1200 UNDERGROUND GENERAL

Size: px
Start display at page:

Download "1200 UNDERGROUND GENERAL"

Transcription

1 100 UNDEGOUND GENEAL 3/15/010 C UA1 Basic Trench equirements ~ UC1 Conduit equirements C UD1 Directional Boring Specifications ~ UVE1 Underground Vault 10 V Wiring ~ UVSP1 Underground Vault - Sump Pump N New Standard edrawn Standard C Changed Standard ~ No Change

2 4" IN. 4" IN. OAD SIDE IELD SIDE CUB GAS 4"-48" GAS 4"-48" CLEAN ILL 1" IN. SEPAATION CLEAN ILL 1" IN. SEPAATION TENCH DETAIL W/ GAS STEET COSSING DETAIL 4" IN. OAD SIDE IELD SIDE OAD SIDE IELD SIDE 1" IN. 4"-48" 18" 4" Trench Depth CLEAN ILL TENCH DETAIL W/O GAS SECONDAY & COUNICATIONS ANDO SEPAATION LEGEND: PIAY POWE X TELEPHONE GAS SECONDAY POWE T.V. CABLE NOTES: 1. All primary and secondary power cables are in conduit.. Select backfill or controlled density fill (CD) may be required. 3. Deliberate separation may be vertical as shown or horizontal. 4. In random separation, power primary and secondary may touch each other. 5. Construction scrap material or trash of any kind is not allowed in any part of the trench. 6. Caution tape is required one foot above the top 1000 C conduit (On Screenings). ev 5: Changed million feeder configuration to triangular w/o spacers. CONSTUCTION STANDADS BASIC TENCH EQUIEENTS EVISIONS DATE ENG OPS 1/9/04 LB AH 3 5/30/07 LB AH 4 1/14/09 KJP CAD ILE: 1 of UA1 UA1 APP: DATE: JEH //00 100

3 BACKILL PE CITY O COUNTY EQUIENTS BACKILL PE CITY O COUNTY EQUIENTS OAD SIDE IELD SIDE OAD SIDE IELD SIDE 56" 48" BED CONDUIT WITH SCEENINGS BED CONDUIT WITH SCEENINGS " SCH 40 PVC CONDUITS * (3)-4" SCHEDULE 40 PVC CONDUITS 1" " SCHEDULE 40 PVC CONDUITS (3)-4" SCHEDULE 40 PVC CONDUITS * (3)-4" SCHEDULE 40 PVC CONDUITS * 8" 4" 8" 8" 4" 4" 8" 8" 4" 4" 4" 1000C W/ 1/0 TENCH DETAIL -1000C W/ 1-1/0 TENCH DETAIL NOTE: CONDUITS WITH 1000C CABLE AE TO BE PLACED IN SPACES EVEY 5 EET. LEGEND: PIAY POWE X TELEPHONE GAS SECONDAY POWE T.V. CABLE NOTES: 1. All primary and secondary power cables are in conduit.. Select backfill or controlled density fill (CD) may be required. 3. Deliberate separation may be vertical as shown or horizontal. 4. In random separation, power primary and secondary may touch each other. 5. Construction scrap material or trash of any kind is not allowed in any part of the trench. 6. Caution tape is required one foot above the top 1000 C conduit (On Screenings). ev 5: Changed million feeder configuration to triangular w/o spacers. CONSTUCTION STANDADS BASIC TENCH EQUIEENTS EVISIONS DATE ENG OPS 1/9/04 LB AH 3 5/30/07 LB AH 4 1/14/09 KJP CAD ILE: of UA1 UA1 APP: DATE: JEH //00 100

4 ALL CONDUIT SHALL BE GAY ELECTICAL CONDUIT AND SHALL BE UL LISTED AND NEA TC- O TC-3 LABELED -- NO OTHE PIPE IS ACCEPTABLE. 1. All primary and secondary cables shall be in conduit.. All road and street crossings shall be in schedule 40, PVC, gray electrical conduit or polyethylene of equal or greater strength specifications. Pipe with other designated use is not acceptable. 3. All risers above finished grade shall be in schedule 80 PVC. 4. Acceptable conduit sizes are as follows: - 1Ø, 1/0 primary cable in 1-" conduit - 3Ø, 1/0 primary cable in 1-4" or 3-" conduits - Triplex secondary cable in 1-3" conduit - 3Ø, 1000C cable in 3-4" conduits 5. Where rock is encountered and the depths shown on UA1 cannot be accomplished, a lesser depth with schedule 80 conduit* and/or control density fill (CD) may be approved.* Contact CPU Engineering. 6. All conduit terminations shall have end bells or bushings. 7. All conduits that terminate into energized enclosures shall be installed by qualified personnel with a CPU standby person. 8. All conduit runs shall be designed to limit pulling tension to the values specified on UCP1. 9. All conduit ends shall be chamfered 45 x 1/4" internally at all straight ends (not belled ends). 10. All conduits installed for future use shall be marked with 3 electrical markers within six inches at both ends. All ends shall be elbowed up as per Std. ULE (section 1500). The elbow shall NOT be glued to the conduit. The elbow shall be covered with a CPU loop enclosure. 11. Sufficient select backfill shall be placed to prevent crushing of the conduits due to trucks and other heavy equipment. 1. Unused conduits shall have removable plugs designed for that purpose in both ends. 13. oad and street crossings may be either trenched and backfilled, bored or pushed whichever is acceptable to the governing agency. 14. All street and road crossings shall be at property lines. 15. Where conduit bends are required, they shall meet the requirements for cable pulling in the construction specifications. Only manufactured radii are acceptable. No heated bends. 16. A condulet (LB) shall never be used. 17. Conduit sweeps shall be 4" secondary* and 36" primary radius. 18. Conduits installed for futures should be plumbed into transformer with elbows and capped. lex pipe is not acceptable. 19. Conduits shall be installed so that cable is pulled toward the end bells to avoid scraping cable on sharp edges of conduit. 0. All cut ends of conduits shall be square. 1. Steel mandrels shall be pulled through the conduits to detect damage and debris. ev 3: Updated Notes Have A * CONSTUCTION STANDADS CONDUIT EQUIEENTS EVISIONS DATE ENG OPS 1/9/04 LB AH 3 5/30/07 LB AH 1 EVISIONS AKED WITH STA 1 of 1 UC1 UC1 DATE: 9/94 100

5 DIECTIONAL BOING SPECIICATIONS 1. DIECTIONAL DILLING SHALL BE PEOED ONLY BY CPU APPOVED ELECTICAL CONTACTOS ON JOBS THAT HAVE BEEN PE-APPOVED O DIECTIONAL DILLING.. DIECTIONAL DILLING EQUIPENT SHALL BE PE-APPOVED BY CPU. 3. DIECTIONAL DILLING EQUIPENT SHALL BE OPEATED ONLY BY PESONNEL WHO HAVE BEEN CETIIED O APPOVED BY CPU O A CPU ACCEPTED AGENCY. 4. CONDUIT INSTALLATIONS SHALL BE ", 4" O 6" GAY POLYETHYLENE PIPE O NOT-LESS-THAN STANDAD ADIUS DIENSION (SD) (OUTSIDE DIAETE DIVIDED BY WALL THICKNESS NLT 13.5). ALL CONDUIT WILL EET AST STANDADS O CONSTUCTION AND INSTALLATION O POLYETHYLENE (PE) CONDUIT. CONDUIT INSTALLATIONS USING PVC CONDUIT SHALL HAVE DESIGNS, ATEIAL AND INSTALLATION PACTICES PE-APPOVED BY CPU. 5. ALL CONNECTION TO PVC SWEEPS O CONDUIT WILL BE ULLY GLUED USING IS WELD-ON 600 ADHESIVE O CPU APPOVED EQUIVALENT. GLUE USED TO ASTEN PVC TO PVC SHALL BE IS WELD ON 71 WITH A COPATIBLE PIE (O APPOVED EQUIVALENT GLUE AND PIE). 6. A PLOT AND TACK O THE BOE USING THE BOE EQUIPENT SOTWAE, O A CETIIED COPY O A SUVEYED POILE O THE BOE, SHALL BE POVIDED TO CPU BEOE ACCEPTANCE O THE INSTALLATION. 7. THE DEPTH O THE CONDUIT SHALL BE IDENTIIED BY A STAKE WITH THE DEPTH EVEY 10 EET ALONG THE OUTE IN UNPAVED AEAS AND BY THE DEPTH WITTEN IN AKE PAINT EVEY 10 EET ALONG ALONG THE OUTE IN PAVED AEAS. 8. THE CONDUIT DEPTHS SHALL CONO TO THE CPU STANDADS O 4" NOINAL DEPTH, NOT LESS THAN 36", NO GEATE THAN 48". ANY OTHE DEPTH SHALL EQUIE PIO APPOVAL BY CPU. 9. ALL INSTALLED CONDUITS SHALL BE "POOED" USING THE APPOPIATE ANDEL, AND HAVE A 500 POUND, 3/4" SEQUENTIALLY-NUBEED, CONTINUOUS "ULE TAPE" INSTALLED O UTUE CABLE PULLING. CETIICATION O THE TEST ANDELING SHALL BE POVIDED TO CPU PIO TO ACCEPTANCE BY THE UTILITY. 10. CPU ESEVES THE OPTION TO EQUIE "POTHOLING" TO DETEINE DEPTH AND LOCATION O ANY INSTALLATIONS THAT AE QUESTIONABLE. THE "POTHOLING" WILL BE AT THE CONTACTO'S EXPENSE. ev : Added "Gray" to Item #4 and 3/4" mule tape in all conduit in Item #9 CONSTUCTION STANDADS DIECTIONAL BOING SPECIICATIONS EVISIONS DATE ENG OPS 1 1/9/04 LB AH 1/14/09 KJP 1 of 1 UD1 UD1 DATE: 4/4/01 100

6 CABLE DETAIL ITE 4 EOTE SOUCE WHITE USE BLACK GEEN CABLE TO NEUTAL AND GOUND BUS DETAIL ITE 4 IN VAULT SOUCE TO UVE- 11 USE CABLE SEE ASSEBLY DETAIL BELOW TO 10V SOUCE SUP PUP LOAT SWITCH STOE ITE 10 NEA ECEPTACLE WHEN NOT IN USE ECEPTACLE ASSEBLY (TYPICAL) 1 - EDAWN IN CAD CONSTUCTION STANDADS UNDEGOUND VAULT 10 VOLT WIING EVISIONS DATE ENG OPS 1 EDAWN IN CAD 1 of 3 UVE1 UVE1 DATE: 4/94 100

7 ATEIAL LIST ITE QTY. DESCIPTION TD SWITCH, DUST-TIGHT, WATE-TIGHT, 15V, 0A SQUAE 'D' CAT #KW-1 LIGHT IXTUE, VAPO-TIGHT, 150V WITH GLOBE, GUAD AND BASE WITH - 3/4" NPT HUBS HUBBELL CAT #NVX15CHG CONNECTO, STAIGHT, 3/4" NPT HUB SIZE, ALE, NYLON HUBBELL #SHC-1037-C USE HOLDE, HOAC #SLK 5 BOX, CONDUIT, PVC, TYPE SC, 3/4" 6 4 ADAPTE, EALE, 3/4", PVC A.. POWE OUTLET, CHOE PLATED BASS 30A, 3 WIE, 15V, HUBBELL #60C63 ADAPTE, HUBBELL #60C75 O ITE #7 COD, POTABLE, TYPE STO 3 CONDUCTO 10 AWG 10 ADAPTE, TWIST LOCK ALE 30A TO STAIGHT BLADE EALE 30A, HUBBELL #31C9 11 A.. CONDUCTO #10 CU BLACK 1 A A.. CONDUCTO #10 CU WHITE CONDUCTO #10 CU BAE SPLICE COVE, STEET LIGHT, HOAC SS0 15 A.. CONDUIT, PVC, SCH 40, 3/4" CONSTUCTION STANDADS UNDEGOUND VAULT 10 VOLT WIING EVISIONS DATE ENG OPS 1 EDAWN IN CAD of 3 UVE1 UVE1 DATE: 4/94 100

8 NOTES: THIS WIING DIAGA IS TYPICAL ONLY. EACH VAULT EQUIES SPECIAL CONSIDEATION TO LOCATE EACH COPONENT O OPTIU UTILIZATION. LOCATE THE LIGHT SWITCH AS CLOSE TO THE LADDE AS POSSIBLE BUT POTECT IT O DAAGE WHEN EQUIPENT IS BEING OVED IN O OUT. THE 10 VOLT SOUCE AY BE O A TANSOE IN THE VAULT O O AN EXTENAL SOUCE. THE LOAD SWITCH LOCATION UST BE CALCULATED O EACH VAULT SE- PAATELY. THE LOCATION DEPENDS UPON THE AOUNT O OIL IN THE EQUIPENT IN THE VAULT. EE THIS TO ENGINEEING. LOCATE ECEPTACLES AS HIGH AS POSSIBLE TO INIIZE THE POBABILITY O BEING SUBEGED. LOCATE USE ON O NEA THE CEILING USE IS 600 VOLT, 30 AP, 13/3" x 1 1/" NON-GLASS TYPE. CONNECTO, ITE 3, SCEWS DIECTLY INTO HUB. THE NEUTAL AY COE O ANY AVAILABLE SOUCE WITHIN THE VAULT I THE 10 VOLT SOUCE IS INTENAL. I THE SOUCE IS EXTENAL, IT UST INCLUDE A NEUTAL. CONSTUCTION STANDADS UNDEGOUND VAULT 10 VOLT WIING EVISIONS DATE ENG OPS 1 EDAWN IN CAD 3 of 3 UVE1 UVE1 DATE: 4/94 100

9 5 3 7 STO DAIN 10 6 LAST CONNECTION = ALE = EALE 3 PUP 1 NOTES: 1. ALL PIPE AND ITTINGS UST BE SCHEDULE 40 SEWE TYPE. SEWE AND WATE ITTINGS DON'T IT TOGETHE EXCEPT AT THEATED JOINTS.. THIS SPECIICATION IS TYPICAL ONLY. LOCATION O STO DAIN WILL DICTATE PIPE OUTING. 3. LOCATE CHECK VALVE CLOSE TO PUP AND IN THE VETICAL POSITION. 4. PUP UST BE IN VAULT SUP. 5. SEE UVE O ELECTICAL CONNECTIONS. 1 - EDAWN IN CAD CONSTUCTION STANDADS UNDEGOUND VAULT SUP PUP EVISIONS DATE ENG OPS 1 EDAWN IN CAD 1 of UVSP1 UVSP1 DATE: 4/9 100

10 ATEIAL LIST ITE QTY. DESCIPTION TD. 1 1 SUP PUP ADAPTE, ALE, " PLASTIC, SEWE 3 A PIPE, SEWE, PLASTIC, " CHECK VALVE, ", BONZE 5 1 COBINATION Y, ", PLASTIC 6 1 CLEANOUT ITTING ", PLASTIC 7 1 EDUCE, PLASTIC, SEWE, " x A.. A.. 1 1/4 BEND, PLASTIC, SEWE, " CLAP, PIPE, ", ONE BOLT CLEANOUT PLUG " A CONSTUCTION STANDADS UNDEGOUND VAULT SUP PUP EVISIONS DATE ENG OPS 1 EDAWN IN CAD of UVSP1 UVSP1 DATE: 4/9 100