yard 72 Curb Frame and Door for CenturyLink Manhole 1 Each 73 2-Inch Street Lighting Conduit 230 Linear Foot 74 Bollards and Chain Fence 350 Linear Foot 75 Private Sewer Service 620 Linear Foot 76 Private Sewer Cleanout 12 Each 77 Private Storm Service 260 Linear Foot 78 Private Storm Cleanout 5 Each 79 Grease Interceptor 1 Each 80 Private Indoor Plumbing 1 Each 81 Private Catch Basin 2 Each 82 Private Ribbon Drain 20 Linear Foot 83 Early Completion Bonus 20 Day 2, , SUM OF EXTENDED TOTALS SCHEDULE A SCHEDULE B Main Street from 1st Avenue to 2 nd Avenue ITEM 1 Mobilization 2 Temporary Traffic Control 3 Erosion Prevention and Sediment Control 4 Unclassified Excavation 1,450 Cubic Yard 5 Overexcavation and Foundation Stabilization 300 Cubic Yard 6 Subgrade Geotextile Fabric 1,500 Square Yard 7 Crushed Aggregate Base 990 Ton 8 1/2-Inch Warm Mix Asphalt Concrete 585 Ton 9 Transition Paving 50 Square Yard 10 Standard Curb and Gutter 850 Linear Foot 11 Bid Item Not Used 0 Linear Foot 12 Bid Item Not Used 0 Lump Sum SCHEDULE OF CONTRACT PRICES Addendum No. 1 Page 6 of 43

7 13 Bid Item Not Used 0 Lump Sum 14 4-Inch PCC Sidewalk 600 Square Yard 15 8-Inch PCC Driveway Approach 200 Square Yard 16 Curb Drain 50 Linear Foot 17 Bid Item Not Used 0 Linear Foot Inch PVC Storm Drain 165 Linear Foot 19 Bid Item Not Used 0 Linear Foot 20 Bid Item Not Used 0 Linear Foot 21 Bid Item Not Used 0 Each 22 Adjust Fixtures to Grade 4 Each 23 Adjust Manhole Rim to Grade 3 Each 24 Bid Item Not Used 0 Each 25 Standard Curb Inlet 4 Each 26 Bid Item Not Used 0 Each 27 Bid Item Not Used 0 Each 28 Bid Item Not Used 0 Each 29 Ribbon Drains 50 Linear Foot 30 Connection to Existing Storm Manholes 31 Stormwater Quality Planter 900 Square Foot 32 Remove Existing Catch Basin 2 Each 33 Abandon Existing Pipe 85 Linear Foot 34 Bid Item Not Used 0 Each 35 Bid Item Not Used 0 Each 36 Bid Item Not Used 0 Linear Foot Inch White Non-Profiled Thermoplastic 8-Inch White Non-Profiled Thermoplastic 12-Inch White Non-Profiled Thermoplastic 170 Linear Foot 130 Linear Foot 400 Linear Foot 40 Thermoplastic Single Arrow Symbol 2 Each 41 Thermoplastic Double Arrow Symbol 2 Each 42 Thermoplastic Bicycle Lane Legend 2 Each 43 Bid Item Not Used 0 Each 44 Bid Item Not Used 0 Each 45 Install New Street Signs 46 Topsoil 100 Cubic Yard SCHEDULE OF CONTRACT PRICES Addendum No. 1 Page 7 of 43

8 47 Install Truncated Domes 48 Square Foot 48 4-Inch Asphalt Trench Patch 55 Square Yard 49 Bid Item Not Used 0 Linear Foot 50 Bid Item Not Used 0 Each 51 Bid Item Not Used 0 Each 52 Bid Item Not Used 0 Each 53 Bid Item Not Used 0 Lump Sum 54 Coordinate 12-Inch x 6-Inch Live Tap 55 Bid Item Not Used 0 Lump Sum 56 Bid Item Not Used 0 Lump Sum 57 Remove Fire Hydrant Assembly 1 Each 58 Standard Fire Hydrant Assembly 1 Each 59 Bid Item Not Used 0 Each 60 Bid Item Not Used 0 Each 61 Bid Item Not Used 0 Linear Foot 62 Bid Item Not Used 0 Linear Foot 63 Bid Item Not Used 0 Each 64 Bid Item Not Used 0 Lump Sum 65 Bid Item Not Used 0 Each 66 Bid Item Not Used 0 Each 67 Construct Private Parking Lot at 102 Main Street 68 Bid Item Not Used 0 Lump Sum 69 Bid Item Not Used 0 Lump Sum 70 Bid Item Not Used 0 Lump Sum 71 Bark Nuggets 115 Square Yard 72 Bid Item Not Used 0 Each 73 Bid Item Not Used 0 Linear Foot 74 Bid Item Not Used 0 Linear Foot 75 Bid Item Not Used 0 Linear Foot 76 Bid Item Not Used 0 Each 77 Bid Item Not Used 0 Linear Foot 78 Bid Item Not Used 0 Each 79 Bid Item Not Used 0 Each 80 Bid Item Not Used 0 Each 81 Bid Item Not Used 0 Each SCHEDULE OF CONTRACT PRICES Addendum No. 1 Page 8 of 43

9 82 Bid Item Not Used 0 Linear Foot 83 Bid Item Not Used SUM OF EXTENDED TOTALS SCHEDULE B TOTALS SCHEDULE A + SCHEDULE B NOTE: Subject to change if addition or extensions are in error. Bidder s Signature Company Name (please print) Date Bidder s Name (please print) Mailing Address (please print) CCB License Number Bidder s Title (please print) City, State Zip Federal Tax ID Number Telephone No.: Fax No.: SCHEDULE OF CONTRACT PRICES Addendum No. 1 Page 9 of 43