FitTech UP171F ELLIPTICAL (FOOTING) UP171I ELLIPTICAL (IN GROUND) UP171S ELLIPTICAL (SURFACE) Parts List

Size: px
Start display at page:

Download "FitTech UP171F ELLIPTICAL (FOOTING) UP171I ELLIPTICAL (IN GROUND) UP171S ELLIPTICAL (SURFACE) Parts List"

Transcription

1 ELLIPTICAL BASE COVER DESCRIPTION FOOTBUCK WELD ASS'Y HARDWARE COMPLETE HARDWARE COMPLETE HARDWARE COMPLETE /" ANCHOR ROD 3/" x " HEX HEAD CAP SCREW 3/" WEDGE ANCHOR 3/" ANCHOR BOLT 3/" FLATWASHER (" O.D.) 3/" LOCKWASHER UP7F ELLIPTICAL (FOOTING) UP7I ELLIPTICAL (IN GROUND) UP7S ELLIPTICAL (SURFACE) Parts List UP7F (FOOTING) UP7I (IN GROUND) 8 8 UP7S (SURFACE) PART NUMBER * 833* 638* 8* 88* 87* 873* Unless Otherwise Specified, All Units of Measure are Each Items listed below Hardware Complete line are included with Hardware Complete Number Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed. Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location. Any bolt end protruding more than two full threads beyond the face of the nut causes risk of clothing entanglement. Promptly cut-off flush, file smooth, and treat to prevent corrosion. Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete. Note: Loctite (supplied by others) should be used on any non-patch hardware. SPECIFICATIONS: BASE COVER: The Base Cover shall be constructed from aluminum and powder coated. BOLT CAP: The Bolt Cap shall be constructed from aluminum and powder coated. FOOTREST: The Footrest shall be constructed from injection molded Nylon W6. HANDLE GRIP: The Handle Grip shall be constructed from injection molded PVC. INSTRUCTIONS: The Instructions shall be constructed from aluminum produced by silk-screen printing. MAIN PIPE: The main frame shall be an all welded assembly fabricated from SPP (carbon steel pipe) and dual phase steel plate. The frame shall be powder coated. SADDLE: The Saddle shall be constructed from injection molded Nylon W6. HARDWARE: All nuts, bolts, screws, and lock washers used in the assembly shall be stainless steel, yellow dichromate plated steel, blue-coat plated steel, mechanically galvanized or powder coated/yellow dichromate plated steel. All primary fasteners shall be 3 alloy stainless steel. Fasteners with yellow dichromate treatment have an electro-deposited, 99.9% pure zinc substrate applied from a specially formulated solution sealed with a yellow dichromate top coat designed to work in conjunction with the zinc plating. Issued/Revised: 8/3/

2 UP7F ELLIPTICAL (FOOTING) UP7I ELLIPTICAL (IN GROUND) UP7S ELLIPTICAL (SURFACE) NOTE: Do not overtighten bolts. To overtighten may cause buckling or dimpling of some parts. NOTE: Read installation instructions thoroughly before starting assembly. Pour concrete only after final assembly is completed. Bracing material is required during assembly. NOTE: Assembly and leveling times will be greatly reduced if a transit is used to set location and depth of ground holes. INSTALLATION INSTRUCTIONS FOR UP7F (FOOTING):. Dig holes or drill holes according to Plan View and Elevation View. NOTE: Due to extremes in weather and soil conditions, hole size may have to be increased to meet local conditions.. Fill hole with concrete. While the concrete is still soft, yet firm enough to support the Elliptical, Place () Anchor Bolts of the Elliptical in postion. See Footing Detail. NOTE: Use Elliptical as a template for Anchor Bolt location, then remove Elliptical. IMPORTANT: DO NOT MOUNT THE ELLIPTICAL TO THE ANCHOR BOLTS FOR AT LEAST 7 DAYS. 3. After concrete has cured and set for a minimum of 7 Days, attach Elliptical to 3/" Anchor Bolt using 3/" Flat Washer (" O.D.), 3/" Lock Washer, and 3/" Hex Nut. See Footing Assembly Detail.. Attach Base Cover to Equipment Post using Base Cover Nut and Base Cover Bolt included with Base Cover. See Base Cover Detail. INSTALLATION INSTRUCTIONS FOR UP7I (IN-GROUND):. Dig holes or drill holes according to Plan View and Elevation View. NOTE: Due to extremes in weather and soil conditions, hole size may have to be increased to meet local conditions.. Attach the Footbuck Weld Assembly to the Elliptical using 3/" Hex Nut, 3/" Lockwasher, 3/" Flatwasher (" O.D.), 3/" x " Hex Head Cap Screw. See In-Ground Assembly Detail. 3. Place Elliptical into hole making sure it rests on the brick. See In-Ground Detail.. Level Elliptical using sway bracing.. Pour concrete according to the Plan View and Elevation View. Allow concrete to cure for a minimum of 7 days. 6. Attach Base Cover to Equipment Post using Base Cover Detail. INSTALLATION INSTRUCTIONS FOR UP7S (SURFACE):. Mark correct location of holes for Wedge Anchor using the Base Plate as a guide.. Drill 3/" x /" hole in concrete for Wedge Anchor. See Surface Detail. 3. Insert Wedge Anchors and secure with 3/" Flatwasher (" O.D.), 3/" Lockwasher, and 3/" Hex Nut. See Surface Assembly Detail.. Attach Base Cover to Equipment Post using Base Cover Detail. Issued/Revised: 8/3/

3 UP7F ELLIPTICAL (FOOTING) UP7I ELLIPTICAL (IN GROUND) UP7S ELLIPTICAL (SURFACE) MAINTENANCE PROCEDURE: Periodically check hardware for tightness, and tighten as necessary. Always check all parts for breakage or wear, and immediately put equipment out of service until any faulty parts found are repaired or replaced. Also Check all metal parts for rust, paint loss and touch-up if necessary with paint. Check for welded areas and verify integrity. Check periodically resilient surfacing for appropriate depth and remove extraneous materials that could cause injury, infection, or disease. Maintain detailed installation, inspection, maintenance, and repair records for each public-use playground equipment. ELLIPTICAL (68) BASE COVER (67) Issued/Revised: 8/3/3 FINISHED ASSEMBLY

4 UP7F ELLIPTICAL (FOOTING) UP7I ELLIPTICAL (IN GROUND) UP7S ELLIPTICAL (SURFACE) 8 in [.7 cm] 9 in [.8 cm] in [6.96 cm] in [6.96 cm] PLAN VIEW UP7F (FOOTING) 9 7 /8 in [6.3 cm] 7 3/6 in [8.6 cm] in [6.96 cm] in [6.96 cm] ELEVATION VIEW UP7F (FOOTING) Issued/Revised: 8/3/

5 UP7F ELLIPTICAL (FOOTING) UP7I ELLIPTICAL (IN GROUND) UP7S ELLIPTICAL (SURFACE) 8 in [.7 cm] 9 in [.8 cm] in [6.96 cm] in [6.96 cm] PLAN VIEW UP7I (IN GROUND) 9 8 /8 in [7.7 cm] IN GROUND MOUNT MUST HAVE 3" OF SURFACING 7 /6 in [9.6 cm] in [6.96 cm] in [6.96 cm] Issued/Revised: 8/3/3 ELEVATION VIEW UP7I (IN GROUND)

6 UP7F ELLIPTICAL (FOOTING) UP7I ELLIPTICAL (IN GROUND) UP7S ELLIPTICAL (SURFACE) 8 in [.79 cm] 9 in [.86 cm] PLAN VIEW UP7S (SURFACE) 7 /8 in [6.3 cm] 9 7 3/6 in [8.6 cm] EXISTING CONCRETE MUST BE " MINIMUM DEPTH Issued/Revised: 8/3/3 ELEVATION VIEW UP7S (SURFACE)

7 INCH 3 6 CM 3 (88) 3/" LOCKWASHER (873) 3/" FLATWASHER (" O.D) (87) UP7F ELLIPTICAL (FOOTING) UP7I ELLIPTICAL (IN GROUND) UP7S ELLIPTICAL (SURFACE) BASE PLATE CONCRETE REQUIRED:.3 CUBIC YARDS.8 CUBIC METERS 3/" FLATWASHER (" O.D.) (87) (88) " EARTH CONCRETE (CURE 7 DAYS MIN.) NOTE: -SLOPED FOOTING IS A REQUIREMENT OF EUROPEAN STANDARD EN76- ONLY. -SUGGESTED MINIMUM CONCRETE RATING 3 PSI 3/" ANCHOR BOLT (8) " FOOTING DETAIL UP7F (FOOTING) (88) 3/" LOCKWASHER (873) 3/" FLATWASHER (" O.D.) (87) 3/" FLATWASHER (" O.D.) (87) (88) 3/" ANCHOR BOLT (8) Issued/Revised: 8/3/3 FOOTING ASSEMBLY DETAIL UP7F (FOOTING)

8 INCH 3 6 CM IN-GROUND MOUNT MUST HAVE 3" OF SURFACING UP7F ELLIPTICAL (FOOTING) UP7I ELLIPTICAL (IN GROUND) UP7S ELLIPTICAL (SURFACE) BASE PLATE 3/" x " HEX HEAD CAP SCREW (833) 3/" FLATWASHER (" O.D.) (87) 3/" LOCKWASHER (873) " [6.96 cm] (88) EARTH /" ANCHOR ROD (338) CONCRETE REQUIRED:.3 CUBIC YARDS.3 CUBIC METERS CONCRETE " [6.96 cm] IN GROUND DETAIL UP7I (IN GROUND) 3/" x " HEX HEAD CAP SCREW (833) BRICK OR EQUIVALENT FOOTBUCK WELD ASSEMBLY (667) NOTE: -SLOPED FOOTING IS A REQUIREMENT OF EUROPEAN STANDARD EN76- ONLY. -SUGGESTED MINIMUM CONCRETE RATING 3 PSI. 3/" FLATWASHER (" O.D.) (87) 3/" LOCKWASHER (873) (88) Issued/Revised: 8/3/3 /" ANCHOR ROD (338) IN GROUND ASSEMBLY DETAIL UP7I (IN GROUND)

9 INCH 3 6 CM 3/" FLATWASHER (" O.D.) (87) UP7F ELLIPTICAL (FOOTING) UP7I ELLIPTICAL (IN GROUND) UP7S ELLIPTICAL (SURFACE) (88) 3/" LOCKWASHER (873) BASE PLATE WIRE MESH WEDGE ANCHOR (638) SUBSTANTIAL COMPACT SUBGRADE SURFACE DETAIL UP7S (SURFACE) EXISTING CONCRETE MUST BE MINIMUM 3, PSI, " MINIMUM DEPTH, WITH WIRE MESH REINFORCEMENT. MINIMUM 7 DAYS CURE-FULL CURE AFTER 8 DAYS. (88) 3/" LOCKWASHER (873) USE BASE PLATE AS A GUIDE FOR HOLE LOCATION 3/" FLATWASHER (" O.D.) (87) DRILL 3/" x /" HOLE IN CONCRETE TO RECEIVE WEDGE ANCHORS 3/" WEDGE ANCHOR (638) Issued/Revised: 8/3/3 SURFACE ASSEMBLY DETAIL UP7S (SURFACE)

10 INCH 3 6 CM UP7F ELLIPTICAL (FOOTING) UP7I ELLIPTICAL (IN GROUND) UP7S ELLIPTICAL (SURFACE) BASE COVER NUT BASE COVER EQUIPMENT POST BASE COVER BOLT BASE COVER BOLT NOTE: BASE COVER BOLT AND BASE COVER NUT ARE INCLUDED WITH BASE COVER. BASE COVER NUT BASE COVER BASE COVER DETAIL Issued/Revised: 8/3/