NYC Department of Education

Size: px
Start display at page:

Download "NYC Department of Education"

Transcription

1 Architectural Inspection Building Assessment Survey Asset: P.S BROOKLYN, 3000 WEST 1 STREET, New York, Inspection Id Inspection Type Time In Last Edited Asset Data Architectural - Senior :02 AM :22 PM Architectural - Associate :48 AM :24 PM Was the building fully accessible for inspection Principal(s) Information Custodian Fireman Principal Name Organization Did you meet with this Principal? Did this Principal provide feedback? Summary of Principal's Feedback Answer Yes Susan Miller P.S Brooklyn Yes Yes Assistant Principal, Hope Smith provided the following comments on behalf of the Principal: 1. The wooden Cafeteria Flooring is warped in several areas and the entire Floor needs to be replaced. 2. The illumination in the Auditorium is very insufficient with no operable stage lighting. The Auditorium needs a lighting upgrade. 3. The Auditorium Audio/Visual system is antiquated and not functioning and needs to be replaced with one based on today's standards. Louis Granato Eli Santiago Building Square Footage Comments on the Area Comments on the Stories (Floors) plus Basements Comments on the Number of Classrooms 18 None Comments on the Year Built 1921 Student Population 98 Staff Population 91 Weather Facade Photo 4+PH (No Basement) Fair West 1st Street - North view PB/A&W Page 1 of 35

2 Main Entrance Photo Building Assessment Survey Roof Photo Facade A - West 1st Street Roof 1 - North view Have any Systems/Major Building Components been upgraded? Yes Systems: Four Side Entrance (Stair E) Doors replaced Year: 2018 Systems: Four Main Entrance Doors replaced Year: 2014 Systems: Exterior Modernization Project including Lower Roofing, Flashing, Barriers, Leaders and Gutters replacement; Higher Roofing perimeter replacement, Parapets, Coping, Bulkheads refaced with metal panels; Exterior Walls and Chimney Brick veneer replacement; Exterior Paving replacement; Foundation Waterproofing; Windows, Window Guards Year: 2012 Systems: Auditorium upgrade including Seating and partial vinyl Flooring replacement Year: 2008 Systems: Partial Exterior Wall repairs; Roofing and Flashing replacement. Year: 1997 Systems: Exterior Door replacement; Parapet replacement; New Elevator and Roofing repairs. Year: 1994 PB/A&W Page 2 of 35

3 Building Assessment Survey Architectural Inspection Have there been any New Building Additions? No Tandem Schools? No Leased Space? No Priority Priority Exist Last Year? Priority Category Description Component Affected Location Description Person(s) Notified Person(s) Title PhotoImage Yes Potential Falling Debris Deteriorated concrete floor structure with exposed reinforcing steel is a potential falling debris hazard. INTERIOR STRUCTURAL ROOF STRUCTURE Basement Gas Meter Room B2 Eli Santiago Fireman Structural Engineer Required Structural Type Description Component Affected Location Description Person(s) Notified Person(s) Title PhotoImage No condition recorded Accessibility Accessibility Status Is the primary or secondary entrance on an accessible route? Is the building a multi-story building? Are all floors of the building accessible through compliant means? Accessible classrooms exists on each floor? Boys and Girls or Unisex accessible toilets exist on at least every other floor? If the following spaces exist, are they ALL accessible? Art Room, Auditorium, Cafeteria, Computer, Gymnasiums, Library, Multipurpose Room, Science Labs Yes Yes Yes Yes Yes Yes Physical Breakdown Structure Exists Complies Required FUNCTIONAL ACCESSIBILITY Exterior Routes Exterior Entrances & Exits Yes Exterior H/C Lifts No No Exterior Ramps and Railings Yes Yes Interior Routes Corridor and Lobby H/C Lifts No No Interior Corridor Doors and Hardware Yes Yes Interior Corridors and Lobbies Yes Interior Elevators Yes Yes Interior Lobby Doors and Hardware Yes Interior Ramps No Rooms & Spaces Art Rooms Room 408 Yes Auditorium 2nd Floor No Wheelchair Parking Cafeteria 1st Floor Yes Classrooms 2nd to 4th Floor Yes Computer Rooms No Gymnasium 3rd Floor Yes Library No PB/A&W Page 3 of 35

4 Building Assessment Survey Physical Breakdown Structure Exists Complies Required Rooms & Spaces Main Office Room 207 Yes Multi-purpose Room No Nurse's Room Room 102 Yes Pool No Science Lab No Toilet Rooms (Boys) 1st - 4th Floor Yes Toilet Rooms (Girls) 1st - 4th Floor No Insufficient Latch Clearance Toilet Rooms (Staff) 1st - 4th Floor Yes Building Template Inspection Architectural EXTERIOR AREAWAY AWNINGS AND CANOPIES CHIMNEY Material Type(s) COPING CORNICE DOORS DOORS AND FRAMES Masonry 1 - Good 1 - Good PB/A&W Page 4 of 35

5 EXTERIOR DOORS DOORS AND FRAMES Roof Plan reference Building Assessment Survey Between Fair and Poor METAL CLAD: DETERIORATED DOOR - MAJOR DETERIORATION Quantity 2 EACH Urgency of Action PRIORITY 4 Photo1 Roof Plan reference Façade F - East Exit METAL CLAD: DETERIORATED DOOR AND FRAME - MAJOR DETERIORATION Quantity 2 EACH Urgency of Action PRIORITY 4 PB/A&W Page 5 of 35

6 EXTERIOR DOORS DOORS AND FRAMES Photo1 Building Assessment Survey East Exit DOOR HARDWARE LINTELS TRANSOM/SIDE LIGHT EXTERIOR WALLS Material Type(s) Masonry Replacement Quantity 17,000 Replacement Uom Instance on All Facades Instance 3 - Fair Instance Quantity 17,000 Instance BRICK: WATER INFILTRATION IN INSTRUCTIONAL SPACE Roof Plan reference PB/A&W Page 6 of 35

7 EXTERIOR EXTERIOR WALLS Elevation Building Assessment Survey Quantity 20 REPAIR Urgency of Action PRIORITY 5 Photo1 Roof Plan reference Façade H - Room 209 BRICK: OPEN JOINTS Elevation Quantity 250 REPOINT PB/A&W Page 7 of 35

8 Building Assessment Survey Architectural Inspection EXTERIOR EXTERIOR WALLS Photo1 Facade B EXTERIOR SOFFITS LOADING DOCK LOUVER PARAPETS Material Type(s) Masonry Replacement Quantity 4,000 Replacement Uom Instance on All Facades Instance C.F. Instance Quantity 4,000 Instance PLAZA DECK ROOF Roofing C.F. Replacement Quantity 15,000 Replacement Uom ROOF HATCH/SMOKE HATCH LEADERS, GUTTERS, DOWNSPOUTS, SCUPPERS ROOF BARRIER ROOF CAGE ROOF FENCE ROOFING Instance on Modified Bitumen: All Roofs Instance 1 - Good 3 - Fair Instance Quantity 15,000 PB/A&W Page 8 of 35

9 EXTERIOR ROOF Roofing ROOFING Instance Does the roof have major mechanical equipment sitting on Dunnage Steel less than 18" above the Roofing? Installation Year 1997 Source of Installation Location/Instance Yes Documented Quantity 15,000 MODIFIED BITUMEN: ROOFING: BEYOND USEFUL LIFE Modified Bitumen: All Roofs Urgency of Action PRIORITY 1 Photo1 Building Assessment Survey No photo recorded ROOFING DRAINS Specialties BULKHEAD/PENTHOUSE Roof Plan reference 3 - Fair BULKHEAD/PENTHOUSE WALLS/INTERIOR: GYPSUM BOARD DAMAGED/DETERIORATED Quantity 20 MAINTENANCE Photo1 PB/A&W Page 9 of 35 BH1

10 EXTERIOR ROOF Specialties BULKHEAD/PENTHOUSE Building Assessment Survey Roof Plan reference BULKHEAD/PENTHOUSE WALLS/INTERIOR: PLASTER CRACKS/SPALLING Quantity 20 MAINTENANCE Photo1 Roof Plan reference BH2 BULKHEAD/PENTHOUSE WALLS/INTERIOR: BRICK CRACKS/SPALLING Quantity 10 MAINTENANCE PB/A&W Page 10 of 35

11 EXTERIOR ROOF Specialties BULKHEAD/PENTHOUSE Photo1 Building Assessment Survey CUPOLA/ SPIRES/ TOWERS DORMER DUNNAGE STEEL Roof Plan reference PH1 3 - Fair MINOR RUSTING Quantity 50 L.F. MAINTENANCE Photo1 Roof 1 HEIGHT LESS THAN 18" PB/A&W Page 11 of 35

12 EXTERIOR ROOF Specialties DUNNAGE STEEL Roof Plan reference Building Assessment Survey Quantity 60 L.F. Urgency of Action PRIORITY 1 Purpose of Action LEVEL 1 Photo1 Roof 1 SKYLIGHT/ROOF VENT ROOF/GRAVITY TANK STAIRS/RAMPS: EXTERIOR BUILDING CHEEK/FLANK WALLS RAILINGS STAIRS/RAMPS WINDOWS Replacement Quantity 2,500 Replacement Uom EXTERIOR GUARDS LINTELS WINDOWS Material Type(s) Instance on Aluminum - Double Hung: All Facades Aluminum PB/A&W Page 12 of 35

13 Building Assessment Survey Architectural Inspection EXTERIOR WINDOWS WINDOWS Instance 1 - Good Instance Quantity 2,500 Instance Installation Year 2012 Source of Installation Documented INTERIOR POOLS STRUCTURAL COLUMNS/BEAMS/BEARING WALLS Location/Instance Quantity 20 STEEL COLUMNS/BEAMS: DETERIORATED MASONRY FIREPROOFING 1st Floor Purpose of Action LEVEL 5 Photo1 Emergency Generator Room FLOOR STRUCTURE FOUNDATION WALLS Material Type(s) Masonry ROOF STRUCTURE 3 - Fair STEEL COLUMNS/BEAMS: MINOR RUSTING Location/Instance Roof 1 Quantity 20 REPAIR AND REPAINT Purpose of Action LEVEL 5 PB/A&W Page 13 of 35

14 INTERIOR STRUCTURAL ROOF STRUCTURE Photo1 Building Assessment Survey Roof 1 PH1 Location/Instance Quantity 30 CONCRETE: CRACKED/SPALLED/REINFORCEMENT EXPOSED Room B2 - Near Boiler Room REPAIR Urgency of Action PRIORITY 5 Purpose of Action LEVEL 6 Photo1 VAULTS-BUNKERS AUDITORIUM Instance on 2nd Floor seats Ceiling Instance on 2nd Floor seats Door(s) Instance on 2nd Floor seats Fixed H/C Lift Instance on 2nd Floor seats Fixed Seating Instance on 2nd Floor seats Gas Meter Room shown, also in Boiler Room PB/A&W Page 14 of 35

15 Building Assessment Survey Architectural Inspection INTERIOR AUDITORIUM Fixed Seating Floor Finish Instance on 2nd Floor seats VINYL TILES: BROKEN/DETERIORATED/MISSING TILES Location/Instance Near the Entrance, Near the windows Quantity 40 Photo1 Near the Entrance Sliding-folding Partition Instance on 2nd Floor seats Stage Instance on 2nd Floor seats Stage Instance on 2nd Floor seats Stage Curtain Rigging Instance on 2nd Floor seats Stage Curtains Instance on 2nd Floor seats 3 - Fair WORN/DETERIORATED Location/Instance Stage Left Quantity 100 PB/A&W Page 15 of 35

16 INTERIOR AUDITORIUM Stage Stage Curtains Photo1 Building Assessment Survey Stage Left Walls Instance on 2nd Floor seats Window Curtains/Shades/Blinds Instance on 2nd Floor seats CAFETERIA Instance on 1st Floor Ceiling Instance on 1st Floor PLASTER: CRACKS/SPALLING Location/Instance Near the Kitchen Quantity 10 Photo1 Door(s) Instance on 1st Floor Near the Kitchen PB/A&W Page 16 of 35

17 Building Assessment Survey Architectural Inspection INTERIOR CAFETERIA Fixed Equipment Instance on 1st Floor Floor Finish Instance on 1st Floor 3 - Fair WOOD: DAMAGED/DETERIORATED Location/Instance Near the Kitchen, Near the drinking fountain Quantity 200 Photo1 Near the Kitchen Sliding-folding Partition Instance on 1st Floor Stage Walls Location/Instance Quantity Poor MECHANISM/TRACKS: DAMAGED/INOPERABLE Near the Kitchen L.F. Photo1 Instance on 1st Floor Instance on 1st Floor Window Curtains/Shades/Blinds Instance on 1st Floor CLASSROOMS/CORRIDORS/ADMIN SPACES Ceiling No photo recorded PLASTER: CRACKS/SPALLING Location/Instance Corridor near Stair E/3 PB/A&W Page 17 of 35

18 Building Assessment Survey Architectural Inspection INTERIOR CLASSROOMS/CORRIDORS/ADMIN SPACES Ceiling Quantity 20 Photo1 Corridor near Stair E/3 GYPSUM BOARD: DAMAGED/DETERIORATED Location/Instance Inside Room 402 Quantity 10 Photo1 Inside Room 402 Door(s) 5 - Poor METAL: DETERIORATED DOOR Location/Instance Room 203, 305, 308 Quantity 3 EACH MAINTENANCE Photo1 Location/Instance No photo recorded WOOD: DETERIORATED DOOR Main Entrance Vestibule PB/A&W Page 18 of 35

19 Building Assessment Survey Architectural Inspection INTERIOR CLASSROOMS/CORRIDORS/ADMIN SPACES Door(s) Quantity 1 EACH MAINTENANCE Photo1 Main Entrance Vestibule Floor Finish 3 - Fair VINYL TILES: BROKEN/DETERIORATED/MISSING TILES Location/Instance Room 109 Quantity 100 Photo1 Room 109 VINYL TILES: DETERIORATED SUBSTRATE Location/Instance Corridor near Stair E/1. Corridor near Room 101, 107. Room 202, 302, and others Quantity 600 PB/A&W Page 19 of 35

20 Building Assessment Survey Architectural Inspection INTERIOR CLASSROOMS/CORRIDORS/ADMIN SPACES Floor Finish Photo1 Corridor near Stair E/1 TERRAZZO: CRACKS Location/Instance Main Entrance Lobby, 2nd Floor Auditorium Lobby Quantity 300 Photo1 Main Entrance Lobby Walls PLASTER: CRACKS/SPALLING - ACTIVE LEAK Location/Instance Room 209 Quantity 50 Urgency of Action PRIORITY 5 Photo1 PB/A&W Page 20 of 35

21 Building Assessment Survey Architectural Inspection INTERIOR CLASSROOMS/CORRIDORS/ADMIN SPACES Walls Room 209 PLASTER: CRACKS/SPALLING Location/Instance Inside Room 402 Quantity 10 Photo1 Inside Room 402 Specialties Classroom Locker(s) Fixed Seating GYMNASIUM Instance on 3rd Floor Ceiling Instance on 3rd Floor Door(s) Instance on 3rd Floor 3 - Fair METAL: DETERIORATED DOOR Location/Instance Storage Room Quantity 1 EACH MAINTENANCE PB/A&W Page 21 of 35

22 INTERIOR GYMNASIUM Door(s) Photo1 Building Assessment Survey Storage Room Fixed Equipment Instance on 3rd Floor Floor Finish Instance on 3rd Floor Seating Instance on 3rd Floor Sliding-folding Partition Instance on 3rd Floor Stage Instance on 3rd Floor Walls Instance on 3rd Floor Window Curtains/Shades/Blinds Instance on 3rd Floor INTERIOR DOOR HARDWARE 3 - Fair INTERIOR GUARDS 3 - Fair DETERIORATED/TORN-OUT/MISSING Location/Instance Stair B/3, E/4 Quantity 80 PB/A&W Page 22 of 35

23 INTERIOR INTERIOR GUARDS Photo1 Building Assessment Survey Stair E/4 KITCHEN Ceiling Instance on 1st Floor Instance on 1st Floor Door(s) Instance on 1st Floor Floor Finish Instance on 1st Floor Walls Instance on 1st Floor LIBRARY LOCKER ROOM MULTI-PURPOSE ROOM SCIENCE DEMO ROOM SCIENCE LAB SCIENCE PREP ROOM SHOWER ROOM STAIRS/RAMPS: INTERIOR Ceiling Do Letter Stair Signs Exist? Door(s) Partition Yes Location/Instance Stair E/4 GLASS PANEL: DAMAGED/DETERIORATED PB/A&W Page 23 of 35

24 Building Assessment Survey Architectural Inspection INTERIOR STAIRS/RAMPS: INTERIOR Partition Quantity 10 Photo1 Stair E/4 Railings Stairs and Landings 5 - Poor METAL: RUST - MAJOR Location/Instance Stair E/1 Quantity 40 Photo1 No photo recorded ROLLED ASPHALT: CRACKS Location/Instance Stair B/Bulkhead, C/1, 2, E/Bulkhead, D/2, and others Quantity 300 Photo1 Stair B/Bulkhead PB/A&W Page 24 of 35

25 INTERIOR STAIRS/RAMPS: INTERIOR Stairs and Landings Building Assessment Survey VINYL TILES: BROKEN/DETERIORATED/MISSING TILES Location/Instance Stair B/Bulkhead Quantity 10 Photo1 Stair B/Bulkhead VINYL TILES: DETERIORATED SUBSTRATE Location/Instance Stair E/1 Quantity 30 Photo1 Stair E/1 Walls TOILET ROOMS - STAFF Ceiling Location/Instance Quantity 10 ACOUSTIC TILES: DAMAGED/MISSING Room 406A PB/A&W Page 25 of 35

26 Building Assessment Survey Architectural Inspection INTERIOR TOILET ROOMS - STAFF Ceiling Photo1 Room 406A Door(s) Floor Finish Stalls Walls TOILET ROOMS - STUDENTS Ceiling Door(s) Floor Finish CERAMIC TILE: BROKEN/MISSING TILES Location/Instance 1st Floor Girls Quantity 10 PB/A&W Page 26 of 35

27 INTERIOR TOILET ROOMS - STUDENTS Floor Finish Photo1 Building Assessment Survey st Floor Girls Stalls 3 - Fair BROKEN/MISSING Location/Instance 3rd Floor Girls Quantity 1 EACH Photo1 3rd Floor Girls Walls LIFE SAFETY F.D. HOLDING AREA STEEL STAIRS SITE CONTAINERIZATION Location/Instance Quantity Between Fair and Poor FENCING MISSING Parking Lot INSTALL NEW PB/A&W Page 27 of 35

28 SITE CONTAINERIZATION Photo1 Building Assessment Survey Parking Lot Drainage System for Asphalt Drainage System for Concrete Catch Basins/Manhole - Surrounded by concrete 5 - Poor BLOCKED Location/Instance North side Quantity 1 EACH MAINTENANCE Photo1 North side DAMAGED COVER Location/Instance South Side, Parking Lot Quantity 2 EACH Urgency of Action PRIORITY 5 Purpose of Action LEVEL 6 PB/A&W Page 28 of 35

29 Building Assessment Survey Architectural Inspection SITE Drainage System for Concrete Catch Basins/Manhole - Surrounded by concrete Photo1 Parking Lot Culverts - Concrete Covering Drainage System for Soil Catch Basins/Manhole - Surrounded by Soil Culverts - Soil Covering DRINKING FOUNTAINS FENCES 4 - Between Fair and Poor CHAIN LINK: DAMAGED/DETERIORATED Location/Instance West 2nd Street, West Side Quantity 100 Photo1 West Side CHAIN LINK: RUST - MAJOR Location/Instance West 2nd Street Quantity 600 PB/A&W Page 29 of 35

30 SITE FENCES Photo1 Building Assessment Survey West 2nd Street IRRIGATION SYSTEM PAVING Student Non-Use Gravel Exists? No Asphalt Concrete DAMAGED/DETERIORATED/MISSING SECTIONS Location/Instance Parking Lot Quantity 25 Photo1 Parking Lot Pavers Student Use Gravel Exists? Yes Site Sidewalks & Walkways Asphalt LOCALIZED SINK AREA Location/Instance Near the Entrance Quantity 20 REPAIR PB/A&W Page 30 of 35

31 Building Assessment Survey Architectural Inspection SITE PAVING Site Sidewalks & Walkways Asphalt Photo1 Near the Entrance CRACKS - MAJOR Location/Instance Near the Entrance Quantity 10 Photo1 Near the Entrance HEAVING Location/Instance Near the Entrance Quantity 10 PB/A&W Page 31 of 35

32 SITE PAVING Site Sidewalks & Walkways Asphalt Photo1 Building Assessment Survey Near the Entrance Concrete 3 - Fair DAMAGED/DETERIORATED/MISSING SECTIONS Location/Instance Main Entrance Quantity 50 Photo1 Main Entrance Pavers DOT Sidewalk Asphalt Concrete 4 - Between Fair and Poor DAMAGED/DETERIORATED/MISSING SECTIONS Location/Instance West 2nd Street Quantity 825 PB/A&W Page 32 of 35

33 SITE PAVING DOT Sidewalk Concrete Photo1 Building Assessment Survey West 2nd Street Pavers PLAYGROUNDS PLAYING SURFACE RETAINING WALLS Are there any Retaining Walls 6' OR higher facing public street/sidewalk? Location/Instance Quantity 10 No CAST IN PLACE CONCRETE: CRACKS/SPALLING - MAJOR North side Photo1 North side Location/Instance Quantity 10 CAST IN PLACE CONCRETE: DETERIORATED EXPANSION JOINT Parking Lot L.F. PB/A&W Page 33 of 35

34 SITE RETAINING WALLS Photo1 Building Assessment Survey Parking Lot SEATING SITE WALLS (NOT RETAINING WALLS) STAIRS/RAMPS: EXTERIOR Railings 3 - Fair DAMAGED Location/Instance Parking Lot Quantity 10 L.F. Photo1 Parking Lot Site Cheek/flank Walls CAST IN PLACE CONCRETE: CRACKS/SPALLING - MAJOR Location/Instance Exit to West 2nd Street Quantity 40 PB/A&W Page 34 of 35

35 SITE STAIRS/RAMPS: EXTERIOR Site Cheek/flank Walls Photo1 Building Assessment Survey Stairs/ramps Exit to West 2nd Street PB/A&W Page 35 of 35