Construction Progress and Inspection Report

Size: px
Start display at page:

Download "Construction Progress and Inspection Report"

Transcription

1 U.S. Department of Transportation Federal Aviation Administration Airport Name Fayetteville Regional Airport Project Description Airline Terminal Improvements - Part 1 Construction Progress and Inspection Report Airport Grant Program Contractor s Name OMB CONTROL NUMBER: EXPIRATION DATE: /3 /201 Period Ending Project Number 1. Contract Time No. Days Charged to Date 109 Last Working Day Charged (Date) 04/27/ Brief Weather Summary this Period, including Approximate Rainfall and Periods of Below Freezing Temperature (On earthwork jobs, include soil conditions.) Average high temperatures have averaged in the mid 70's 04/27/2018 Resolute Building Company Rough Estimate of Percent Completion to Date of Construction Phases (Include items such as clearing, grading, drainage, base, surface, lighting, etc.) Concourse A footings 75%, structural connector 35%, Electrical duct bank 25% 4. Work Completed or In Progress this Period Main terminal wall framing at TSA Checkpoint complete, shoring installed at retaining wall of Concourse A, rough-in of utilities at entering Concourse A 5a. Summary of Laboratory and Field Testing this Period (Note failing tests and any retests. Summarize out-of-tolerance.) testing 5b. Material (Identify material subject to pay reduction.) None 6. Description of Anticipated Work by Contractor for Next Period Pour concrete at Concourse A retaining wall, start masonry at mechanical room of Concourse A 7. Problem Areas/Other Comments (Include revisions to plans and specifications approved or denied, delays, difficulties, etc. and actions taken.) A solution to the steel structure connector was devised and the fabricator is in the process of fabrication new base plates. SPONSOR S INSPECTOR OR REPRESENTATIVE Date Typed or Printed Name and Title Signature 04/27/2018 Jason D. Pike FAA Form ( ) SUPERCEDES PREVIOUS EDITION

2 Installation of forms (Concourse A) Installation of forms (Concourse A) Installation of underground plumbing (Concourse A) footings poured (Concourse A) Installation of metal stud framing (Main Terminal) Installation of metal stud framing (Main Terminal)

3 Date: APN: 1721 Ground: Dry Wet Frozen Temperature: 63 Ironworker Operator (Backhoe/Excavator) 1 Loader No 3 Plumber Operator (Bulldozer) 1 Crane No Drywall Operator (Forklift) 2 Electrician Operator (Loader) 12 Laborer (General) Roofer M-R Electric: Running conduit to new electrical Concourse A (4) New Shine: Pouring Concourse A & working on steel in retaining wall (7) Ivey : Underground Concourse A (5) Resolute: General escort & supervision (3)

4 Date: APN: 1721 Ground: Dry Wet Frozen Temperature: 67 Precipitation: 1.06 in. Ironworker Operator (Backhoe/Excavator) 1 Loader No Plumber Operator (Bulldozer) 1 Crane No Electrician Operator (Loader) 2 Laborer (General) Roofer Trinity Drywall: Doing drywall work in Main Terminal (2) Resolute: General escort & supervision (4)

5 Date: APN: 1721 Ground: Dry Wet Frozen Temperature: 71 Ironworker Operator (Backhoe/Excavator) 1 Loader No Plumber Operator (Bulldozer) 1 Crane No 2 Electrician Operator (Loader) 2 Laborer (General) Roofer M-R Electric: Fixing lights at rental car parking lot (4) New Shine: Shoring up retaining walls (6) Ivey Plumbing: Roughing in of Concourse A (4) Trinity Drywall: Demolition of existing game room walls at Main Terminal (2) Premier: Backfilling duct bank (2) Resolute: General escort & supervision (5)

6 Date: APN: 1721 Ground: Dry Temperature: 78 Wet Frozen Ironworker 1 Operator (Backhoe/Excavator) 1 Loader No 2 Plumber Operator (Bulldozer) 1 Crane No 2 Electrician Operator (Loader) 14 Laborer (General) Roofer M-R Electric: Installing conduit to electrical room at Concourse A (4) New Shine: Shoring up retaining walls (7) Ivey Plumbing: Passed inspection for rough-in at Concourse A, backfilling utilities (4) Trinity Drywall: Doing drywall work in Main Terminal at new TSA Checkpoint (2) Premier: Cleaning duct bank from rain erosion (2) Resolute: General escort & supervision (4)

7 Date: APN: 1721 Ground: Dry Temperature: 76 Wet Frozen Ironworker 1 Operator (Backhoe/Excavator) 1 Loader No 2 Plumber Operator (Bulldozer) 1 Crane No Electrician Operator (Loader) 11 Laborer (General) Roofer New Shine: Shoring up retaining walls & preparing for concrete pour next week (7) Ivey Plumbing: Backfilling and installing floor drain (4) Trinity Drywall: Doing drywall work in Main Terminal at new TSA Checkpoint (2) Resolute: General escort & supervision (4)