1 Purpose and Scope Instructions for the application of Dex-O-Tex Posi- Tred CR slip-retardant finish over various types of surfaces including concrete, metal, ceramic tile as well as certain Dex-O-Tex floors. Posi-Tred CR is mixed at a rate of three parts Component "A" to two parts Component "B" by volume. Colors Available See Color Chart. Profiles Available Dex-O-Tex Posi-Tred CR is available in five different slip-retardant profiles ranging from Very Fine (having negligible slip-retardant qualities and designed primarily as a durable floor coating), Fine, Medium and Coarse. Mixing Ratio (Bulk Packaging) 3 parts Comp. A to 2 parts Comp. B by volume Brief of Installation (See Application Steps One through Three on following pages for detailed instructions) A. Prepare surfaces in accordance with instructions below. B. Apply AF Bondcoat by trowel, brush or squeegee. (Note: AF Bondcoat is not required when making application over Dex-O-Tex floors except when such floors have previously been finished with Dex-O-Tex D-C Dressing.) C. Apply Posi-Tred CR incorporating Grout Powder by trowel. D. Apply Posi-Tred CR incorporating Slip- Resistant Aggregate in profile as selected. Unit Packaging Posi-Tred CR Unit 5 Component A... (3 gal. Pail) Component B... (2 gal. Pail) NOTE: AF Bondcoat materials are not packaged for mixing within themselves. A separate mixing container is required. Bulk Packaging Posi-Tred CR, Bulk Component A... (5 gal. can) Component B... (5 gal. can) NOTE: Mixing Ratio is 3 parts Component A to 2 parts Component B. Posi-Tred Grout Powder (1/2 gal. can) or (5 gal. can) Posi-Tred S/R Aggregate (specify profile size) (1 pt. can) or (5 gal. can) Approximate Equivalents Grout Powder 5 gal. Can... =...1/2 gal. Cans S/R Aggregate 5 gal. Can... = pint Cans One Pt. Can S/R Aggregate... =... 2 lbs. One qt. Can S/R Aggregate... =... 4 lbs. One Unit 1 mixed... = gallon... mixed material One Mixed Gallon of Bulk... = Unit 1's One Mixed Gallon of Bulk... = Unit 2's Approximate Mixing Requirement for Grout & S/R Aggregate w/posi-tred CR Resin Grout SR Aggregate Size Weight Size Weight Unit 1 requires...1/2 gal or... 6 lbs... 1/2 pt (approx.)... 2 lbs. (approx.) Bulk Mixed Gallon...2/3 gal or... 8 pounds... 2/3 qt (approx.) lbs. (approx.) Material Packaging AF Bondcoat (specify color) Component A... (1 gal. Can) Component B... (1 qt. Can) Dex-O-Tex Application Specification Page 1 of 5 Posi-Tred CR

2 Approximate Quantity of Materials Required To Cover ONE HUNDRED SQ. FT (9.3 sq. meters) Description/Packaging Amount Required... Method A...Method B... (Trowel-Roller) (Trowel Broadcast) For Very Fine Profile: *AF Bondcoat....4 unit Posi-Tred CR units Posi-Tred Slip-Resistant Aggregate Very Fine pt. Can Posi-Tred Grout Powder can For Fine Profile: *AF Bondcoat....4 unit Posi-Tred CR units Posi-Tred Slip-Resistant Aggr. Fine pt can Posi-Tred Grout Powder can Medium Profile *AF Bondcoat....4 unit....4 unit Posi-Tred CR units units Posi-Tred Slip-Resistant Aggregate, Medium pt can pt can Posi-Tred Grout Powder can can For Coarse Profile * AF Bondcoat unit Posi-Tred CR units Posi-Tred Slip-Resistant Aggr Coarse pt can Posi-Tred Grout Powder can Notes: 1. AF Bondcoat is not required when applying over Dex-O-Tex floors except for those previously finished with Dex-O-Tex Quik-Glaze. 2. AF Bondcoat is furnished pigmented in color as selected. Equipment Required Mixing Buckets (2 gallon size preferred) 1/4 Electric Drill Jiffy Mixing Blade Paint Roller with Short-Nap Roller Covers Steel Trowels Protective Handcream Thermometer Surface Preparation A. Concrete: Clean of all dirt, grease, paint and foreign matter. Shot-blast or acid-etch surfaces (see Crossfield Products Corp. Specification S- 2). Note: Insure that concrete does not have hydrostatic pressure of water from beneath. B. Metal: Clean of all dirt, grease and foreign matter. C. Ceramic Tile: Clean of all dirt, grease and foreign matter. D. Dex-O-Tex Floors: Sand and vacuum in manner as for grouting. Job Site Survey A. Perform moisture testing in accordance with one of the following methods: ASTM F1869 Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride. Verify and document the results in accordance with the specification. If MVER exceeds 3 lbs./24 hrs./1000 sq. ft. and is under 10 lbs./24 hrs./1000 sq. ft., apply Dex- O-Tex VaporControl Primer 200 as per Application Specification S-970. If MVER exceeds 10 lbs./24 hrs./1000 sq. ft. and under 15 22* lbs./24 hrs./1000 sq. ft., apply VaporControl Primer 100 as per application specification S-972. ASTM F2170 Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes. Verify and document the results in accordance with the specification. If the insitu relative humidity (rh) of the substrate is greater than 75% and less than 84%, apply Dex-O-Tex VaporControl Primer 200 as per Application Specification S-970. If the insitu relative humidity (rh) is greater than 84%, and less than 89 99%*, apply VaporControl Primer 100 as per Application Specification S-972. *Apply VaporControl Primer 100 at the specified thickness required as per Application Dex-O-Tex Application Specification Page 2 of 5 Posi-Tred CR

3 Specification S-972 for the level of MVER or insitu relative humidity percentage of the substrate. B. Inspect substrate to verify proper preparation before applying any materials. C. Measure and record ambient temperature and humidity, surface temperature and the temperature of the material being used. Do not proceed with the application if the conditions are outside the recommended parameters. D. Inspect materials to be used. Verify material is the proper material and all components and sizes are correct. Inspect all containers and verify a proper factory seal with no signs of damage or leakage. Premix Liquid materials into a smooth homogenous blend before uses. Environmental Conditions All materials are mixed, applied and cured at the job site. Minimum environmental conditions are required to facilitate proper curing and Performance of the Products. Ensure conditions are in accordance with the following requirements. Ambient Min Max Temperature 45 O F 100 O F Relative Humidity 20% rh 85% rh Wind NA 30 mph Substrate Temperature 55 O F 90 O F Relative Humidity NA 78% MVER NA 3 lbs* Materials Temperature 60 O F 85 O F *3 lbs of MVT, per 1000 sq. ft., during 24 hr. period as measured by ASTM F1869. Materials should be delivered in original packages and containers with seals unbroken and bearing manufacturer's labels containing brand name and directions for storage and mixing with other components. Check materials immediately upon receipt, verify all the correct materials in the correct packaging are accounted for in good condition. Sort the materials and store them in a tempered storage area. STEP ONE - Bondcoat A. After the surface to be covered has been properly prepared, pour the contents of the can containing AF Bondcoat Component B into the can containing Component A. Blend thoroughly with a Jiffy mixer or other mechanical means for two (2) minutes. AF Bondcoat has a pot life of approximately one hour. The working time of the material will be lengthened if it is poured out of the mixing pail and either onto the surface and then worked from there, or else poured into a wide receptacle (such as a paint roller tray) and then worked from that.a unit of AF Bondcoat when applied with squeegee, will cover approximately 250 sq. ft. (23.23 sq. meters) over typically absorptive concrete. B. Apply AF Bondcoat by trowel, brush or hand squeegee. Apply only a thin coating. Apply evenly and remove all excess, leave no puddles. C. AF Bondcoat may be applied in one of several techniques: 1. Apply to small area in a very thin coat with squeegee or trowel immediately prior to application of Posi-Tred "CR" Grout. LEAVE NO PUDDLES. 2. Apply as above to large area and subsequently install Posi-Tred CR Grout over wet AF Bondcoat with mechanics working on knee-boards. 3. Apply as above, broadcast fine sand onto wet Bondcoat, allow to dry overnight, and apply Posi-Tred CR Grout over dry Bondcoat. STEP TWO - Posi-Tred CR Grout A. If using Unit 1 packaging, pour entire contents of the cans containing Posi-Tred CR, Components A & B into mixing bucket and blend thoroughly. Add to this mixture the entire contents of 1/2 gal. can containing Posi-Tred Grout Powder. Continue to mix. Blending time should be Dex-O-Tex Application Specification Page 3 of 5 Posi-Tred CR

4 approximately two minutes with a powder drill and puddle similar to a "Jiffy" blade to ensure thorough dispersing of the Components A & B with the Posi-Tred Grout Powder. If using bulk packaging, mix material at ratio of 3 parts Component A to 2 parts Component B. Scale up grout powder to 1.3 one-half gallon of mixed Posi-Tred. Pour mixed material onto the prepared surface and spread out evenly with a trowel or squeegee: Workability time is up to thirty (30) minutes depending upon room temperature. Typical spread rate per unit for Posi-Tred Grout coat will be approximately 100 sq. ft. (9.3 sq. meters) per unit. Spread rates vary depending on surface texture. Allow Posi-Tred Grout to set to hardness - minimum eight (8) hours. B. After Posi-Tred Grout has set, lightly and rapidly sand surface with disc sander mounting #60 grit paper. STEP THREE - Posi-Tred CR NOTE: Posi-Tred CR in medium profile may be installed in either of two methods described below. In general, Method A (Trowel-Roller) will produce the most uniformly textured surface. Method B (Trowel-Broadcast) will produce a more slipresistant surface. Posi-Tred CR Very Fine and Fine can be installed only by Method A. Posi-Tred CR Coarse can be installed only by Method B. METHOD A (Trowel-Roller) A. If using Unit 1 packaging, pour entire contents of the can containing Posi-Tred CR Components A&B into a mixing bucket and blend thoroughly, then add Slip-Resistant Aggregate in desired profile and quantity and blend until all dry particles are wetted. Blending time should be approximately three (3) minutes with a power drill and paddle similar to a "Jiffy" blade to ensure thorough dispersing of the Components A & B with Slip-Resistant Aggregate. Note: If using Bulk packaging, scale up Slip-Resistant Aggregate by a ratio of 1.3 times amount shown for Unit for each gallon of mixed Posi-Tred. B. Pour mixed material onto the previously grouted surface and spread out evenly with a trowel to the thickness of the largest aggregate. Workability time is up to thirty (30) minutes depending upon room temperature. Follow the troweled spread with a short-nap mohair roller to even out the texture and to eliminate trowel marks. Change roller covers as necessary. Spread rate per unit for this coat by the Trowel- Roller Method will be approximately: Unit Packaging One Mixed Gallon (Bulk) Very Fine Profile sq. ft sq. ft. Fine Profile sq. ft sq. ft. Medium Profile sq. ft sq. ft. C. For best results allow to dry for sixteen - twentyfour hours before opening to foot traffic. Maximum chemical cure will not result for seven (7) days. METHOD "B" (Trowel-Broadcast) A. Pour entire contents of Posi-Tred CR Component A and Component B into a mixing bucket and blend thoroughly. Blending time should be approximately two minutes with a power drill and mixing blade similar to a Jiffy blade to ensure thorough dispersing of Components A & B. B. Pour mixed material onto the prepared surface and spread out evenly with a trowel. Workability time is up to thirty (30) minutes depending upon room temperature. Spread rate per unit for this coat will be approximately 255 sq. ft. Dex-O-Tex Application Specification Page 4 of 5 Posi-Tred CR

5 C. Immediately, as the Posi-Tred CR material flows out, the Slip-Resistant Aggregates should be broadcast into the wet Posi-Tred Broadcasting aggregate may be accomplished by means of mechanical broadcaster or manually. Care must be taken to ensure uniformity of aggregate distribution. Follow the broadcasting by using a short-nap roller to even out the texture, coat the aggregate, and to eliminate trowel marks. Change roller covers as necessary. D. For best results allow to set for sixteen (16) hours before opening to foot traffic. Maximum cure and chemical resistance will not result for seven days. Cautions 1. Obtain, read and observe Material Safety Data Sheets for this product. 2. Obtain, read and observe Crossfield Specification S-900. DEX-O-TEX PRODUCT LINE Crossfield Products Corp. West Coast Office East Coast Office 3000 E. Harcourt Street 140 Valley Road Rancho Dominguez, CA Roselle Park, NJ fax fax Dex-O-Tex Application Specification Page 5 of 5 Posi-Tred CR