1 Architectural Inspection Building Assessment Survey Asset: P.S MANHATTAN, 71 HESTER STREET, New York, Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior :41 AM :15 PM AA : Architectural - Associate :15 AM :17 PM Asset Data Was the building fully accessible for inspection Principal(s) Information Custodian Fireman Principal Name Organization Did you meet with this Principal? Did this Principal provide feedback? Summary of Principal's Feedback Answer Yes May Lee Building Square Footage Comments on the Area Comments on the Stories (Floors) plus Basements 5+B Comments on the Number of Classrooms 39 P.S Manhattan Yes Yes The Principal expressed the following concerns regarding the functionality of the building 1.Staff and Student Toilets are very old and need to be modernized. Fixtures do not properly work and leaks are frequent. 2. Main Lobby on the 2nd Floor has a crack in the ceiling. 3. Main Lobby light has no diffuser. 4.Electrical upgrade is needed. Air ing units were installed but have no outlets to power them. 5 Gym wall matting needs to be replaced. The present ones do not protect students from the columns or walls.6. Water Fountains need to be replaced. Present ones are unsanitary to use. 7. Flagpole cannot be accessed from the building. School cannot attach the flag. 8. New Safety Surfacing has covered the yard drains. This is causing a pounding condition. Joanne O'Neill Juan Curbelo None Comments on the Year Built 1899 Student Population 670 Staff Population 79 Weather Facade Photo Fair View from Hester and Orchard Street PB/A&W Page 1 of 42

2 Main Entrance Photo Building Assessment Survey Roof Photo Hester Street Have any Systems/Major Building Components been upgraded? Have there been any New Building Additions? Tandem Schools? Leased Space? Priority Roof 1 Yes Systems: Play Equipment Safety Surfacing. Year: 2017 Systems: Floor Structure repairs, partial new concrete paving in Schoolyard, 1st Floor Multi Purpose Room flooring replacement, new 1st Floor Interior Stair Doors. Year: 2010 Systems: Basement Flood Elimination Year: 2008 Systems: Roofing and Window replacement, Exterior Door replacement (except main entrance doors). Year: 2002 Systems: Plaza Deck Year: 1997 No No No Priority Exist Last Year? Priority Category Description Component Affected Location Description Person(s) Notified Person(s) Title PhotoImage PB/A&W Page 2 of 42

3 Building Assessment Survey Architectural Inspection Last Year? No Potential Falling Debris Open Brick joints with loose brick at archway is a potential safety hazard. SITE SITE WALLS (NOT RETAINING WALLS) Archway above Ramp on Ludlow Street Joanne O'Neill Custodian No Tripping Hazard Severely damaged DOT Sidewalk curb with metal edge is a potential safety hazard. SITE PAVING DOT Sidewalk Concrete Along Hester Street at Main Entrance Joanne O'Neill Custodian Yes Tripping Hazard Protruding metal on DOT Sidewalk is a potential safety hazard. SITE PAVING DOT Sidewalk Concrete Along Orchard Street Joanne O'Neill Custodian Structural Engineer Required Structural Type Description Component Affected Location Description Person(s) Notified Person(s) Title PhotoImage No condition recorded Accessibility Accessibility Status Is the primary or secondary entrance on an accessible route? Is the building a multi-story building? Are all floors of the building accessible through compliant means? Are SOME floors other than the 1st floor and basement accessible through compliant means? Do any of the following spaces exist on the First floor? Classroom, Art Room, Auditorium, Cafeteria, Computer, Gymnasiums, Library, Multipurpose Room, Science Labs For the rooms that do exist, are SOME of them accessible on the 1st floor? Yes Yes No No Yes No Physical Breakdown Structure Exists Complies Required FUNCTIONAL ACCESSIBILITY Exterior Routes Exterior Entrances & Exits No Door width < 36" Exterior H/C Lifts No No Exterior Ramps and Railings Yes Yes Interior Routes Corridor and Lobby H/C Lifts No No Interior Corridor Doors and Hardware Yes Yes Interior Corridors and Lobbies Interior Elevators Interior Lobby Doors and Hardware Interior Ramps Rooms & Spaces PB/A&W Page 3 of 42 No No Yes Yes

4 Building Assessment Survey Physical Breakdown Structure Exists Complies Required Rooms & Spaces Art Rooms Room 301 No Not on Accessible Route Auditorium 4th Floor No Not on Accessible Route No Stage Access Cafeteria 1st Floor No Not on Accessible Route Classrooms All Floors No Not on Accessible Route Computer Rooms Room 402 No Not on Accessible Route Gymnasium 5th Floor No Not on Accessible Route Library Room 314 No Not on Accessible Route Main Office Room 209 No Not on Accessible Route Multi-purpose Room 1st and 5th Floors No Not on Accessible Route Nurse's Room Room 408a No Not on Accessible Route Pool Science Lab Toilet Rooms (Boys) None on accessible route No Not on Accessible Route Toilet Rooms (Girls) None on accessible route No Not on Accessible Route Toilet Rooms (Staff) None on accessible route No Not on Accessible Route No No Building Template Inspection Architectural EXTERIOR AREAWAY Instance on AW1-AW12 Instance Instance Quantity 12 Instance EACH AREAWAY WALLS: OPEN JOINTS PB/A&W Page 4 of 42

5 EXTERIOR AREAWAY Roof Plan reference Building Assessment Survey Quantity 300 REPAIR Photo1 AWNINGS AND CANOPIES CHIMNEY Material Type(s) Roof Plan reference AW 4 Masonry 3 - Fair BRICK: MINOR CRACKS AND SPALLING Quantity 25 RESTITCH PB/A&W Page 5 of 42

6 EXTERIOR CHIMNEY Photo1 Building Assessment Survey Facade D COPING Roof Plan reference 3 - Fair CAST STONE: OPEN TRANSVERSE JOINTS WITH DAMAGED CAULKING Quantity 30 L.F. MAINTENANCE Photo1 Ludlow Street CAST STONE: CRACKED/BROKEN PIECES PB/A&W Page 6 of 42

7 EXTERIOR COPING Roof Plan reference Building Assessment Survey Quantity 5 L.F. -IN-KIND Photo1 CORNICE Roof Plan reference Ludlow Street 3 - Fair TERRA COTTA: MINOR CRACKS, SPALLING Quantity 15 REPAIR PB/A&W Page 7 of 42

8 EXTERIOR CORNICE Photo1 Building Assessment Survey DOORS DOORS AND FRAMES Roof Plan reference Corner Ludlow and Hester Street 4 - Between Fair and Poor WOOD: DETERIORATED DOOR AND FRAME - MAJOR DETERIORATION Quantity 6 EACH Purpose of Action LEVEL 4 Photo1 DOOR HARDWARE LINTELS TRANSOM/SIDE LIGHT Main Entrance J 3 - Fair PB/A&W Page 8 of 42

9 Building Assessment Survey Architectural Inspection EXTERIOR DOORS TRANSOM/SIDE LIGHT EXTERIOR WALLS Material Type(s) Masonry Replacement Quantity 34,000 Replacement Uom Instance on All Facades Instance 3 - Fair Instance Quantity 34,000 Instance TERRA COTTA: CHIPPED/SPALLED/BROKEN PIECES Roof Plan reference Elevation Quantity 10 Photo1 Facade A TERRA COTTA: OPEN JOINTS PB/A&W Page 9 of 42

10 EXTERIOR EXTERIOR WALLS Roof Plan reference Building Assessment Survey Elevation Quantity 25 L.F. REPOINT Photo1 Roof Plan reference Façade A BRICK: MINOR CRACKS AND SPALLING PB/A&W Page 10 of 42

11 EXTERIOR EXTERIOR WALLS Elevation Building Assessment Survey Quantity 50 RESTITCH Photo1 Orchard Street EXTERIOR SOFFITS LOADING DOCK LOUVER PARAPETS Material Type(s) Masonry Replacement Quantity 5,000 Replacement Uom C.F. Instance on All Facades Instance 5 - Poor Instance Quantity 5,000 Instance C.F. BRICK: OPEN JOINTS PB/A&W Page 11 of 42

12 EXTERIOR PARAPETS Roof Plan reference Building Assessment Survey Quantity 2,400 REPOINT Photo1 Hester Street facade PLAZA DECK Instance on Concrete: Rear Schoolyard Instance 4 - Between Fair and Poor Instance Quantity 2,000 Instance Installation Year 1997 Source of Installation Documented CONCRETE: MINOR LEAKAGE Roof Plan reference Quantity 2,000 REPAIR Urgency of Action PRIORITY 5 PB/A&W Page 12 of 42

13 Building Assessment Survey Architectural Inspection EXTERIOR PLAZA DECK Photo1 No photo recorded ROOF Roofing Replacement Quantity 15,000 Replacement Uom ROOF HATCH/SMOKE HATCH LEADERS, GUTTERS, DOWNSPOUTS, SCUPPERS 5 - Poor DAMAGED/MISSING Roof Plan reference Quantity 140 L.F. Photo1 Hester Street ROOF BARRIER ROOF CAGE ROOF FENCE ROOFING Instance on Built-Up: Roof 1 Instance 3 - Fair Instance Quantity 14,500 Instance Does the roof have major mechanical equipment sitting on Dunnage Steel less than 18" above the Roofing? Installation Year 2002 PB/A&W Page 13 of 42 No

14 EXTERIOR ROOF Roofing ROOFING Source of Installation Roof Plan reference Building Assessment Survey Documented BUILT-UP: ROOFING: MAJOR ACTIVE ROOF LEAKS IN INSTRUCTIONAL SPACE Quantity 100 Urgency of Action PRIORITY 5 Photo1 ROOFING WITHOUT MAJOR EQUIPMENT REMOVAL Room 508 (504 similar) Instance on Built-Up: Roof 2-4 Instance Instance Quantity 500 Instance Does the roof have major mechanical equipment sitting on Dunnage Steel less than 18" above the Roofing? 3 - Fair Installation Year 2002 Source of Installation ROOFING DRAINS Specialties BULKHEAD/PENTHOUSE No Documented 4 - Between Fair and Poor BULKHEAD/PENTHOUSE CEILING: PLASTER DAMAGED/DETERIORATED PB/A&W Page 14 of 42

15 EXTERIOR ROOF Specialties BULKHEAD/PENTHOUSE Roof Plan reference Building Assessment Survey Quantity 50 Photo1 Roof Plan reference BH 4 BULKHEAD/PENTHOUSE WALLS/INTERIOR: PLASTER CRACKS/SPALLING Quantity 300 PB/A&W Page 15 of 42

16 EXTERIOR ROOF Specialties BULKHEAD/PENTHOUSE Photo1 Building Assessment Survey CUPOLA/ SPIRES/ TOWERS DORMER DUNNAGE STEEL SKYLIGHT/ROOF VENT ROOF/GRAVITY TANK STAIRS/RAMPS: EXTERIOR BUILDING CHEEK/FLANK WALLS RAILINGS Roof Plan reference Bulkhead Poor MISSING RAILING Quantity 80 L.F. Urgency of Action PRIORITY 5 Purpose of Action LEVEL 6 PB/A&W Page 16 of 42

17 EXTERIOR STAIRS/RAMPS: EXTERIOR RAILINGS Photo1 Building Assessment Survey STAIRS/RAMPS Roof Plan reference Ludlow Street X 4 - Between Fair and Poor STONE: CRACKS, SPALLING Quantity 200 Photo1 Ludlow Street. WINDOWS Replacement Quantity 14,000 Replacement Uom EXTERIOR GUARDS 3 - Fair RUST - MINOR PB/A&W Page 17 of 42

18 EXTERIOR WINDOWS EXTERIOR GUARDS Roof Plan reference Building Assessment Survey Elevation Quantity 150 MAINTENANCE Photo1 Facade E LINTELS WINDOWS Material Type(s) Instance on Wood: All Facades Instance Solid Wood Instance Quantity 14,000 Instance Installation Year 2002 Source of Installation 4 - Between Fair and Poor Documented WOOD: INOPERABLE BALANCE PB/A&W Page 18 of 42

19 EXTERIOR WINDOWS WINDOWS Roof Plan reference Building Assessment Survey Elevation Quantity 50 EACH BALANCES Photo1 INTERIOR Room 414 POOLS STRUCTURAL COLUMNS/BEAMS/BEARING WALLS Location/Instance Quantity Fair STEEL COLUMNS/BEAMS: DETERIORATED/MISSING PLASTER FIREPROOFING Boiler Room Urgency of Action PRIORITY 5 PB/A&W Page 19 of 42

20 Building Assessment Survey Architectural Inspection INTERIOR STRUCTURAL COLUMNS/BEAMS/BEARING WALLS Purpose of Action LEVEL 5 Photo1 Boiler Room STEEL COLUMNS/BEAMS: MAJOR RUSTING Location/Instance Facade C Vault Quantity 25 Urgency of Action PRIORITY 5 Purpose of Action LEVEL 5 Photo1 Facade C FLOOR STRUCTURE 3 - Fair CLAY TILE: PLASTER MISSING Location/Instance Boiler Room Quantity 1,500 Purpose of Action LEVEL 5 PB/A&W Page 20 of 42

21 INTERIOR STRUCTURAL FLOOR STRUCTURE Photo1 Building Assessment Survey FOUNDATION WALLS Material Type(s) Location/Instance Quantity 500 Boiler Room H Masonry 5 - Poor BRICK: WATER INFILTRATION IN NON- INSTRUCTIONAL SPACE Boiler Room Urgency of Action PRIORITY 5 Purpose of Action LEVEL 5 Photo1 INSTALL WATERPROOFING Boiler Room BRICK: OPEN JOINTS Location/Instance All Walls Quantity 600 REPOINT Urgency of Action PRIORITY 5 Purpose of Action LEVEL 5 PB/A&W Page 21 of 42

22 INTERIOR STRUCTURAL FOUNDATION WALLS Photo1 Building Assessment Survey Boiler Room ROOF STRUCTURE VAULTS-BUNKERS Foundation Walls 3 - Fair OPEN JOINTS Location/Instance Facade C Quantity 100 REPOINT Purpose of Action LEVEL 5 Photo1 Façade C Slab Structure 3 - Fair CONCRETE: CRACKS/SPALLED/REINFORCEMENT EXPOSED Location/Instance Facade C Quantity 30 REPAIR Urgency of Action PRIORITY 5 Purpose of Action LEVEL 5 PB/A&W Page 22 of 42

23 INTERIOR STRUCTURAL VAULTS-BUNKERS Slab Structure Photo1 Building Assessment Survey Facade C Vault/Ash Hoist Doors and Framing AUDITORIUM Instance on 4th Floor Seats Ceiling Instance on 4th Floor Seats Door(s) Instance on 4th Floor Seats Fixed H/C Lift Instance on 4th Floor Seats Fixed Seating Instance on 4th Floor Seats 3 - Fair DAMAGED/BROKEN/INOPERABLE Location/Instance Seats A/16, B/12, E/3, 10, G/4, and others Quantity 11 EACH Photo1 PB/A&W Page 23 of 42 Seat E/3

24 INTERIOR AUDITORIUM Fixed Seating Building Assessment Survey Floor Finish Instance on 4th Floor Seats WOOD: DAMAGED/DETERIORATED Location/Instance Center near Stage Quantity 30 Photo1 Center near Stage Sliding-folding Partition Stage Stage Instance on 4th Floor Seats Instance on 4th Floor Seats Instance on 4th Floor Seats Stage Curtain Rigging Instance on 4th Floor Seats Stage Curtains Walls Instance on 4th Floor Seats Instance on 4th Floor Seats Window Curtains/Shades/Blinds Instance on 4th Floor Seats Location/Instance Quantity Poor INOPERABLE SHADES Left and Right sides EACH MAINTENANCE PB/A&W Page 24 of 42

25 Building Assessment Survey Architectural Inspection INTERIOR AUDITORIUM Window Curtains/Shades/Blinds Photo1 No photo recorded CAFETERIA Ceiling Door(s) Fixed Equipment Floor Finish Sliding-folding Partition Stage Walls Window Curtains/Shades/Blinds CLASSROOMS/CORRIDORS/ADMIN SPACES Ceiling PLASTER: CRACKS/SPALLING Location/Instance Room 208 Quantity 40 PB/A&W Page 25 of 42

26 Building Assessment Survey Architectural Inspection INTERIOR CLASSROOMS/CORRIDORS/ADMIN SPACES Ceiling Photo1 Room 208 PLASTER: CRACKS/SPALLING - ACTIVE LEAK Location/Instance Rooms 504, 508 Quantity 20 Urgency of Action PRIORITY 5 Photo1 Room 504 Door(s) 5 - Poor WOOD: DETERIORATED DOOR Location/Instance Rooms 208, 306, 404, 507, 508, and others Quantity 11 EACH MAINTENANCE Photo1 PB/A&W Page 26 of 42

27 Building Assessment Survey Architectural Inspection INTERIOR CLASSROOMS/CORRIDORS/ADMIN SPACES Door(s) Room 508 Floor Finish VINYL TILES: TRIPPING HAZARD - ELECTRICAL OUTLET Location/Instance Room 402 Quantity 5 Urgency of Action PRIORITY 5 Purpose of Action LEVEL 6 Photo1 Room 402 VINYL TILES: DETERIORATED SUBSTRATE Location/Instance Rooms 213, 306, 308A, 402, 414 Quantity 955 Photo1 Room 402 Location/Instance Corridor near Stair A/2 Quantity 10 VINYL TILES: BROKEN/DETERIORATED/MISSING TILES PB/A&W Page 27 of 42

28 Building Assessment Survey Architectural Inspection INTERIOR CLASSROOMS/CORRIDORS/ADMIN SPACES Floor Finish Photo1 Corridor near Stair A/2 Walls PLASTER: CRACKS/SPALLING - ACTIVE LEAK Location/Instance Room 504 Quantity 15 Urgency of Action PRIORITY 5 Photo1 Specialties GYMNASIUM Instance on 5th Floor Ceiling Instance on 5th Floor Door(s) Instance on 5th Floor Fixed Equipment Instance on 5th Floor Floor Finish Room 504 PB/A&W Page 28 of 42

29 Building Assessment Survey Architectural Inspection INTERIOR GYMNASIUM Floor Finish Instance on 5th Floor Seating Instance on 5th Floor Sliding-folding Partition Instance on 5th Floor Stage Instance on 5th Floor Walls Instance on 5th Floor WALL PADDING: DETERIORATED Location/Instance Near Entrance, Center, Left and right sides Quantity 80 Photo1 Near Entrance Window Curtains/Shades/Blinds Instance on 5th Floor INTERIOR DOOR HARDWARE 3 - Fair INTERIOR GUARDS DETERIORATED/TORN-OUT/MISSING Location/Instance Stair H/2 Quantity 40 PB/A&W Page 29 of 42

30 INTERIOR INTERIOR GUARDS Photo1 Building Assessment Survey Stair H/2 KITCHEN Ceiling Door(s) Floor Finish Walls LIBRARY Instance on Room 314 Built-in Furnishing Instance on Room 314 Ceiling Instance on Room 314 Door(s) Instance on Room 314 Location/Instance Quantity Between Fair and Poor WOOD: DETERIORATED DOOR Left and right Entrances EACH MAINTENANCE PB/A&W Page 30 of 42

31 Building Assessment Survey Architectural Inspection INTERIOR LIBRARY Door(s) Photo1 Left Entrance Floor Finish Instance on Room Fair SHEET VINYL: DETERIORATED SUBSTRATE Location/Instance Center Quantity 40 Photo1 Center Walls Instance on Room 314 LOCKER ROOM MULTI-PURPOSE ROOM Ceiling Instance on 5th Floor Location/Instance Quantity 10 ACOUSTIC TILES ON PLASTER: DAMAGED/MISSING PB/A&W Page 31 of 42 Center

32 Building Assessment Survey Architectural Inspection INTERIOR MULTI-PURPOSE ROOM Ceiling Photo1 Door(s) Instance on 5th Floor Fixed Equipment Instance on 5th Floor Floor Finish Instance on 5th Floor Sliding-folding Partition Instance on 5th Floor Stage Instance on 5th Floor Walls Instance on 5th Floor Center PB/A&W Page 32 of 42

33 Building Assessment Survey Architectural Inspection INTERIOR MULTI-PURPOSE ROOM Window Curtains/Shades/Blinds Instance on 5th Floor SCIENCE DEMO ROOM SCIENCE LAB SCIENCE PREP ROOM SHOWER ROOM STAIRS/RAMPS: INTERIOR Do Letter Stair Signs Exist? Yes Ceiling Door(s) Partition Railings Stairs and Landings CERAMIC TILE: BROKEN/MISSING Location/Instance Stair A/1 - Main Entrance Lobby Quantity 30 Photo1 Stair A/1 - Main Entrance Lobby Walls Location/Instance Quantity 100 CERAMIC TILE: BROKEN/ MISSING Stairs A/1, 2, 4, 5, DE/2, and others PB/A&W Page 33 of 42

34 Building Assessment Survey Architectural Inspection INTERIOR STAIRS/RAMPS: INTERIOR Walls Photo1 Stair A/4 TOILET ROOMS - STAFF Ceiling Door(s) Floor Finish CERAMIC TILE: BROKEN/MISSING TILES Location/Instance Room 308A Quantity 10 Photo1 Stalls Walls Location/Instance Room 308A CERAMIC TILE: BROKEN/ MISSING 3rd Floor Mens Toilet Room PB/A&W Page 34 of 42

35 Building Assessment Survey Architectural Inspection INTERIOR TOILET ROOMS - STAFF Walls Quantity 10 Photo1 3rd Floor Men Toilet Room TOILET ROOMS - STUDENTS Ceiling Door(s) 5 - Poor WOOD: DETERIORATED DOOR Location/Instance Room 201, 5th Floor Boys Toilet Room Quantity 2 EACH MAINTENANCE Photo1 Floor Finish Location/Instance Quantity 100 CERAMIC TILE: BROKEN/MISSING TILES 5th Floor Boys Toilet Room, 5th Floor Girls Toilet Room PB/A&W Page 35 of 42

36 Building Assessment Survey Architectural Inspection INTERIOR TOILET ROOMS - STUDENTS Floor Finish Photo1 Stalls Walls LIFE SAFETY F.D. HOLDING AREA STEEL STAIRS SITE CONTAINERIZATION Drainage System for Asphalt Drainage System for Concrete Catch Basins/Manhole - Surrounded by concrete Culverts - Concrete Covering Drainage System for Soil DRINKING FOUNTAINS FENCES WROUGHT IRON: DAMAGED/DETERIORATED Location/Instance Along Hester Street Quantity 40 PB/A&W Page 36 of 42

37 SITE FENCES Photo1 Building Assessment Survey Along Hester Street IRRIGATION SYSTEM PAVING Student Non-Use Gravel Exists? No Asphalt Concrete DAMAGED/DETERIORATED/MISSING SECTIONS Location/Instance Along Hester Street Quantity 25 Photo1 Along Hester Street Pavers Student Use Gravel Exists? No Asphalt Concrete 3 - Fair DAMAGED/DETERIORATED/MISSING SECTIONS Location/Instance Schoolyard Quantity 75 PB/A&W Page 37 of 42

38 Building Assessment Survey Architectural Inspection SITE PAVING Student Use Concrete Photo1 Schoolyard Pavers Site Sidewalks & Walkways Asphalt Concrete Pavers DOT Sidewalk Asphalt Concrete 4 - Between Fair and Poor DAMAGED CURBS Location/Instance Along Hester Street at Main Entrance Quantity 5 L.F. Urgency of Action PRIORITY 5 Purpose of Action LEVEL 6 Photo1 Along Hester Street DAMAGED/DETERIORATED/MISSING SECTIONS Location/Instance Along Hester Street, Along Orchard Street, Along Ludlow Street Quantity 650 PB/A&W Page 38 of 42

39 Building Assessment Survey Architectural Inspection SITE PAVING DOT Sidewalk Concrete Photo1 Along Orchard Street DAMAGED/DETERIORATED/MISSING SECTIONS Location/Instance Along Orchard Street Quantity 25 Urgency of Action PRIORITY 5 Purpose of Action LEVEL 6 Photo1 Along Orchard Street DAMAGED CURBS Location/Instance Along Hester Street, Along Orchard Street, Along Ludlow Street Quantity 75 L.F. PB/A&W Page 39 of 42

40 SITE PAVING DOT Sidewalk Concrete Photo1 Building Assessment Survey Along Hester Street Pavers PLAYGROUNDS Benches Fence Pavement Instance on Schoolyard Instance on Schoolyard Instance on Schoolyard Instance on Schoolyard Play Equipment Instance on Schoolyard Safety Surfacing Instance on Schoolyard Unpaved Area Instance on Schoolyard PLAYING SURFACE RETAINING WALLS Are there any Retaining Walls 6' OR higher facing public street/sidewalk? Location/Instance Quantity Good 1 - Good No CAST IN PLACE CONCRETE: CRACKS/SPALLING - MAJOR Along Ludlow Street PB/A&W Page 40 of 42

41 SITE RETAINING WALLS Photo1 Building Assessment Survey Along Ludlow Street SEATING Benches Concrete Metal/Wood/Plastic Bleachers SITE WALLS (NOT RETAINING WALLS) BRICK: OPEN JOINTS Location/Instance Schoolyard Quantity 10 REPOINT Photo1 Schoolyard BRICK: OPEN JOINTS Location/Instance Archway above Ramp on Ludlow Street Quantity 10 REPOINT Urgency of Action PRIORITY 5 Purpose of Action LEVEL 6 PB/A&W Page 41 of 42

42 Building Assessment Survey Architectural Inspection SITE SITE WALLS (NOT RETAINING WALLS) Photo1 Archway above Ramp on Ludlow Street STAIRS/RAMPS: EXTERIOR Railings Site Cheek/flank Walls CAST IN PLACE CONCRETE: CRACKS/SPALLING - MAJOR Location/Instance Along Ludlow Street Quantity 10 Photo1 Stairs/ramps Along Ludlow Street PB/A&W Page 42 of 42