1 Page 1 of SECTION: 01 COMMON ITEMS CONTRACTOR CONSTRUCTION STAKING FIELD OFFICE MOBILIZATION MOBILIZATION (DBE) REMOVAL OF EXISTING STRUCTURES FOUNDATION STABILIZATION (SET PRICE) CUYD 4, , , , , , , , , , , , , , , , , , , , , , , , FLAGGER (SET PRICE) HOUR $77, $98, $128, Section Total with LCC: $77, $98, $128,565.00

2 Page 2 of SECTION: 02 ROAD ITEMS CLEARING AND GRUBBING COMMON EXCAVATION (URB) ROCK EXCAVATION INLET (TYPE 22 CURB) STORM SEWER (15") (RCP) MANHOLE (REINFORCED CONCRETE) ADJUSTMENT OF VALVE BOX (WATER) SIDEWALK CONSTRUCTION ( 4") (AE) CUYD 1, CUYD , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , SIDEWALK RAMP $55, $58, $70, Section Total with LCC: $55, $58, $70,169.00

3 Page 3 of SECTION: 03 TEMP PRJ WTR POL CTL TEMPORARY SEEDING SEDIMENT REMOVAL (SET PRICE) TEMPORARY BERM (SET PRICE) TEMPORARY INLET SEDIMENT BARRIER BIODEGRADABLE LOG (20") CUYD , , , , , , , , , , WATER (EROSION CONTROL) (SET PRICE) MGAL $7, $7, $6, Section Total with LCC: $7, $7, $6,696.00

4 Page 4 of SECTION: 04 CONCRETE SURFACING ITEMS CURB AND GUTTER, COMBINED (AE) CONCRETE PAVEMENT ( 6" UNIFORM) (AE) CONCRETE PAVEMENT ( 9" UNIFORM) (AE) (NRDJ) GRANULAR BASE ( 8") WATER (GRANULAR BASE) (SET PRICE) , , MGAL 3, , , , , , , , , , , , , , , , GEOSYNTHETIC REINFORCEMENT (FOR BASE) $299, $309, $301, Section Total with LCC: $299, $309, $301,118.00

5 Page 5 of SECTION: 05 ASPHALT SURFACING ITEMS MILLING TRANSPORTING SALVAGEABLE MATERIAL (0-2.5MI) NON-PART HMA-COMMERCIAL GRADE (CLASS A) , TON TON , , , , , , , , , FIELD OFFICE AND LABORATORY (TYPE A) $85, $105, $105, Section Total with LCC: $85, $105, $105,609.00

6 Page 6 of SECTION: 06 PAVEMENT MARKING ITEMS PAVEMENT MARKING (MULTI- COMPONENT) (WHITE) ( 6") PAVEMENT MARKING (MULTI- COMPONENT) (YELLOW) ( 4") PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (12") PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) , , , , , , , , , , , , , PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) THRU-RT ARROW $11, $11, $11, Section Total with LCC: $11, $11, $11,856.00

7 Page 7 of SECTION: 07 TRAFFIC SIGNAL ITEMS TRAFFIC SIGNAL , , , , , , , , , , , , VIDEO DETECTION SYSTEM $104, $105, $104, Section Total with LCC: $104, $105, $104,000.00

8 Page 8 of SECTION: 08 SEEDING ITEMS , , , SOD (TALL TURF TYPE FESCUE) (STRIPS) $7, $7, $6, Section Total with LCC: $7, $7, $6,903.00

9 Page 9 of SECTION: 09 TRAFFIC CONTROL ITEMS WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) WORK ZONE SIGNS ( 9.26 TO SQ.FT.) WORK ZONE BARRICADES (TYPE 3-4 TO 12 LIN. FT.) CHANNELIZER (PORTABLE) WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) WORK ZONE WARNING LIGHT (RED TYPE "B" HIGH INTENSITY) PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I) PAVEMENT MARKING (TEMP) 4" SOLID (TYPE II) PAVEMENT MARKING REMOVAL 5, EADA 4, EADA 3, EADA 18, EADA 3, EADA EADA STAL STAL 3, , , , , , , , , , , , , , , ,596.00

10 Page 10 of SECTION: 09 TRAFFIC CONTROL ITEMS , , , , , , TRAFFIC CONTROL (INITIAL SETUP) $39, $41, $43, Section Total with LCC: $39, $41, $43, Contract Item Totals $688, $746, $778, Contract Time Totals Contract Life Cycle Costs Totals $0.00 $0.00 $0.00 Contract Grand Totals ( ) indicates item is bid as Lump Sum $688, $746, ,537.50

11 Page 11 of

12 Vendor Ranking Page 1 of 1 NHPP-A425(601) Rank Vendor ID/Name Total Bid Percent Of Low Bid MORGAN BROTHERS $688, % L & M CONTRACTORS INC $746, % VENTURE CORPORATION $778, %